Fire_testing_FY26.pdf

PDF 48 KB Posted

Attached to
Fire Testing - DRC260078 - LORCI
Solicitation number
SRC0000034637
Issued by
Lorain County, Ohio

About this file

This document is a Fire Testing schedule for the Lorain Correctional facility covering the 2025-2026 period. The document details a comprehensive list of fire safety and inspection activities, including 48 backflow inspections, 200 annual fire extinguisher inspections, 30 quarterly sprinkler riser inspections, 13 private yard hydrant flush and flow inspections, 18 annual control panel inspections, and 166 horn/strobe annual inspections. Additional specialized inspections include FM200 room inspections, clean agent smoke detector checks, clean agent pull station assessments, and kitchen hood suppression system inspections across multiple locations within the correctional facility.

The testing schedule is meticulously organized with specific quantities and frequencies for each type of inspection, primarily occurring in December 2025 and June 2026. The document covers critical fire safety components including control rooms, dining halls, main kitchens, and other facility areas. These inspections are crucial for maintaining safety standards, ensuring proper functioning of fire detection and suppression systems, and meeting regulatory compliance requirements for the correctional facility. The comprehensive nature of the testing suggests a proactive approach to fire safety and emergency preparedness.

View the file

Other files

File Type Posted
EO_2019-12D.pdf PDF
EO_2022-02D__2.pdf PDF
Instructions for Bidding.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .