Fire Dept Roof_Addendum_2.docx
DOCX document 71 KB Posted
- Attached to
- Roof at Plymouth St Fire Station
- Solicitation number
- BD-26-1249-B220-B220-133319
- Issued by
- Bristol County, Boston City, Massachusetts
About this file
This is an addendum to the Invitations for Bid issued by the Town of Bridgewater, Massachusetts for roof replacement at the Plymouth Street Fire Station. Addendum No. 2, dated September 29, 2026, clarifies two key scope items for bidders submitting proposals. The addendum addresses the inclusion of gutter and downspout replacement in roofing estimates, confirming that bidders shall include replacement of these components using provided measurements. The addendum also specifies that the roofing contractor shall be responsible for removing and reinstalling lightning rods as part of the roofing work, with the Town arranging for a separate qualified contractor to inspect and verify proper installation and functionality of the lightning protection system upon completion. Bidders are reminded to acknowledge this addendum on their bid forms.
The addendum serves to eliminate ambiguity in the original scope of work and reduce potential disputes regarding contractor responsibilities for gutters, downspouts, and lightning rod work. These clarifications are essential for bidders to prepare accurate cost estimates and ensure consistent bid submissions based on uniform project requirements.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Fire Dept Roof_Addendum_3.pdf | ||
| WageSchedule_20260908235813.pdf | ||
| Fire Dept Roof_Addendum_1.pdf | ||
| Bridgewater_Fire_Station_Roof_IFB Sept 16.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Town of Bridgewater 66 Central Square Marshfield, MA 02324
Addendum NO. 2 September 29, 2026
To all Bidders on the Project titled:
Roof at Plymouth St Fire Station Town of Bridgewater
Reference Contract Documents dated September 16, 2026 The attention of bidders submitting proposals for the above subject project is called to the following addendum:
1. Gutters and downspouts: The original scope of work did not specifically include gutters and downspouts; however, the addendum includes measurements for the gutters and downspouts. Should the roofing estimates include the replacement of the gutters and downspouts?
Answer: Yes. Bidders shall include replacement of the gutters and downspouts in their roofing estimates using the measurements provided.
2. Lightning rods: How should the lightning rods be handled? Should the roofer be responsible for removing and reinstalling them, or should they be responsible for having a qualified company inspect and verify that they are properly wired after the roofing work is completed?
Answer: The roofing contractor shall remove and reinstall the lightning rods as part of the roofing work. After installation is complete, the Town will arrange for a separate qualified contractor to inspect the lightning protection system and verify that it has been properly installed and is functioning correctly.
Please be reminded to acknowledge this Addendum on the bid forms.
--- End of Addendum No. 2 ---image1.png