Fire Alarm Panel Sprinkler Hydrant and Exting.pdf

PDF 705 KB Posted

Attached to
Fire Alarm Panel, Sprinkler, Hydrant, and Extinguisher Inspections & Maintenance (RFP 27-007-075)
Solicitation number
PE-65615-NONST-2027-000000117
Issued by
Douglas County, Georgia

About this file

This Request for Proposals (RFP 27-007-075) issued by Fayette County Public Schools seeks qualified vendors to provide annual inspections and maintenance services for fire alarm panels, sprinkler systems, private fire hydrants, and fire extinguishers across all district school buildings and facilities. The scope encompasses inspections of 32 service locations including elementary schools, middle schools, high schools, educational centers, and administrative facilities throughout Fayette County, Georgia. All inspections must comply with current National Fire Protection Association standards and applicable city, county, and state regulations, with comprehensive reports and checklists provided for each service category. Site visits for proposal preparation must be scheduled with the Lead Electronic Technician by December 10, 2026, and all proposals are due before 9:00 AM EST on Monday, December 14, 2026. Inspections and any required repairs must be completed during the summer break prior to Fire Marshal verification at the start of each school year. The contract term begins upon award and continues through December 31, 2027, with an option to renew for up to four additional one-year terms. Fayette County government entities and local municipalities may also purchase from the awarded contract at the same quoted prices.

The cost proposal requires vendors to submit separate pricing for each service category (fire alarm panels, sprinklers, hydrants, and extinguishers) broken down by individual school location, along with labor rates, service charges, travel charges, and after-hours rates. Additional pricing must include repair costs for specific components and sprinkler head replacement costs by manufacturer. Vendors must submit minimum three letters of recommendation from previous clients dated within the previous two calendar years, proof of three years' minimum experience in similar fire safety inspections and maintenance, current certificates of insurance, completed E-Verify compliance documentation, and a notarized Contractor Affidavit. The evaluation methodology applies a 100-point weighted system with qualifications and experience weighted at 30 percent, submitted proposal quality at 40 percent, and price and cost at 30 percent, with the lowest responsive cost proposal receiving the maximum 30 points and other proposals evaluated proportionally. No set-asides are indicated in this solicitation.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Fire Alarm Panel, Sprinkler, Hydrant, and Extinguisher Inspections & Maintenance Request for Proposals No. 27-007-075 GPR Event No. PE-65615-NONST-2027-000000117

NOTICE TO VENDORS

Brief Description of Need: Fayette County Public Schools is seeking vendors who can inspect and maintain all fire alarm panels, sprinklers, hydrants and extinguishers districtwide.

Service Location(s): Multiple Locations

Complete solicitation documents may be obtained at www.fcboe.org. Fayette County Public Schools is not responsible for respondents or subcontractors failing to obtain the information provided through the full set of contract documents.

Responses must be submitted via email, mail or parcel delivery, or hand delivery to the Fayette County Public Schools office located at Facilities Services and directed to Jamie Marrero, Purchasing Associate & Risk Management . Envelopes should be sealed and marked conspicuously on the front with the solicitation name and number above.

SUBMISSION - BY HAND, MAIL, OR COMMON COURIER

Fayette County Public Schools ATTN: Jamie Marrero, Purchasing Department Facilities Services 939 Goza Road, Fayetteville, Georgia 30215

SUBMISSION - BY EMAIL to: marrero.jamie@fcboe.org

-1-http://www.fcboe.org mailto:marrero.jamie@fcboe.org

Fire Alarm Panel, Sprinkler, Hydrant, and Extinguisher Inspections & Maintenance (RFP 27-007-075)

Objective

Fayette County Public Schools (hereinafter referred to as FCPS or the district) is soliciting proposals through this Request for Proposals (RFP) from interested and qualified respondents to provide fire alarm panel, sprinkler, hydrant, and extinguisher inspections and maintenance, as specified within this solicitation, for the Fayette County School District.

As fully explained in this RFP, an award, if made, will be made to the responsible and responsive respondent who provides the best solution to the described need, taking into consideration multiple evaluation factors as determined by FCPS and defined herein.

It is the responsibility of respondents to address all elements of this RFP. Respondents failing to meet the terms and conditions herein may suffer a reduction in their evaluation scores, up to a complete rejection of their proposals.

Responses Due

Responses to this request for proposals are due no later than the date and time specified in the timeline of events. Submissions must be delivered either physically or electronically to the FCPS purchasing department, located at Facilities Services, 939 Goza Road, Fayetteville, Georgia 30215. Proposals received after the specified date and time will not be considered.

Section A: Instructions to Respondents

1. Designated Representative

1.1. The FCPS purchasing department has designated the following staff member as the representative of the department and district during the solicitation process:

Jamie Marrero (marrero.jamie@fcboe.org).

2. Communication Restriction

2.1. From the date of issuance of this RFP until an award is made, all communications must be through the designated representative listed above. Any contact or communication with other school board members, district officials, or employees regarding this solicitation is strictly prohibited and may result in the immediate disqualification of the respondent's proposal.

3. Respondent Registration

3.1. Respondents are encouraged to register with the designated representative listed above via email after reviewing this solicitation. Respondents who register will automatically receive email updates with additional documents, such as addenda, and will be notified of the award issuance, even if they choose not to submit a proposal.

4. Schedule of Events

4.1. RFP Released: Friday, November 20, 2026

4.2. Respondent Questions Due: Friday, December 4, 2026

-2-mailto:marrero.jamie@fcboe.org

4.3. Addenda Issued (if applicable): Wednesday, December 9, 2026

4.4. Proposals Due: Before 9:00AM (EST), Monday, December 14, 2026

5. Georgia Open Records Act Compliance (O.C.G.A. § 50-18-70)

5.1. This solicitation and any resulting responses, evaluations, contracts, agreements, or purchase orders are subject to the Georgia Open Records Act and may be released publicly.

5.2. Under the Georgia Open Records Act, any records marked “confidential” or “trade secrets” must include an attached affidavit. This affidavit must affirmatively declare that the specific information meets the trade secret criteria under O.C.G.A. § 10-1-761.

5.2.1. Public Release: Failure to attach the affidavit results in the record being treated as a public document subject to disclosure.

5.2.2. Agency Overrule: If Fayette County Public Schools (FCPS) determines the information is not a trade secret, it will notify the submitter of its intent to disclose the records within 10 days, unless a court order prohibits disclosure.

5.2.3. If a submitting entity wishes to prevent the disclosure of requested records, the entity may file an action in superior court to seek an order declaring the records exempt trade secrets. The filing entity must serve the requester with a copy of its court filing.

5.2.4. Conversely, if the agency determines that the identified information does constitute a trade secret, the agency must withhold the records. In that scenario, the requester may file an action in superior court to obtain an order declaring that the records are not trade secrets and are subject to public disclosure.

6. Solicitation Documents and Forms

6.1. Documents and forms required for submission as part of this request for proposals

(RFP) are available on the Fayette County Public Schools (FCPS) Purchasing Department website.

6.2. Failure to include the required submissions listed in this document may result in the rejection of the proposal. A list of required forms is included below, and additional submissions may be required based on the specifications detailed in this solicitation.

7. Proposal Delivery

7.1. Proposals must be submitted to the FCPS Purchasing Department and received prior to the proposal due date and time specified in this solicitation.

-3-

7.2. Proposals may be submitted electronically, delivered by mail, or hand-delivered to Facilities Services, 939 Goza Road, Fayetteville, Georgia 30215, Attention:

Purchasing Department. Faxed or telephone proposals will not be accepted or considered.

7.3. Proposals may be emailed to the designated representative subject to the following guidelines:

7.3.1. Format: Emailed proposals must be complete and in a consistent, clear, and readable format. Adobe PDF format is preferred unless specified otherwise.

7.3.2. Consolidation: All proposal documents must be combined into one single document. Submitting multiple separate documents may result in an evaluation score reduction.

8. Attachments

8.1. Any specification designated with "Must Include Attachment" must include a document within the proposal conforming to the established standards.

8.2. All attachments must be clearly marked and labeled in the following format:

Attachment [Number], Solicitation Reference, Respondent Name, Solicitation Title, and Solicitation Number.

9. Proposal Format Requirements

9.1. Proposals must be typed, legible, and formatted to comply with federal accessibility standards, including the Americans with Disabilities Act (ADA) and Section 508 of the Rehabilitation Act.

9.2. Respondents must organize their proposals to mirror the exact structure of this solicitation. Because all sections, specifications, requirements, and appendices are sequentially numbered, proposals must follow the same numbering sequence and reference this solicitation document where necessary.

9.3. Proposals must include the following sections, clearly identified and delineated:

9.3.1. Section I: Letter of Interest

9.3.2. Section II: Technical Proposal

9.3.3. Section III: Qualifications and Experience

9.3.4. Section IV: References

9.3.5. Section V: Price/Cost

-4-

10. Multiple Proposals from the Same Respondent

10.1. Respondents may submit multiple proposals when offering alternative solutions.

Each alternative proposal must be submitted separately and must conform to all terms and conditions of this solicitation.

10.2. Each proposal must be labeled separately to ensure clear identification of the different alternatives submitted by the same respondent.

Section B: Scope of Work and Specifications

1. Background and Project Overview

1.1. Fayette County Public Schools is seeking contractor(s) to perform fire alarm panel, sprinkler, hydrant, and extinguisher inspections and maintenance for all building locations owned and operated by the Fayette County School District. The inspections must be completed during the summer break. Any maintenance and repairs, required to keep the school district in compliance, must be completed by the awarded contractor who is responsible for the inspection. The Fire Marshall from each Municipality (where the building is located) will verify these inspections prior to the start of the new school year. The awarded contractor(s) will be responsible for performing these inspections, maintenance, and repairs to the satisfaction of the Fayette County School District and assigned Fire Marshall.

2. Site Visits

2.1. Site visits must be scheduled with David Bowden, Lead Electronic Technician, or his designee. Site visits can be scheduled by phone 770-460-3522, or via email bowden.david@fcboe.org. All Site visits must be scheduled prior to Thursday, December 10, 2026; and will occur between the hours of 7:00AM and 3:00PM (EST), Monday through Friday, with the exception of school holidays and/or breaks.

3. Technical/Performance/Service Requirements and Specifications

3.1. Fire Alarm Panel Inspections

3.1.1. All fire detection and alarm systems within the Fayette County Schools District must be inspected annually.

3.1.2. Inspections performed must meet the current National Fire Protection Association Standard (National Fire Alarm Code) as well as city, county, and state code/regulations.

3.1.3. The awarded proposer must provide a full report of all inspections with any recommended and/or required repairs.

-5-mailto:bowden.david@fcboe.org

3.1.3.1. Annual inspection cost provided will not include repair cost, unless repair is included in the annual inspection.

3.1.3.2. Any additional repairs needed to keep the system(s) within compliance must be submitted to Facilities Services, in writing, for approval.

3.1.3.2.1. If a system is found out of compliance without notification or pending repair, this will result in vendors performance being under review.

3.1.4. Cost proposal must include all requested information, including the cost for repairs and labor rates listed within this solicitation. If the proposer would like to provide any other repair cost, an attachment must be provided.

3.1.5. The proposer must provide a blank inspection report checklist for review, as part of their solicitation submission.

3.1.6. All fire alarm panels will be inspected by the Fire Marshall prior to the first day of each school year.

3.1.6.1. The awarded contractor must ensure that all inspections and necessary repairs are made (upon approval by Fayette County Public School District/Facilities Services) within code/regulations to pass the annual inspection.

3.2. Sprinkler Systems Inspections

3.2.1. All fire sprinkler systems within the Fayette County School District must be inspected annually.

3.2.2. Inspections performed must meet the current National Fire Protection Standard (Inspections, Testing, and Maintenance of Water-Based Fire Protection Systems) as well as city, county, and state code/regulations.

3.2.3. The awarded proposer must provide a full report of all inspections with any recommended and/or required repairs.

3.2.3.1. Annual inspection cost provided will not include repair cost, unless repair is included in the annual inspection.

-6-

3.2.3.2. Any additional repairs needed to keep Fayette County Public Schools in compliance must be submitted to Facilities Services, in writing, for approval.

3.2.4. Cost proposal must include the cost of sprinkler head replacement for each manufacturer within the Fayette County School District.

3.2.4.1. If additional space is needed to list all manufacturers, the proposer must provide an attachment with that requested information.

3.2.5. The proposer must provide a blank inspection checklist for review, as part of their solicitation submission.

3.2.6. All fire suppression sprinkler systems will be inspected by the Fire Marshall prior to the first day of each school year.

3.2.6.1. The awarded contractor must ensure that all inspections and necessary repairs are made (upon approval by Fayette County Public School District/Facilities Services) within code/regulations to pass the annual inspection.

3.3. Private Fire Hydrant Inspections

3.3.1. All private fire hydrants within the Fayette County School District must be inspected and flow tested annually.

3.3.2. Inspections performed must meet all city, county, and state code/regulations.

3.4. The proposer must provide a blank inspection report checklist for review, as part of their solicitation submission.

3.5. All private fire hydrants will be inspected by the Fire Marshall prior to the first day of each school year.

3.5.1. The awarded contractor must ensure that all inspections and necessary repairs are made (upon approval by Fayette County Public School District/Facilities Services) within code/regulations to pass the annual inspection.

3.5.2. The awarded proposer must provide a full report of all inspections with any recommended and/or required repairs.

-7-

3.5.2.1. Annual inspection cost provided will not include repair cost, unless repair is included in the annual inspection.

3.5.2.2. Any additional repairs needed to keep Fayette County Public Schools in compliance must be submitted to Facilities Services, in writing, for approval.

3.5.3. Site visits will be required to determine locations of all private fire hydrants within the Fayette County School District.

3.6. Fire Extinguisher Inspections

3.6.1. All fire extinguishers within the Fayette County School District must be inspected annually.

3.6.2. The awarded proposer must provide a full report of all inspections with any recommended and/or required repairs.

3.6.2.1. Annual inspection cost provided will not include repair cost, unless repair is included in the annual inspection.

3.6.2.2. Any additional repairs needed to keep Fayette County Public Schools in compliance must be submitted to Facilities Services, in writing, for approval.

3.6.2.2.1. If the awarded contractor has to tag any existing fire extinguishers, at any location, that they don’t have a replacement for; Facilities Services must be notified upon the inspection completion.

3.6.2.2.1.1. If a tagged extinguisher is found during a

walkthrough and the awarded vendor did not notify Facilities Services or swap out the extinguisher during inspection, the contractor must return to the site within 24 hours to make that correction.

3.6.3. Cost proposal must include all requested information, including the cost outlined within this solicitation. If the proposer includes any other additional cost, an additional attachment must be provided.

3.6.4. The proposer must provide a blank inspection report checklist for review, as part of their solicitation submission.

-8-

3.6.5. All fire extinguishers will be inspected by the Fire Marshall prior to the first day of each school year.

3.6.5.1. The awarded contractor must ensure that all inspections and necessary swap outs, replacements, and/or repairs have been completed (upon approval by Fayette County Public School District/Facilities Services) within code/regulations to pass the annual inspection.

3.7. Report of Compliance (Additional Requirements)

3.7.1. Maintenance and reporting of records for fire safety systems

3.7.1.1. Records of all system inspections, test, and maintenance required by the governing NFPA standard for the systems listed below shall be maintained on the premises and shall be provided to the city and county through a third party inspection reporting system of the city’s or county’s choosing, per annum. Respondent is responsible for including the cost that will be charged, per jurisdiction, as part of this solicitation.

3.7.1.1.1. Automatic fire sprinkler system

3.7.1.1.2. Fire Alarm system

3.7.1.1.3. Commercial hood cleaning

3.7.1.1.4. Commercial hood suppression system

3.7.1.1.5. Standpipe

3.7.1.1.6. Active smoke control system

3.7.1.1.7. Private hydrant system

3.7.1.1.8. Fire pump

3.7.1.1.9. Spray paint booth

3.7.1.1.10. Emergency generator

3.7.1.2. All inspections must be sent to the Compliance Engineer of Peachtree City, City of Fayetteville, Fayette County Fire, and any

-9-other municipality required; and fees must be included in the pricing of inspections.

3.8. Billing of Inspections: Billing must be separated per location, per system.

3.8.1.1. Site locations should be billed separately for fire alarm panel, sprinkler, hydrant, and extinguishers.

3.9.

Section C: Evaluation of Proposals

1. Evaluation Committee

1.1. All proposals deemed responsive will be evaluated by an evaluation committee composed of project administrators and end users.

1.2. The evaluation process will be based on the following criteria:

1.2.1. Qualifications and experience

1.2.2. Submitted proposal quality

1.2.3. Price and cost

2. Evaluation Methodology

2.1. The evaluation committee will assess all responsive technical proposal components using a 100-point weighted system. Non-cost criteria will be initially rated using a four-tier qualitative scale, which converts directly to baseline points as defined below:

2.1.1. Excellent (4 Points): The proposed solution fully complies with all specification requirements and serves as the highest benchmark in the evaluation process.

2.1.2. Good (3 Points): The proposed solution complies with the core specification requirements and meets the project’s intended goals, though minor elements may be lacking.

2.1.3. Fair (2 Points): The proposed solution only partially complies with the specification requirements and requires modification to meet the project's intended goals.

2.1.4. Poor (0 Points): The proposed solution fails to comply with the specification requirements, or the specification is omitted entirely.

-10-

2.2. Final Point Calculation: The baseline points awarded by evaluators will be converted into weighted points using the following distribution matrix:

2.2.1. Qualifications and Experience: Weighted at 30% of the total allocation (Maximum 30 Points). Calculated as: (Evaluator Baseline Points / 4) x 30.

2.2.2. Submitted Proposal Quality: Weighted at 40% of the total allocation (Maximum 40 Points). Calculated as: (Evaluator Baseline Points / 4) x 40.

2.2.3. Price and Cost: Weighted at 30% of the total allocation (Maximum 30 Points).

2.3. Cost Evaluation Formula: Cost proposals will be evaluated mathematically. The lowest responsive proposed cost will automatically receive the maximum allocation of 30 points. All other higher cost proposals will be evaluated proportionally using the following formula:

2.3.1. Points = (Lowest Proposed Cost / Respondent's Proposed Cost) x 30.

2.4. The committee is the sole and final arbiter for awarding points and determining whether a proposed solution complies with the specifications and project goals.

3. Interviews and Presentations

3.1. Post-proposal interviews and presentations may be required in person at the direction of the evaluation committee. Submission of a proposal does not guarantee an interview or presentation, and selection remains at the sole discretion of the committee.

4. Contract Award and Negotiations

4.1. Following the conclusion of the evaluation process, the evaluation committee will issue a recommendation for award.

4.2. The committee reserves the right to reject any or all proposals. A recommendation for award does not guarantee a contract, and final approval from the Superintendent, the Board of Education, or both may be required. Following the recommendation for award, the Superintendent or their designee may engage in final negotiations with the selected respondent.

Section D: General Terms and Conditions

The Fayette County Public Schools (FCPS) General Terms and Conditions are attached to this solicitation and are available on the Purchasing Department website under the heading "Vendor Terms, Conditions, and Forms." By submitting a proposal, the respondent acknowledges that they have read and understood these General Terms and Conditions, as well as all other terms and conditions included in this solicitation.

-11-

Section E: Special Terms and Conditions

1. Contract Incorporation

1.1. This solicitation will be incorporated into any resulting contract. If this solicitation and the resulting contract conflict, Fayette County Public Schools will determine the controlling method.

1.2. Only the Superintendent or their designated representative may sign or enter into a contract on behalf of Fayette County Public Schools.

2. Term

2.1. The proposal term will begin at the time of award and continue through December

31, 2027, with an option to renew for up to four [4] additional terms.

2.2. Terms are defined as the fiscal year running from January 1 to December 31 of each calendar year.

3. Cooperative Purchasing

3.1. This solicitation allows other Fayette County, GA government entities, including local municipalities, to purchase from the awarded contract at the same quoted prices during the effective term, subject to an agreement between the awarded respondents and the governing entity.

4. Substitutions and Alternates

4.1. Products similar to or other than those specified may be acceptable if they comply with all specification requirements and are of equal or superior quality.

4.2. The respondent must provide substantiation that the proposed substitution or alternative does not violate any manufacturer's patent, patent allowed, or patent pending, and that the proposed alternative meets the specifications included in this solicitation.

4.3. The school system is the sole arbiter of specification compliance and alternative acceptability. No pre-proposal approval will be given for a proposed alternative.

5. Insurance Requirements

5.1. Respondents must submit a current and valid certificate of insurance (COI) in accordance with the General Terms and Conditions and the specifications included in this solicitation.

5.2. If the respondent chooses to utilize subcontractors for installation or other services, the respondent must provide a valid COI for each subcontractor that complies with the requirements established in the General Terms and Conditions.

6. Sequencing and Scheduling

6.1. Inspections and/or repairs, as detailed within this solicitation, must be coordinated with Facilities Services.

-12-

6.1.1. All inspections and repairs must occur during the summer break. If repairs exceed this timeline, they must be approved and scheduled through the Facilities Department to assure that the building and administration is prepared for the contractor to be onsite.

7. Minimum Qualification/Certification Requirements

7.1. Respondent must be an experienced service provider who has provided fire alarm panel, sprinkler, hydrant, and/or extinguisher inspections and repairs similar in scope for no less than three (3) years with successful in-service performance.

Section F: Required Forms and Submissions

1. Required Respondent Submissions

1.1. Product Data: The Fayette County School District must receive all product data pertaining to the solicitation's scope of work. This documentation includes the following items:

1.1.1. Product Data Sheets: Provide a comprehensive description of the proposed items.

1.1.2. Product Certifications: Submit the manufacturer’s certification verifying that all products and materials comply with the specification requirements.

1.1.3. Technical Literature: Provide the manufacturer’s catalog cuts, safety data sheets (SDSs), brochures, and technical specifications.

1.1.4. Manuals: Submit instructions and recommendations for preparation, maintenance, and installation.

1.1.5. Logistics and Care: Provide storage and handling requirements and recommendations.

1.1.6. Warranties: Submit all applicable manufacturer warranty documents for each item in accordance with the specifications.

2. Cost Proposal

2.1. All respondents must submit a separate cost proposal. Pricing that is not entered directly on the provided cost proposal form will not be considered.

2.2. If pricing variations exist for different finishes, materials, or product options, the respondent must include an attachment detailing those variations and their associated costs.

2.3. Line items must be formatted to detail all costs applicable to the proposed solution, culminating in a grand total cost to execute the solution fully.

-13-

3. Letters of Recommendation

3.1. The respondent must include a minimum of three letters of recommendation dated within the previous two calendar years.

3.2. Letters must be from clients or customers who have engaged the respondent for services in the past. Each letter must feature a comprehensive overview of the previous engagement, including the scope of work, timeline and budget parameters, and an assessment of the respondent’s ability to complete the services as specified.

3.3. Additionally, each letter must contain complete contact information, including the organization or firm name, a contact name, a telephone number, and an email address. Letters detailing projects that are similar in size and scope to Fayette County Public Schools are preferred.

4. Checklist of Required Forms

4.1. Respondents must complete and submit all forms listed below, attached to this solicitation, and available on the Purchasing Department website.

4.2. Failure to attach any required form may result in an evaluation score reduction or the rejection of the proposal.

Required Form Purpose Provider/Location

Solicitation Response Form General information form required for the front of submitted proposal.

Attached

Business Capability Information Questionnaire

Questions related to the nature and performance of your business/firm.

Attached

Certificate of Insurance Detailing coverage limits as defined in this RFP and General Terms and Conditions.

Respondent

IRS W-9 Form Completed and signed version currently available.

IRS Website

E-Verify Compliance Documentation

Required documentation and affidavit ensuring E-Verify program requirements per law.

FCPS Website

Attached

Cost Proposal Give a cost breakdown of anticipated cost for this project.

Attached

-END OF DOCUMENT-

-14-https://www.irs.gov/pub/irs-pdf/fw9.pdf https://www.fcboe.org/departments/purchasing/vendor-information

Fire Alarm Panel Inspection: Cost Proposal

Location Fire Alarm Panel Annual Inspection Cost

Bennett’s Mill Middle School NFS-640 $

Braelinn Elementary School Firelite 9600 $

Center of Innovations Firelite 9600 $

Cleveland Elementary School AFP-200 $

Crabapple Lane Elementary School AFP-200 $

Fayette County High School NFS-640 $

Fayette Elementary School EX-200 $

Fayette Life Academy NFS2-640 $

FIS/Operations Silent Knight $

Flat Rock Middle School NFS-320 $

Huddleston Elementary School NFS-320 $

Inman Elementary School NFS2-640 $

JC Booth Middle School Firelite 9600 $

Kedron Elementary School NFS-320 $

Lafayette Educational Center NFS-320/NFS-640 $

Liberty Tech Charter School NFS-640 $

McIntosh High School Simplex 4100 U $

North Fayette Elementary School Simplex 4100 U $

Oak Grove Elementary School Notifier 500 $

Peachtree City Elementary School FA-1670 CT $

Peeples Elementary School NFS-320 $

Rising Starr Middle School NFS-320 $

Robert J Burch Elementary School Firelite 9600 $

-15-

Sandy Creek High School NFS-640 $

Sara Harp Minter Elementary School AFP-200 $

Spring Hill Elementary School AFP-320 $

Starr’s Mill High School NFS-320 $

Tyrone Elementary School Ademco 5140 $

Whitewater High School Notifier AFP 1010 $

Whitewater Middle School AFP-200 $

FCSD Goza Road Complex ADEMCO 1600

Total Cost of Annual Fire Alarm Panel Inspections: _____________________________________

Fire Alarm Panel Repair Cost

Description Standard (First Alert, Ademco, Notifier, Firelight)

Simplex

Manual Pull $ $

Smoke Detector $ $

Horn Strobe $ $

Strobe $ $

Relay Module $ $

Control Module $ $

Monitor Module $ $

FCPS

(Fire Alarm Control Panel Power Supply)

Additional Cost

Standard Labor Rate (per hour) $

Service Charge (per occurrence) $

Travel/Truck Charge (per occurrence) $

After Hours Labor Rate (per hour) $

-16-

Fire Alarm Panel Inspection: Cost Proposal

Contract Contact Phone Number Email

Company Name Date

Representative Name (Print) Signature

-17-

Fire Sprinkler Systems Inspections: Cost Proposal

Location Sprinkler System Annual Inspection Cost

Bennett’s Mill Middle School $

Braelinn Elementary School $

Center of Innovations $

Cleveland Elementary School $

Crabapple Lane Elementary School $

Fayette County High School $

Fayetteville Elementary School $

Flat Rock Middle School $

Huddleston Elementary School $

Inman Elementary School $

JC Booth Middle School $

Kedron Elementary School $

Lafayette Educational Center (VoTech) $

McIntosh High School $

North Fayette Elementary School $

Peachtree City Elementary School $

Peeples Elementary School $

Rising Starr Middle School $

Robert J Burch Elementary School $

Sandy Creek High School $

Sara Harp Minter Elementary School $

Spring Hill Elementary School $

-18-

Starr’s Mill High School $

Whitewater High School $

Whitewater Middle School $

FCSD Goza Road Complex $

Total Cost of Annual Fire Sprinkler System Inspections: ____________________________________

Standard Labor Rate (per hour) $

Service Charge (per occurrence) $

Sprinkler Head Replacement Cost:

**Provide cost for a quantity of one sprinkler head replacement for each line item applicable**

Sprinkler Manufacturer Item Number Cost (Including Labor)

-19-

Fire Sprinkler Systems Inspections: Cost Proposal

-20-

Private Fire Hydrant Inspection: Cost Proposal

Location Number of Hydrants Annual Inspection Cost

Braelinn Elementary School $

Center of Innovations $

Cleveland Elementary School $

Crabapple Lane Elementary School $

Fayette County High School $

Fayette Life Academy $

Fayetteville Elementary School

FIS/Operations $

Flat Rock Middle School $

Huddleston Elementary School $

Inman Elementary School $

JC Booth Middle School $

Kedron Elementary School $

Lafayette Educational Center $

McIntosh High School $

North Fayette Elementary School $

Oak Grove Elementary School $

Peachtree City Elementary School $

Peeples Elementary School $

Rising Starr Middle School $

Robert J Burch Elementary School $

Sandy Creek High School $

-21-

Sara Harp Minter Elementary School $

Spring Hill Elementary School $

Starr’s Mill High School $

Whitewater High School $

FCDS Goza Road Complex $

Total Cost of Annual Private Fire Hydrant Inspections: _____________________________________

Standard Labor Rate (per hour) $

Service Charge (per occurrence) $

-22-

Fire Extinguisher Inspection: Cost Proposal

Location Number of Extinguishers Annual Inspection Cost

Braelinn Elementary School $

Center of Innovations $

Cleveland Elementary School $

Crabapple Lane Elementary School $

Fayette County High School $

Fayette Elementary School $

Fayette Life Academy $

FIS/Operations $

Flat Rock Middle School $

Huddleston Elementary School $

Inman Elementary School $

JC Booth Middle School $

Kedron Elementary School $

Lafayette Educational Center $

Liberty Tech Charter School $

McIntosh High School $

North Fayette Elementary School $

Oak Grove Elementary School $

Peachtree City Elementary School $

Peeples Elementary School $

Rising Starr Middle School $

Robert J Burch Elementary School $

-23-

Sandy Creek High School $

Sara Harp Minter Elementary School $

Spring Hill Elementary School $

Starr’s Mill High School $

Tyrone Elementary School $

Whitewater High School $

FCSD Goza Road Complex $

Total Cost of Annual Fire Extinguisher Inspections: _____________________________________

Fire Extinguisher Hydrotest and Replacement Cost

Extinguisher Size Hydrotest Cost Replacement Cost

2.5 lbs $ $

5 lbs $ $

10 lbs $ $

6 Liter (K-Extinguisher) $ $

Standard Labor Rate (per hour) $

Service Charge (per occurrence) $

-24-

Fire Extinguisher Inspection: Cost Proposal

-25-

Appendix A: Service Locations

1. Braelinn Elementary School

1.1. 975 Robinson Road, Peachtree City, Georgia 30269

2. Bennett’s Mill Middle School

2.1. 210 Lester Road, Fayetteville, Georgia 30215

3. Center of Innovations

3.1. 250 Peachtree Parkway, Peachtree City, Georgia 30269

4. Cleveland Elementary School

4.1. 190 Lester Road, Fayetteville, Georgia 30214

5. Crabapple Lane Elementary School

5.1. 450 Crabapple Lane, Peachtree City, Georgia 30269

6. FIS/Operations

6.1. 440 Hood Avenue, Fayetteville, Georgia 30214

7. Fayette County High School

7.1. 1 Tiger Trail, Fayetteville, Georgia 30214

8. Fayette Elementary School

8.1. 490 Hood Avenue, Fayetteville, Georgia 30214

9. Fayette Life Academy

9.1. 450 Grady Avenue, Fayetteville, Georgia 30214

10. Flat Rock Middle School

10.1. 325 Jenkins Road, Tyrone, Georgia 30290

11. Huddleston Elementary School

11.1. 200 McIntosh Trail, Peachtree City, Georgia 30269

12. Inman Elementary School

12.1. 667 Inman Road, Fayetteville, Georgia 30214

13. JC Booth Middle School

13.1. 250 Stagecoach Road, Peachtree City, Georgia 30269

14. Kedron Elementary School

14.1. 200 Kedron Drive, Peachtree City, Georgia 30269

15. LaFayette Educational Center

15.1. 205 LaFayette Avenue, Fayetteville, Georgia 30214

16. McIntosh High School

16.1. 201 Walt Banks Road, Peachtree City, Georgia 30269

17. McIntosh Stadium

17.1. 201 Walt Banks Road, Peachtree City, Georgia 30269

18. North Fayette Elementary School

18.1. 609 Kenwood Road, Fayetteville, Georgia 30214

19. Oak Grove Elementary School

19.1. 101 Crosstown Road, Peachtree City, Georgia 30269

20. Peachtree City Elementary School

20.1. 201 Wisdom Road, Peachtree City, Georgia 30269

21. Peeples Elementary School

-26-

21.1. 153 Panther Path, Fayetteville, Georgia 30215

22. Robert J Burch Elementary School

22.1. 330 Jenkins Road, Tyrone, Georgia 30290

23. Sandy Creek High School

23.1. 360 Jenkins Road, Tyrone, Georgia 30290

24. Sandy Creek Stadium

24.1. 360 Jenkins Road, Tyrone, Georgia 30290

25. Sara Harp Minter Elementary School

25.1. 1650 Highway 85 South, Fayetteville, Georgia 30215

26. Spring Hill Elementary School

26.1. 100 Bradford Square, Fayetteville, Georgia 30214

27. Starr’s Mill High School

27.1. 193 Panther Path, Fayetteville, Georgia 30215

28. Starr’s Mill Stadium

28.1. 193 Panther Path, Fayetteville, Georgia 30215

29. Whitewater Middle School

29.1. 1533 Highway 85 South, Fayetteville, Georgia 30215

30. Whitewater High School

30.1. 100 Wildcat Way, Fayetteville, Georgia 30215

31. Whitewater Stadium

31.1. 100 Wildcat Way, Fayetteville, Georgia 30215

32. FCSD Goza Road Complex: Transportation/Bus Shop/Facilities Services

32.1. 939 Goza Road, Fayetteville, Georgia 30215

-27-

Solicitation Response Form RFP 27-007-075: Fire Alarm Panel, Sprinkler, Hydrant, and Extinguisher Inspections & Maintenance Place this form on top of your response.

Company Name:

Point of Contact:

Street Address:

City:

State:

Zip Code:

Telephone:

Email:

Website:

Authority to Act By signing below, you state that you have the authority to sign for your company.

You also agree to provide the products or services according to all terms and conditions in this document.

Terms, Conditions, and Specifications By signing below, you verify that your solution complies with all general terms, special terms, conditions, and specifications. If your solution has an exception, you must note it. For instructions on how to submit exceptions, read the FCPS General Terms and Conditions.

Addenda (If Applicable) By signing below, you verify that you have read and understood all addenda issued for this solicitation.

Signature: ______________________________ Date:_____________________

RFP 27-007-075: Fire Alarm Panel, Sprinkler, Hydrant, and Extinguisher Inspections & Maintenance Business Capability and Respondent Qualification Questionnaire

Please answer all questions fully. Additional pages for responses must be clearly marked to identify the respondent’s name and solicitation number.

1) How long has your company been in business?

2) What was your annual gross revenue in 2025?

3) Please indicate current contracts in hand similar to the scope of this project and attach a separate document indicating the name, telephone, and email of each owner/controlling firm; and the status and completion date of each. (Must Include Attachment).

4) Does your company have experience in public school services? List all public school projects completed in Georgia since 2015.

5) Has your company ever completed a project more than one month behind schedule? If so, please identify the project and explain the circumstances. (If applicable, must include an attachment.)

6) Has your company ever failed to complete any work awarded to it? If so, please explain.

(If applicable, must include an attachment.)

7) Has your company ever defaulted on a contract? If so, please explain. (If applicable, must include an attachment.)

8) Please indicate your company’s bonding capacity.

9) Please indicate your company’s insurance carrier.

10)Please indicate whether any insurance claim has been made against or by your company in the past seven (7) years, the circumstances surrounding such claims, and the outcome.

(If applicable, must include an attachment.)

11)Please indicate whether any legal claim, administrative hearings and/or proceedings has been made against your company in the past seven (7) years (including state and federal Department of Labor as well as OSHA), the circumstances surrounding such claims, and the adjudicated outcome. (If applicable, must include an attachment.)

12)Please list bank reference:

13)Has your company ever had a bankruptcy petition, arbitration demand, or lien filed against it in the previous seven (7) years? If so, please explain. (If applicable, must include an attachment.)

14)Has your company, any principal officers, or project managers had any criminal investigations or proceedings brought against them in the previous ten (10) years? If so, please explain. (If applicable, must include an attachment.)

15)Please attach a separate list of all employees who will be assigned to work on the project described herein and include any professional licenses or certifications they hold. (Must Include Attachment)

The respondent attests that the information included as attachments and responses are true and accurate as of the date of submission. Respondent also agrees by submission to allow Fayette County Public Schools to review or investigate any response contained herein. Respondent may be required to submit recent financial statements/reports and should indicate any objection herein. Failure to indicate or answer questions may deem the proposal non-responsive.

Notarized

FAYETTE COUNTY PUBLIC SCHOOLS - PURCHASING DEPARTMENT

GEORGIA SECURITY & IMMIGRATION COMPLIANCE ACT FORM

GEORGIA SECURITY AND IMMIGRATION COMPLIANCE ACT OF 2006, AS AMENDED BY THE

ILLEGAL IMMIGRATION REFORM ACT OF 2011, OCGA 13-10-90, ET SEQ.

TO ALL PROSPECTIVE CONTRACTORS:

If you are providing services to Fayette County Public Schools, this completed document, as well as the applicable Georgia Security and Immigration Compliance forms and affidavits referenced herein must be completed, signed, notarized and submitted with your bid, proposal or contract.

Fayette County Public Schools shall comply with the Georgia Security and Immigration Compliance Act, as amended, O.C.G.A.,~13-10-90 et seq. In order to ensure compliance with the Immigration Reform and Control Act of 1986 (IRCA,P.L.99-603 and the Georgia Security and Immigration Compliance Act of 2006, as amended by the Illegal Immigration Reform Act of 2011,O.C.G.A ~ 13-10-90 et seq. (collectively the “Act”) the contractor (“Contractor”) MUST INITIAL the statement applicable to Contractor below:

INITIAL ONLY ONE CHOICE BELOW

____ (Initial here) Contractor represents and warrants that Contractor has registered at https://e-verify.uscis.gov/enroll/ to verify information of all new employees in order to comply with the Act; Is authorized to use and uses the federal authorization program; and will continue to use the authorization program throughout the contract period. Contractor further represents, warrants and agrees that it shall execute and return any and all affidavits required by the Act and the rules and regulations issued by the Georgia Department of Labor as set forth at Rule 300-10-1-01 et.seq. In accordance with the terms thereof; (Complete and submit the Contractor Affidavit and Agreement); OR

____ (Initial here) Contractor represents and warrants that it has no employees and does not intend to hire employees to perform contractual services, and that Contractor has therefore provided a U.S. state-issued Driver’s license or ID card in lieu of an affidavit and that such license or ID card was issued by a State that verifies lawful Immigration status before issuing the license or ID card. If my status changes I will, before hiring any employees, immediately notify the School District in writing and provide all affidavits required under the Act; OR

____ (Initial here) Contractor represents and warrants that it does not physically perform any service within the State of Georgia as defined in the Act and thus does not have to comply with foregoing Georgia law; OR

_____(Initial here) Contractor is a foreign company and therefore not required to provide the affidavit as required by the Act. The Contractor must comply with any other laws required to perform services in the United States, including but not limited to having an appropriate visa.

USE OF SUBCONTRACTOR(S) and COMPLIANCE AS ABOVE

___(Initial here) Contractor will not employ or contract with any subcontractor in connection with a covered contract unless the subcontractor is registered, Is authorized to use, and uses the Federal Work Authorization Program and provides Contractor with all affidavits required by the Act and the rules and regulations issued by the Georgia Department of labor as set forth at Rule 300-10-01 et seq.

____(Initial here) Contractor covenants and agrees that, if Contractor employs or contracts with any Subcontractor in connection with the covered contract under the Act and DOL Rule 300-10-1-02, then in such event Contractor will secure from each subcontractor at the time of the subcontract, the subcontractor’s name and address, the employer identification number/taxpayer identification number applicable to the subcontractor; the date the authorization to use the Federal Work Authorization Program was granted to subcontractor; the subcontractor’s attestation of the subcontractor’s compliance with the Act and Georgia Department of Labor Rule 300-10-1-.2.; and the subcontractor’s agreement not to contract with subcontractors unless the subcontractor is registered, authorized to use, and uses the Federal Work Authorization Program; and provides subcontractor with all affidavits required by the Act and the rules and regulations issued by the Georgia Department of Labor as set forth at Rule 300-10-1-01 et seq. (Complete and submit the Subcontractor Affidavit and Agreement)

_____(Initial here) Contractor agrees to provide Fayette County Public Schools with all affidavits of compliance as required by the Act and Georgia Department of Labor Rule 300-10-1-02, 300-10-1-03, 300-10-1-07 and 300-10-1-08 within five (5) business days of its receipt of any such documents.

Company Name: _____________________________________________________________

SIGNATURE: __________________________________________________________________

DATE: __________________________________________

CONTRACTOR AFFIDAVIT PROVIDED PURSUANT TO O.C.G.A. § 13-10-91(b)(2)

(Rev. 4/18/2019)

By executing this affidavit, the undersigned contractor verifies its compliance with O.C.G.A. § 13-10-91 stating affirmatively that the individual, firm or corporation which is engaged in the physical performance of services under a contract with Fayette County Public Schools, has registered with, is authorized to use, and uses the federal work authorization program commonly known as E-Verify, or any subsequent replacement program, in accordance with the applicable provisions and deadlines established in O.C.G.A. § 13-10-91. Furthermore, the undersigned contractor covenants that it will continue to use the federal work authorization program throughout the contract period, that the undersigned contractor will contract for the physical performance of services in the performance of such contract only with subcontractors who present an affidavit to the contractor with the information required by O.C.G.A. § 13-10-91(b), and that the contractor shall forward any subcontractor’s affidavit to the School District within five (5) days of its receipt of the same.

Contractor hereby attests that its federal work authorization user identification number and date of authorization are as follows:

EEV User Identification Number (4 to 6 Digit Number)

Date of Authorization

Contractor/Company

Email Address

Telephone Number

Name of Project

Project Number

Name of Public Employer

I hereby declare under penalty of perjury that the foregoing is true and correct.

Executed on , 20 in (city), (state).

Signature of Authorized Officer or Agent

Printed Name of Authorized Officer or Agent Title of Authorized Officer or Agent

NOTARY INFORMATION

Sworn to before me this day of , 20 .

Notary Public Signature

My Commission Expires: ____________________________

SUBCONTRACTOR AFFIDAVIT PURSUANT TO O.C.G.A. § 13-10-91(b)(3)

(Rev. 4/18/2019)

By executing this affidavit, the undersigned subcontractor verifies its compliance with O.C.G.A. § 13-10-91 stating affirmatively that the individual, firm or corporation which is engaged in the physical performance of services under a contract with ___________________, which has a contract with Fayette County Public Schools, has registered with, is authorized to use and uses the federal work authorization program commonly known as E-Verify, or any subsequent replacement program, in accordance with the applicable provisions and deadlines established in O.C.G.A. § 13-10-91.

Furthermore, the undersigned subcontractor covenants that it will continue to use the federal work authorization program throughout the contract period, that the undersigned subcontractor will contract for the physical performance of services in the performance of such contract only with sub-subcontractors who present an affidavit to the subcontractor with the information required by O.C.G.A. § 13-10-91(b), and that the subcontractor shall forward any sub-subcontractors affidavit to the contractor and School District within five (5) days of its receipt of the same.

Subcontractor hereby attests that its federal work authorization user identification number and date of authorization are as follows:

EEV User Identification Number (4 to 6 Digit Number)

Date of Authorization

Subcontractor/Company

Email Address

Telephone Number

Name of Project

Project Number

Name of Public Employer

I hereby declare under penalty of perjury that the foregoing is true and correct.

Executed on , 20 in (city), (state).

Signature of Authorized Officer or Agent

Printed Name of Authorized Officer or Agent Title of Authorized Officer or Agent

NOTARY INFORMATION

Sworn to before me this day of , 20 .

Notary Public Signature

My Commission Expires: ____________________________

Fire Alarm Panel, Sprinkler, Hydrant, and Extinguisher Inspections & Maintenance
Objective
Responses Due
Section A: Instructions to Respondents
1.Designated Representative
2.Communication Restriction
3.Respondent Registration
4.Schedule of Events
5.Georgia Open Records Act Compliance (O.C.G.A. § 50-18-70)
6.Solicitation Documents and Forms
7.Proposal Delivery
8.Attachments
9.Proposal Format Requirements
10.Multiple Proposals from the Same Respondent
Section B: Scope of Work and Specifications
1.Background and Project Overview
2.Site Visits
3.Technical/Performance/Service Requirements and Specifications
Section C: Evaluation of Proposals
1.Evaluation Committee
2.Evaluation Methodology
3.Interviews and Presentations
4.Contract Award and Negotiations
Section D: General Terms and Conditions
Section E: Special Terms and Conditions
1.Contract Incorporation
2.Term
3.Cooperative Purchasing
4.Substitutions and Alternates
5.Insurance Requirements
6.Sequencing and Scheduling
7.Minimum Qualification/Certification Requirements
Section F: Required Forms and Submissions
1.Required Respondent Submissions
2.Cost Proposal
3.Letters of Recommendation
4.Checklist of Required Forms

Fire Alarm Panel Repair Cost

a483b28e-0989-4b5e-bd3a-d9e77b7b19aa.pdf
Solicitation Response Form
Authority to Act

Terms, Conditions, and Specifications

Addenda (If Applicable)

7cbb8256-d2d5-4f55-a25b-b18fd57186ab.pdf
GEORGIA SECURITY & IMMIGRATION COMPLIANCE ACT FORM
USE OF SUBCONTRACTOR(S) and COMPLIANCE AS ABOVE
CONTRACTOR AFFIDAVIT PROVIDED PURSUANT TO O.C.G.A. § 13-10-91(b)(2)
SUBCONTRACTOR AFFIDAVIT PURSUANT TO O.C.G.A. § 13-10-91(b)(3)

File details come from the government source that posted it. Updated .