Fire Engine Floor Coating Project Drawings.pdf
PDF 3 MB Posted
- Attached to
- Engine Room Floor Coating Project
- Solicitation number
- BD-26-2258-SHFD0-SHFD-129906
- Issued by
- Hampshire County, Massachusetts
About this file
This is a project drawings file for the Engine Room Floor Coating Project in Massachusetts. The project encompasses the removal and disposal of existing epoxy and vinyl asbestos tile flooring from a fire engine room, followed by installation of a seamless, textured, epoxy-based floor surfacing system. The drawings provide detailed specifications and visual representations of the work scope, including floor layouts, preparation requirements, and the final epoxy coating application specifications necessary for bidders to prepare accurate lump sum and unit price bids as required by the bid form.
The drawings serve as essential documentation for contractors to understand the project dimensions, surface conditions, and technical requirements for proper cost estimation and project execution. Bidders must reference these drawings in conjunction with the bid form to submit competitive proposals on both a lump sum basis for the total project work and unit price basis for specific components, ensuring comprehensive pricing that accounts for removal, disposal, floor preparation, and the installation of the seamless epoxy flooring system.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Engine Room Floor Coating Project Specifications~1.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Pl ot te d
O n:
M ay
2, 6- 2:
pm
B y:
J Ps ze ni cz ny
La st
S av ed
5/
/2
Ti gh e
B on d:
J
S \S
\0
F ir e
S ta ti on
F lo or C oa ti ng
\D ra w in gs \A ut oC
A D
\S he et \S
-0
-C O
V
ER
.d w g
PREPARED BY:
PROJECT
LOCATION
SOUTH HADLEY FIRE
DISTRICT NO. 1
ENGINE ROOM FLOOR COATING
PROJECT
MAY 2026
LIST OF DRAWINGS
SHEET NO. DRAWING NO. DRAWING TITLE
1 G-001 COVER SHEET
2 A-101 FIRST FLOOR PLAN
3 A-102 EPOXY FLOORING DETAILS
SITE LOCATION MAP
1" = 2000'
COMPLETE SET 3 SHEETS
PETER M. VALINSKI, PE AARON B. SABBS, PE
N
PETER M.
VALINSKI
CHEMICAL
38143No.
05/27/2026
AARON
SABBS
CIVIL
55364No.
05/26/2026
CONSTRUCTION
JOINT TYPE II
A-102
A-102
A-102
A-102
A-102
A-102
A-102
SEE DETAILS
1, 2, AND 3 ON
THIS SHEET
A-102
A-102
A-102
A-102
A-102
A-102
A-102
A-102
A-102
A-102
UP
DN
DN
DN
DN
DN
STAIR UP TO FIRST FLOOR
NOT SHOWN FOR CLARITY
A-102
A-102
A-102
4' -2
9'-2"'
4' -6
A-102
A-102
A-102
A-102
A-102
A-102
A-102
A-102
A-102
4' -2
9'-2"'
4"
9'-2"'
4' -2
REMOVE AND REINSTALL
TRANSITION STRIP FOR
EPOXY TO RUBBER FLOORING
SAWCUT VAT FLOORING BY
ABATEMENT CONTRACTOR 14
6"
2'-8"'
2'-8"'
SAWCUT VAT FLOORING BY
ABATEMENT CONTRACTOR
SAWCUT VAT FLOORING BY
ABATEMENT CONTRACTOR
A-102
A-102
D.BISHOP
FIRST FLOOR PLAN
AS SHOWN
0 2' 4' 8'
SCALE: 1/4"=1'-0"
P.PAPINEAU
A.SABBS
SHEET 2 OF 3
A-101
N
CHECKED BY:
DRAWN BY:
FILE:
APPROVED BY:
South Hadley, Massachusetts
Engine Room Floor Coating Project
South Hadley Fire District No. 1
DATE:
PROJECT NO:
MARK DATE DESCRIPTION
S0389-033-A-101.dwg
MAY 2026
S0389-033
SCALE:
Pl ot te d
O n:
M ay
7, 6- 9:
am
B y:
A B S
La st
S av ed
5/
/2
Ti gh e
B on d:
\t ig he bo nd .c om \d at a\
D at a\ Pr oj ec ts \S
\S
\0
F ir e
S ta tio n
Fl oo r C oa tin g\
D ra w in gs \A ut oC
A D
\S he et \S
-0
-A -1
.d w g
DESIGNED BY:
P.VALINSKI
FIRST FLOOR PLAN
1/8" = 1'-0"
APPROXIMATE LIMITS OF EPOXY
RESINOUS FLOOR COATING SYSTEM
(TYP)
SECOND FLOOR STAIR LANDING PARTIAL FLOOR PLAN
1/4" = 1'-0"
FIRST FLOOR STAIR LANDING PARTIAL FLOOR PLAN
1/4" = 1'-0"
GROUND FLOOR STAIR LANDING PARTIAL FLOOR PLAN
1/4" = 1'-0"
ABATEMENT NOTES:
REMOVE ASSUMED ASBESTOS CONTAINING FLOOR
TILE, ASSOCIATED MASTIC AND COVE BASE AND
MASTIC FROM THE STAIRWELL NO.2 LANDINGS IN
ACCORDANCE WITH APPLICABLE REGULATIONS.
REFER TO SPECIFICATION SECTION 02 82 13
ASBESTOS ABATEMENT FOR SPECIFIC DETAILS.
0 4' 8' 16'
SCALE: 1/8"=1'-0"
DEMOLITION NOTES:
1. REMOVE AND DISPOSE OF EXISTING EPOXY
FLOORING AND CANT COVE IN ENGINE ROOM.
2. REMOVE AND DISPOSE OF FLOOR TILE, MASTIC, AND
COVE BASE FROM STAIRWELL NO.2 LANDINGS. SEE
ABATEMENT NOTES ON THIS SHEET.
3. PREPARE EXISTING CONCRETE SUBFLOOR TO
RECEIVE SEAMLESS EPOXY FLOOR SYSTEM IN
ACCORDANCE WITH SECTION 09 67 50.
ABBREVIATIONS
DN - DOWN
TYP - TYPICAL
VAT - VINYL ASBESTOS TILE
0 5/27/2026 ISSUED FOR BIDDING
CONSTRUCTION
JOINT TYPE I
12" PARKING STRIPES
(TYP.), MATCH EXISTING
LOCATIONS
NOTES:
1. REPAIR ANY NON-MOVING IRREGULAR CRACKS FOUND
DURING DEMOLITION PER DETAIL 7 ON A-102. BASE BID
SCOPE SHALL INCLUDE 25 LINEAR FEET OF CRACK
REPAIR.
2. REPAIR ANY SPALLED CONCRETE FOUND DURING
DEMOLITION IN ACCORDANCE WITH THE EPOXY
FLOORING MANUFACTURER'S RECOMMENDATIONS. BASE
BID SCOPE SHALL INCLUDE 10 SQUARE FEET OF SPALL
REPAIR.
APPROXIMATE AREA OF
CONCRETE SPALL (±1 SF),
PATCH IN ACCORDANCE
WITH EPOXY FLOORING
MANUFACTURER'S
RECOMMENDATIONS
PETER M.
VALINSKI
CHEMICAL
38143No.
05/27/2026
AARON
SABBS
CIVIL
05/27/2026
EPOXY BASE RESINOUS FLOOR
COATING SYSTEM (TYP)
EPOXY BASE RESINOUS FLOOR
COATING SYSTEM (TYP)
EPOXY BASE RESINOUS FLOOR COATING SYSTEM
SHALL BE FLUSH WITH EXISTING STAIR RISER
EXISTING 8" CMU
EPOXY BASE RESINOUS FLOOR
COATING SYSTEM (TYP)
EXISTING 8" CMU
D.BISHOP
EPOXY FLOORING DETAILS
AS SHOWN
P.PAPINEAU
A.SABBS
SHEET 3 OF 3
A-102
CHECKED BY:
DRAWN BY:
FILE:
APPROVED BY:
South Hadley, Massachusetts
Engine Room Floor Coating Project
South Hadley Fire District No. 1
DATE:
PROJECT NO:
MARK DATE DESCRIPTION
S0389-033-A-101.dwg
MAY 2026
S0389-033
SCALE:
Pl ot te d
O n:
M ay
7, 6- 9:
am
B y:
A B S
La st
S av ed
5/
/2
Ti gh e
B on d:
\t ig he bo nd .c om \d at a\
D at a\ Pr oj ec ts \S
\S
\0
F ir e
S ta tio n
Fl oo r C oa tin g\
D ra w in gs \A ut oC
A D
\S he et \S
-0
-A -1
.d w g
DESIGNED BY:
P.VALINSKI
4"
MIN
SAWCUT AND GRIND EXISTING
CONCRETE BACK A MINIMUM OF
4" FOR TRANSITION WITH A 1/2"
DEPTH (TYP.)
NEW FLOOR DRAIN
GRATED COVER
EPOXY BASE RESINOUS
FLOOR COATING SYSTEM
(TYP)
EXISTING CONCRETE
FLOOR SLAB (TYP)
METAL OR PLASTIC COVE
TERMINATION STRIP ALONG EDGE
OF EXISTING TILE FLOORING
EXISTING CONCRETE
FLOOR SLAB (TYP)
EXISTING TILE FLOOR
(TYP)
EPOXY BASE RESINOUS
FLOOR COATING SYSTEM
(TYP)
NOTE:
1. FLEXIBLE JOINT SEALANT WIDTH TO DEPTH RATIO SHOWN IS
APPROXIMATELY 2:1. DETAIL CAN BE BUILT BY INSTALLING FLOOR SYSTEM
OVER JOINT, RESAWCUTTING, AND INSTALLING BACKER ROD AND SEALANT.
CONSTRUCTION JOINT TYPE I DETAIL
EPOXY TO TILE OR VCT TREATMENT DETAIL
EPOXY TO FLOOR DRAIN DETAIL
45 DEGREE CANT COVE
EXISTING CONCRETE
FLOOR SLAB (TYP)
EPOXY BASE RESINOUS
FLOOR COATING SYSTEM
(TYP)
EPOXY TREATMENT AT VERTICAL WALL DETAIL
EXISTING VERTICAL SURFACE (CONCRETE,
CMU, METAL RISER, ETC.) (TYP)
1" TO 2"
(TYP)
4"
MIN
SAWCUT AND GRIND EXISTING
CONCRETE BACK A MINIMUM OF
4" FOR TRANSITION WITH A 1/2"
DEPTH
EXISTING CAST-IN-PLACE
EMBEDDED NOSING OR
ANGLE IRON
EPOXY BASE RESINOUS
FLOOR COATING SYSTEM
(TYP)
EXISTING CONCRETE
FLOOR SLAB (TYP)
EPOXY TREATMENT AT FLOOR EMBEDMENT DETAIL
FLEXIBLE JOINT SEALANT EPOXY BASE RESINOUS
FLOOR COATING SYSTEM
(TYP)
EXISTING CONCRETE
FLOOR SLAB (TYP)
NOTE:
1. FLEXIBLE JOINT SEALANT WIDTH TO DEPTH RATIO SHOWN IS
APPROXIMATELY 2:1. DETAIL CAN BE BUILT BY INSTALLING FLOOR SYSTEM
OVER JOINT, RESAWCUTTING, AND INSTALLING BACKER ROD AND SEALANT.
CONSTRUCTION JOINT TYPE II DETAIL
METAL OR PLASTIC
TERMINATION STRIP AT MID
POINT OF DOOR THRESHOLD
EXISTING CONCRETE
FLOOR SLAB (TYP)
EXISTING FLOOR
SURFACE (TYP)
EPOXY BASE RESINOUS
FLOOR COATING SYSTEM
(TYP)
EPOXY TREATMENT AT DOOR THRESHOLD DETAIL
REMOVE EXISTING THRESHOLD
AND REPLACE WITH NEW, MODIFY
AS REQUIRED FOR FITMENT (TYP)
EPOXY BASE RESINOUS
FLOOR COATING SYSTEM
(TYP)
EXISTING CONCRETE
FLOOR SLAB (TYP)
NOTE:
1. ROUT OUT CRACK PRIOR TO PATCHING IF LARGER THAN 1/16". PATCHING
MATERIAL TO BE COMPATIBLE WITH EPOXY FLOOR COATING SYSTEM AND TO
BE INSTALLED PER MANUFACTURER'S RECOMMENDATIONS.
NON-MOVING CRACK CONTROL DETAIL
ROUTE AND PATCH WITH BASE
COAT FILLER MATERIAL PRIOR TO
INSTALLING EPOXY FLOORING
SYSTEM (TYP)
NOTE:
1. USE DRY MIXED TROWELABLE MORTAR VERSION OF
FLOORING MATERIAL TO BUILD COVE
A-101
DETAIL
NO SCALE
A-101
DETAIL
NO SCALE
A-101
DETAIL
NO SCALE
A-101
DETAIL
NO SCALE
A-101
DETAIL
NO SCALE
A-101
DETAIL
NO SCALE
A-101
DETAIL
NO SCALE
A-101
DETAIL
NO SCALE
BACKER ROD AND
FLEXIBLE JOINT
SEALANT (TYP.)
EPOXY BASE RESINOUS
FLOOR COATING SYSTEM
(TYP)
EXISTING CONCRETE
FLOOR SLAB (TYP) EXISTING PIPE
1/2"
PIPE PENETRATION FLOOR DETAIL
A-101
DETAIL
NO SCALE
1/2"
STAIR LANDING
SECTION DETAIL
A-101
DETAIL
NO SCALE
NOTE:
1. SAWCUT VAT FLOORING BY ABATEMENT CONTRACTOR
STAIR LANDING SECTION DETAIL
AT WALL MOUNTED STAIR FRAMING
A-101
DETAIL
NO SCALE
STAIR LANDING SECTION DETAIL
AT EXISTING WALL
A-101
DETAIL
NO SCALE
EPOXY TO CONCRETE TREATMENT DETAIL
A-101
NOTE:
1. SAWCUT VAT FLOORING BY ABATEMENT CONTRACTOR
DETAIL
NO SCALE
4"
MIN
SAWCUT AND GRIND EXISTING
CONCRETE BACK A MINIMUM OF
4" FOR TRANSITION WITH A 1/2"
DEPTH
EXISTING CONCRETE FLOOR
EPOXY BASE RESINOUS
FLOOR COATING SYSTEM
(TYP)
EXISTING CONCRETE
FLOOR SLAB (TYP)
REMOVE AND REINSTALL RUBBER
MAT TERMINATION STRIP ALONG
EDGE OF NEW EPOXY FLOORING
EXISTING CONCRETE
FLOOR SLAB (TYP)
EXISTING TILE FLOOR
WITH RUBBER MAT
EPOXY BASE RESINOUS
FLOOR COATING SYSTEM
(TYP)
EPOXY TO TILE OR VCT TREATMENT DETAIL
A-101
DETAIL
NO SCALE
NOTE:
1. SAWCUT VAT FLOORING BY ABATEMENT CONTRACTOR
0 5/27/2026 ISSUED FOR BIDDING
METAL OR PLASTIC COVE
TERMINATION STRIP ALONG EDGE
OF EXISTING TILE FLOORING
NOTE:
1. SAND EXISTING CAST-IN-PLACE ANGLE IRON PRIOR TO INSTALL OF EPOXY
BASE RESINOUS FLOOR COATING SYSTEM.
EXISTING
CAST-IN-PLACE
FLOOR DRAIN
1/2"
BOND BREAKER TAPE EPOXY BASE RESINOUS
FLOOR COATING SYSTEM
(TYP)
EXISTING CONCRETE
FLOOR SLAB (TYP)
1/2"
PETER M.
VALINSKI
CHEMICAL
38143No.
05/27/2026
AARON
SABBS
CIVIL
05/27/2026
| Sheets and Views |
| S0389-033-A-101-Layout1 |
| S0389-033-A-101-Layout2 |
| Drawing Cover |
| COVER |
File details come from the government source that posted it. Updated .