Fire_Flow_Test_Documentation_Sheet.pdf

PDF 69 KB Posted

Attached to
Fire Hydrant Inspection, Testing, and Maintenance Services (Bid Discount)
Solicitation number
26-P-00517
Issued by
Hillsborough County, Florida

About this file

Fire Flow Test Documentation Sheet Summary

This document is a Fire Flow Test Documentation Sheet for the City of Tampa Wastewater Department, specifically designed for conducting standardized fire flow testing on hydrants at municipal facilities. The sheet provides a systematic procedure for testing approximately 32 fire hydrants at the Howard F. Curren Advanced Wastewater Treatment Plant (AWTP) located at 2700 Maritime Boulevard, Tampa, Florida. The testing procedure involves locating a residual hydrant and flow hydrant, measuring static pressure and residual pressure, recording nozzle outlet information, and using a pitot gauge to measure flow rates. The documented data is then used to calculate total flow using Equation 1.1 and circulation flow using Equation 1.2. Upon completion of testing, hydrants are painted according to color-coding standards based on calculated flow rates at 20 psi residual pressure, with the hydrant barrel and caps painted yellow and the bonnet painted the appropriate color corresponding to flow capacity.

The testing requirements are governed by material specifications referenced in M17 for the City of Tampa Water Department. Contractors performing inspection, testing, certification, and maintenance services on these hydrants must comply with all procedures outlined in this documentation sheet, including proper nozzle measurement, pressure stabilization protocols, and adherence to the minimum 10 psi pressure differential requirement between static and residual pressures. The procurement is designated as a sheltered-market contract for Small Local Business Enterprise (SLBE) vendors, with bids due September 14, 2026. Additional compliance requirements include ADA accessibility standards and OSHA safety protocols as specified in the procurement package.

View the file

Other files

File Type Posted
Fire_Hydrant_Inspection,_Testing,_and_Maintenance_Services_(Bid_Discount).pdf PDF
Fire_Hydrant_Inspection,_Testing,_and_Maintenance_Services_(Bid_Discount).pdf PDF
EBO-26-P-00363-Sheltered-Market-Project-Details-SLBE1.pdf PDF
Fire_Hydrant_Maintenance_Form.pdf PDF
Tampa_Cloud_Hosting_Policy_ADA.pdf PDF
Fire_Hydrant_Maintenance_Form.pdf PDF
26-P-00363-EBO-Determination-Letter-SLBE.pdf PDF
Attachment_#2_-_Fire_Hydrant_Maintenance_Form.pdf PDF
Attachment_#3_-_Fire_Flow_Test_Documentation_Sheet.pdf PDF
Fire_Flow_Test_Documentation_Sheet.pdf PDF
Fire_Hydrant_MAP2.pdf PDF
DMI-30-Form-Payment-Package-or-Final-with_Invoices_SLBE_ADA.pdf PDF
26-P-00363-Minimum-Certified-Contact-List-SLBE.xlsx XLSX spreadsheet
ADA_Requirements_.pdf PDF
Attachment_#1_-_Material_Specifications.pdf PDF
Fire_Hydrant_MAP2.pdf PDF
Material_Specifications.pdf PDF
Occupational_Safety_and_Health_Administration_SDS.pdf PDF
Tampa_Cloud_Hosting_Policy_ADA.pdf PDF
Attachment_#4_-_Fire_Hydrant_MAP2.pdf PDF
BID_RESPONSE_FOR_FIRE_HYDRANTS.docx DOCX document
DMI-30-Form-Payment-Package-or-Final-with_Invoices_SLBE_ADA.pdf PDF
Fire_Hydrant_Inspection_Tech_Specs_v1.docx DOCX document
Material_Specifications.pdf PDF
Occupational_Safety_and_Health_Administration_SDS.pdf PDF
ADA_Requirements_.pdf PDF
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT G

Date:

Test By:

Time:

Equation 1.1

Where:

Comments:

Nozzle CoefficientDuration of Flow (min)

If hydrant flow tested (462) If hydrant painted (348) If blue(382) If green(383) If orange(384) If red(385) pumper nozzle. If 10 psi drop still not attained, flow multiple hydrants. Provide additional hydrant number and location description in comment area below. Note test procedure requirements in M17 for

City of Tampa Water Department Use

Flow test data entered by: Date entered:

Equation 1.2

16.) Calculate the flow (Total Flow) using Equation 1.1 below.

use of pumper nozzle outlets for flow test if pumper nozzle is utilized.

d = nozzle ID (in)

P = Pitot gauge pressure (psi)

9.) Feel inside hydrant and note the type of nozzle outlet. Refer to Figure 6-3 in M17. Use appropriate Outlet coefficient in Eq. 1.1

10.) Slowly open hydrant valve fully and allow to flow.

17.) Calculate the C.C. Flow using Equation1.2 above.

12.) Open Flow Hydrant slowly until fully open.

13.) Wait for pressure at the residual hydrant to stabilize and record pressure in psi as Residual Pressure.

15.) If residual pressure is not at least 10 psi less than static pressure repeat test while flowing through

Q = 29.83cd (P)

1/2 Q = Discharged Flow c = nozzle coefficient

(Static Pressure - 20) .54

= C.C. Flow (gpm) x Total Flow (gpm) (Static Pressure-Residual Pressure)

.54

Fire Flow Test Documentation Sheet

City Of Tampa Wastewater Department

Flow Hydrant No. Residual Hydrant No.

Location Description:

Flow Hydrant (gpm):

Residual Pressure (psi):

Location Description:

Static Pressure (psi):

C.C. Flow (gpm)

Hydrant Bonnet Painted (Y/N) Paint Color Used

14.) Simultaneously use pitot gauge to measure the flow at the flow hydrant.

8.) Remove hose nozzle cap and measure the inside diameter in inches of the nozzle to the nearest 1/16".

1.) Locate Residual Hydrant. Verify hydrant number and location on the form in spaces provided.

7.) Locate Flow Hydrant. Note hydrant number and location on the form in spaces provided.

18.) If the observed residual pressure is below 40 psi the hydrant color scheme shall be based upon half of the observed flow.

11.) Station one observer at the residual hydrant and one observer at the flow hydrant.

19.) The initial flow hydrant is the hydrant that shall be painted. Paint hydrant barrel and caps yellow. Paint hydrant bonnet the appropriate color based on the calculated flow at 20 psi residual. Use high grade enamel

2.) Flush residual hydrant until water is free of foreign material.

3.) Install nozzle cap fitted with pressure guage.

5.) Close vent and open hydrant valve fully.

4.) Open hydrant valve slowly until all air is vented from hydrant.

6.) Record pressure as Static Pressure