Fire Engine Floor Coating Project Drawings.pdf

PDF 3 MB Posted

Attached to
Engine Room Floor Coating Project
Solicitation number
BD-26-2258-SHFD0-SHFD-129906
Issued by
Hampshire County, Massachusetts

About this file

This is a project drawings file for the Engine Room Floor Coating Project in Massachusetts. The project encompasses the removal and disposal of existing epoxy and vinyl asbestos tile flooring from a fire engine room, followed by installation of a seamless, textured, epoxy-based floor surfacing system. The drawings provide detailed specifications and visual representations of the work scope, including floor layouts, preparation requirements, and the final epoxy coating application specifications necessary for bidders to prepare accurate lump sum and unit price bids as required by the bid form.

The drawings serve as essential documentation for contractors to understand the project dimensions, surface conditions, and technical requirements for proper cost estimation and project execution. Bidders must reference these drawings in conjunction with the bid form to submit competitive proposals on both a lump sum basis for the total project work and unit price basis for specific components, ensuring comprehensive pricing that accounts for removal, disposal, floor preparation, and the installation of the seamless epoxy flooring system.

View the file

Other files

File Type Posted
Engine Room Floor Coating Project Specifications~1.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Pl ot te d

O n:

M ay

2, 6- 2:

pm

B y:

J Ps ze ni cz ny

La st

S av ed

5/

/2

Ti gh e

B on d:

J

S \S

\0

F ir e

S ta ti on

F lo or C oa ti ng

\D ra w in gs \A ut oC

A D

\S he et \S

-0

-C O

V

ER

.d w g

PREPARED BY:

PROJECT

LOCATION

SOUTH HADLEY FIRE

DISTRICT NO. 1

ENGINE ROOM FLOOR COATING

PROJECT

MAY 2026

LIST OF DRAWINGS

SHEET NO. DRAWING NO. DRAWING TITLE

1 G-001 COVER SHEET

2 A-101 FIRST FLOOR PLAN

3 A-102 EPOXY FLOORING DETAILS

SITE LOCATION MAP

1" = 2000'

COMPLETE SET 3 SHEETS

PETER M. VALINSKI, PE AARON B. SABBS, PE

N

PETER M.

VALINSKI

CHEMICAL

38143No.

05/27/2026

AARON

SABBS

CIVIL

55364No.

05/26/2026

CONSTRUCTION

JOINT TYPE II

A-102

A-102

A-102

A-102

A-102

A-102

A-102

SEE DETAILS

1, 2, AND 3 ON

THIS SHEET

A-102

A-102

A-102

A-102

A-102

A-102

A-102

A-102

A-102

A-102

UP

DN

DN

DN

DN

DN

STAIR UP TO FIRST FLOOR

NOT SHOWN FOR CLARITY

A-102

A-102

A-102

4' -2

9'-2"'

4' -6

A-102

A-102

A-102

A-102

A-102

A-102

A-102

A-102

A-102

4' -2

9'-2"'

4"

9'-2"'

4' -2

REMOVE AND REINSTALL

TRANSITION STRIP FOR

EPOXY TO RUBBER FLOORING

SAWCUT VAT FLOORING BY

ABATEMENT CONTRACTOR 14

6"

2'-8"'

2'-8"'

SAWCUT VAT FLOORING BY

ABATEMENT CONTRACTOR

SAWCUT VAT FLOORING BY

ABATEMENT CONTRACTOR

A-102

A-102

D.BISHOP

FIRST FLOOR PLAN

AS SHOWN

0 2' 4' 8'

SCALE: 1/4"=1'-0"

P.PAPINEAU

A.SABBS

SHEET 2 OF 3

A-101

N

CHECKED BY:

DRAWN BY:

FILE:

APPROVED BY:

South Hadley, Massachusetts

Engine Room Floor Coating Project

South Hadley Fire District No. 1

DATE:

PROJECT NO:

MARK DATE DESCRIPTION

S0389-033-A-101.dwg

MAY 2026

S0389-033

SCALE:

Pl ot te d

O n:

M ay

7, 6- 9:

am

B y:

A B S

La st

S av ed

5/

/2

Ti gh e

B on d:

\t ig he bo nd .c om \d at a\

D at a\ Pr oj ec ts \S

\S

\0

F ir e

S ta tio n

Fl oo r C oa tin g\

D ra w in gs \A ut oC

A D

\S he et \S

-0

-A -1

.d w g

DESIGNED BY:

P.VALINSKI

FIRST FLOOR PLAN

1/8" = 1'-0"

APPROXIMATE LIMITS OF EPOXY

RESINOUS FLOOR COATING SYSTEM

(TYP)

SECOND FLOOR STAIR LANDING PARTIAL FLOOR PLAN

1/4" = 1'-0"

FIRST FLOOR STAIR LANDING PARTIAL FLOOR PLAN

1/4" = 1'-0"

GROUND FLOOR STAIR LANDING PARTIAL FLOOR PLAN

1/4" = 1'-0"

ABATEMENT NOTES:

REMOVE ASSUMED ASBESTOS CONTAINING FLOOR

TILE, ASSOCIATED MASTIC AND COVE BASE AND

MASTIC FROM THE STAIRWELL NO.2 LANDINGS IN

ACCORDANCE WITH APPLICABLE REGULATIONS.

REFER TO SPECIFICATION SECTION 02 82 13

ASBESTOS ABATEMENT FOR SPECIFIC DETAILS.

0 4' 8' 16'

SCALE: 1/8"=1'-0"

DEMOLITION NOTES:

1. REMOVE AND DISPOSE OF EXISTING EPOXY

FLOORING AND CANT COVE IN ENGINE ROOM.

2. REMOVE AND DISPOSE OF FLOOR TILE, MASTIC, AND

COVE BASE FROM STAIRWELL NO.2 LANDINGS. SEE

ABATEMENT NOTES ON THIS SHEET.

3. PREPARE EXISTING CONCRETE SUBFLOOR TO

RECEIVE SEAMLESS EPOXY FLOOR SYSTEM IN

ACCORDANCE WITH SECTION 09 67 50.

ABBREVIATIONS

DN - DOWN

TYP - TYPICAL

VAT - VINYL ASBESTOS TILE

0 5/27/2026 ISSUED FOR BIDDING

CONSTRUCTION

JOINT TYPE I

12" PARKING STRIPES

(TYP.), MATCH EXISTING

LOCATIONS

NOTES:

1. REPAIR ANY NON-MOVING IRREGULAR CRACKS FOUND

DURING DEMOLITION PER DETAIL 7 ON A-102. BASE BID

SCOPE SHALL INCLUDE 25 LINEAR FEET OF CRACK

REPAIR.

2. REPAIR ANY SPALLED CONCRETE FOUND DURING

DEMOLITION IN ACCORDANCE WITH THE EPOXY

FLOORING MANUFACTURER'S RECOMMENDATIONS. BASE

BID SCOPE SHALL INCLUDE 10 SQUARE FEET OF SPALL

REPAIR.

APPROXIMATE AREA OF

CONCRETE SPALL (±1 SF),

PATCH IN ACCORDANCE

WITH EPOXY FLOORING

MANUFACTURER'S

RECOMMENDATIONS

PETER M.

VALINSKI

CHEMICAL

38143No.

05/27/2026

AARON

SABBS

CIVIL

05/27/2026

EPOXY BASE RESINOUS FLOOR

COATING SYSTEM (TYP)

EPOXY BASE RESINOUS FLOOR

COATING SYSTEM (TYP)

EPOXY BASE RESINOUS FLOOR COATING SYSTEM

SHALL BE FLUSH WITH EXISTING STAIR RISER

EXISTING 8" CMU

EPOXY BASE RESINOUS FLOOR

COATING SYSTEM (TYP)

EXISTING 8" CMU

D.BISHOP

EPOXY FLOORING DETAILS

AS SHOWN

P.PAPINEAU

A.SABBS

SHEET 3 OF 3

A-102

CHECKED BY:

DRAWN BY:

FILE:

APPROVED BY:

South Hadley, Massachusetts

Engine Room Floor Coating Project

South Hadley Fire District No. 1

DATE:

PROJECT NO:

MARK DATE DESCRIPTION

S0389-033-A-101.dwg

MAY 2026

S0389-033

SCALE:

Pl ot te d

O n:

M ay

7, 6- 9:

am

B y:

A B S

La st

S av ed

5/

/2

Ti gh e

B on d:

\t ig he bo nd .c om \d at a\

D at a\ Pr oj ec ts \S

\S

\0

F ir e

S ta tio n

Fl oo r C oa tin g\

D ra w in gs \A ut oC

A D

\S he et \S

-0

-A -1

.d w g

DESIGNED BY:

P.VALINSKI

4"

MIN

SAWCUT AND GRIND EXISTING

CONCRETE BACK A MINIMUM OF

4" FOR TRANSITION WITH A 1/2"

DEPTH (TYP.)

NEW FLOOR DRAIN

GRATED COVER

EPOXY BASE RESINOUS

FLOOR COATING SYSTEM

(TYP)

EXISTING CONCRETE

FLOOR SLAB (TYP)

METAL OR PLASTIC COVE

TERMINATION STRIP ALONG EDGE

OF EXISTING TILE FLOORING

EXISTING CONCRETE

FLOOR SLAB (TYP)

EXISTING TILE FLOOR

(TYP)

EPOXY BASE RESINOUS

FLOOR COATING SYSTEM

(TYP)

NOTE:

1. FLEXIBLE JOINT SEALANT WIDTH TO DEPTH RATIO SHOWN IS

APPROXIMATELY 2:1. DETAIL CAN BE BUILT BY INSTALLING FLOOR SYSTEM

OVER JOINT, RESAWCUTTING, AND INSTALLING BACKER ROD AND SEALANT.

CONSTRUCTION JOINT TYPE I DETAIL

EPOXY TO TILE OR VCT TREATMENT DETAIL

EPOXY TO FLOOR DRAIN DETAIL

45 DEGREE CANT COVE

EXISTING CONCRETE

FLOOR SLAB (TYP)

EPOXY BASE RESINOUS

FLOOR COATING SYSTEM

(TYP)

EPOXY TREATMENT AT VERTICAL WALL DETAIL

EXISTING VERTICAL SURFACE (CONCRETE,

CMU, METAL RISER, ETC.) (TYP)

1" TO 2"

(TYP)

4"

MIN

SAWCUT AND GRIND EXISTING

CONCRETE BACK A MINIMUM OF

4" FOR TRANSITION WITH A 1/2"

DEPTH

EXISTING CAST-IN-PLACE

EMBEDDED NOSING OR

ANGLE IRON

EPOXY BASE RESINOUS

FLOOR COATING SYSTEM

(TYP)

EXISTING CONCRETE

FLOOR SLAB (TYP)

EPOXY TREATMENT AT FLOOR EMBEDMENT DETAIL

FLEXIBLE JOINT SEALANT EPOXY BASE RESINOUS

FLOOR COATING SYSTEM

(TYP)

EXISTING CONCRETE

FLOOR SLAB (TYP)

NOTE:

1. FLEXIBLE JOINT SEALANT WIDTH TO DEPTH RATIO SHOWN IS

APPROXIMATELY 2:1. DETAIL CAN BE BUILT BY INSTALLING FLOOR SYSTEM

OVER JOINT, RESAWCUTTING, AND INSTALLING BACKER ROD AND SEALANT.

CONSTRUCTION JOINT TYPE II DETAIL

METAL OR PLASTIC

TERMINATION STRIP AT MID

POINT OF DOOR THRESHOLD

EXISTING CONCRETE

FLOOR SLAB (TYP)

EXISTING FLOOR

SURFACE (TYP)

EPOXY BASE RESINOUS

FLOOR COATING SYSTEM

(TYP)

EPOXY TREATMENT AT DOOR THRESHOLD DETAIL

REMOVE EXISTING THRESHOLD

AND REPLACE WITH NEW, MODIFY

AS REQUIRED FOR FITMENT (TYP)

EPOXY BASE RESINOUS

FLOOR COATING SYSTEM

(TYP)

EXISTING CONCRETE

FLOOR SLAB (TYP)

NOTE:

1. ROUT OUT CRACK PRIOR TO PATCHING IF LARGER THAN 1/16". PATCHING

MATERIAL TO BE COMPATIBLE WITH EPOXY FLOOR COATING SYSTEM AND TO

BE INSTALLED PER MANUFACTURER'S RECOMMENDATIONS.

NON-MOVING CRACK CONTROL DETAIL

ROUTE AND PATCH WITH BASE

COAT FILLER MATERIAL PRIOR TO

INSTALLING EPOXY FLOORING

SYSTEM (TYP)

NOTE:

1. USE DRY MIXED TROWELABLE MORTAR VERSION OF

FLOORING MATERIAL TO BUILD COVE

A-101

DETAIL

NO SCALE

A-101

DETAIL

NO SCALE

A-101

DETAIL

NO SCALE

A-101

DETAIL

NO SCALE

A-101

DETAIL

NO SCALE

A-101

DETAIL

NO SCALE

A-101

DETAIL

NO SCALE

A-101

DETAIL

NO SCALE

BACKER ROD AND

FLEXIBLE JOINT

SEALANT (TYP.)

EPOXY BASE RESINOUS

FLOOR COATING SYSTEM

(TYP)

EXISTING CONCRETE

FLOOR SLAB (TYP) EXISTING PIPE

1/2"

PIPE PENETRATION FLOOR DETAIL

A-101

DETAIL

NO SCALE

1/2"

STAIR LANDING

SECTION DETAIL

A-101

DETAIL

NO SCALE

NOTE:

1. SAWCUT VAT FLOORING BY ABATEMENT CONTRACTOR

STAIR LANDING SECTION DETAIL

AT WALL MOUNTED STAIR FRAMING

A-101

DETAIL

NO SCALE

STAIR LANDING SECTION DETAIL

AT EXISTING WALL

A-101

DETAIL

NO SCALE

EPOXY TO CONCRETE TREATMENT DETAIL

A-101

NOTE:

1. SAWCUT VAT FLOORING BY ABATEMENT CONTRACTOR

DETAIL

NO SCALE

4"

MIN

SAWCUT AND GRIND EXISTING

CONCRETE BACK A MINIMUM OF

4" FOR TRANSITION WITH A 1/2"

DEPTH

EXISTING CONCRETE FLOOR

EPOXY BASE RESINOUS

FLOOR COATING SYSTEM

(TYP)

EXISTING CONCRETE

FLOOR SLAB (TYP)

REMOVE AND REINSTALL RUBBER

MAT TERMINATION STRIP ALONG

EDGE OF NEW EPOXY FLOORING

EXISTING CONCRETE

FLOOR SLAB (TYP)

EXISTING TILE FLOOR

WITH RUBBER MAT

EPOXY BASE RESINOUS

FLOOR COATING SYSTEM

(TYP)

EPOXY TO TILE OR VCT TREATMENT DETAIL

A-101

DETAIL

NO SCALE

NOTE:

1. SAWCUT VAT FLOORING BY ABATEMENT CONTRACTOR

0 5/27/2026 ISSUED FOR BIDDING

METAL OR PLASTIC COVE

TERMINATION STRIP ALONG EDGE

OF EXISTING TILE FLOORING

NOTE:

1. SAND EXISTING CAST-IN-PLACE ANGLE IRON PRIOR TO INSTALL OF EPOXY

BASE RESINOUS FLOOR COATING SYSTEM.

EXISTING

CAST-IN-PLACE

FLOOR DRAIN

1/2"

BOND BREAKER TAPE EPOXY BASE RESINOUS

FLOOR COATING SYSTEM

(TYP)

EXISTING CONCRETE

FLOOR SLAB (TYP)

1/2"

PETER M.

VALINSKI

CHEMICAL

38143No.

05/27/2026

AARON

SABBS

CIVIL

05/27/2026

Sheets and Views
S0389-033-A-101-Layout1
S0389-033-A-101-Layout2
Drawing Cover
COVER

File details come from the government source that posted it. Updated .