Fire Hydrant Replacement_SOW.pdf

PDF 2 MB Posted

Attached to
USCG BASE NEW ORLEANS FIRE HYDRANT REPLACEMENT
Solicitation number
70Z02925QNEWO0190
Issued by

About this file

This Performance Work Statement (PWS) details a fire hydrant replacement project for the U.S. Coast Guard Base New Orleans located on the NASA Michoud Assembly Facility in New Orleans, Louisiana. The primary objective is to replace two discontinued inoperable fire hydrants in compliance with National Fire Protection Association (NFPA) code requirements. The project scope includes pressure and flow testing of all six base fire hydrants, following replacement, and obtaining certification for hydrant pressure rating and flow rate. The contractor will be responsible for furnishing all labor, tools, materials, transportation, equipment, and personnel to complete the work, with strict adherence to safety regulations and environmental compliance standards. The project timeline requires submittal of all documentation within 14 calendar days after contract award, with the U.S. Coast Guard having 7 calendar days to review, and the contractor expected to begin work within 14 calendar days of approval and complete the project within 30 calendar days.

View the file

Other files

File Type Posted
LA20250041.txt TXT text file
SF1442-22.pdf PDF
Construction Clauses (Mar) 2025.odt ODT document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .