This is a final specifications document for the State of Hawaii Department of Transportation Highways Division regarding Project No. HWY-OM-2027-38, a sidewalk, curb and gutter, and concrete median barrier repair contract on the Island of Oahu. The scope of work requires contractors to furnish all labor, equipment, materials, and traffic control necessary to repair severely cracked, popped up, and depressed reinforced Portland cement concrete sidewalks, curbs, gutters, and concrete median barriers on an open-ended, as-needed basis throughout the 24-month contract period. The solicitation was released in HIePRO on August 28, 2026, with a mandatory virtual pre-bid conference scheduled for September 8, 2026, at 10:00 a.m. HST. Bidders must submit Requests for Information and substitution requests by September 11, 2026, at 2:00 p.m. HST. The proposal due date is September 25, 2026, at 2:00 p.m. HST, with award anticipated within 60 calendar days of bid opening. Contractors must respond to work requests within 48 hours of notification and maintain an office on the Island of Oahu to be eligible for award.
Eligible bidders must possess a valid State of Hawaii General Engineering "A," General Building "B," or Specialty Contractors "C-31" license at the time of bidding. A five percent apprenticeship preference applies to bidders party to registered apprenticeship programs, and a five percent Hawaii bidder preference is available for qualifying bidders. The bidder must provide a proposal guaranty equal to not less than 5% of the total bid amount, with separate performance and payment bonds required at contract execution ranging from $121,200 for each of four contract areas. A minimum of 80 percent of the bidder's workforce must consist of Hawaii residents in compliance with HRS Section 103B-3. The contract requires contractors to comply with Chapter 104 HRS wages and hours requirements for public works. The successful bidder will be required to submit tax clearance certificates, Department of Labor and Industrial Relations compliance certificates, and a Certificate of Good Standing from the Department of Commerce and Consumer Affairs before contract execution.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATE OF HAWAII
DEPARTMENT OF TRANSPORTATION
HIGHWAYS DIVISION
HONOLULU, HAWAII
SPECIAL PROVISIONS
PROPOSAL
CONTRACT AND BOND
FOR
SIDEWALK, CURB AND GUTTER, CONCRETE
MEDIAN BARRIER REPAIRS
AT VARIOUS LOCATIONS
PROJECT NO. HWY-OM-2027-38
ISLAND OF OAHU
FY 2027
NTB-1
NOTICE TO BIDDERS
Hawaii Revised Statutes (HRS), Chapter 103D
The receiving of bids for SIDEWALK, CURB AND GUTTER, CONCRETE MEDIAN
BARRIER REPAIRS AT VARIOUS LOCATIONS, ISLAND OF OAHU, PROJECT
NO. HWY-OM-2027-38, will begin as of the HIePRO Release Date. Bidders shall register and submit complete bids through HIePRO only. Refer to the following HIePRO link for important information on Vendor Registration: https://hiepro.ehawaii.gov/welcome.html.
The solicitation specifications, proposal, and additional documents designated or incorporated by reference shall be available in HIePRO.
HIePRO OFFER DUE DATE AND TIME is September 25, 2026, at 2:00 p.m., Hawaii
Standard Time (HST). Bidders shall submit and upload the complete proposal to HIePRO prior to the offer due date and time. Proposals received after said due date and time shall not be considered. Any additional support documents explicitly designated as confidential and/or proprietary shall be uploaded as a separate file to HIePRO. Bidders shall not include confidential and/or proprietary documents as part of their proposal. The record of each bidder and their respective proposal shall be open to public inspection. FAILURE TO
UPLOAD THE PROPOSAL TO HIePRO SHALL BE GROUNDS FOR REJECTION.
The scope of work consists of furnishing all labor, necessary equipment, materials and traffic control, to repair severely cracked, popped up and depressed reinforced Portland cement concrete (PCC) sidewalks, curb and/or gutters, and severely damaged concrete median barriers on the Island of Oahu on an open end, basis.
NTB-2
To be eligible for award, bidders must possess a valid State of Hawaii General Engineering
"A" or General Building "B" or Specialty Contractors "C-31 - license at the time of bidding.
A virtual pre-bid conference is scheduled for September 8, 2026, at 10:00 a.m., HST.
Interested bidders shall contact Jillian Chen, Project Manager, directly at jillian.m.chen@hawaii.gov, no later than one working day prior to the scheduled pre-bid conference to receive the meeting invitation. All prospective bidders and/or their respective representatives are encouraged to attend, however, attendance is not mandatory. All information presented at the pre-bid conference shall be provided for clarification and information only. Any amendments to the solicitation shall be made by formal addendum and posted in HIePRO.
All Request for Information (RFI) questions and Substitution Requests shall be submitted in HIePRO no later than September 11, 2026, at 2:00 p.m., HST. RFI questions received after the stated deadline shall not be addressed. Substitution Requests received after the stated deadline shall not be considered. Verbal RFI(s) shall not receive a response. All responses to RFI questions shall be provided for clarification and information only and issued by formal addendum. Any amendments to the solicitation shall be made by formal addendum and posted in HIePRO.
If there is a conflict between the solicitation and information stated in the pre-bid conference, the meeting minutes, and/or the responses to RFI questions, the solicitation shall govern and control, unless as amended by formal addendum.
Apprenticeship Preference. A five percent bid adjustment for bidders that are party to apprenticeship agreements pursuant to HRS Section 103-55.6 is applicable to this project.
NTB-3
Employment of State Residents on Construction Procurement Contracts. Compliance with HRS Section 103B-3 is a requirement for this project whereby a minimum of 80 percent of the bidder's work force on this project shall consist of Hawaii residents.
Campaign contributions by State and County Contractors. Contractors are hereby notified of the applicability of HRS Section 11-355 which states that campaign contributions are prohibited from specified State or county government contractors during the term of the contract if the contractors are paid with funds appropriated by a legislative body. For more information, contact the Campaign Spending Commission at (808) 586-0285.
Protests. Any protest of this solicitation shall be submitted in writing to the Director of
Transportation, in accordance with HRS Section 103D-701 and Hawaii Administrative Rules
Section 3-126.
Federally Assisted Programs of the U.S. Departme
Federal Regulations (CFR), Part 21, is applicable to this project. Bidders are hereby notified that the Department of Transportation shall affirmatively ensure that the contract entered into pursuant to this advertisement shall be awarded to the lowest responsible bidder without discrimination on the grounds of race, color, national origin or sex (as directed by 23 CFR Part 200).
Driving While Impaired (DWI) Education. The Hawaii Department of
Transportation (HDOT) encourages all organizations contracted with HDOT to have an employee education program preventing DWI. DWI is defined as operating a motor vehicle while impaired by alcohol or other legal or illegal substances. HDOT promotes this type of program to accomplish our mission to provide a safe environment for motorists, bicyclists and
NTB-4
pedestrians utilizing our State highways, and expects its contractors to do so as well.
For additional information, contact Jillian Chen, Project Manager, by phone at (808) 692-8439 or by email at jillian.m.chen@hawaii.gov.
The State reserves the right to reject any or all proposals and to waive any defects in said proposals in the best interest of the public.
ROBIN K. SHISHIDO
Deputy Director of Transportation for Highways
HIePRO RELEASE DATE: August 28, 2026
HWY-OM-2027-38
-1- 8/14/26
TABLE OF CONTENTS
Instructions for Contractor’s Licensing
Special Provisions Title Page
Special Provisions
DIVISION 100 - GENERAL PROVISIONS
Section Description Pages
101 Terms, Abbreviations, and Definitions 101-1a – 101-13a
102 Bidding Requirements and Conditions 102-1a – 102- 13a
103 Award and Execution of Contract 103-1a – 103-5a
104 Scope of Work 104-1a – 104-3a
105 Control of Work 105-1a – 105-3a
106 Material Restrictions and Requirements 106-1a
107 Legal Relations and Responsibility to Public 107-1a – 107-4a
108 Prosecution and Progress 108-1a – 108-25a
109 Measurement and Payment 109-1a – 109-2a
Portland Cement Concrete Sidewalk, Curb and Gutter, Concrete Median Barrier Repairs at Various Locations
110-1a – 110-7a
DIVISION 600 - INCIDENTAL CONSTRUCTION
601 Structural Concrete 601-1a – 601-15a
602 Reinforcing Steel 602-1a – 602-2a
621 Invasive Species Management 621-1a – 621-13a
634 Portland Cement Concrete Sidewalks 634-1a – 634-3a
638 Portland Cement Concrete Curb and Gutter 638-1a – 638-2a
645 Work Zone Traffic Control 645-1a – 645-18a
650 Curb Ramps 650-1a
671 Protection of Endangered Species 671-1a – 671-6a
680 Defective Concrete Repairs 680-1a – 680-10a
DIVISION 700 - MATERIALS
701 Hydraulic Cement 701-1a
719 Macro-Synthetic Fibers for Concrete Reinforcement
719-1a
Sidewalk Standard Plan ............................................................................. Figure 1
Curb and Gutter Standard Plan.................................................................. Figure 2
-2- 8/14/26
Curb Ramp Notes and Details………….………………….…Figure 3.1 – Figure 3.9
Concrete Barrier Repair Details and Notes……………….…Figure 4.1 – Figure 4.4
Oahu Work Zone Areas ............................................................................. Figure 5
Work Order Form ... ................................................................................... Figure 6
Requirements of Chapter 104, HRS Wages and Hours of Employees on Public Works Law
Proposal Title Page
Proposal …………………………………………………………………….…P-1 – P-8
Proposal Schedule ………………………………………..……………. ..... P-9 – P-28
Surety Bid Bond
Sample Form Title Page
Contract
Performance Bond (Surety)
Performance Bond
Labor and Material Payment Bond (Surety)
Labor and Material Payment Bond
Chapter 104, HRS Compliance Certificate
Certification of Compliance for Employment of State Residents
END OF TABLE OF CONTENTS
HAI
-1- 9/01/02
INSTRUCTIONS FOR CONTRACTOR’S LICENSING
"A" general engineering contractors and "B" general building contractors are reminded that due to the Hawaii Supreme Court’s January 28, 2002 decision in Okada
Trucking Co., Ltd. v. Board of Water Supply, et al., 97 Haw. 450 (2002), they are prohibited from undertaking any work, solely or as part of a larger project, which would require the general contractor to act as a specialty contractor in any area where the general contractor has no license. Although the "A" and "B" contractor may still bid on and act as the "prime" contractor on an "A" or "B" project (See, HRS § 444-7 for the definitions of an "A" and "B" project.), respectively, the "A" and "B" contractor may only perform work in the areas in which they have the appropriate contractor’s license (An "A" or "B" contractor obtains "C" specialty contractor’s licenses either on its own, or automatically under HAR § 16-77-32.). The remaining work must be performed by appropriately licensed entities. It is the sole responsibility of the contractor to review the requirements of this project and determine the appropriate licenses that are required to complete the project.
4/26/06
STATE OF HAWAII
DEPARTMENT OF TRANSPORTATION
HIGHWAYS DIVISION
HONOLULU, HAWAII
S P E C I A L P R O V I S I O N S
These Special Provisions shall supplement and/or amend the applicable provisions of the Hawaii Standard Specifications for Road and Bridge Construction, 2005, hereinafter referred to as the "Standard Specifications".
101-1a 5/6/2021
Amend Section 101 - TERMS, ABBREVIATIONS, AND DEFINITIONS to read as 1 follows: 2
“DIVISION 100 - GENERAL PROVISIONS 4
SECTION 101 - TERMS, ABBREVIATIONS, AND DEFINITIONS 7
101.01 Meaning of Terms. The specifications are generally written in the 9 imperative mood. In sentences using the imperative mood, the subject, “the 10
Contractor shall”, is implied. In the material specifications, the subject may also 11 be the supplier, fabricator, or manufacturer supplying material, products, or 12 equipment for use on the project. The word “will” generally pertains to decisions 13 or actions of the State. 14
When a publication is specified, it refers to the most recent date of issue, 16 including interim publications, before the bid opening date for the project, unless a 17 specific date or year of issue is provided. 18
101.02 Abbreviations. Meanings of abbreviations used in the specifications, 20 on the plans, or in other contract documents are as follows: 21
AAN American Association of Nurserymen 23
AASHTO American Association of State Highway and 25
Transportation Officials 26
ACI American Concrete Institute 28
ADA Americans with Disabilities Act 30
ADAAG Americans with Disabilities Act Accessibility Guidelines 32
AGC Associated General Contractors of America 34
AIA American Institute of Architects 36
AISC American Institute of Steel Construction 38
AISI American Iron and Steel Institute 40
ANSI American National Standards Institute 42
APA American Plywood Association 44
101-2a 5/6/2021
ARA American Railway Association 46
AREA American Railway Engineering Association 48
ASA American Standards Association 50
ASCE American Society of Civil Engineers 52
ASLA American Society of Landscape Architects 54
ASTM American Society for Testing and Materials 56
AWG American Wire Gauge 58
AWPA American Wood Preserver's Association 60
AWS American Welding Society 62
AWWA American Water Works Association 64
BMP Best Management Practice 66
CCO Contract Change Order 68
CFR Code of Federal Regulations 70
CRSI Concrete Reinforcing Steel Institute 72
DCAB Disability and Communication Access Board, Department of 74
Health, State of Hawaii 75
DOTAX Department of Taxation, State of Hawaii 77
EPA U.S. Environmental Protection Agency 79
FHWA Federal Highway Administration, 81
U.S. Department of Transportation 82
FSS Federal Specifications and Standards, 84
General Services Administration, U.S. Department of Defense 85
HAR Hawaii Administrative Rules 87
HDOT Department of Transportation, State of Hawaii 89
101-3a 5/6/2021
HIOSH Occupational Safety and Health, Department of Labor and 91
Industrial Relations, State of Hawaii 92
HMA Hot Mix Asphalt 94
HRS Hawaii Revised Statutes 96
ICEA Insulated Cable Engineers Association (formerly IPCEA) 98
IMSA International Municipal Signal Association 100
IRS Internal Revenue Service 102
ITE Institute of Transportation Engineers 104
MUTCD Manual on Uniform Traffic Control Devices for Streets and 106
Highways, FHWA, U.S. Department of Transportation 107
NCHRP National Cooperative Highway Research Program 109
NEC National Electric Code 111
NEMA National Electrical Manufacturers Association 113
NFPA National Forest Products Association 115
NPDES National Pollutant Discharge Elimination System 117
OSHA Occupational Safety and Health Administration/Act, 119
U.S. Department of Labor 120
SAE Society of Automotive Engineers 122
SI International Systems of Units 124
UFAS Uniform Federal Accessibility Standards 126
UL Underwriter's Laboratory 128
USGS U.S. Geological Survey 130
VECP Value Engineering Cost Proposal 132
101.02 133
101-4a 5/6/2021
101.03 Definitions. Whenever the following words, terms, or pronouns are 135 used in the contract documents, unless otherwise prescribed therein and without 136 regards to the use or omission of uppercase letters, the intent and meaning shall 137 be interpreted as follows: 138
Addendum (plural - Addenda) - A written or graphic document, including 140 drawings and specifications, issued by the Director during the bidding period. This 141 document modifies or interprets the bidding documents by additions, deletions, 142 clarifications or corrections. 143
Addition (to the contract sum) - Amount added to the contract sum by change 145 order. 146
Advertisement - A public announcement inviting bids for work to be performed or 148 materials to be furnished. 149
Amendment - A written document issued to amend the existing contract between 151 the State and Contractor and properly executed by the Contractor and Director. 152
Award - Written notification to the bidder that the bidder has been awarded a 154 contract. 155
Bad Weather Day (or Unworkable Day) - A day when weather or other conditions 157 prevent a minimum of four hours of work with the Contractor’s normal work force 158 on critical path activities at the site. 159
Bag - 94 pounds of cement. 161
Barrel - 376 pounds of cement. 163
Base Course - The layer or layers of specified material or selected material of a 165 designed thickness placed on a subbase or subgrade to support a surface course. 166
Basement Material - The material in excavation or embankments underlying the 168 lowest layer of subbase, base, pavement, surfacing or other specified layer. 169
Bid - See Proposal. 171
Bidder - An individual, partnership, corporation, joint venture or other legal entity 173 submitting, directly or through a duly authorized representative or agent, a 174 proposal for the work or construction contemplated. 175
Bidding Documents (or Solicitation Documents) - The published solicitation 177 notice, bid requirements, bid forms and the proposed contract documents including 178 all addenda and clarifications issued prior to receipt of the bid. 179
101-5a 5/6/2021
Bid Security - The security furnished by the bidder from which the State may 181 recover its damages in the event the bidder breaches its promise to enter into a 182 contract with the State, or fails to execute the required bonds covering the work 183 contemplated, if its proposal is accepted. 184
Blue Book - EquipmentWatch Cost Recovery (formerly known as 186
EquipmentWatch Rental Rate Blue Book), available from EquipmentWatch, a 187 division of Penton, Inc. 188
Calendar Day - See Day. 190
Change Order (or Contract Change Order) - A written order signed by the 192
Engineer issued with or without the consent of the Contractor directing changes in 193 the work, contract time or contract price. The purposes of a change order include, 194 but are not limited to (1) establishing a price or time adjustment for changes in the 195 work; (2) establishing full payment for direct, indirect, and consequential costs, 196 including costs of delay; (3) establishing price adjustment or time adjustment for 197 work covered and affected by one or more field orders; or (4) settling Contractor’s 198 claims for direct, indirect, and consequential costs, or for additional contract time, 199 in whole or in part. 200
Completion - See Substantial Completion and Final Completion. 202
Completion Date - The date specified by the contract for the completion of all 204 work on the project or of a designated portion of the project. 205
Comptroller - the Comptroller of the State of Hawaii, Department of Accounting 207 and General Services. 208
Contract - The written agreement between the Contractor and the State, by which 210 the Contractor shall provide all labor, equipment, and materials and perform the 211 specified work within the contract time stipulated, and by which the State of Hawaii 212 is obligated to compensate the Contractor at the prices set forth in the contract 213 documents. 214
Contract Certification Date - The Date on which the Deputy Comptroller for the 216
State of Hawaii (or authorized representative) signs the Contract Certification. 217
Contract Completion Date - The calendar day on which all work on the project, 219 required by the contract, must be completed. See CONTRACT TIME. 220
101-6a 5/6/2021
Contract Documents - The contract, solicitation, addenda, notice to bidders, 222
Contractor’s bid proposal (including wage schedule, list of subcontractors and 223 other documentations accompanying the bid), notice to proceed, bonds, general 224 provisions, special provisions, specifications, drawings, all modifications, all written 225 amendments, change orders, field orders, orders for minor changes in the work, 226 the Engineer’s written interpretations and clarifications issued on or after the 227 effective date of the contract. 228
Contract Item (Pay Item) - A specific unit of work for which there is a price in the 230 contract. 231
Contract Modification (Modification) - A change order that is mutually agreed to 233 and signed by the parties to the contract. 234
Contract Price - The amount designated on the face of the contract for the 236 performance of work. 237
Contract Time (or Contract Duration) - The number of calendar or working days 239 provided for completion of the contract, inclusive of authorized time extensions. 240
Contract time shall commence on the Start Work Date and end on the Substantial 241
Completion Date. If in lieu of providing a number of calendar or working days, the 242 contract requires completion by a certain date, the work shall be completed by that 243 date. 244
Contracting Officer - See Engineer. 246
Contractor - Any individual, partnership, firm, corporation, joint venture, or other 248 legal entity undertaking the execution of the work under the terms of the contract 249 with the State. 250
Critical Path - Longest logical sequence of activities that must be completed on 252 schedule for the entire project to be completed on schedule. 253
Day - Any day shown on the calendar, beginning at midnight and proceeding up 255 to, but not including, midnight the following day. If no designation of calendar or 256 working day is made, "day" shall mean calendar day. 257
Department - The Department of Transportation of the State of Hawaii 259
(abbreviated HDOT). 260
Director - The Director of the HDOT acting directly or through duly authorized 262 representatives. 263
Plans (or Drawings) - The contract drawings in graphic or pictorial form including 265 the notes, tables and other notations thereon indicating the design, location, 266 character, dimensions, and details of the work. 267
101-7a 5/6/2021
Engineer - The Highway Administrator, Highways Division, HDOT, or the 269 authorized person delegated to act on the Administrator’s behalf. 270 Equipment - All machinery, tools, and apparatus needed to complete the contract. 272
Field Order - A written order issued by the Engineer or the Engineer’s authorized 274 representative to the Contractor requiring a change or changes to the contract 275 work. A field order may (1) establish a price adjustment or time adjustment; or (2) 276 may declare that no adjustment will be made to contract price or contract time; or 277
(3) may request the Contractor to submit a proposal for an adjustment to the 278 contract price or contract time. 279
Final Acceptance - The Status of the project when the Engineer finds that the 281
Contractor has satisfactorily completed all contract work in compliance with the 282 contract including all plant establishment requirements, and all the materials have 283 been accepted by the State. 284
Final Completion - The date set by the Director that all work required by the 286 contract has been completed in full compliance with the contract documents. 287
Final Inspection - Inspection where all contract items (with the exception of 289
Planting Period and Plant Establishment Period) are accepted by the Engineer. 290
Substantial Completion will be issued by the Engineer based on the satisfactory 291 results of the Final Inspection. 292
Float - The amount of time between when an activity can start and when an activity 294 must start, i.e., the time available to complete non-critical activities required for the 295 performance of the work without affecting the critical path. 296
Guarantee - Legally enforceable assurance of the duration of satisfactory 298 performance of quality of a product or work. 299
Hawaii Administrative Rules - Rules adopted by the State in accordance with 301
Chapter 91 of the Hawaii Revised Statutes, as amended. 302
Hawaii eProcurement System (HIePRO) - The State of Hawaii eProcurement 304
System for issuing solicitations, receiving proposals and responses, and issuing 305 notices of award. 306
Highway (Street, Road, or Roadway) - A public way within a right-of-way 308 designed, intended, and set aside for use by vehicles, bicyclists, or pedestrians. 309 Highways Division - The Highways Division of the Hawaii Department of 311 Transportation constituted under the laws of Hawaii for the administration of 312 highway work. 313
101-8a 5/6/2021
Holidays - The days of each year which are set apart and established as State 315 holidays pursuant to Chapter 8 of the Hawaii Revised Statutes, as amended. 316 Inspector - The Engineer's authorized representative assigned to make detailed 318 inspections of contract performance, prescribed work, and materials supplied. 319 Laboratory - The testing laboratory of the Highways Division or other testing 321 laboratories that may be designated by the Engineer. 322
Laws - All Federal, State, and local laws, executive orders and regulations having 324 the force of law. 325
Leveling Course - An aggregate mixture course of variable thickness used to 327 restore horizontal and vertical uniformity to existing pavements or shoulders. 328
Liquidated Damages - The amount prescribed in Subsection 108.08 - Liquidated 330
Damages for Failure to Complete the Work or Portions of the Work on Time, to be 331 paid to the State or to be deducted from any payments payable to or, which may 332 become payable to the Contractor. 333
Lump Sum (LS) - When used as a payment method means complete payment 335 for the item of work described in the contract documents. 336
Material - Any natural or manmade substance or item specified in the contract to 338 be incorporated in the work. 339 Notice to Bidders - The advertisement for proposals for all work or materials on 341 which bids are required. Such advertisement will indicate the location of the work 342 to be done or the character of the material to be furnished and the time and place 343 for the opening of proposals. 344 Notice to Proceed - Written notice from the Engineer to the Contractor identifying 346 the date on which the Contractor is to begin procuring materials and required 347 permits and adjusting work forces, equipment, schedules, etc. prior to beginning 348 physical work. 349
Pavement - The uppermost layer of material placed on the traveled way or 351 shoulders or both. Pavement and surfacing may be interchangeable. 352
Pavement Structure - The combination of subbase, base, pavement, surfacing or 354 other specified layer of a roadway constructed on a subgrade to support the traffic 355 load. 356
Payment Bond - The security executed by the Contractor and surety or sureties 358 furnished to the Department to guarantee payment by the Contractor to laborers, 359 material suppliers and subcontractors in accordance with the terms of the contract. 360
101-9a 5/6/2021
Physical Work - Physical construction activities on the project site or at 362 appurtenant facilities including staging areas. It includes; (i) building or installing 363 any structures or facilities including, but not limited to sign erection; BMP 364 installation; field office site grading and building; (ii) removal, adjustment, or 365 demolition of physical obstructions on site; (iii) any ground breaking activities; and 366
(iv) any utility work. It does not include pre-construction environmental testing 367
(such as water quality baseline measurements) that may be required as part of 368 contract. 369
Pre-Final Inspection - Inspection scheduled when Contractor notifies Engineer 371 that all physical work on the project, with the exception of planting period and plant 372 establishment period, has been completed. Notice from Contractor of substantial 373 completion will suspend contract time until Contractor receives punchlist from 374
Engineer. 375
Profile Grade - The elevation or gradient of a vertical plane intersecting the top 377 surface of the proposed pavement. 378
Project Acceptance Date - The calendar day on which the Engineer accepts the 380 project as completed. See Final Completion. 381
Proposal (Bid) - The executed document submitted by a Bidder in response to a 383 solicitation request, to perform the work required by the proposed contract 384 documents, for the price quoted and within the time allotted. 385
Public Traffic - Vehicular or pedestrian movement on a public way. 387
Punchlist - A list compiled by the Engineer specifying work yet to be completed or 389 corrected by the Contractor in order to substantially complete the contract. 390
Questionnaire - The specified forms on which the bidder shall furnish required 392 information as to its ability to perform and finance the work. 393
Request for Change Proposal - A written notice from the Engineer to the 395
Contractor requesting that the Contractor provide a price and/or time proposal for 396 contemplated changes preparatory to the issuance of a field order or change order. 397
Right-of-Way - Land, property, or property interests acquired by a government 399 agency for, or devoted to transportation purposes. 400
Roadbed - The graded portion of a highway within top and side slopes, prepared 402 as a foundation for the pavement structure and shoulders. 403
Roadside - The area between the outside edges of the shoulders and the right-of-405 way boundaries. Unpaved median areas between inside shoulders of divided 406 highways and infield areas of interchanges are included. 407
101-10a 5/6/2021
Section and Subsection - Section or subsection shall be understood to refer to 408 these specifications unless otherwise specified. 409
Shop Drawings - All drawings, diagrams, illustrations, schedules and other data 411 or information which are specifically prepared or assembled by or for the 412
Contractor and submitted by the Contractor to illustrate some portion of the work. 413 Shoulder - The portion of the roadway next to the traveled way for: 415 accommodation of stopped vehicles, placement of underground facilities, 416 emergency use, and lateral support of base and surface courses. 417 Sidewalk - That portion of the roadway primarily constructed for use by 419 pedestrians. 420 Solicitation - An invitation to bid or request for proposals or any other document 422 issued by the Department to solicit bids or offers to perform a contract. The 423 solicitation may indicate the time and place to receive the bids or offers and the 424 location, nature and character of the work, construction or materials to be provided. 425 Specifications - Compilation of provisions and requirements to perform 427 prescribed work. 428
(A) Standard Specifications. Specifications by the State intended for 430 general application and repetitive use. 431
(B) Special Provisions. Revisions and additions to the standard 433 specifications applicable to an individual project. 434
Standard Plans - Drawings provided by the State for specific items of work 436 approved for repetitive use. 437 State - The State of Hawaii, its Departments and agencies, acting through its 439 authorized representative(s). 440 State Waters – All waters, fresh, brackish, or salt, around and within the State, 442 including, but not limited to, coastal waters, streams, rivers, drainage ditches, 443 ponds, reservoirs, canals, ground waters, and lakes; provided that drainage 444 ditches, ponds, and reservoirs required as a part of a water pollution control system 445 are excluded. 446
Start Work Date - Date on which Contractor begins physical work on the contract. 448 This date shall also be the beginning of Contract Time. 449 Structures - Bridges, culverts, catch basins, drop inlets, retaining walls, cribbing, 451 manholes, endwalls, buildings, sewers, service pipes, underdrains, foundation 452 drains, and other such features that may be encountered in the work. 453
101-11a 5/6/2021
Subbase - A layer of specified material of specified thickness between the 455 subgrade and a base. 456
Subcontract - Any written agreement between the Contractor and its 458 subcontractors which contains the conditions under which the subcontractor is to 459 perform a portion of the work for the Contractor. 460
Subcontractor - An individual, partnership, firm, corporation, joint venture or other 462 legal entity, as licensed or required to be licensed under Chapter 444, Hawaii 463
Revised Statutes, as amended, which enters into an agreement with the 464
Contractor to perform a portion of the work. 465
Subgrade - The top surface of completed earthwork on which subbase, base, 467 surfacing, pavement, or a course of other material is to be placed. 468
Substantial Completion - The Status of the project when the Contractor has 470 completed the work, except for the planting period and plant establishment period, 471 and each of the following requirements are met: 472
(1) All traffic lanes (including shoulders, ramps, sidewalks and bike 474 paths) are in their final configuration as designed and the final 475 wearing surface has been installed; 476
(2) All operational and safety devices have been installed in accordance 478 with the contract documents including guardrails, end treatments, 479 traffic barriers, required signs and pavement markings, drainage, 480 parapet, and bridge and pavement structures; 481
(3) All required illumination and lighting for normal and safe use and 483 operation is installed and functional in accordance with the contract 484 documents; 485
(4) All utilities and services are connected and working; 487
(5) The need for temporary traffic controls or lane closures at any time 489 has ceased, except for lane closures required for routine 490 maintenance; 491
(6) The building, structure, improvement or facility can be used for its 493 intended purpose. 494
Substantial Completion Date - The date the Substantial Completion is granted 496 by the Engineer in Writing and Contract Time stops. 497
Superintendent - The employee of the Contractor who is responsible for all the 499 work and is a Contractor’s agent for communications to and from the State. 500
101-12a 5/6/2021
Surety - The qualified individual, firm or corporation other than the Contractor, 502 which executes a bond with and for the Contractor to insure its acceptable 503 performance of the contract. 504 Surfacing - The uppermost layer of material placed on the traveled way or 506 shoulders. This term is used interchangeably with pavement. 507
Traveled Way - The portion of the roadway for the movement of vehicles, 509 exclusive of shoulders. 510
Unsuitable Material - Materials that contain organic matter, muck, humus, peat, 512 sticks, debris, chemicals, toxic matter, or other deleterious materials not suitable 513 for use in earthwork. 514
Utility - A line, facility, or system for producing, transmitting, or distributing 516 communications, power, electricity, heat, gas, oil, water, steam, waste, or storm 517 water. 518
Utility Owner - The entity, whether private or owned by a State, Federal, or County 520 governmental body, that has the power and responsibility to grant approval for, or 521 undertake construction work involving a particular utility. 522
Water Pollutant - Dredged spoil, solid refuse, incinerator residue, sewage, 524 garbage, sewage sludge, munitions, chemical waste, biological materials, 525 radioactive materials, heat, wrecked or discarded equipment, rock, sand, soil, 526 sediment, cellar dirt and industrial, municipal, and agricultural waste. 527
Water Pollution - (1) Such contamination or other alteration of the physical, 529 chemical, or biological properties of any state waters, including change in 530 temperature, taste, color, turbidity, or odor of the waters, or (2) Such discharge of 531 any liquid, gaseous, solid, radioactive, or other substances into any state waters, 532 as will or is likely to create a nuisance or render such waters unreasonably harmful, 533 detrimental, or injurious to public health, safety, or welfare, including harm, 534 detriment, or injury to public water supplies, fish and aquatic life and wildlife, 535 recreational purposes and agricultural and industrial research and scientific uses 536 of such waters or as will or is likely to violate any water quality standards, effluent 537 standards, treatment and pretreatment standards, or standards of performance for 538 new sources adopted by the Department of Health. 539
Work - The furnishing of all labor, material, equipment, and other incidentals 541 necessary or convenient for the successful execution of all the duties and 542 obligations imposed by the contract. 543
Working Day - A calendar day in which a Contractor is capable of working four or 545 more hours with its normal work force, exclusive of: 546
101-13a 5/6/2021
(1) Saturdays, Sundays, and recognized legal State holidays and such 548 other days specified by the contract documents as non-working days, 549
(2) Day in which the Engineer suspends work for four or more hours 551 through no fault of the Contractor.” 552
END OF SECTION 101 557
102-1a 8/6/26
Make this section a part of the Standard Specifications: 1
“SECTION 102 - BIDDING REQUIREMENTS AND CONDITIONS 3
102.01 Prequalification of Bidders. Prospective bidders shall be capable of 6 performing the work for which they are bidding. 7
In accordance with HRS Chapter 103D-310, the Department may require 9 any prospective bidder to submit answers to questions contained in the 'Standard 10
Qualification Questionnaire For Prospective Bidders On Public Works Contracts' 11 furnished by the Department, properly executed and notarized, setting forth a 12 complete statement of the experience of such prospective bidder and its 13 organization in performing similar work and a statement of the equipment 14 proposed to be used, together with adequate proof of the availability of such 15 equipment. Whenever it appears to the Department, from answers to the 16 questionnaire or otherwise, that the prospective bidder is not fully qualified and 17 able to perform the intended work, the Department will, after affording the 18 prospective bidder an opportunity to be heard and if still of the opinion that the 19 bidder is not fully qualified to perform the work, refuse to receive or consider any 20 bid offered by the prospective bidder. All information contained in the answers to 21 the questionnaire shall be kept confidential. Questionnaire so submitted shall be 22 returned to the bidders after serving their purpose. 23
No person, firm or corporation may bid where (1) the person, firm, or 25 corporation, or (2) a corporation owned substantially by the person, firm, or 26 corporation, or (3) a substantial stockholder or an officer of the corporation, or (4) 27 a partner or substantial investor in the firm is in arrears in payments owed to the 28
State or its political subdivisions or is in default as a surety or failure to do 29 faithfully and diligently previous contracts with the State. 30
102.02 Contents of Proposal Forms. The Department will furnish 32 prospective bidders with proposal forms posted in HIePRO stating: 33
(1) The location, 35
(2) Description of the proposed work, 37
(3) The approximate quantities, 39
(4) Items of work to be done or materials to be furnished, 41
(5) A schedule of items, and 43
(6) The time in which the work shall be completed. 45
102-2a 8/6/26
Papers bound with or attached to the proposal form are part of the 47 proposal. The bidder shall not detach or alter the papers bound with or attached 48 to the proposal when the bidder submits its proposal through HIePRO. 49
Also, the bidder shall consider other documents including the plans and 51 specifications a part of the proposal form whether attached or not. 52
102.03 (Unassigned) 54
102.04 Estimated Quantities. The quantities shown in the contract are 56 approximate and are for the comparison of bids only. The actual quantity of work 57 may not correspond with the quantities shown in the contract. The Department 58 will make payment to the Contractor for unit price items in accordance with the 59 contract for only the following: 60
(1) Actual quantities of work done and accepted, not the estimated 62 quantities; or 63
(2) Actual quantities of materials furnished, not the estimated 65 quantities. 66
The Department may increase, decrease, or omit each scheduled 68 quantities of work to be done and materials to be furnished. When the 69
Department increases or decreases the estimated quantity of a contract item by 70 more than 15% the Department will make payment for such items in accordance 71 with Subsection 104.06 - Methods of Price Adjustment. 72
102.05 Examination of Contract and Site of Work. The bidder shall 74 examine carefully the site of the proposed work and contract before submitting a 75 proposal. 76
By the act of submitting a bid for the proposed contract, the bidder 78 warrants that: 79
(1) The bidder and its Subcontractors have reviewed the contract 81 documents and found them free from ambiguities and sufficient for the 82 purpose intended; 83
(2) The bidder and its workers, employees and subcontractors have 85 the skills and experience in the type of work required by the contract 86 documents bid upon; 87
(3) Neither the bidder nor its employees, agents, suppliers or 89 subcontractors have relied upon verbal representations from the 90
Department, its employees or agents, including architects, engineers or 91 consultants, in assembling the bid figure; and 92
102-3a 8/6/26
(4) The basis for the bid figure is solely on the construction contract 93 documents. 94
Also, the bidder warrants that the bidder has examined the site of the 96 work. From its investigations, the bidder acknowledges satisfaction on: 97
(1) The nature and location of the work; 99
(2) The character, quality, and quantity of materials; 101
(3) The difficulties to be encountered; and 103
(4) The kind and amount of equipment and other facilities needed. 105
Subsurface information or hydrographic survey data furnished are for the 107 bidders' convenience only. The data and information furnished are the product of 108 the Department's interpretation gathered in investigations made at the specific 109 locations. These conditions may not be typical of conditions at other locations 110 within the project area or that such conditions remain unchanged. Also, 111 conditions found at the time of the subsurface explorations may not be the same 112 conditions when work starts. The bidder shall be solely responsible for 113 assumptions, deductions, or conclusions the bidder may derive from the 114 subsurface information or data furnished. 115
If the Engineer determines that the natural conditions differ from that 117 originally anticipated or contemplated by the Contractor in the items of 118 excavation, the State may treat the difference in natural conditions, as falling 119 within the meaning of Subsection 104.02 – Changes. 120
102.06 Preparation of Proposal. The submittal of its proposal shall be on 122 forms furnished by the Department. The bidder shall specify in words or figures: 123
(1) A unit price for each pay item with a quantity given; 125
(2) The products of the respective unit prices and quantities; 127
(3) The lump sum amount; and 129
(4) The total amount of the proposal obtained by adding the amounts 131 of the several items. 132
The words and figures shall be in ink or typed. If a discrepancy occurs 134 between the prices written in words and those written in figures, the prices written 135 in words shall govern. 136
102-4a 8/6/26
When an item in the proposal contains an option to be made, the bidder 138 shall choose in accordance with the contract for that particular item. 139
Determination of an option will not permit the Contractor to choose again. 140
The bidder shall sign the proposal properly in ink. A duly authorized 142 representatives of the bidder or by an agent of the bidder legally qualified and 143 acceptable to the Department shall sign, including one or more partners of the 144 bidder and one or more representatives of each entity comprising a joint venture. 145
When an agent, other than the officer(s) of a corporation authorized to 147 sign contracts for the corporation or a partner of a partnership, signs the 148 proposals, a ‘Power of Attorney’ shall be on file with the Department or submitted 149 with the proposal. Otherwise, the Department will reject the proposal as irregular 150 and unauthorized. 151
The bidder shall submit acceptable evidence of the authority of the 153 partner, member(s) or officer(s) to sign for the partnership, joint venture, or 154 corporation respectively with the proposal. Otherwise, the Department will reject 155 the proposal as irregular and unauthorized. 156
102.07 Irregular Proposals. The Department may consider proposals 158 irregular and may reject the proposals for the following reasons: 159
(1) The proposal is a form not furnished by the Department, altered, or 161 detached; 162
(2) The proposal contains unauthorized additions, conditions, or 164 alternates. Also, the proposal contains irregularities that may tend to 165 make the proposal incomplete, indefinite, or ambiguous to its meaning; 166
(3) The bidder adds provisions reserving the right to accept or reject an 168 award. Also, the bidder adds provisions into a contract before an award; 169
(4) The proposal does not contain a unit price for each pay item listed 171 except authorized optional pay items; and 172
(5) Prices for some items are out of proportion to the prices for other 174 items. 175
(6) If in the opinion of the Director, the bidder and its listed 177 subcontractors do not have the Contactor’s licenses or combination of 178
Contractor’s licenses necessary to complete the work. 179
102-5a 8/6/26
Where the prospective bidder is bidding on multiple projects 181 simultaneously and the proposal limits the maximum gross amount of awards 182 that the bidder can accept at one bid letting, the proposal is not irregular if the 183 limit on the gross amount of awards is clear, and the Department selects the 184 awards that can be given. 185
102.08 Proposal Guaranty. The Department will not consider a proposal 187 of $25,000 or more unless accompanied by: 188
(1) A deposit of legal tender; or 190
(2) A valid surety bid bond, underwritten by a company licensed to 192 issue bonds in the State of Hawaii, in the form and composed, 193 substantially, with the same language as provided herewith and signed by 194 both parties; or 195
(3) A certificate of deposit, share certificate, cashier's check, 197 treasurer's check, teller's check, or official check drawn by, or a certified 198 check accepted by and payable on demand to the State by a bank, 199 savings institution, or credit union insured by the Federal Deposit 200
Insurance Corporation (FDIC) or the National Credit Union Administration 201
(NCUA). 202
(a) The bidder may use these instruments only to a maximum of 204
$100,000. 205
(b) If the required security or bond amount totals over $100,000 207 more than one instrument not exceeding $100,000 each and issued 208 by different financial institutions shall be acceptable. 209
(c) The instrument shall be made payable at sight to the 211
Department. 212
(d) If bidder elects options (1) or (3) above for its bid 214 security, said bid security shall be in its original form and shall 215 be submitted before the bid deadline to the Contract Office, 216
Department of Transportation, Aliiaimoku Hale, 869 Punchbowl 217
Street, Room 103, Honolulu, Hawaii 96813. Original surety bid 218 bonds do not need to be submitted to the Contracts Office. 219
Bidders are reminded that a copy of its surety bid bond shall 220 be included with its bid submitted and uploaded to HIePRO. 221
In accordance with HRS Chapter 103D-323, the above shall be in a sum 223 not less than 5% of the total amount bid per area. 224
102-6a 8/6/26
102.09 Delivery of Proposal. Bidders shall submit and upload the 226 complete proposal in HIePRO prior to the bid opening date and time. 227
Proposals received after said due date and time shall not be considered. 228
Any additional support documents explicitly designated as confidential 229 and/or proprietary shall be uploaded as a separate file to HIePRO. Bidders 230 shall not include confidential and/or proprietary documents with the 231 proposal. The record of each bidder and respective bid shall be open to 232 public inspection. Original (wet ink, hard copy) proposal documents are not 233 required to be submitted. Contract award shall be based on evaluation of 234 proposals submitted and uploaded to HIePRO. 235
FAILURE TO UPLOAD THE COMPLETE PROPOSAL TO HIePRO SHALL BE 237
GROUNDS FOR REJECTION OF THE BID. 238
If there is a conflict between the specification document and the HIePRO 240 solicitation, the specifications shall govern and control, unless otherwise 241 specified. 242
102.10 Withdrawal or Revision of Proposals. A bid may be modified or 244 withdrawn prior to the bid opening date and time. Withdrawal or revision of 245 proposal shall be completed, submitted and uploaded to HIePRO prior to the bid 246 opening date and time. 247
102.11 Public Opening of Proposals. Not applicable. 249
102.12 Disqualification of Bidders. The Department may disqualify a bidder 251 and reject its proposal for the following reasons: 252
(1) Submittal of more than one proposal whether under the same or 254 different name. 255
(2) Evidence of collusion among bidders. The Department will not 257 recognize participants in collusion as bidders for any future work of the 258
Department until such participants are reinstated as qualified bidders. 259
(3) Lack of proposal guaranty. 261
(4) Submittal of an unsigned or improperly signed proposal. 263
(5) Submittal of a proposal without a listing of subcontractors or 265 containing only a partial or incomplete listing of subcontractors. 266
(6) Submittal of an irregular proposal in accordance with Subsection 268
102.07 - Irregular Proposals. 269
102-7a 8/6/26
(7) Evidence of assistance from a person who has been an employee 271 of the agency within the preceding two years and who participated while in 272
State office or employment in the matter with which the contract is directly 273 concerned, pursuant to HRS Chapter 84-15. 274
(8) Suspended or debarred in accordance with HRS Chapter 104-25. 276
(9) Failure to complete the prequalification questionnaire, if applicable. 278
(10) Failure to attend the mandatory pre-bid meeting, if applicable. 280
102.13 Material Guaranty. The successful bidder may be required to furnish 282 a statement of the composition, origin, manufacture of materials, and samples. 283
102.14 Substitution of Materials and Equipment Before Bid Opening. See 285
Subsection 106.13 for Substitution of Materials and Equipment After Bid 286
Opening. 287
(A) General. When brand names of materials or equipment are 289 specified in the contract documents, they are to indicate a quality, style, 290 appearance, or performance and not to limit competition. The bidder shall 291 base its bid on one of the specified brand names unless alternate brands 292 are qualified as equal or better in an addendum. As specified in the 293
Notice to Bidders, all requests shall be posted as a question in HIePRO 294 under the “Question and Answer” tab. 295
Supporting documents for specific request shall be emailed to the 297
Project Manager specified in the Notice to Bidders. Request must be 298 posted in HIePRO and supporting documents received by the Project 299
Manager no later than fourteen (14) calendar days before the bid opening 300 date. 301
An addendum will be issued to inform all prospective bidders of any 303 accepted substitution in accordance with Subsection 102.17 – Addenda. 304
(B) Statement of Variances. The statement of variances must list all 306 features of the proposed substitution that differ from the contract 307 documents and must further certify that the substitution has no other 308 variant features.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .