This is a Statement of Work (SOW) for inspection, maintenance, and repair services of fire protection and alarm systems at U.S. Coast Guard Sector San Diego and CG Moorings at Ballast Point/Naval Base Point Loma in San Diego, California. The scope covers ten buildings (A through I) plus exterior HAZMAT/flammable storage lockers and three additional buildings at the Ballast Point moorings location. The contractor must be FAA or San Diego County certified and possess Silent Knight/Harrington Signal equipment certification to perform all work. Services include monthly inspections, semi-annual and annual testing, and preventative maintenance on multiple fire suppression and alarm system types complying with NFPA standards (NFPA-72, NFPA-17, NFPA-25, NFPA-96, and NFPA-10).

The equipment inventory requiring maintenance includes 6 fire alarm control panels, 2 annunciators, 91 manual pull stations, 190 smoke detectors, 17 heat detectors, 170+ horn/strobe notification devices, 6 Ansul IND-X dry chemical systems, 1 R-102 wet chemical range guard system, 2 FM-200 systems, 2 Chemguard C2 foam sprinkler systems, 5 fire main wet/dry sprinkler systems, 138 portable fire extinguishers, and supporting infrastructure (relay modules, control modules, flow switches, pressure sensing switches, and surge suppressors). The contractor must provide 24-hour priority response for service calls during normal business hours including weekends and holidays, maintain detailed blue prints of fire alarm systems, provide written post-inspection documentation with official tags and stickers, and maintain a monthly maintenance calendar/spreadsheet. Labor and material repair costs are contractor-responsible, with exclusions for damage from unusual weather phenomena, owner misuse, vandalism, or acts of aggression. The contractor is responsible for all sub-contractors hired and will have access to electrical, restroom, and water facilities on the military installation.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SCOPE OF WORK

Inspection, Maintenance and Repair of Fire Protection and Alarm Systems

U.S. COAST GUARD

SECTOR SAN DIEGO

2710 NORTH HARBOR DRIVE

SAN DIEGO, CA 92101 & CG MOORINGS AT

BALLAST POINT/NAVAL BASE POINT LOMA

Table of Contents Scope of Work

1.1 Service Requirements and Contact Information

2.1 Fire alarm and Detection Systems

2.1.1 Inspections

2.1.2 Tests

2.1.3 Maintenance

2.2 Automatic Dry-Chemical Systems

2.2.1 Inspections

22.2 Tests

2.2.3 Maintenance

2.3 Foam Sprinkler System

2.3.1 Inspections

2.3.2 Tests

2.3.3 Maintenance

2.4 Galley Gaylord Hood and Range Guard System

2.4.1 Inspections
2.4.2 Test

2.4.3 Maintenance

2.5 Fire Extinguishers

2.5.1 Inspections

2.5.2 Tests

2.5.3 Maintenance

2.5.4 Extinguishers List

2.6 Fire Main and Sprinkler Systems

2.7.1 Inspections

2.7.2 Tests

2.7.3 Maintenance

Section 1.1: Service Requirements and Contact Information Maintenance, Inspections, and repair work agreement to cover all fire alarm and detection systems not limited to, but including main notifier panels, annunciators, manual pull stations, heat/smoke detectors, horns, sprinklers and batteries as well as all other related equipment connected to the systems serving the following Buildings:

A. Building "A" (Prevention/Response) B. Building "B" (Galley) C. Building "C" (BBQ) D. Building " D" (BOQ) E. Building "E" (Admin) F. Building "F" (Multi-Purpose Bldg) G. Building "G" (Armory) H. Building "H" (Hangar #1) I. Building "I" (Hangar #2) J. Hazmat/Flammable Storage lockers located outside between Bldg “F” and Bldg “G” and tarmac behind Building “I”.

K. CG Moorings at Ballast Point/Naval Base Point Loma (Three Buildings) Address: USCG Ballast Point Moorings Kerrick Rd. Bldg 5 San Diego, CA 92106 There are approximately:

· 06 Ansul IND-X Dry Chemical systems (one located behind Bldg “I”/Hangar #2 next to tarmac, the other five are located in the HAZMAT/Flammable Storage area between Bldg “F” and Bldg “G”)

· 01 R-102 Wet Chemical system with Range Guard and Gaylord Hood (located in Building “B”/Galley)

· 02 FM-200 systems (located in Bldg “F”/JHOC OPCEN and COMCEN)

· 02 Chemguard C2 Foam Systems (located in Bldg “H” (Hangar #1) and Bldg “I” (Hangar #2)

· 05 Fire Main Wet Sprinkler Systems/Dry System (located in Bldg "F", Building “H” (Hangar #1), Building "I" (Hangar #2), and CG Moorings at Ballast Point)

· 06 Fire Alarm Control Panels (five locations: Main Alarm Panel in Bldg “E”, Local Alarm/System Panel in Bldg “H” (Hangar #1), Local Alarm/System Panel in Bldg “I” (Hangar #2), two Local Alarm/System Panels in Bldg “F” (JHOC OPCEN and COMCEN), Local Alar1h/System Panel at CG Moorings at Ballast Point)

· 02 Fire Alarm Annunciators (two locations: one in Bldg "C"/OOD Room, the other in Bldg "F"/JHOC OPCEN).

· 91 Manual Pull Station

· 05 Relay Module

· 48 Address Module

· 03 Supervised Control Module

· 190 Smoke Detector

· 03 Smoke Detector with Piezo Horn Base

· 17 Heat Detector

· 02 Flow Switch

· 18 Tamper Switch

· 08 Pressure Sensing Switch

· 01 Solenoid Valve 24VDC

· 87 Horn/Strobe Ceiling

· 35 Ceiling Mount Strobe Only

· 86 Wall Mount Horn/Strobe

· 04 Wall Mount Strobe only

· 03 Water Flow Bell

· 47 Wall/Ceiling Mount Horn only

· 01 Line Voltage Surge Suppressor

· 01 Low Voltage Surge Suppressor

· 09 NAC Power Supply

· 10 Fire Alarm Termination Cabinet

· 06 Sprinkler Riser

· 03 SYNC Module

· 02 Forced Air Unit

· 01 Voltage Detector

· 04 IIIR Flame Detector

· 16 Junction Box

· 138 Fire Extinguishers

· 02 Foam systems

Contractor will be responsible for service call labor and material repair costs associated with the FIRE ALARM SYSTEM’s. Contractors must be certified by the FAA or San Diego County in addition to certified to work on Silent Knight/Harrington Signal equipment to perform scheduled maintenance, inspections and repair work on all our equipment. Proof of certification will be given to USCG Engineering Support. Contractor will draft and maintain blue prints of the fire alarm systems and copies will be provided to USCG when requested.

For the duration of this agreement, the Contractor will provide the Owner with a priority response to service calls responding within 24 hours or the next business day. This agreement will cover the costs of technician labor for trouble shooting and repairs performed during Contractors normal business hours and including weekends and holidays. Faulty equipment which requires replacement will be replaced with equipment of equal performance and value. This agreement covers repair costs as defined but is not intended to cover failure due to the following:

· Unusual or abnormal phenomena of the elements

· Owners misuse, maltreatment or improper maintenance

· Vandalism

· Insurrection or acts of aggression including war

Additionally, for our recordkeeping, the contractor will provide written documentation immediately following any inspections/testing of suppression systems, alarms, extinguishers or other equipment. Official post-test documentation must include: company letterhead, type of test/system location, date of test, person(s) who performed test, test results, pass/fail test results, list of discrepancies, test expiration, signature of person(s) conducting and responsible for test, and any additional comments. Additionally, official tags or stickers need to be posted at operating panels for systems, on tank cylinders, and actuating pulls. A calendar/spreadsheet will also be required, providing monthly scheduling maintenance and tests.

CONTRACTOR USE OF PREMISES: The Contractor will be working on a United States Military Installation. The facility will have electrical, restrooms and water. The Contractor will also be responsible for any sub-contractor hired.

Section 2.1: Fire Alarm and Detections Systems

2.1.1 Inspections-

The contractor shall perform the following monthly inspections:

Fire Alarm Systems-General to comply with NFPA-72:

· Check and replace batteries as needed

· Check all fire alarm equipment to make sure it is not damaged or inoperative. Report and discrepancies to USCG Facility Engineer, to include;

· Check power supply for normal indication and lamps for proper working order on power panels.

· Check speakers for proper audible alarms

· Check manual pull stations for damage or obstructions

· Check detectors for damage, obstruction, or in-operative status.

· Check initiating devices semi-annually for proper calibration

2.1.2 Tests-

The contractor shall perform the following semi-annual tests:

· Test the primary power supply for initiating and notification of appliance circuits.

· When initiating devices are out of calibration the contractor shall clean and recalibrate the device. If device cannot be corrected a detailed report will be given to U

· SCG Engineering Support office within 24 hours, reports will be written to detail which device is not operating properly, what the cause is, where the device is located and estimate time of repair

· Test signal receiving equipment on radio alarm systems

· Activate all devices on each initiating device circuits

2.1.3 Maintenance-

The contractor shall perform the following maintenance replace batteries as needed Section 2.2: Automatic Dry-chemical Systems Automatic/manual dry-chemical for HAZMAT/Flammable Storage containers will cover six containers, at two different locations. Five are located along waterfront between Bldg “F” and Bldg “G”. The other is located behind Bldg “I” (Hangar #2) next to tarmac near Harbor Drive. Additionally, there are two FM-200 systems (located on the second deck of Bldg “F”/JHOC OPCEN and COMCEN). These systems are both manually and automatically activated and protect the JHOC OPCEN and COMCEN.

2.2.1 Inspections-

Contractor will perform the following monthly inspections to comply with NFPA 17. Inspections will include repair of faulty materials.

· Check pressure switch for obstructions

· Check cylinder pressure

· Ensure push knobs are not obstructed

· Check fusible links and nozzles damage or deteriorations replace as needed

· Ensure piped supple for emergency flooding is free of debris

· Ensure audible alarms are operable on containers

· The maintenance tag or certificate is in place

2.2.2 Test-

Contractor will perform the following inspections/tests to comply with NFPA 17. Contractor will note hydro dates and inform USCG Engineering Support when dates are coming due within 6 months

· Monthly visual inspections of HAZMAT/Flammable Storage containers and FM-200 systems

· Semi-Annual operational test/inspection of HAZMAT/Flammable storage containers and FM-200 systems

· Semi-Annual operational/actuating test involves testing all system components without discharging the dry chemical agent.

2.2.3 Maintenance-

Contractor will replace nozzles and fusible links as required from monthly inspections.

Section 2.3: Foam Sprinkler System Chemguard C2 foam sprinkler system will cover all items from city water supply valve to overhead foam generators in each Hangar. From the city water supply valve, water is fed to a riser on both Hangars and foam is drawn from two bladder tanks by a combination of firemain psi acting on the bladders, that, when activated either manually (electric pull station) or automatically (wet fire main sprinkler system flow detection or ThermoCable), and the venturi effect to the foam generators in the hangar’s overheads.

2.3.1 Inspections-

Contractor will perform the following monthly/quarterly/annual inspections to comply with NFPA 25

· Monthly inspections of all gauges, tanks, and valves

· Quarterly inspections of alarms, foam strainers, and fire department connections

· Annual inspections of bracing, piping, and sprinkler heads

2.3.2 Tests-

Contractors will perform the following tests to comply with NFPA 25 Annually test alarms, main drainage, valves, and concentrate solution by use of quantab test.

Section 2.4: Galley Gaylord Hood and Range Guard System Gaylord hood and range guard systems are located in the galley on board Sector San Diego. Contractor will be responsible for conducting visual inspections and minor tests of Ventilation to comply with NFPA 96

2.4.1 Inspections-

Contractors will perform the following monthly/semi-annual inspections.

· Monthly check nozzles for grease build up or damage

· Monthly check agent level and tamper seals on pull stations

· Semi-annually inspect ventilation, dampers and exhaust plenums according to owner's manual

2.4.2 Tests-

Contractors will perform the following semi-annual tests to comply with NFPA 96

· Conduct actuating test of the system

· Actuating test involves testing all system components without discharging the dry chemical agent.

· Check for proper operation of fuel shut-off mechanism

2.4.3 Maintenance-

Contractors will perform the following maintenance to comply with NFPA 96

· Provide and replace all fusible links and nozzles caps semiannually

Section 2.5: Fire Extinguishers Contractor will perform monthly/semi-annual/annual inspections and minor repairs to extinguishers and station at 2710 North Harbor Drive and CG Moorings at Ballast Point/Naval Base Point Loma. All inspections are to comply with NFPA 10 and NFPA 17

2.5.1 Inspections-

Contractor will perform the following inspections on all portable fire extinguishers located throughout Sector San Diego and Ballast Point facility,

• Monthly check extinguisher for damage to include hose, nozzle, pin and tamper seal, extinguisher body, and agent. Any discrepancy will be noted and highlighted on monthly report given to USCG Facility Engineer.

2.5.2 Tests-

Contractor will hydrostatically test cylinders as needed.

2.5.3 Maintenance-

Contractor will perform the following maintenance for all extinguishers.

· Semi-annually inspect dry chemical for caking and break up agent

· Contractor will be responsible for repairs to include but not limited to tamper seal replacement, re-attaching bolts for brackets, cleanliness of extinguisher, and replacing shrink tape on metal hose connections. Contractor will be responsible for renewing of agent, replacement of dry rot hoses, hydrostatic tests, and cylinder replacement.

· Annual fire extinguisher inspection and certification

2.5.4 Extinguishers List-

Location of Ext.SizeType
1. Bld. F, Plumbing5 lbABC
2. Bld. F, Plumbing5 lbABC
3. Bld. F, DC Shop5 lbCO2
4. Bld. F, DC Shop10 lbABC
5. Bld. F, DC Shop2.5 lbWM
6. Bld. F, Plumbing Shop2.5 lbWM
7. Bld. F, Generator Rm5LBABC
8. Bld. F, Station10LBABC
9. Bld. F, Gear Locker5 LBABC
10. Bld. F, GSE Shop10 LBABC
11. Bld. F, GSE Shop10 LBABC
12. Bld. F, Surf Eng. WH5 LBABC
13. Bld. F, Surf Eng. WH20 lbABC
14. Bld. F, EM Shop20 lbABC
15. Bld. F, ATON Office20 lbABC
16. Bld. F, Upstairs Hall10 lbABC
17. Bld. F, UP Plan Prevent.10 lbABC
18. Bld. F, UP Plan Prevent.10 lbABC
19. Bld. F, UP Plan Prevent.10 lbABC
20. Bld. F, UP PreAction Hall5 lbABC
21. Bld. F, UP PreAction10 lbABC
22. Bld. F, UP PreAction10 lbABC
23. Bld. F, UP PreAction5 lbABC
24. Bld. F, UP PreAction5 lbABC
25. Bld. F, UP PreAction5 lbABC
26. Bld. F, UP PreAction5 lbHALON
27. Bld. F, UP PreAction5 lbCO2
28. Bld. F, Reception10 lbABC
29. Bld. G, Armory5 lbABC
30. Bld. G, Work Area10 lbABC
31. Bld. G, Telco10 lbABC
32. Bld. G, Outside, Back10 lbABC
33. Bld. H, H-2 Public, IT Shop5 lbABC
34. Bld. H, Hallway5 lbABC
35. Bld. H, Hangar 110 lbABC
36. Bld. H, UP Hangar 110 lbABC
37. Bld. H, Hangar 120 lbABC
38. Bld. H, Hangar 110 lbABC
39. Bld. H, QA Shop5 lbABC
40. Bld. H, Hangar 110 lbABC
41. Bld. H, Survival Shop10 lbABC
42. Bld. H, Hangar 110 lbABC
43. Bld. H, Generator Rm10 lbABC
44. Bld. H,Composite Shop5 lbABC
45. Bld. H, Metal Shop10 lbABC
46. Bld. H, Met. Shop Weld Cart5 lbABC
47. Dock (Station Pier)20 lbABC
48. Dock (Station Pier)20 lbABC
49. Bld. H, Outside20 lbABC
50. Bld. H, Generator Bld.10 lbABC
51. Past the Tarmac10 lbABC
52. Bld. A, Entry10 lbABC
53. Bld. A, A-95 lbABC
54. Bld. A, Switchboard Rm5 lbABC
55. Bld. I Hangar 210 lbABC
56. Bld. I Hangar 210 lbABC
57. Bld. I Hangar 210 lbABC
58. Bld. I Hangar 25 lbABC
59. Bld. I Hangar 210 lbABC
60. Bld. I Hangar 210 lbABC
61. Bld. I Hangar 210 lbABC
62. Bld. I Hangar 210 lbABC
63. Bld. I Hangar 210 lbABC
64. Bld. I Hangar 25 lbABC
65. Bld. I Hangar 210 lbABC
66. Bld. I Hangar 25 lbABC
67. Bld. I Hangar 210 lbABC
68. Bld. I Hangar 210 lbABC
69. Bld. I Hangar 210 lbABC
70. Bld. I Hangar 210 lbABC
71. Bld. I Hangar 210 lbABC
72. Bld. I Hangar 210 lbABC
73. Bld. I Hangar 210 lbABC
74. Bld. I Hangar 210 lbABC
75. Bld. I Hangar 25 lbABC
76. Bld. I Hangar 210 lbABC
77. Bld. I Hangar 210 lbABC
78. Bld. I Hangar 210 lbABC
79. Bld. I Hangar 220 lbABC
80. Bld. I Hangar 210 lbCO2
81. Bld. I Hangar 210 lbCO2
82. Bld. I Hangar 25 lbABC
83. Bld. I Hangar 25 lbABC
84. Bld. I Hangar 210 lbCO2
85. Bld. I Hangar 210 lbABC
86. Guard Shack5 lbABC
87. Fork Lift Tent2.5 lbABC
88. Fork Lift Tent2.5 lbABC
89. Hangar 2 Fuel Form10 lbABC
90. Galley5 lbABC
91. Galley2.5 lbK
92. Galley10 lbABC
93. Bld. E SPO Office5 lbABC
94. Bld. E10 lbABC
95. Bld. E5 lbABC
96. Bld. E CO Office10 lbABC
97. Bld. E Server Rm5 lbCO2
98. Bld. C10 lbABC
99. Bld. C10 lbABC
100. Bld. C5 lbABC
101. Bld. C10 lbABC
102. Bld. C10 lbABC
103. Bld. C10 lbABC
104. Bld. C5 lbABC
105. Bld. C10 lbABC
106. Bld. C5 lbABC
107. Bld. C10 lbABC
108. Bld. C10 lbABC
109. Bld. C5 lbABC
110. Bld. C, in back, medical5 lbABC
111. Bld. C20 lbABC
112. Bld. C10 lbABC
113. Bld. D, officer duty room10 lbABC
114. Bld. D, ward room5 lbABC
115. Bld. D, officer locker rm10 lbABC
116. Bld. D, boiler rm #220 lbABC
117. 90 Days Storage10 lbABC
118. Pavilion Grill5 lbABC
119. Back 405 lbABC
120. Back 405 lbABC
121. Connex5 lbABC
122. Spare10 lbCO2
123. Spare20 lbABC
124. Spare20 lbABC
125. Spare20 lbABC
126. Spare20 lbABC
127. Spare10 lbABC
128. Spare10 lbABC
129. Ballast P Dock20 lbABC
130. Ballast P Dock20 lbABC
131. Ballast P Storage Shack BB20 lbABC
132. B.P. Garage10 lbABC
133. B.P. Office Hallway10 lbABC
134. Storage Locker10 lbABC
135. B.P. Office Upstairs10 lbABC
136. B.P. Dock5 lbABC
137. B.P. Drum Storage10 lbABC
138. B.P. Drum Storage10 lbABC
139. Tarmac Fuel Farm150 lbBC
140. Tarmac Fuel Farm150 lbBC
141. Tarmac Wash Rack150 lbBC
142. Tarmac Magazine/Diesel150 lbBC
143. Tarmac Magazine/Diesel150 lbBC

Section 2.6: Fire Main and Sprinkler Systems The Specific Fire Main Sprinkler System are located in Building’s F, H (Hangar 1), I (Hangar 2), and CG Moorings at Ballast Point. These “wet” systems are electronically monitored by sensors through the main alarm panel in Building E and main alarm panel at CG Moorings at Ballast Point. Building “F” also had a “dry” system with a pre-action activation system that can be manually activated by a pull station or automatically activated through the wet bulb sprinkler heads. The various components (valves, piping, sensors, etc.), and individual sprinkler heads for these independent systems are located throughout various shops, garages, passageways, hangar bays, and offices of both the first and second floors of these buildings. These system are directly tied into the base Fire Main which is supplied from the city water supply. Additionally, risers are located both inside and outside of the buildings supplying water to the second floors. All sprinkler heads are equipped with a fusible plug that once removed/melted will allow water to flow.

Contractor will perform annual inspections of sprinkler heads, semi-annual flow testing and annual inspection and lubrication of all fire main sprinkler system valves and components at 2710 North Harbor Drive and CG Moorings at Ballast Point. All inspection and test are to comply with NFPA 25

2.6.1 Inspections-

Contractor will perform the following inspection on all fire main sprinkler heads located throughout Sector San Diego/CG Moorings at Ballast Point to comply with NFPA 25.

· Annual inspection of sprinkler heads. Annual inspection and lubrication of all stems, caps, plugs, and threads ion each fire main supply valves including drain lines and testing valves.

2.6.2 Tests-

Contractor will perform the following tests on all fire main sprinkler heads located throughout Sector San Diego/CG Moorings at Ballast Point to comply with NFPA 25.

· Semi-annual flow testing and pressure testing on each building system followed by complete drainage of “dry”portions of the various systems.

2.6.3 Maintenance-

Contractor will perform the following maintenance for all fire main sprinkler heads located throughout Sector San Diego/CG Moorings at Ballast Point to comply with NFPA 25.

· Annual inspection and lubrication of all stems, caps, plugs, and threads on each fire main supply valve including drain lines and testing valves.

image4.jpg image5.jpg image6.jpg image7.jpg image8.jpg image9.jpg image10.png image11.jpg image12.jpg image13.jpg image14.jpg image15.jpg image16.jpg image17.jpg image18.jpg image19.jpg image20.jpg image21.jpg image22.jpeg image23.jpg image24.jpg image25.jpg image26.jpg image27.jpg image28.jpg image2.jpg image3.jpg