Solicitation No. W912HV-24-R-00XX

US Army Corps of Engineers Japan District

FY24 HY2403 WHOLE HOUSE

REVITALIZATION, IKEGO TOWNHOUSES,

PH 5

ZUSHI, JAPAN

SPECIFICATIONS

Draft Submittal

14 NOV 2022

FOR IN

FORMATIO

N O

NLY

This page was intentionally left blank for duplex printing.

FOR IN

FORMATIO

FY24 HY2403 Whole House Revitalization, Ikego Townhouses, PH 5 24NA0003 Zushi, Japan

W912HV-24-R-00XX PROJECT TABLE OF CONTENTS Page 1

PROJECT TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

01 11 00 STATEMENT OF WORK

01 11 00-A DESIGN CRITERIA (STATEMENT OF WORK)

01 11 00-B CONCEPT DRAWINGS

01 11 00-C PHOTOGRAPHS

01 11 00-D FIRE FLOW TEST

01 11 00-E HAZARDOUS MATERIALS SURVEY REPORT

01 11 00-F EXCERPTS FROM YOKOSUKA INSTALLATION APPEARANCE PLAN

01 11 00-G GOVERNMENT FURNISHED CONTRACTOR INSTALLED (GFCI) EQUIPMENT

01 11 00.00 10 GENERAL CONTRACT REQUIREMENTS

01 20 00 PRICE AND PAYMENT PROCEDURES

01 32 01.00 10 PROJECT SCHEDULE

01 33 00 SUBMITTAL PROCEDURES

01 33 00-A ENG FORM 4025-R

01 33 00-B SUBMITTAL REGISTER

01 33 16 DESIGN AFTER AWARD

01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS

01 35 26-A USACE ACCIDENT PREVENTION PLAN CHECKLIST

01 42 00 SOURCES FOR REFERENCE PUBLICATIONS

01 42 15 METRIC MEASUREMENTS

01 45 00.00 10 QUALITY CONTROL

01 45 00.15 10 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM)

01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS

01 50 00-A PROJECT SIGNAGE

01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS

01 57 19-A ENVIRONMENTAL PROTECTION PLAN TEMPLATE

01 57 19-B ENVIORNMENTAL CHECKLIST

01 57 19-C COMFLEACT YOKOSUKA INSTRUCTION 5090.1D

01 57 19-D CONTRACTOR TURN IN OF RECYCLABLE MATERIALS

01 57 19-E CONTRACTOR SOLID WASTE TONNAGE REPORT

01 74 19 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT

01 78 00 CLOSEOUT SUBMITTALS

01 78 00-A DD 1354

01 78 23 OPERATION AND MAINTENANCE DATA

FOR IN

FORMATIO

This page was intentionally left blank for duplex printing.

FORMATIO

SECTION 01 11 00

STATEMENT OF WORK

PART 1 GENERAL

1.1 General

The Contractor shall design and provide revitalization for fifty-three (53) townhouse family housing units of nine (9) two-story concrete construction family housing buildings within Area Group C, D, and G at CFAY Ikego attachment at Zushi, Japan resulting in complete and usable facility.

The intent of this section is to specify the minimum design and construction requirements for quality, function, materials, and types of construction in sufficient detail for Contract completion.

Basis of design, design submittal requirements, construction document drawings, and specifications shall be prepared to comply with this section and Section 01 33 16 DESIGN AFTER AWARD. No deviations from these sections shall be allowed unless prior approval is obtained from the Contracting Officer. All questions or problems encountered by the Contractor in following the requirements in this section shall be promptly submitted with recommendations to the Contracting Officer for resolution.

Coordinate with U.S. Army Corps of Engineers, Japan District regarding the following sections during design:

a. Section 01 45 35 SPECIAL INSPECTIONS

b. Section 01 91 00.15 TOTAL BUILDING COMMISSIONING

PART 2 PRODUCTS (NOT USED)

PART 3 EXECUTION

3.1 ATTACHMENTS

Information provided in the attachments is intended to provide design requirements and information.

3.1.1 01 11 00-A

Design Criteria (Statement of Work): Design and construction for this project shall comply with Attachment 01 11 00-A. Secure any necessary reference at Contractor's own expense and resources.

3.1.2 01 11 00-B

Concept Drawings: Provided for design and coordination purposes.

Information depicted in the Concept Drawings serves as a guide only.

Further development shall require coordination with the using agency and base personnel.

3.1.3 01 11 00-C

Photographs.

W912HV-24-R-00XX SECTION 01 11 00 Page 1 DRAFT

FOR IN

FORMATIO

3.1.4 01 11 00-D

Fire Flow Test.

3.1.5 01 11 00-E

Hazardous Materials Survey Report.

3.1.6 01 11 00-F

Excerpts from Yokosuka Installation Appearance Plan.

3.1.7 01 11 00-G

Government Furnished Contractor Installed (GFCI) Equipment.

3.2 DESIGN COORDINATION, SUBMITTALS, AND OTHER REQUIREMENTS

Refer to Section 01 33 16 DESIGN AFTER AWARD.

-- End of Section --

W912HV-24-R-00XX SECTION 01 11 00 Page 2 DRAFT

FOR IN

FORMATIO

FY24 MCN HY2403 WH and Utilities Revitalization Ikego Townhouse, PH5 DRAFT

SECTION 01 11 00-A (SOW) - PAGE 1

SECTION 01 11 00-A

TABLE OF CONTENTS

CHAPTER 1 - GENERAL REQUIREMENTS

GENERAL SCOPE OF WORK

APPLICABLE CRITERIA

FIELD OFFICE SPACE

MECHANICAL UTILITY PHASING

DEMOLITION

EXISTING CONSTRUCTION LIMITS AND PROTECTION

DESIGN QUALITY

DESIGN REQUIREMENTS

CONCEPT DRAWINGS

SUSTAINABILITY

DISTRICT DESIGN GUIDE

ACCESSIBILITY FOR DISABLED PERSONS

SPECIAL INSPECTIONS

TOTAL BUILDING COMMISSIONING

GENERAL

APPLICABLE CRITERIA

EXISTING CONDITIONS

GENERAL DESCRIPTION OF WORK

CONSTRUCTION DRAWINGS

EARTHWORK

GRADING AND DRAINAGE

LANDSCAPING

EROSION AND SEDIMENT CONTROL

FENCING

WATER DISTRIBUTION SYSTEM

STORM DRAIN SYSTEM

AS-BUILTS

GENERAL

APPLICABLE CRITERIA

EXISTING CONDITIONS

DESIGN CONSIDERATION

GENERAL DESCRIPTION OF WORK

FUNCTIONAL SPACE REQUIREMENTS

EXTERIOR ARCHITECTURAL SYSTEMS AND CONSTRUCTION

INTERIOR ARCHITECTURAL SYSTEMS AND CONSTRUCTION

STRUCTURAL INTERIOR DESIGN

CONTRACTOR FURNISHED CONTRACTOR INSTALLED (CFCI) EQUIPMENT

GOVERNMENT FURNISHED CONTRACTOR INSTALLED (GFCI) EQUIPMENT

GENERAL

APPLICABLE CRITERIA

EXISTING CONDITIONS

MINIMUM LOAD STANDARDS

MINIMUM MATERIAL STRENGTH AND PROPERTIES

SPECIAL REQUIREMENTS

GENERAL

APPLICABLE CRITERIA

GENERAL DESCRIPTION OF WORK

MECHANICAL UTILITY PHASING

DESIGN CALCULATIONS AND CRITERIA

HVAC SYSTEM REQUIREMENTS

TRAINING, OPERATIONS & MAINTENANCE (O&M) MANUALS

FOR IN

FORMATIO

SECTION 01 11 00-A (SOW) - PAGE 2

MANUFACTURER WARRANTY

GENERAL

APPLICABLE CRITERIA

GENERAL DESCRIPTION OF WORK

Plumbing Utility PHASING

DESIGN AND CALCULATIONS

EQUIPMENT

PLUMBING FIXTURES

PIPING SYSTEMS

MISCELLANEOUS ITEMS

PIPE INSULATION

GOVERNMENT FURNISHED EQUIPMENT

GENERAL

APPLICABLE CRITERIA

EXISTING CONDITIONS

GENERAL DESCRIPTION OF WORK

CALCULATIONS AND DRAWINGS

GENERAL

APPLICABLE CRITERIA

EXISTING CONDITIONS

GENERAL DESCRIPTION OF WORK

TELEPHONE / LAN SYSTEM

CATV SYSTEM

GENERAL

DESIGN CRITERIA

DEFINITIONS

AUTHORITY HAVING JURISDICTION (AHJ)

WAIVER TO CRITERIA

FIRE PROTECTION ENGINEER SERVICES

IRC REQUIREMENTS

LIFE SAFETY REQUIREMENTS

FIRE SPRINKLER REQUIREMENTS

FIRE ALARM REQUIREMENTS

MISCELLANEOUS FIRE REQUIREMENTS

ENVIRONMENTAL ISSUES

ASBESTOS

LEAD

PCB & MERCURY CONTAINING LIGHT BALLASTS AND LAMPS

PCB TRANSFORMERS

SAFETY

DETAILED SPECIFICATIONS

FORMATIO

SECTION 01 11 00-A (SOW) - PAGE 3

(Page Intentionally Left Blank)

FOR IN

FORMATIO

SECTION 01 11 00-A (SOW) - PAGE 4

CHAPTER 1

GENERAL REQUIREMENTS

GENERAL SCOPE OF WORK

This Contract shall include, but is not limited to the design, demolition, and construction for the full improvement of fifty-three (53) townhouse units of nine (9) two-story concrete construction family housing buildings within Group C, D, and G at CFAY Ikego Detachment, Zushi, Japan.

Part of Group C’s thirteen (13) townhouse family housing units of three (3) buildings include the following:

Building 624 contains 3-bedroom units. Each unit is comprised of three

(3) bedrooms, two and a half (2.5) bathrooms, and measures approximately 148 square meters. This building consists of 6 units and measures 888 square meters in total.

o NOTE: only (1) unit within B624 is in scope for this project.

The location of this unit will be disclosed prior to award of this contract.

Buildings 626, and 640 each contain 3-bedroom units. Each unit is comprised of three (3) bedrooms, two and a half (2.5) bathrooms, and measures approximately 148 square meters. Each building consists of 6 units and measures 888 square meters in total.

Part of Group D’s two (2) townhouse family housing units of one (1)

Building 655 contains 3-bedroom units. Each unit is comprised of three approximately 148 square meters. Each building consists of 2 units and measures 296 square meters in total.

Group G’s thirty-eight (38) townhouse family housing units of five (5)

Building 699 contains 3-bedroom units. Each unit is comprised of three approximately 148 square meters. Each building consists of 6 units and measures 888 square meters in total.

Building 695 contains 4-bedroom units. Each unit is comprised of four

(4) bedrooms, two and a half (2.5) bathrooms, and measures approximately 159 square meters. Each building consists of 8 units and measures 1272 square meters in total.

Building 696 contains 4-bedroom units. Each unit is comprised of four

(4) bedrooms, two and a half (2.5) bathrooms, and measures approximately 159 square meters. Each building consists of 4 units and measures 636 square meters in total.

Buildings 697 and 698 contain 4-bedroom units. Each unit is comprised of four (4) bedrooms, two and a half (2.5) bathrooms, and measures approximately 159 square meters. Each building consists of 10 units and measures 159 square meters in total.

SECTION 01 11 00-A (SOW) - PAGE 5

Floor plans and exterior elevations located in Attachment 01 11 00-B Concept Drawings represent one (1) individual unit that is typical for all units.

Work herein shall apply to each housing unit and each building in this project.

The Contractor shall perform demolition work necessary to remove everything within each building down to the concrete structure, including but not limited to:

a. Exterior windows, doors, and frames

b. Interior doors and frames, interior finishes, and casework

c. Architectural, Electrical, Communications, Mechanical, and Plumbing systems, fixtures, equipment, and their components as described in this Attachment.

The Contractor shall provide new construction that includes:

a. Exterior windows, doors, and frames

b. Exterior floor finishes at front entry and back patio area

c. Interior doors and frames

d. Ceiling and floor access hatches

e. Wall, floor, and ceiling finishes

f. Cabinetry and shelving

g. HVAC system components

h. Plumbing system components

i. Power system components

j. Lighting system components

k. Communication systems components

l. Fire sprinklers and nine (9) exterior fire riser rooms

Base bid shall include the demolition and construction of all units within buildings 626, 640, 655, 695, 696, 698, and 699. This accounts for a total of forty-three (43) housing units. Base bid shall include all site mechanical piping work except site mechanical piping work associated with building 697.

Bid Option #1 shall include the demolition and construction of all units within building 697, associated site mechanical piping work, and associated work in mechanical building 725. This accounts for ten (10) housing units.

Design and construction shall comply with the specification and requirements contained in the Request for Proposal (RFP). The Designers of Record (DOR) shall use the Unified Facilities Guide Specifications (UFGS), the Japan Edited Specifications, and the requirements contained in the RFP to fully develop the technical specifications and construction drawings. The Designers of Record (DOR) shall comply with applicable requirements of UFC and other U.S. and Japanese codes and regulations, as described herein. The Designers of Record (DOR) shall use references to the Ministry of Land, Infrastructure, Transport, and Tourism (MLIT) specifications as is customarily used in Japan design drawings and is familiar to local (Japan) Contractor’s and trade where possible.

Contractor shall provide new construction for distribution and building systems (electrical, mechanical, plumbing, fire protection) that will be adequately sized to fulfill load demands of future housing unit renovation projects such as phase 5.

FOR IN

FORMATIO

SECTION 01 11 00-A (SOW) - PAGE 6

APPLICABLE CRITERIA

Applicable design and construction criteria references are listed in this RFP. Use criteria from the most current references and applicable codes. In the event of conflict between References and/or Applicable Military Criteria, apply the most stringent requirement, unless otherwise specifically noted in the Contract or task order. Applicable design and construction criteria references are listed in the Statement of Work (SOW).

a. UFC 4-711-01 Family Housing, 10 August 2018

b. Japan Industrial Standards (JIS)

c. Japan Edited Specifications (JES) ver 1.5, Acceptable Alternative

Japanese Standards, Japan Regional Guide Specifications, October 2022

d. USACE Japan District, Japan District Design Guide, Version 6, January

e. Department of Defense Japan Environmental Governing Standards (JEGS) issued by Headquarters, U.S. Forces Japan-2022

f. UFC 1-200-01 DoD Building Code, 01 September 2022

g. UFC 1-300-02 Unified Facilities Guide Specifications (UFGS) Format

Standard with Change 3, 18 May 2021

h. International Existing Building Code (IEBC), 2021

i. International Residential Code (IRC), 2021

j. International Energy Conservation Code (IECC), 2021

FIELD OFFICE SPACE

Field office space for the Contractor shall be located within designated laydown areas as indicated on sheets G-102 & G-103 in Attachment 01 11 00-B Concept Drawings. All housing units to be renovated under this project are anticipated to be vacant for the duration of construction. Field office space may be established within a vacant housing unit at the contractor’s discretion. The location shall be submitted to the government for review and approval.

MECHANICAL UTILITY PHASING

The mechanical utility work in each housing Group must be phased to allow partial occupancy of the Ikego housing area. Each phase shall be complete and usable before proceeding to the next phase. Coordinate with the COR to determine the specific starting date and completion date for each phase. The general phasing scheduled shall be:

a. Groups A and B: January 2025 - May 2025

b. Groups C and D: August 2025 - December 2025

c. Groups E and F: July 2026 - October 2026

d. Group G: Any time during the period of performance

DEMOLITION

The Contractor shall begin demolition or deconstruction work after authorization is received from the Contracting Officer. The Contractor shall fast-track demolition ONLY for the building’s existing interior concurrent with design development. Fast-track demolition allows exploratory surveys of

FOR IN

FORMATIO

SECTION 01 11 00-A (SOW) - PAGE 7

existing conditions, prior to official construction activities, and facilitates a more accurate design. Remove rubbish and debris from the project site. All rubbish and debris shall be removed daily from Government property, unless otherwise directed. Store materials that cannot be removed daily in areas specified by the Contracting Officer. Yokosuka’s Base’s Occupational Safety and Health official shall perform the work in accordance with EM 385-1-1, Section 23, Demolition and other applicable Sections.

EXISTING CONSTRUCTION LIMITS AND PROTECTION

Do not disturb existing construction beyond the extent indicated or necessary for required demolition and installation of new construction. Take necessary precautions to avoid damages to existing items and finishes to remain in place, to be reused, or to remain the property of the Government.

Repair or replace damaged items and finishes to match adjacent surfaces or better or as approved by the Contracting Officer.

DESIGN QUALITY

The main objective of this project is to obtain fully renovated family housing buildings that have been brought up to contemporary housing standards with funds available and to optimize livability. Design quality is achieved through the optimization of interior planning, integration of housing structures with the site, sustainability, selection of building systems for low-cost maintenance and operation, and an overall balance of aesthetics and functionality.

Remove or alter existing work in such a manner as to prevent damage to any portions of the existing work that will remain. Repair or replace portions of existing work, which have been altered during construction operations to match existing or adjoining work. At the completion of construction, existing work shall be in a condition equal to or better than that which existed before new work started.

DESIGN REQUIREMENTS

The Contractor shall prepare complete design documents for all work required in the Design Criteria. The design documents to be prepared shall include, but are not limited to: design drawings, technical specifications, submittals, and basis of design as required in Section 01 33 16 Design Data (Design After Award).

The Contractor shall utilize products that are manufactured in Japan to the fullest extent possible that meet applicable requirements as outlined in Design Criteria.

Materials and equipment shall be limited to those specified except that where no specific material and equipment is specified or no basis of design is identified, the Contractor shall use materials and equipment accepted within the construction industry and in compliance with Design Criteria.

CONCEPT DRAWINGS

Attachment 01 11 00-B Concept Drawings are provided for design and coordination purposes. Information depicted in the Concept Drawings serves as a guide only. Further development shall require coordination with the using agency and base personnel.

FOR IN

FORMATIO

SECTION 01 11 00-A (SOW) - PAGE 8

The Concept Drawings are provided in RFP to simply establish required functional relationships and illustrate proof of concept within the established Construction Limits. The intent is to allow the Contractor the flexibility to meet or exceed the minimum requirements as established in the RFP, while promoting innovation and creativity for the design and construction of the building. Contractor shall not assume that Concept Drawings contain, indicate, or complies with all RFP requirements.

SUSTAINABILITY

The Contractor shall design and construct in accordance with UFC 1-200-02 (01 June 2022), Chapters 1 and 2 to achieve the following sustainability measures:

PERFORMANCE REQUIREMENTS

OPTIMIZE ENERGY PERFORMANCE

The Contractor shall design and construct to reduce energy consumption in a life-cycle, cost-effective manner using products designed to conserve energy and resources. Provide products that are either labeled energy efficient or meet the Federal Energy Management (FEMP) recommended efficiencies. Energy efficiencies ca be referenced at: https://www.energy.gov/eere/femp/federal-energy-management-program and http://www.energystar.gov/.

PROTECT AND CONSERVE WATER

The Contractor shall design and construct to reduce energy consumption in a life-cycle, cost-effective manner using products designed to conserve water and resources. Provide only the most efficient water fixtures available that meet the requirements of Chapter 6 PLUMBING FIXTURES. Products must comply with WaterSense efficiency requirements.

Reduce stormwater runoff by providing temporary erosion and sediment control measures, as applicable. Conduct work in accordance with Section 01 57 19.

REDUCE VOLATILE ORGANIC COMPOUNDS (VOC) (LOW EMITTING MATERIALS)

Provide low- or no-VOC products for composite wood products, adhesives, sealants, interior paints and finishes, solvents, carpet systems, and cleaning supplies.

Provide F 4-star or 4VOC labels that demonstrate compliance with cited requirements. Use products with no added urea-formaldehyde resins, including laminating adhesives for composite wood and agrifiber assemblies.

VENTILATION AND THERMAL COMFORT

Meet the ventilation and thermal comfort requirements UFC 3-410-01 (with change 8, 7-21-2021).

MOISTURE CONTROL

Establish and implement a moisture control strategy for controlling moisture flows and condensation to prevent building damage, minimize mold contamination, and reduce health risks related to moisture in accordance

FOR IN

FORMATIO

SECTION 01 11 00-A (SOW) - PAGE 9

with IgCC 10.3.1.5, UFC 3-410-01 (with change 8, 7-21-2021) Chapter 3 Ventilation Air, and UFC 3-101-01 Architecture with Change 1, 1-05-2021, as applicable.

ENHANCE INDOOR ENVIRONMENTAL QUALITY (DURING CONSTRUCTION)

Utilize cleaning techniques that minimize dust generation. Cycle equipment off when not needed. Prohibit idling motor vehicles where emissions could be drawn into building. Designate receiving/storage areas for incoming material that minimize indoor air quality impacts. Clean frequently to remove construction dust and debris. Promptly clean up spills. Remove accumulated water and keep work areas dry to discourage the growth of mold and bacteria.

Take extra measures when hazardous materials are involved.

Prohibit the use of tobacco products inside the building and within 15 meters (~50 feet) of the building entrance at all times during construction.

Consider prohibiting smoking on the entire job site. If smoking will be allowed, locate on a site plan the designated locations and signage. Comply with the tobacco use policy of the local jurisdiction.

Remove accumulated water and keep work dry. Use dehumidification to remove moist, humid air from a work area. Do not use combustion heaters or generators inside the building. Protect porous materials from exposure to moisture. Remove and replace items which remain damp for more than a few hours. Identify and eliminate potential sources of moisture, consider proper site drainage, sealing, and keeping construction materials dry and selecting materials that dry quickly and/or are resistant to mold and bacteria growth.

ENVIRONMENTAL TOBACCO SMOKE CONTROL

Prohibit smoking during construction within the building and within a minimum of 50 feet (~15 meters) of all building entrances, windows, and ventilation intakes.

REDUCE ENVIRONMENTAL IMPACT OF MATERIALS

Incorporate into project design, where applicable, the procurement of the Recycled Content, Biobased Content, and other green products.

Provide products that meet or exceed EPA’s recycled content recommendations for building construction and modifications, the Recycled Content and Comprehensive Procurement Guidelines for Construction, including metals, concrete, masonry, gypsum wallboard, acoustic tile, carpet, ceramic tile, rubber flooring, wall base, and insulation.

Provide products and material composed of the highest percentage of biobased materials (including rapidly renewable resources and certified sustainably harvested products) to the maximum extent possible without jeopardizing the intended end use or detracting from the overall quality delivered to the end user. Provide the GreenPla or BioBasedPla labelled products, including sealants and coatings, building materials, carpet, lumber, interior wall and ceiling patch, floor coverings, wall coverings, composite panels, countertops, dust suppressants, insulation, paving and concrete forming, roofing, traffic and zone marking paints, surface guards, molding, trims, and erosion control.

SECTION 01 11 00-A (SOW) - PAGE 10

Provide products to the maximum extent that reduce the environmental impact of materials. See Section 01 57 19 for ozone-depleting substance requirements.

WASTE DIVERSION

Divert 60% of non-hazardous construction debris from landfill disposal per Japan Building Law and in accordance with Section 01 74 19 CONSTRUCTION

WASTE MANAGEMENT AND DISPOSAL.

OZONE DEPLETING SUBSTANCES

Eliminate the use of ozone depleting substances in accordance with Section

01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS.

DISTRICT DESIGN GUIDE

The Japan District Design Guide (JDDG), Version 6 January 2022, provides guidance specific to Japan that assists designers of preparing engineering deliverables for the U.S. Army Corps of Engineers (USACE), Japan District.

Design and deliverables for this project shall adhere to the guidance of the Japan District Design Guide.

ACCESSIBILITY FOR DISABLED PERSONS

The required adaptable or accessible units are satisfied by other family housing units on the installation. The twenty-one (21) residential buildings in this Contract are not required to be accessible.

SPECIAL INSPECTIONS

Fully edit JES 01 45 35 Special Inspections, including the Schedule of Special Inspections and Statement of Special Inspections. Special Inspection shall be performed where required. Structural observations will be performed by the Designer of Record (DOR).

TOTAL BUILDING COMMISSIONING

Fully edit JES 01 91 00.15 10 Total Building Commissioning, including the Commissioning Plan (01 91 00.15 10-A). The following systems to be commissioned include but is not limited to the following: Service Water Heating Systems, Plumbing Systems.

End of Chapter 1

SECTION 01 11 00-A (SOW) - PAGE 11

(Page Intentionally Left Blank)

FORMATIO

SECTION 01 11 00-A (SOW) - PAGE 12

CHAPTER 2

CIVIL DESIGN

GENERAL

The design objective is to provide efficient and functional infrastructure site systems adhering to existing conditions and minimizing impact to the site for this project. Design and install earthwork, fire water distribution system, storm drainage, and sodding using the references listed below and all pertinent references in Chapter 1. (Note: Where a conflict between requirements and/or standards occurs, the more stringent shall apply.)

Applicable design and construction criteria references are listed below.

Criteria shall be taken from the most current references as of the RFP issue date. Referenced codes and standards are minimum acceptable criteria. See Section 1.2 for criteria common to all disciplines.

a. UFC 3-201-01 Civil Engineering, with Change 5, 01 April 2021

b. UFC 3-230-01 Water Storage and Distribution, with Change 3, 01 July 2021

c. UFC 3-240-01 Wastewater Collection and Treatment, with Change 2, 1

January 2021

d. Structures Standardized Design Criteria for Civil Engineering Under the

Facilities Improvement Projects, 1997.

e. NFPA 24 Standard for the Installation of Private Service Mains and Their

Appurtenances

f. UFGS 33 11 00 Water Utility Distribution Piping

g. UFGS 33 40 00 Storm Drainage Utilities

EXISTING CONDITIONS

Refer to Attachment 01 11 00-B Concept Drawings for existing building dimensions and additional site details.

Existing non-permanent storage sheds located at the back of each unit shall become the responsibility of the contractor during project duration.

Contractor to temporary relocate if storage sheds are in way of demolition and installation of exterior fencing. Upon completion of exterior work, nonpermanent storage sheds shall be placed in existing locations.

Contractor shall repair site, including but not limited to landscaping, concrete sidewalks, and asphalt pavement to match existing conditions after completion of exterior work or unless noted elsewhere herein.

EXISTING UTILITIES

It is the Contractor’s responsibility to obtain all topographic survey information that may be required for a completed design and construction project. Any discrepancies which are found shall be brought to the immediate attention of the Contracting Officer for clarification.

The locations of existing utilities shown in Attachment 01 11 00-B Concept Drawings are approximate only. The contractor shall scan the construction

FOR IN

FORMATIO

SECTION 01 11 00-A (SOW) - PAGE 13

site and locate utilities with electromagnetic or sonic equipment to mark the surface of the ground where existing underground utilities are discovered. Immediately contact the contracting officer if actual conditions vary from the topographic survey.

The contractor shall coordinate all utility adjustment work with NAVFAC- Asset Management at Yokosuka Base. All existing paved areas, drainage, and utility systems at the interface with the demolition shall be properly coordinated and new construction provided for the continued functionality, operation and maintenance of adjoining and remaining facilities and systems.

All existing utility structure and related appurtenances, which will not be utilized in the project shall be removed and disposed. Abandonment in-place shall not be permitted unless noted elsewhere herein, or as approved by the Contracting Officer.

GENERAL DESCRIPTION OF WORK

Install new fire water distribution system to residential buildings 626, 640, 655, 695, 696, 697, 698, and 699. Connect new piping to existing cold water distribution system mains to new fire riser building for each building.

Restore site with new sodding where landscaping has been removed. Ensure to provide positive surface water runoff away from the building.

Replace existing steel fencing with white PVC privacy fencing and gate.

Provide new asphalt pavement and concrete sidewalks in areas damaged or removed during construction.

Restore laydown areas to existing site conditions, including but not limited to remarking existing pavement lines within parking areas.

CONSTRUCTION DRAWINGS

Develop utility site plan and create the details necessary to provide complete design. Construction drawings shall include but are not limited to Cover Sheet, Demolition Plan, Site Utility Plan, and Details.

EARTHWORK

Earthwork for the building and the utility systems shall be designed and constructed in accordance with industry standards, unless otherwise specified herein or as approved by the Contracting Officer.

SOIL COMPACTION

Soil compaction shall be per local standards specified for use in this contract and as amended herein. Compact each layer to not less than the percentage of maximum determined in accordance with JIS A 1210.

SATISFACTORY MATERIALS

Satisfactory materials for filling and backfilling under all structures and general earthwork shall comprise of any excavated on-site materials free of organic matter, and stones larger than 75 mm in any dimension. Where satisfactory materials are not available in sufficient quantity from

FOR IN

FORMATIO

SECTION 01 11 00-A (SOW) - PAGE 14

required excavations, borrow materials shall be obtained from approved sources at the contractor’s responsibility.

EXCAVATION PERMITS

The Contractor shall complete necessary paperwork and submit the forms to the Contracting Officer in order to obtain all needed excavation permits.

The Contractor shall carry all excavation permits at all times during excavation.

DISPOSAL

Excavated material not required or not satisfactory for backfill shall become the property of the Contractor and shall be removed from the site and disposed of off base at no additional cost to the Government.

GRADING AND DRAINAGE

At areas where ground cover is disturbed, ensure grading scheme provides a positive drainage away from building foundation.

LANDSCAPING

Contractor shall remove all established landscaping, including but not limited to, large shrubs and trees located within 1.5 meters of exterior walls of residential buildings 626, 640, 655, 695, 696, 697, 698, and 699.

Trees identified by Contractor for removal due to installation of new fire water distribution system shall be coordinated with CFAY Public Works Department (PWD) - Environmental to verify if 1:1 replacement is required.

Trees identified as interfering with construction shall be shown on DOR’s design drawings and include location and type of species for government review.

Replacement trees may be planted in exact location, or adjacent location, to sites where previous existing trees were removed. If no space to replant is available onsite, Contractor shall coordinate with CFAY Housing and CFAY (PWD) PRY12 Asset Management as appropriate for alternative planting locations. The planting locations shall be shown on DOR’s design drawings for government review.

Upon completion of exterior work, Contractor shall repair site, including but not limited to landscaping, which shall be replaced with sodding where landscaping was disturbed. No other vegetation shall be provided or installed at these disturbed locations. Utilize sodding that is common to the area.

Establishment period shall commence on date of inspection by Contracting Officer shows that new landscaping furnished has been satisfactorily installed to a ninety-five percent (95%) stand of coverage. The establishment period must continue for a period of 365 days.

EROSION AND SEDIMENT CONTROL

Erosion and sediment control facilities shall be required in accordance with Japan Environmental Governing Standard (JEGS).

SECTION 01 11 00-A (SOW) - PAGE 15

FENCING

Existing steel fencing and concrete foundation shall be removed in its entirety and replaced with new 1.83m (6’) white PVC privacy fencing and gate for each unit.

Installation of new privacy fencing and gate shall be installed at the same location and layout of existing steel fencing.

WATER DISTRIBUTION SYSTEM

The water distribution system shall be designed in accordance with UFC 3-230- 01 Water Storage and Distribution; and as indicated herein or approved.

Construction materials, execution and testing shall be in accordance with UFGS Section 33 11 00 Water Distribution, and as specified herein or approved.

New fire water distribution system shall connect to existing cold-water distribution main and connect into new fire riser room to support new sprinkler system.

Refer to Chapter 9 FIRE PROTECTION for additional fire water distribution system design requirements.

If Bid Option (1) is awarded, fire water distribution system shall be provided to townhouse building 697 fire riser room to ensure fire sprinkler system requirements are met for each unit within the building.

Refer to Sheets C-101 and C-102 of Attachment 01 11 00-B Concept Drawings for proposed location and routing of new fire water distribution line.

Pipe size for distribution mains shall be a minimum diameter of 150mm.

Provide shutoff valves on all laterals to isolate piping section during a single point failure to maintain fire demand.

STORM DRAIN SYSTEM

Relocation of storm drain system may be required based on layout of new piping for water distribution system. If sections of storm drain system are required to be relocated, reconnect to existing storm drain system. Design and construct new storm drain system in accordance with Chapter 3 of UFC 3- 201-01 - Civil Engineering.

Provide a minimum inside diameter of 300 mm for storm drainage piping (not including roof laterals) for runs 15.2m or less. Minimum cover of 0.6 m and a minimum full flow velocity of 0.76m/s shall be provided for all new storm drain pipe installation.

AS-BUILTS

Upon completion of exterior utility work, Contractor shall record and document location of new utilities and connection points to existing systems for NAVFAC-Asset Management at Yokosuka records.

Contractor shall record and document location(s) and length(s) of abandoned lines in as-built drawings for NAVFAC-Asset Management at Yokosuka Base records.

FOR IN

FORMATIO

SECTION 01 11 00-A (SOW) - PAGE 16

End of Chapter 2

SECTION 01 11 00-A (SOW) - PAGE 17

(Page Intentionally Left Blank)

SECTION 01 11 00-A (SOW) - PAGE 18

CHAPTER 3

ARCHITECTURAL DESIGN

GENERAL

The design objective is to provide efficient and functional exterior and interior work improvements resulting in complete and usable housing buildings. The work in support of this project shall be designed and installed using the references listed below and all pertinent references in Chapter 1. (Note: Where a conflict between requirements and/or standards occurs, the more stringent shall apply.)

Applicable design and construction criteria references are listed below.

Criteria shall be taken from the most current references as of the RFP issue date. Referenced codes and standards are minimum acceptable criteria. See Section 1.2 for criteria common to all disciplines.

a. Japanese Architectural Specification Standards (JASS)

b. Japanese Paint Manufacturer’s Association (JPMA)

c. Department of Defense Japan Environmental Governing Standards (JEGS) issued by Headquarters, U.S. Forces Japan-2020

d. List of Certified Industrial Waste Treatment/Landfill Company (“Sangyo

Haikibutsu Shori Gyosha Kyoka Gaiyou”)

e. UFC 3-101-01 Architecture, 05 January 2021

f. UFC 3-110-03 Roofing, with Change 5, 12 June 2020

g. UFC 3-120-01 Design: Sign Standards, with Change 3, 12 December 2017

h. UFC 3-120-10 Interior Design, with change 2, 15 June 2021

i. Architectural Barriers Act Accessibility Guidelines (ABA)

j. Life Safety Code (NFPA 101), ver 2021.

k. American Society for Testing and Materials (ASTM) E648 Standard Test

Method for Critical Radiant Flux of Floor-Covering Systems Using a Radiant Heat Energy Source

l. National Kitchen and Bath Association (NKBA) Space Planning Guidelines

m. JIS A6909 Coating Materials For Textured Finishes Of Buildings, 2014

EXISTING CONDITIONS

Work under this contract will include buildings 624, 626, 640, 655, 695, 696, 697, 698, and 699 across Housing Groups C, D, and G. Refer to Section 1.1: General scope of Work, for an overview of existing conditions.

The Ikego Housing Area first opened in 1996. These buildings consist primarily of concrete construction. Interior walls vary from being solely of reinforced concrete with painted finish, to walls that have been furred out with light gauge metal stud framing and gypsum board finish. Typically, walls that support stairways are painted concrete, while all other interior walls include framing and either a gypsum board or ceramic wall tile finish.

Refer to Attachment 01 11 00-B Concept Drawings for existing building dimensions and additional detail. Photographs of existing conditions have been provided in Attachment 01 11 00-C Photographs. These photographs include buildings from the Ikego housing area that convey the general nature

FOR IN

FORMATIO

SECTION 01 11 00-A (SOW) - PAGE 19

of conditions and spaces to be encountered. Photos are not all encompassing and shall be used for reference purposes only.

DESIGN CONSIDERATION

The Designer of Record (DOR) shall provide a project design with exterior elevations that are architecturally compatible with the Yokosuka/Ikego Master Plan and match the color, materials, and look of adjacent family housing buildings.

The elevations provided in Attachment 01 11 00-B Concept Drawings shall be considered the minimum in terms of exterior architectural elements required for this project. Further development of all the building elevations is necessary and may require incorporation of additional architectural elements to fully achieve the above stated objectives. The Designer of Record shall coordinate the necessity of adding such elements with the Contractor during the proposal stage.

Interior design for the project shall emphasize durable materials and furnishings that can be easily maintained and replaced. Sustainable interior finish materials shall be selected to achieve a balance between occupant convenience and satisfaction, sustainability, appearance, durability, maintenance cost, and life cycle cost.

GENERAL DESCRIPTION OF WORK

EXTERIOR WORK

Exterior demolition and disposal work for buildings under this Contract shall include:

a. Remove all existing exterior doors and frames.

b. Remove all existing exterior windows including window sealants.

c. Remove all existing roof membranes down to existing concrete roof decks.

d. Remove all existing exterior light fixtures.

e. Remove all existing exterior metal grate doormats.

f. Remove unused piping at existing crawl spaces. Existing crawl space areas shall remain.

g. Remove all existing exterior back patio canopy structural systems including translucent panels.

Exterior new construction work for buildings under this Contract shall include:

a. Provide and install new aluminum sliding-glass exterior doors and frames.

Replacement door sizes shall remain the same size and fit within existing rough opening. All exterior sliding doors shall be provided with insect screens.

b. Provide and install new exterior windows that meet energy requirements.

Provide and install fall protection on all operable second floor windows.

Replacement window sizes shall remain the same size and fit within existing rough opening. All exterior windows shall be provided with insect screens.

c. Provide and install new roof membranes at existing concrete roof decks.

d. Provide and install new exterior light fixtures.

e. Provide and install new exterior tile finish flooring at front entries and back patios.

FOR IN

FORMATIO

SECTION 01 11 00-A (SOW) - PAGE 20

f. Provide and install new air barrier system at exterior envelopes.

g. Repair and paint entire exterior of buildings including trim.

h. Provide and install new white PVC fence measuring approximately 1.8 meters (6 feet) in height per Civil description of work.

i. Provide and install new exterior back patio canopy structural systems with translucent panels.

INTERIOR WORK

Interior demolition and disposal work for buildings under this Contract shall include:

a. Remove all existing interior doors and frames.

b. Remove all existing stair handrails.

c. Remove all existing bathroom plumbing fixtures, accessories, tiles, and trims.

d. Remove all existing kitchen plumbing fixtures, accessories, tiles, and trims.

e. Remove all existing cabinetry including base cabinets, overhead cabinets, countertops, built-in closets, shelving, and hanging rods.

f. Remove all existing interior floor finishes including plank wood flooring, carpet, ceramic tile, and wall base.

g. Remove all existing interior ceramic tile wainscoting, wall tile, backsplash, and trims at kitchen, bathrooms, and laundry room.

h. Remove all existing light fixtures.

i. Remove all existing ceiling and wall gypsum board and framing down to the concrete structure.

h. Remove unused piping at existing crawl space. Existing crawl space areas shall remain.

Interior new construction work for buildings under this Contract shall include:

a. Provide and install new interior doors and frames.

b. Provide and install new single-height stair handrail.

c. Provide and install new plumbing fixtures, cabinetry, accessories, and high pressure laminate melamine panel wainscot at walls in all bathrooms.

d. Provide and install new plumbing fixtures, cabinetry, accessories, vinyl plank flooring, and high pressure laminate melamine panels between countertop backsplash and upper cabinets in the Kitchen.

e. Provide and install new built-in closets at Pantry, Upstairs Hall Closet, Bedroom 2 & 3 Closets.

f. Provide and install new shelving and hangar rod at Storage (beneath Stairway), Master Closet, and Bedroom 2 & 3 Closets.

g. Provide and install new sheet vinyl composition tile flooring at Bathrooms, Master Lavatory, Laundry Room, and storage underneath stairway.

h. Provide and install new vinyl plank flooring at kitchen, pantry, Dining Room, Living Room, foyer, and downstairs Hallways.

i. Provide and install new carpet at all Bedrooms, upstairs Closets, upstairs hallway, and stairway treads.

j. All interior walls to be patched, repaired, and painted.

k. All bathroom walls to be moisture-resistant gypsum board and ceramic tile walls to have mortar setting bed or cement backer board. Provide and install new ceramic tile at Master Bathroom shower stall.

l. Provide and install new floor-mounted hatch access cover at existing crawl space hatch location.

FOR IN

FORMATIO

SECTION 01 11 00-A (SOW) - PAGE 21

m. Provide and install new horizontal venetian blinds at all windows.

n. Provide and install new vertical blinds at all sliding doors.

o. Provide and install new ceiling and wall gypsum board and paint.

p. Provide and install new interior light fixtures.

q. Provide and install double-row ceiling-mounted curtain rail track with sliding hooks adjacent to windows and sliding doors in Kitchen, Dining, Living, and all Bedrooms.

FUNCTIONAL SPACE REQUIREMENTS

The following minimum functional space requirements apply to each unit and building included in the Contract. Refer to the Civil, Architectural, Mechanical, Plumbing, Electrical, Fire Protection, and Environmental chapters of this Specification and Concept Drawings for performance and other requirements.

Contractor shall refer to Attachment 01 11 00-B Concept Drawings attached to this Solicitation for all existing room sizes.

Room finishes stated in this chapter are minimum requirements and shall be submitted in Intermediate and Final Design Submittals per Section 01 33 16 DESIGN AFTER AWARD. Performance specifications and additional information associated with room finishes are included in this Chapter.

ENTRY PATIO – ALL BUILDINGS

The existing Entry Patio shall maintain its original layout and net area.

Existing slab recess (where metal grate doormat has been removed) shall be filled and covered with tile. Ceiling height shall be maintained.

FURNISHINGS/EQUIPMENT

Not applicable.

MINIMUM FINISHES

Floor: Non-skid porcelain tile Base: Not applicable Walls: Paint finish on exterior concrete Ceiling: Not applicable Window: Not applicable Doors and Frames: Exterior Aluminum Double-Door and Frame Casework: Not applicable

LIGHTING FIXTURES

Provide and install soffit-mounted LED lighting fixtures for general illumination.

HVAC

OTHER REQUIREMENTS

Unit Label, Doorbell, and Hose Bibb.

SECTION 01 11 00-A (SOW) - PAGE 22

FOYER – ALL BUILDINGS

The existing Foyer shall maintain its original layout and net area. Ceiling height shall be maintained.

Floor: Vinyl plank flooring Base: Vinyl wall cove base Walls: Paint finish on gypsum board Ceiling: Paint finish on gypsum board Window: Not applicable Doors and Frames: Not applicable

Provide and install ceiling-mounted LED lighting fixtures for general

Wall-Mounted Door Stop.

DOWNSTAIRS HALL – ALL BUILDINGS

The existing Downstairs Hall shall maintain its original layout and net area. Ceiling height shall be maintained.

Base: Vinyl wall cove base Walls: Paint finish on gypsum board Ceiling: Paint finish on gypsum board Window: Not applicable

FORMATIO

SECTION 01 11 00-A (SOW) - PAGE 23

DOWNSTAIRS HALL CLOSET – 4-BR UNITS

The existing Downstairs Hall Closet shall maintain its original layout and net area. Ceiling height shall be maintained.

Provide and install new shelves and hanger rod to match existing layout.

Base: Vinyl wall cove base Walls: Paint finish on gypsum board Ceiling: Paint finish on gypsum board Window: Not applicable Doors and Frames: Stained Finish on Solid Core Wood 2 panel Out-swinging Doors as part of Closet Cabinetry Casework: Closet Cabinetry

Provide and install out-swinging doors with Overhead Storage.

STORAGE – ALL BUILDINGS

The existing Storage shall maintain its original layout and net area.

Ceiling height shall be maintained.

Provide and install new shelves and hanger rod where indicated in Attachment 01 11 00-B Concept Drawings.

Base: Vinyl wall cove base Walls: Paint finish on gypsum board Ceiling: Paint finish on gypsum board Window: Not applicable

FOR IN

FORMATIO

SECTION 01 11 00-A (SOW) - PAGE 24

Doors and Frames: Stained Finish on Solid Core Wood 2 panel Swinging Door and Frame

DOWNSTAIRS HALF BATHROOM – ALL BUILDINGS

The existing Downstairs Half Bathroom shall maintain its original layout.

The existing plumbing fixtures, furnishings/equipment, and cabinetry shall be removed and replaced to include new plumbing fixtures, furnishings/equipment, and cabinetry. Cabinetry may include pre-manufactured systems at the contractor’s discretion. Existing wall and floor ceramic tile finishes may be overlaid with new, bypassing the need to remove those existing finishes and abate those areas where such work would otherwise be necessary. The use of large format high pressure laminate wall panel systems is permissible. Product lines such as those of “Cerarl” demonstrate functional intent behind this approach and shall serve as the basis of design for these wall panel systems. Ceiling height shall be maintained.

The Contractor shall provide and install one (1) toilet tissue dispenser and two (2) towel bars.

Floor: Ceramic Tile Base: Ceramic Tile Cove Base Walls: High Pressure laminate wall panel board. Paint finish on moisture-resistant gypsum board Ceiling: Paint finish on moisture-resistant gypsum board Window: Not applicable Doors and Frames: Stained Finish on Solid Core Wood 2 panel Swinging Door

Casework: Stained Finish on Wood

Provide and install wall-mounted vanity lighting fixture and ceiling-mounted LED lighting fixture for general illumination.

Provide and install one (1) bathroom exhaust fan over toilet and ductwork routed to exterior with vent cap.

FOR IN

FORMATIO

SECTION 01 11 00-A (SOW) - PAGE 25

Provide and install one (1) toilet to include any plastic covering accessories attached via velcro patch, one (1) self-rimming white vitreous china lavatory with single lever type mixing faucet, one (1) solid surfacing countertop, one (1) vanity base cabinet with stainless steel hardware, one (1) medicine cabinet with mirror above sink, one (1) cabinet with hardware above the toilet.

STAIRS – ALL BUILDINGS

The existing Stairs shall maintain its original layout and net area. Ceiling height shall be maintained.

Floor: Carpet with non-slip stair nose edging at each tread Base: Vinyl wall cove base installed as per existing configuration Walls: Paint finish on gypsum board Ceiling: Paint finish on gypsum board Window: Not applicable

Provide and install one (1) Aluminum Handrail on one (1) side of Stairway and one (1) Stair Nose Cap at each Stair Tread.

FRONT EXTERIOR STORAGE – ALL BUILDINGS

The existing Front Exterior Storage shall maintain its original layout and net area. Ceiling height shall be maintained.

Provide and install Metal-Framed Wire Mesh Partition with Hinged Access Doors at Existing Piping System for Access in Front Interior Storage Rooms (for units where Existing Piping System is located).

Floor: Sealed concrete

FOR IN

FORMATIO

SECTION 01 11 00-A (SOW) - PAGE 26

Base: Not applicable Walls: Paint finish on concrete Ceiling: Paint finish on concrete Window: Not applicable Doors and Frames: Clear Anodized Aluminum Frame Door with Clear Anodized Aluminum Frame

Provide and install protective wire metal enclosure over light fixture.

KITCHEN – ALL BUILDINGS

The existing Kitchen’s furnishings/equipment, cabinetry, countertops, and finishes shall be removed and replaced with new furnishings/equipment, cabinetry, countertops, and finishes. Kitchen design shall meet NKBA Planning Guidelines to the greatest extent possible. Kitchen cabinet design may include modular systems and/or premanufactured options sized to fit the existing space limitations. Compartments for appliances shall be coordinated against attachment 01 11 00-G GFCI Equipment as required to ensure adequate space is provided. Kitchen backsplash finish shall utilize wall panel systems in lieu of ceramic wall tile.