Final_SpecPackage_ClearwaterRoofing 3.pdf

PDF 178 KB Posted

Attached to
NezPerce Clearwater NF, Red River RD, Elk City Roofing
Solicitation number
1240LU21Q0020
Issued by

View the file

Other files

File Type Posted
Exterior Duplex photo.jpg JPG image
RFQ_21Q0020_ElkCityRoof.docx DOCX document
Elk City Administrative Site Aerial1.pdf PDF
SF18_ElkCityRoof 1240LU21Q0020.pdf PDF
RoofSketch.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USDA FOREST SERVICE, R-1

ELK CITY DUPLEX #1009 ROOFING

SECTION 00050 – SUMMARY OF WORK

GENERAL

1.1 This item shall consist of installing a new roof on the Elk City District Administrative

Site Duplex #1009 on the Nez Perce-Clearwater National Forests. Work includes but is not limited to removing, replacing roofing, repairing sub roof assemblies, installing weather proofing and water barriers.

The project is located at Elk City District Administrative Site, this site is accessible year round.

1.2 Measurement and Payment - Measurement and payment for contract work will be made only for and under those pay items included in the SCHEDULE OF ITEMS. All other work and materials will be considered as incidental to the pay items shown.

1.3 All Submittals - It will be the Contractor's responsibility to submit information on all items required with such promptness as to cause no delay in the work. Approvals must be obtained before starting work on parts of the project which involves the submittal.

Contractor shall allow 10 calendar days for processing of submittals by the Government.

A. Submit four copies of submittals and shop drawings to the Contracting Officer for approval on the items required herein. Literature which is not marked or otherwise designated to show the exact model and size that the contractor proposes to use will be returned by the Contracting Officer "without action." Circle or check items to be used on submittals. Highlighter pens may print black writing or may not show up at all when copied and should not be used. One copy of all submittals and shop drawings will be returned to the contractor. Information must be adequate to determine compliance with specifications.

B. Substitution - Materials in the specifications may be followed by the words "or approved equal." In these cases, wherever the name or brand of a manufacturer's article is specified, it is used as a measure of quality and utility or a standard. If the Contractor prefers to use any other brand or manufacturer of same quality, appearance and utility to that specified, he shall request substitution as provided below, not less than 10 days before the planned installation of the item. The Contracting Officer will approve or disapprove the request for substitution and his decision shall be final. Unless substitutions are requested within the time stated above and as provided below, no deviation from the specifications will be allowed.

Requests for substitutions will only be considered if contractor submits the following:

1. Complete technical data including drawings, complete performance specifications, test data, samples and performance tests of the article proposed for substitution. Submit additional information if required by Contracting Officer. All items in the above information shall be circled, tagged, or marked in some way to indicate all deviations or differences which the proposed item differs from the originally specified item.

2. Similar data as above for item originally specified. All items shall be marked to identify where/how the proposed substitution will differ.

3. A statement by the Contractor that the proposed substitution is in full compliance with the contract documents, applicable codes, and laws; and that the Contractor takes on the responsiblity for any effect upon related work in the project for any substitution and shall pay any additional costs generated by any substitutions.

1.4 Related Work - The work shall be in accordance with these specifications. The follow-ing is a list of the specifications that are included with this package.

SECTION 000500 – SUMMARY OF WORK

SECTION 001900 – MOBILIZATION

SECTION 011250 - MEASUREMENT AND PAYMENT

SECTION 017320 – SELECTIVE DEMOLITION

SECTION 021350 - WASTE MATERIAL DISPOSAL (LANDFILL)

SECTION 062030 - CARPENTRY

SECTION 074113 - METAL ROOF PANELS

SECTION 077253 - COLORGARD SNOW GUARDS

SECTION 079000 - CAULKING AND SEALANTS

END OF SECTION

SECTION 001900 - MOBILIZATION

PART I - GENERAL

1.1 Mobilization - This item is intended to compensate the Contractor for operations in-cluding, but not limited to, those necessary for the movement of personnel, equipment, supplies, and incidentals to the project site; for payment of premiums for bonds and in-surance for the project; and for any other work and operations which must be performed or costs that must be incurred incident to the initiation of meaningful work at the site and for which payment is not otherwise provided for under the contract.

1.2 Method of Measurement - The measurement shall be lump sum for mobilization.

1.3 Basis of Payment - The lump sum price shall include full compensation for mobilization.

Progress payments for mobilization will be made as follows:

A. Bond premiums will be reimbursed after receipt of the evidence of payment.

B. 50% of the lump sum, not to exceed 5% of the original contract amount, will be paid following completion of 5% of the original contract amount not including mobilization and bond premiums.

C. Payment of the remaining portion of the lump sum, up to 10% of the original contract amount, will be paid following completion of 10% of the original contract amount not including mobilization and bond premiums.

D. Any portion of the lump sum in excess of 10% of the original contract amount will be paid after final acceptance.

Progress payments for mobilization and preparatory work shall be subject to retainage.

PART II - PRODUCTS (Not Applicable)

PART III - EXECUTION (Not Applicable)

ELK CITY ROOFING

SECTION 011250 - MEASUREMENT AND PAYMENT

PART 1 - GENERAL

1.1 SUMMARY

A. Measurement and payment for contract work will be made only for and under those pay items included in the Schedule of Items. All other work, labor, materials, equipment, and incidentals necessary to successfully complete the project will be considered as included in the payment for items shown. This section defines the method of measurements and basis of payment for work items listed in the Schedule of Items.

B. When more than one class, size, type, thickness, etc. is specified in the Schedule of Items for any pay item, suffixes will be added to the item number to differentiate between the pay items.

1.2 DETERMINATION OF QUANTITIES

A. The following measurements and calculations shall be used to determine contract quantities for payment.

1. For individual construction items, longitudinal and lateral measurements for area computations shall be made horizontally or corrected to horizontal measurement unless otherwise specified. Measurements for geotextiles, netting and erosion control blankets shall be along slope lines.

2. For excavation or embankment volumes, the average end area method shall be used to compute volumes. However, if in the judgment of the Contracting Officer (CO), the average end area method is impractical, measurement shall be made by volume in hauling vehicles or by other three-dimensional methods.

3. For Structures, they shall be measured according to neat lines shown on the drawings or as altered by the CO, in writing, to fit field conditions.

4. For items that are measured by the linear foot, such as pipe culverts, fencing, guardrail, piping, utilities, and underdrains, measurements shall be made parallel to the base or foundation upon which the structures are placed.

5. For aggregates weighed for payment, the tonnage shall not be adjusted for moisture content, unless otherwise provided for.

6. For standard manufactured items (such as fence, wire, plates, rolled shapes, pipe conduits) identified by gauge, weight, section dimensions, and so forth, such identifications shall be considered the nominal weights or dimensions. Unless controlled by tolerances in cited specifications, manufacturer's tolerances shall be accepted.

B. Earthwork Tolerances - Adjustments of horizontal or vertical alignment, within the tolerances specified in this contract, or shifts of balance points up to 100 feet shall be made by the contractor as necessary to produce the designed sections and to balance earthwork. Such adjustments shall not be considered as "Changes."

1.3 UNITS OF MEASUREMENT

A. Payment shall be by units defined and determined according to U.S. Standard measure and by the following:

1. Acre: Make longitudinal and transverse measurements for area computations horizontally.

2. 50lb Bag: Measurement will be for the actual number of 50lb bags of standard bentonite grout.

3. 94lb Bag: Measurement will be for the actual number of 94lb bags of standard cement or grout.

4. Cubic Yard (CY): A measurement computed by one of the following methods:

a. Excavation, Embankment, or Borrow. The measurement computed by the average end area method from measurements made longitudinally along a centerline or reference line.

b. Material in Place or Stockpile. The measurement computed using the dimensions of the in-place material.

c. Material in the Delivery Vehicle. The measurement computed using measurements of material in the hauling vehicles at the point of delivery.

Vehicles shall be loaded to at least their water level capacity. Leveling of the loads may be required when vehicles arrive at the delivery point.

5. Each (EA): One complete unit, which may consist of one or more parts.

6. Gallons (GAL): The quantity shall be measured by any of the following methods:

a. Measured volume in container.

b. Metered volume by approved metering system.

c. Commercially package volume.

7. Hour (HR): Measurement will be for the actual number of hours (or fraction thereof) ordered by the Contracting Officer and performed by the contractor.

8. Linear Foot (LF): Measurement of work along its length from point-to-point;

parallel to the base or foundation. Do not measure overlaps.

9. Lump Sum (LS): One complete unit.

10. Mile: Measured horizontally along the centerline of each roadway, approach, or ramp.

11. Pound (LB): For sacked or packaged material, measurement will be the net weight as packed by the manufacturer.

12. Square Foot (SF): Measured on a plane parallel to the surface being measured.

13. Square Yard (SY): Measured on a plane parallel to the surface being measured.

14. Ton: Measured as a short ton consisting of 2,000 pounds.

1.4 METHOD OF MEASUREMENT

A. One of the following methods of measurement for determining final payment is designated on the Schedule of Items for each pay item:

1. ACTUAL QUANTITIES (AQ) - These quantities are determined from actual measurements of completed work.

2. DESIGNED QUANTITIES (DQ) - These quantities denote the final number or units to be paid for under the terms of the contract. They are based upon the original design data available prior to advertising the project. Original design data include the preliminary survey information, design assumptions, calculations, drawings, and the presentation in the contract. Changes in the number of units shown in the Schedule of Items may be authorized under any of the following conditions:

a. As a result of changes in the work authorized by the CO.

b. As a result of the CO determining that errors exist in the original design that cause a pay item quantity to change by 15 percent or more.

c. As a result of the Contractor submitting to the CO a written request showing evidence of errors in the original design that cause a pay item quantity to change by 15 percent or more. The evidence must be verifiable and consist of calculations, drawings, or other data that show how the designed quantity is believed to be in error.

3. LUMP SUM QUANTITIES (LSQ) - These quantities denote one complete unit of work as required by or described in the contract, including necessary materials, equipment, and labor to complete the job. They shall not be measured.

4. STAKED QUANTITIES (SQ) - These quantities are determined from staked measurements prior to construction.

5. VEHICLE QUANTITIES (VQ) - These quantities are measured or weighed in hauling vehicles.

PART 2 - PRODUCTS (NOT APPLICABLE)

PART 3 - EXECUTION (NOT APPLICABLE)

END OF SECTION 011250

SECTION 017320 - SELECTIVE DEMOLITION

PART 1 - GENERAL

1.1 SUMMARY

A. This Section includes demolition and removal of the following:

1. Damaged Roof Deck

1.2 DEFINITIONS

A. Remove: Detach items from existing construction and legally dispose of them off-site, unless indicated to be removed and salvaged or removed and reinstalled.

B. Existing to Remain: Existing items of construction that are not to be removed and that are not otherwise indicated to be removed, removed and salvaged, or removed and reinstalled.

1.3 MATERIALS OWNERSHIP

A. Except for items or materials indicated to be reused, salvaged, reinstalled, or other-wise indicated to remain Government property, demolished materials shall become Contractor's property and shall be removed from project site.

1.4 QUALITY ASSURANCE

A. Regulatory Requirements: Comply with hauling and disposal regulations of authori-ties having jurisdiction.

1.5 PROJECT CONDITIONS

A. Government will occupy major portions of buildings that will be immediately adja-cent to selective demolition area. Conduct selective demolition so Government opera-tions will not be disrupted. Provide not less than 72 hours' notice to CO of activities that will affect Government operations.

B. Maintain access to existing walkways, corridors, and other adjacent occupied or used facilities.

1. Do not close or obstruct walkways, corridors, or other occupied or used facili-ties without written permission from COR.

C. Hazardous Materials: In some buildings small areas of flooring materials containing non friable asbestos are known to exist. It is NOT anticipated that this building has asbestos materials.

1. If materials suspected of containing hazardous materials are encountered, do not disturb; immediately notify Contracting Officer (CO). Hazardous materials will be removed by Government under a separate contract.

D. Storage or sale of removed items or materials on-site will not be permitted.

E. Utility Service: Maintain existing utilities indicated to remain in service and protect them against damage during selective demolition operations.

1.6 WARRANTY

A. Existing Warranties: Remove, replace, patch, and repair materials and surfaces cut or damaged during selective demolition, by methods and with materials so as not to void existing warranties.

B. System plan and Workmanship shall be warranted for a minimum of one year.

PART 2 – PRODUCTS

2.1 REPAIR MATERIALS

A. Use repair materials identical to existing materials.

1. If identical materials are unavailable or cannot be used for exposed surfaces, use materials that visually match existing adjacent surfaces to the fullest extent possible.

2. Use materials whose installed performance equal or surpasses that of existing materials.

PART 3 – EXECUTION

3.1 EXAMINATION

A. When unanticipated mechanical, electrical, or structural elements that conflict with intended function or design are encountered, investigate and measure the nature and extent of conflict. Promptly submit a written report to CO.

3.2 UTILITY SERVICES

A. Existing Utilities: Maintain services indicated to remain and protect them against damage during selective demolition operations.

B. Do not interrupt existing utilities serving occupied or operating facilities unless au-thorized in writing by CO and authorities having jurisdiction. Provide temporary services during interruptions to existing utilities, as acceptable to CO.

1. Provide at least 72 hours’ notice to CO if shutdown of service is required during changeover.

3.3 PREPARATION

A. Temporary Enclosures: Provide temporary enclosures for protection of existing build-ing and construction, in progress and completed, from exposure, foul weather, other construction operations, and similar activities. Provide temporary weathertight en-closure for building exterior.

B. Temporary Partitions: Erect and maintain dustproof partitions and temporary enclo-sures if required to limit dust and dirt migration and to separate areas from fumes and noise.

3.4 POLLUTION CONTROLS

1. Dust Control: Use temporary enclosures, and other suitable methods to limit spread of dust and dirt.

2. Wet mop floors to eliminate trackable dirt and wipe down walls and doors within demolition enclosure. Vacuum carpeted areas.

3.5 DISPOSAL OF DEMOLISHED MATERIALS

A. General: Promptly dispose of demolished materials. Do not allow demolished materi-als to accumulate on-site.

B. Disposal: Transport demolished materials off Government property and legally dis-poses of them.

END OF SECTION 01732

SECTION 021350 - WASTE MATERIAL DISPOSAL (LANDFILL)

GENERAL

1.1 This item shall consist of loading, handling, hauling, and disposal of excess materials and trash resulting from construction activities. The waste disposal site shall be off National Forest lands at the county landfill or by other legal means. The Contractor shall be re-sponsible for all costs, royalties, arrangements, procurement, cleanup, and work associ-ated with a waste disposal area.

1.2 Measurement of Payment - No separate measurement or payment will be made for dis-posal of waste material disposal, rather payment will be considered to be incidental to other items of work.

PRODUCTS (Not Applicable)

EXECUTION

All trash and construction debris resulting from installation, demolition, and construc-tion are the responsibility of the Contractor and shall be removed and disposed of legally.

SECTION 062030 - CARPENTRY

GENERAL

Description of Work - Perform all work necessary or required for the construction of the project, as indicated on the drawings. Such work includes, but is not necessarily limited to, the finishing and installing of all rough and finish carpentry work, as shown and noted on the drawings and specified herein.

Grade Marks - All lumber and plywood shall be grade stamped.

Measurement and Payment - No separate payment will be made for work included under this section. Payment for this work will be included in the contract unit price for Remove and Replace Roof or Sub Roof Repair as shown on the schedule of items.

PRODUCTS

Materials - All lumber shall be seasoned, surfaced four sides (S4S), except where shown rough-sawn on drawings, shall not exceed a moisture content of 19 percent for (A), (B), and (C) below and 15 percent for all others, and shall not be less than the following grades:

Light Framing - Douglas Fir, Standard and better grade, as graded by Western Wood Products Association or West Coast Lumber Inspection Bureau, or equal.

Pressure Treated Framing - FDN grade Douglas fir as designated by American Wood Preservers Association or American Wood Preservers Bureau.

Roof Sheathing and Exterior Wall Sheathing – APA Rated ¾” sheathing or as determined in the field and as graded by The Engineered Wood Association (formerly American Plywood Association). Use of the term "plywood" on the drawings does not exclude the use of other panels with equivalent span ratings.

Interior Plywood Wall Sheathing - CDX fir, interior type, with exterior glue, as graded by the American Plywood Association.

Trim and Moldings - Interior - C select pine, as graded by the Western Wood Products Association.

EXECUTION

General

Nailing - Nailing shall conform with the requirements of the International Building Code, unless otherwise specified.

Rough Carpentry

General - All framing shall be accurately cut and constructed plumb, straight, and true to lines and dimensions shown. No cutting and boring of joists and beams shall be done without permission from the Contracting Officer.

Roof Sheathing - The roof sheathing shall be installed with the face grain laid perpendicular to the rafters, end joints staggered, and nailed at each crossing and end. Butted end joints shall occur only over bearing points.

Blocking and Bracing - Blocking needed for bracing, edge support, and backing for miscellaneous accessories, grab bars, toilet paper dispensers, door stops, any needed to stabilize walls and other building elements, and other miscellaneous blocking shall be included as part of this work.

Finish Carpentry

Exterior siding, trim, soffit, and fascia - General:

Seal butt joints at inside and outside corners and at trim locations.

SECTION 074113 - METAL ROOF PANELS

GENERAL

SUMMARY

This Section includes the following:

Preformed Metal Roofing Furnish and install all supplementary or miscellaneous items, appurtenances and devices incidental to or necessary for a sound, secure and complete installation.

See Section 06203 "Carpentry" for supplementary framing, materials, and permanent bracing requirements.

MEASUREMENT AND PAYMENT - There will be no separate measurement and payment made for work in this section. Work in this section will be considered incidental and included in payment for items listed in the Schedule of Items.

PERFORMANCE REQUIREMENTS

1. Structural Performance: Metal roofing shall be designed to meet the most current International Building Code (IBC) and in accordance with the following minimum requirements below:

1. Snow Load: 200 PSF Elk City,

2. Wind Load: 70 MPH, Exposure C, with uplift considerations.

a. Wind Prying shall be considered for roof panels and accessories with the following factors of safety:

1) Single fastener in each connection 3.00

2) Two or more fasteners in each connection 2.25

3. Live Load: 20 PSF

4. Seismic Loads: Per IBC 2008 Edition

5. Span: Varies

6. Thermal Loads: free movement of roof panels in response to temperature changes of 150 degrees F during the life of the structure.

1.3 SUBMITTALS

Metal roof panels: Samples of roofing textures and colors from the full range of manufactures’ roofing textures and colors.

Submit one 8-inch long sample of panel, including clips.

Submit two color chart samples for the approved roof texture.

Submit metal roof system manufacturer's approved shop drawings to the Contracting Officer for a complete metal roof system to include panels, panel clips, trim/flashing, fascia’s, ridge, closures, sealants, fillers and any other required items.

Performance Testing and Documentation:

Metal roof system must be tested in accordance with Underwriters Laboratories, Inc. (UL) Test Method 580 "Tests for Uplift Resistance of Roof Assemblies".

Metal roof system must be tested in accordance with ASTM E 1592-95 for negative loading when AISI specifications do not apply. Capacity for gauge, span or loading other than those tested may be determined by interpolating test values.

Metal roof system must meet the air infiltration requirements of ASTM E 283-84 when test-ed with a 6.24 PSF pressure differential. The resulting air infiltration leakage rate will be a min-imum of 18” LokSeam®-(.0143 cfm/sq. ft.)

Metal roof system must meet the water penetration requirements of ASTM E 331-83 when tested with a 6.24 PSF pressure differential with no uncontrollable water leakage when five gal-lons per hour of water is sprayed per square foot.

Warranties Metal roof system manufacturer shall submit a specimen copy of the warranty upon final acceptance of the project. Provide the following warranties.

Roof Finish: Covering bare metal against rupture, structural failure and perforation due to normal atmospheric corrosion exposure for a period of 20 years.

Weather tightness: The Contractor shall provide to the Contracting Officer, a Standard warranty signed by the roofing manufacturer of the Standing Seam Roof System for a period of ten (10) years from the Date of Substantial Completion, the roofing manufacturer WARRANTS to the Contracting Officer that the roofing manufacturer's furnished roof panels, flashing, and related items used to fasten the roof panels and flashing to the roof structure ("Roof System") will not allow intrusion of water from the exterior of the Roof System into the building envelope, when exposed to ordinary weather conditions and ordinary wear and usage. The Date of Substantial Completion is the date that is certified by the Contracting Officer.

QUALITY ASSURANCE

Manufacturer Qualifications: Minimum five years of experience in manufacture of similar products in successful use in similar applications.

Installer Qualifications: Experienced installer[, certified by metal panel manufacturer, with minimum five of years of experience with successfully completed projects of a similar nature and scope.

Field Supervisor Qualifications: Experienced mechanic, certified by metal panel manufacturer, supervising work whenever work is underway.

PRODUCTS

METAL ROOF PANELS

LokSeam Series, Architectural standing seam metal roof system or an approved equal.

Metal Roof System Profile: 1”-1-3/4” inch high rib x 16 inch wide panels.

Panel Style: Narrow rib, vertical leg, concealed fastener, positive snap lock standing seam, utilizing male and female rib configurations, with factory applied hot melt mastic in female rib.

Gauge: 24 Gauge – UL-90 Underwriters Laboratory Substrate: Galvalume® steel sheet, 0.5 ounces/square foot, minimum yield of 50,000 PSI.

Clip: 18 gauge UL-rated clip with two fasteners to structural (UL-90 rated - Underwriters Laboratories).

Texture: Smooth with striations Color: Forest Green

MISCELLANEOUS ROOFING MATERIALS

Fasteners:

All self-tapping/self-drilling fasteners, bolts, nuts, self-locking rivets and other suitable fas-teners shall be designed to withstand specified design loads.

Use long life fasteners for all interior and exterior metal roof system applications.

Provide fasteners with a factory applied coating in a color to match metal roof system appli-cation.

Provide neoprene washers under heads of exposed fasteners.

Locate and space all exposed fasteners in a true vertical and horizontal alignment. Use proper torque settings to obtain controlled uniform compression for a positive seal without rup-turing the neoprene washer.

Accessories:

Provide all components required per the metal roof system manufacturer's approved shop drawings for a complete metal roof system to include panels, panel clips, trim/flashing, fascias, ridge, closures, sealants, fillers and any other required items.

All outside closures will be fabricated from Galvalume Plus® or Pre-Painted Galvalume sheet steel of the same gauge, finish and color as the panels or an approved equal.

All tape seal is to be a pressure sensitive, 100 percent solids, polyisobutylene compound sealing tape with a release paper backing. Provide permanently elastic, non-sagging, non-toxic, non-staining tape seal approved by the metal roof system manufacturer.

All joint sealant is to be a one-part elastomeric polyurethane sealant approved by the metal roof system manufacturer.

All roof chimneys to have nonpenetrating tiebacks fabricated and installed with concealed fasteners for wind and snow loads.

Gutters & Downspouts - Fabricate gutters and downspouts in the same gauge, material, finish, and color as the roof panels. The gutters shall be a 6” K style gutter matching the metal roof. The gutters shall also have a Leaf Filter screen cover installed on the top of the gutter.

Downspouts shall have a an extension to the vertical section to move water away from the building. All work to be done with Industry Standards and Best Practices.

Ice & Water Shield – Provide Titanium PSU 30 Synthetic Roofing Underlayment over roof decking for Protection from Wind Driven Rain, Water, Snow and Ice Dams. Incidental to Underlayment pay item.

EXECUTION

ROOFING INSTALLATION

Install metal roof system so that it is weathertight, without waves, warps, buckles, fastening stresses or distortion, allowing for expansion and contraction.

Install metal roof system in accordance with manufacturer's instructions and shop drawings.

Provide concealed anchors at all panel attachment locations inclusive of roofing components such as fascia, rake etc..

Install panels plumb, level and straight with seams and ribs parallel, conforming to design as indicated.

Clean work in accordance with manufacturer's recommendations.

Protect work against damage until final acceptance. Replace or repair to the satisfaction of the Contracting Officer’s Representative, any work that becomes damaged prior to final acceptance.

Touch up minor scratches and abrasions with touch up paint supplied by the metal roof system manufacturer.

Do not allow panels or trim to come in contact with dissimilar metals such as copper, lead or graphite. Water run-off from these materials is also prohibited.

www.S-5.com

SECTION 07 72 53

COLORGARD® SNOW GUARDS

- GENERAL

1.1 SUMMARY

Section Includes:

Snow guards for metal roofs.

Non-penetrating attachment system.

RELATED SECTIONS

A. Division 01: Administrative, procedural, and temporary work requirements apply to this section.

B. Section 07 41 13 - Metal Roof Panels

REFERENCES

Aluminum Association (AA) - Aluminum Standards and Data, 2003 Edition.

ASTM International (ASTM):

B85-03 - Standard Specification for Aluminum-Alloy Die Castings.

B221-04a - Standard Specification for Aluminum and Aluminum-Alloy Extruded

Bars, Rods, Wire, Profiles, and Tubes.

SUBMITTALS

Action Submittal:

Shop Drawings: Include roof plans showing locations of snow guards on roof and at-tachment details and spacing.

Product Data:

Product description.

Construction details.

Material descriptions.

http://www.s-5.com/

Individual component dimensions.

Finishes.

Installation instructions.

Samples:

Clamp samples.

12-inch long cross member samples including all associated hardware.

Informational Submittals:

Include calculation of number and location of snow guards based on designed roof snow load, roof slope, roof type, components, spacing’s and finish Test results: Results of product tensile load testing, issued by a recognized inde-pendent testing laboratory, showing ultimate load-to-failure value of attach-ment.

Closeout Submittals:

Certification: Installer's certification that snow guard system was installed in accordance with manufacturer's instructions and approved Shop Drawings.

QUALITY ASSURANCE

Manufacturer Qualifications: Manufacturer to specialize in production of Snow Guard Products of the type specified with a minimum of 20 years documented expe-rience.

DELIVERY, STORGE AND HANDLING

Deliver components to jobsite properly packaged to provide protection during transport, delivery and handling.

Store products in manufacturer’s original labeled and unopened packaging in a clean and dry location, protected from potential damage, until ready for application.

- PRODUCTS

SYSTEM DESCRIPTION

Attachment system to provide attachment to standing seam metal roofs:

With only minor dimpling of panel seams.

Without penetrations through roof seams or panels.

Without use of sealers or adhesives.

Without voiding roof warranty.

B. Performance Requirements: Provide snow guards to withstand exposure to the weather and environmental elements, and resist design forces without failure due to defective manufacture.

1. Loading: Design snow guard system to resist minimum in-service vector load in conjunction with the S-5 distributor.

2. Factor of safety: Utilize a factor of safety 2 to determine allowable loads from ultimate tested clamp tensile load values.

3. Source Limitation: Provide snow guard system as designed and tested by the manufacturer as a complete system. Install components by the same manufac-turer.

MANUFACTURER

Acceptable Manufacturer: S-5! Metal Roof Innovations, Ltd., 8655 Table Butte Road, Colorado Springs, CO. 80908; Tel: 888-825-3432; Fax: 719-495-0045; Email: sup-port@s-5.com; Web: www.s-5.com

Substitutions: Approved substitutions by COR.

2.3 BAR/RAIL-TYPE SNOW RETENTION SYSTEMS FOR STANDING SEAM METAL

ROOFS

A. Basis of Design: ColorGard, manufactured by S-5! Metal Roof Innovations, Ltd.

B. Components:

Clamps

a. Manufactured from 6061-T6 aluminum extrusions conforming to

ASTM B221 or aluminum castings conforming to ASTM B85 and to AA Aluminum Standards and Data.

1) Model: No. [S-5-U.] [S-5-S.] [S-5-T.] [S-5-Z.] [S-5-E.] [S-5-B.] [S-5-Q.] [S-5-H.] [S-5-K700.] [S-5-H90.] [S-5-N.] [S-5-N 1.5.] [S-5-KHD.] [S-5-V.] [S-5-K Grip.] [S-5-R465.]

b. Set screws: 300 Series stainless steel, 18-8 alloy, 3/8 inch diameter, with round nose point.

c. Attachment bolts: 300 Series stainless steel, 18-8 alloy, 8 mm or 10 mm diameter, hex flange bolt..

PART 3- EXECUTION

3.1 EXAMINATION

Prior to beginning installation, verify that:

1. Panel seaming is complete.

2. Panel attachment is sufficient to withstand loads applied by snow guard system.

3. Installation will not impeded roof drainage.

3.2 PREPARATION

Clean areas to receive attachments; remove loose and foreign matter that could interfere with installation or performance.

mailto:support@s-5.com mailto:support@s-5.com

3.3 LOCATION

A. Snow Retention System shall be located (12’) over garage door, (18’) over front en-trance inclusive of both sides of structure, and (10’) over rear sliding glass door ( both sides)

3.3 INSTALLATION

Install system in accordance with manufacturer's instructions and approved Shop Drawings

B. ColorGard Snow Retention System:

Place clamps at maximum 32 inches on center or as required by in-service loads.

Place clamps in straight, aligned rows.

Place both set screws on same side of clamp.

Tighten set screws to manufacturer's recommended torque. Randomly test set screw torque using calibrated torque wrench.

Insert color-matched metal strips into cross members, staggering strips to cover cross member joints.

Attach cross members to clamps; tighten bolts to manufacturer's recommended torque.

Install splice connectors at cross member end joints.

Do not cantilever cross members more than 4 inches beyond last clamp at ends.

SECTION 07900 - CAULKING AND SEALANTS

PART 1 - GENERAL

1.1 Scope - Completely seal with caulking compound all joints around frames and sills of doors, windows, flashing, and other openings in exterior walls, roofing and all other joints or spaces noted in these specifications or required by manufacture’s installation instruction to be caulked.

1.2 Measurement and Payment - There will be no separate measurement or payment for work in this section. All work will be included in the lump sum quantities for roofing in Section B.

PART II - PRODUCTS

2.1 Caulking compound shall be a paintable/stainable siliconized-latex caulking with a min-imum 20 year warranty. Caulking shall match requirements laid out in manufacturer’s installation instructions and color of the substrate to which it is applied (i.e. siding, trim, etc.).

2.2 Backing strip shall be the maximum size recommended by the caulking manufacturer and shall be material manufactured for the purpose.

PART III - EXECUTION

3.1 Joints and spaces to be caulked shall be clean and free from dust and shall be dry. Joints shall be filled slightly concave. Caulk joints before final coat of paint or stain is applied to adjacent work. Where caulking will not be painted or stained, color shall match that of adjacent materials.

Caulking applied to spaces wider than 1/4`` shall have a properly sized backing strip in-stalled.

Apply compound with gun having proper size nozzle or with putty knife as required.

Use sufficient pressure to fill all joints solid leaving a smooth continuous concave joint;

superficial pointing of joints with a skin bead will not be accepted. Remove excess caulking and leave surfaces neat, smooth, and clean. Upon completion, caulking shall have a smooth, even finish. All caulked joints shall be watertight.