Fire Station RFQ Construction Manager 05_2024.docx
DOCX document 35 KB Posted
- Attached to
- Fire Station Construction Manager
- Solicitation number
- PE-66529-NONST-2024-000000005
- Issued by
- Calhoun County, Georgia
About this file
This document is a Request for Proposals (RFP) issued by the City of Metter, Georgia for a Construction Manager at Risk (CM) to manage the demolition of the existing Fire Station and construction of a new Fire Station facility. The project budget is $4.5 million. Proposals are due by July 16, 2024, at 10:00 am at Metter City Hall. A mandatory pre-proposal conference will be held on May 28, 2024 at 10:00 am. Interviews with the top ranked firms will be conducted on July 30, 2024, and a recommendation for Council approval is expected on August 13, 2024. The CM will be required to provide a Guaranteed Maximum Price (GMP) and Guaranteed Delivery Date (GDD) for the project.
The RFP states that the selected CM will be "at risk" and responsible for completing the project within the GMP. If the final cost is less than the GMP, any savings will belong to the City of Metter. The CM will be required to provide performance and payment bonds, and the individual trade contracts will be between the CM and the trade contractors, subject to the City's approval. The City reserves the right to negotiate the CM's fee proposal and to reject any or all proposals received.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFQ for Construction Manager for Fire Dept_ 0.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Metter Fire Station 56 South Lewis Street
REQUEST FOR PROPOSALS FOR
CONSTRUCTION MANAGER AT RISK
1. INTRODUCTION
The City of Metter desires to retain the services of a professional Construction Manager At Risk (CM) firm for the management, under a construction management/contractor at-risk format, for the demolitions of the existing Fire Station and construct a new Fire Station facility in City of Metter , Georgia.
| The Project: | The project would include demolition of the existing Fire Station and into a facility that would house new the Fire Station . |
| The Budget: | Construction value of $4,500,000 |
In addition to managing the construction, the CM will provide pre-construction services and work collaboratively with the architect, Goodwyn, Mills, Cawood LLC “GMC” to develop constructability reviews, cost savings alternatives and schedules in relation to this new facility.
To qualify for consideration, a firm must be prepared to provide the expertise, resources, and personnel experience in project planning, cost management, project control, pre-construction and construction techniques, value-engineering analysis, scheduling and quality assurance throughout the planning and construction phases of the project. In addition to these qualifications, each firm should submit a fee proposal at the time of interview in a separate envelope. The fee will be considered after construction firms are ranked based on qualifications.
The services to be performed by the CM will have as their objective the efficient, economical, and timely delivery of the project by managing the construction of the project within the time and cost limitations and within established quality requirements. The services will be performed during the pre-construction phase and construction phase including working with Owner and Architect in project planning, arrangement of bid packages, bidding and award of the trade contracts, and management of construction until occupancy is achieved.
2. SCOPE AND STYLE OF SERVICES TO BE PERFORMED
In issuing the Request for Proposal, it is the intent of the City of Metter that the successful CM will provide the required services for a fixed fee. It is further the intent of the City of Metter that the successful CM will provide a Guaranteed Maximum Price (GMP) for the cost of the construction of the project to include a Guaranteed Delivery Date (GDD). The City of Metter also intends that the successful CM accept the following stipulations:
· Provide Performance and Material and Labor Payment Bonds in the amount of 100% of the GMP.
· Individual Trade Contracts will be between the CM and the Trade Contractors, subject to the City of Metter’s approval.
· The CM will not perform any portion of the project with its own forces except as may be mutually agreed to by the Owner and the CM.
· The CM will be "at risk" in the proposed undertaking and will be responsible for completing the project within the GMP.
· Should the final cost of the project be less than the GMP, all savings shall belong to the City of Metter .
· An agreed percentage of pay applications will be held in retention.
· The City of Metter shall have the authority to suspend or terminate the performance of the project.
· Construction Manager will share with the City of Metter the calculations and assumptions on which the CM's proposed GMP is based and provided to the City of Metter any information requested by the City of Metter in a timely manner or according to a scheduled developed by the parties.
3. LIST OF REPRESENTATIVE SERVICES TO BE PROVIDED BY THE CM
· Project Planning - The CM is expected to work with the Owner to plan the project to include:
· Reviewing ideas and suggestion offered by the Owner with regard to feasibility or constructability.
· Evaluate designs with respect to constructability issues.
· Evaluate value-engineering opportunities.
· Bidding and Awarding Phase
· Arrange bid packages.
· Develop requirements to assure time, cost, and quality control during construction.
· Provide a provisional construction schedule for issuance with the bid package.
· Identify bidders and generate bidder interest.
· Schedule and conduct pre-bid conferences in conjunction with the architect and representatives from the City of Metter .
· Advertise and distribute bidding documents in accordance with applicable federal and state laws, rules and regulations.
· Monitor bidder activity.
· Review and analyze bids and recommend awards.
· Update schedule.
· Construction Phase
· Maintain on-site staff for construction management.
· Establish and maintain coordinating procedures.
· Develop and maintain a detailed schedule including delivery, approvals, inspection, testing, construction, and occupancy.
· Conduct and record job meetings.
· Prepare and submit change order documentation for approval of the architect and the City of Metter .
· Maintain a system for review and approval of shop drawings.
· Maintain records and submit reports to architect and the City of Metter .
· Maintain quality control and ensure conformity to contract documents.
· Provide cost control through progress payment review and verification according to the approved schedule and contract amounts.
· Coordination of post completion activities, including the assembly of guarantees, manuals, and the Owner's final acceptance.
4. SELECTION OF CM
· Selection Committee The selection of the CM firm will be by an evaluation committee consisting of representatives selected by the Owner.
· Selection Procedure
· Selection of the CM will be a qualification-based process through a written proposal and presentation/interview.
· Following completion of the initial written proposal evaluations, if deemed necessary by the committee, up to three highest ranked firms best qualified will be granted an opportunity to appear before the Evaluation Committee to make an oral presentation and submit to an interview.
· Each firm selected for an interview should bring a separate envelop to the interview which contains a fee proposal. The fee will be evaluated after the final ranking of firms based on qualifications.
· Information on the presentation will be provided to the firms selected.
· Schedule of Events
| · 05/14/2024 | RFP Release |
| · 05/28/2024 | Mandatory Pre-Proposal Conference (10:00 A.M. Est.) |
| · 06/18/2024 | Proposal Questions Deadline (5:00 P.M. Est.) |
| · 06/25/2024 | Response to Questions to Proposers |
| · 07/16/2024 | Proposals Due (10:00 A.M. Est.) |
| · 07/23/2024 | Interview Selection Notification |
| · 07/30/2024 | Interviews |
| · 08/13/2024 | Recommendation for Council Approval |
| · xx/xx/2024 | Substantial Completion |
· Contract Negotiation Upon selection, the Owner will attempt to negotiate a contract based on the CM’s fee proposal. The Owner has the right to reject the fee proposal and elect to either negotiate a new fee proposal with the selected firm, or enter negotiations with the next highest ranked firm. The Owner retains the Ownership of and all rights to use all documents produced during the interview process for use in selecting the final firm and completing the project.
5. PROPOSAL PREPARATION, REQUIREMENTS AND SCORING
· Proposal Preparation
· Each firm will be asked to submit detailed information concerning their experience and abilities, attend a required pre-proposal conference, if selected for interview submit a proposal for fees and overhead costs for the project.
· The Owner reserves the right to negotiate, prior to award, adjustments in any and all elements of what proposers submit in their proposals.
· Where the RFP requires the proposer to submit a number of days, or to submit a milestone chart, the days used shall be calendar days unless otherwise specified herein.
· Any submitted proposal shall remain valid for 60 days after the proposal due date or until the Owner executes a contract, whichever is sooner. The Owner may, in the event the selected proposer fails to perform and/or the contract is terminated within forty-five days of its initiation, request the proposer submitting the next acceptable proposal to honor its proposal.
· Requirements
· General
· One (1) original and five (5) printed copies of the submittal
· One (1) electronic copy (pdf format) submitted on (6) six Flash Drives (File Name: City of Metter Fire Station – Firm Name)
· Clear and Concise Transmittal Letter
· Proposal must be typed on 8 ½” x 11” paper with pages numbered.
· Table of contents with corresponding tabs must be included to identify each section.
Submittals are to be made to:
Missy Edenfield/Purchasing Manager PO Box 74 City of Metter , GA 30439
· Proposal Information
· Section 1: Firm History and Information
· Provide brief overview of firm.
· Provide listing of key employees and their positions. Indicate which employees are being considered for roles on this project.
· Has the firm been involved in litigation in the past five (5) years? If yes, please list any active or pending litigation and explain.
· Has the firm ever failed to complete any work awarded or been removed from any project awarded to the firm?
· List the contact person(s), addresses and phone numbers for your insurance carrier and agent.
· List the contact person(s), addresses and phone numbers for the firms bonding company.
· What is the firms bonding capacity and how much work is currently bonded? Provide a list of current projects and percent complete.
· Provide information on the firm’s total amount of construction cost completed on a yearly basis over the past five (5) years.
· Section 2: Relevant Project Experience
· Provide examples of your experience as a CM in constructing facilities of similar nature. Provide a minimum of 5 projects and a maximum of 10 projects.
· Include the following information for each project:
· Project Budget
· Initial GMP at pre-construction phase
· Original GMP
· Final Project Cost (reasons for change – if any)
· Project Team – please note if team members are proposed for this project
· Project Owner Contact or Reference
· Project Completion Date
· Section 3: Project Team
· Provide an organizational chart showing the lines of responsibility and accountability for the project.
· Describe your firm’s proposed organization for the project. Specifically identify the following and include resumes:
· Project Executive
· Project Manager
· Superintendent
· Cost Estimator
· Other (if applicable)
· Please identify the individual who will serve as the primary point of contact for the Owner, architect and project team; CMR shall certify that the teams presented in this RFP shall remain as indicated until project completion.
· Describe your firms approach to Quality Assurance.
· Section 4: Project Approach and Services
· Provide a brief outline and description of your firm's approach for a program of this nature. If selected for an interview, include detailed explanation of the fees and expenses for this project (including reimbursable), as well as any other contingency for which the Construction Manager expects to be compensated.
· Describe your firm’s approach to Pre-Construction services.
· Describe your firm’s views on change orders as related to projects containing pre-construction services.
· Occasionally, subcontractors and suppliers file for bankruptcy during the course of a project. How do you protect the Owner from being adversely affected by this situation?
· How will your firm ensure the best value for the Owner’s budget? Discuss a subcontractor’s role in this effort.
· Scoring
· Firm History & Information = 20 Points
· Relevant Project Experience = 30 Points
· Project Team = 25 points
· Project Approach = 25 Points
· Total = 100 Points
· Questions
· Any questions related to the RFP may be asked at the Mandatory Pre-Proposal Conference.
· Mandatory Pre-Proposal Conference Location:
Metter City Hall 49 South Rountree St.
City of Metter , GA 30439
· All questions which have been submitted to the Architect/Owner will be answered in writing and distributed to those firms registered from the mandatory pre-proposal conference.
· Additional questions must be submitted via email to:
City of Metter //Fire Station Project medenfield@cityofmetterga.gov
6. Additional Considerations
· The Owner reserves the right to reject any or all proposals received. The Owner is not obligated to request clarifications or additional information but may do so at their discretion. The Owner may extend the due dates if it is at the advantage of the Owner. Proposers will be notified of any/all changes in scheduled due dates/times by written addendum.
· Confidentiality of Documents: upon receipt of a proposal by the Owner the proposal shall become the property of the Owner without compensation to the proponent, for disposition or usage by the Owner at its discretion.
· The Owner does not desire to enter into “joint venture” agreements with multiple Construction Management firms. In the event two or more firms desire to “joint venture”, it is strongly recommended that one incorporated firm become the Construction Management firm with the remaining firms being consultants.