Final SOW RBH Bathtub disposal four units Project0227202.pdf

PDF 5 MB Posted

Attached to
Remodel of Government Housing Bathrooms
Solicitation number
21-20-CEUSJ009A
Issued by

View the file

Other files

File Type Posted
wage determination Puerto Rico.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Purchase and Install New Bathtubs and walls at selected houses.

USCG Rio Bayamon Housing

Statement of Work

1. Description Of Work:

The work includes furnishing all personnel, equipment, materials, tools, supervision, labor and other items necessary to perform the removal and disposition of the existing bathroom tubs, the existing tiles at E1, E-6, J-6 and T-7 houses (four houses). These bathtubs and tiles are located on the second floor of each house. The project includes the installation of new bathtubs and the new three wall system around the bathroom tubs. The houses are three bedrooms and non ADA.

2. The work consist of but is not limited to the following:

a) The existing tubs were tested for lead and exceed the existing threshold. See assessment report attachment for reference only.

b) Remove existing bathtub and wall tiles around the bathtub (4 each). The

Contractor shall clean the areas after the removal of the bathtubs and certify the spaces are lead free as required using a “Certified Lead Abatement Professional.”

c) Provide “Certified Lead Risk Assessor” that will certify that the spaces are free of lead and provide a report (see item i).

d) Provide, install, and test new bathtubs at E1, E6, J-6 and T-7 houses. The new bathtubs must be from a non-lead material and shall be individually tested for lead using the XRF test.

e) Provide and install new three wall system. See reference attachment for similar walls being use in other housing bathtubs or approved equal.

f) The contractor shall install new appurtenances as needed for the new bathtubs and walls.

g) The Contractor shall repair any damaged without additional cost to the

Government.

h) The Contractor shall provide recommendations and a final report of the work performed including any laboratory results.

i) The Contractor is encourage to request a “site visit” to verify existing conditions.

j) The Contractor shall protect the work areas as needed and keep them clean.

k) The Contractor shall comply with all local and federal environmental requirements including the removal and disposition of the existing bathtubs.

l) The Contractor shall provide a project schedule prior project start.

m) The Contractor shall provide submittals for the new items to be installed.

n) Two of the four houses are occupied by tenants. USCG plans to relocate and pay for the relocation of the tenants to a guest house or hotel. It is expected that the

Contractor have all materials, labor and coordination ready to reduce as possible the house downtime.

General Requirements:

The Contractor is responsible for verifying all dimensions, quantities and conditions at the job site before commence of work and before ordering materials.

a) Materials and work not specifically mentioned herein but necessary for the proper completion of the specified work shall be coordinated with the Project Officer.

Only a warranted Contracting Officer can authorize additional work not covered in this scope. In the event additional work is authorized, the Contracting Officer shall issue a modification to the contract. Contractor Qualifications: The contractor shall have demonstrated at least four (4) years experience in general construction and plumbing work.

b) Contractor shall be required to commence work under this contract within the next forty five days after notice to proceed (NTP) given by the Contracting Officer. The project shall be completed within 15 days after commencement for a total of 60 days. The 60 days will include the time for submittals review and approved and to complete all project records (closeout documents). Any weather delays shall be immediately notified to the Contracting Officer.

c) Contractor shall submit a schedule of activities prior project start and also a three

(3) week activity vision plan for the project.

d) The project is located at:

US Coast Guard Rio Bayamón Housing

e) Contractor shall request final inspection prior to departing the worksite. The Contractor shall request final inspection with at least 2 working days in advance for proper coordination and approval. The Contractor shall provide any materials, labor and equipment and others so as to provide a usable and complete project.

f) Contractor shall coordinate all work with the USCG Engineering Department (COR) at 787-729-4302, the Facilities Manager Engineer at X-4304. Notify the USCG Engineering Department with at last 3 working days in advance of work at the site to allow the USCG to provide notification to affected users. Do not interrupt utilities until authorized by USCG Engineering Department.

g) The Contractor is authorized to work from 7:00 am – 16:00 Monday to Friday.

For any Saturday, Sunday or Holiday work the Contractor shall submit a letter five days prior the work to the RBH personnel and coordinate verbally with them.

Contractor shall provide the Contracting Officer with of names of all personnel who will be working on the site. The Contractor shall fill the “Visitor Log Form” and send to the USCG CSO Mr.Rolon. The list shall be provided at least 10 days prior the project start. The contractor may submit a revised list at any time during the project. Only personnel on the approved listing will be allowed on the site. All personnel shall carry proper identification (ID) when on site. Proper ID is defined as either the individual’s driver’s license, or a passport issued ID. The identification must be laminated, and show facial picture of the individual.

Individuals without proper ID will be escorted off the Coast Guard premises.

h) Warranty Document: Document shall state the manufacturer and/or contractor shall repair or replace the complete component if deterioration is caused by defective materials or workmanship. Also included shall be a paragraph certifying that all work was performed according to manufacturer’s recommendations. In addition, warranty shall specify that in the event of any deficiency created by an “Act of God” or any other event, if the contractor with the same original product does the repairs, the contractor shall continue honoring the existing warranty. Document shall be submitted to the COR or Facilities Manager Engineer for record.

i) The Contractor shall comply with the Immigration and Nationality Act (INA).

j) Contractor shall clean job site daily and dispose debris outside of USCG property.

k) Contractor shall conduct his operations so as to cause the least possible interference with the normal operations, streets, driveways, parking areas and others.

l) Contractor shall store materials only in places where directed by the Contracting Officer. No fire and hazardous materials or flammable liquids shall be stored or otherwise maintained within a building or structure, except as approved, and in accordance with the local fire regulations.

m) Contractor shall comply with all safety requirements, personnel protective equipment (PPE) and OSHA Safety and Health Standards Digest, latest version, in all his activities and operations to perform the work. The Contractor shall comply with EM-385 and PROSHA requirements.

n) Cleaning up: All clothes, cotton, wastes, sanding disks, and other cleaning materials which might constitute a fire hazard shall be placed in a metal container or destroyed at the end of each workday. Upon completion of the work, all staging, containers, and debris shall be removed from the site.

Adjacent areas and surfaces negatively affected during the performance of this contract shall be left clean and returned to the original condition. The Contractor shall not use Coast Guard waste disposal facilities including garbage cans, trash piles or dumpster to dispose of cleaning materials.

o) Protection of Premises: The Contractor shall take all necessary precautions to protect the Government and private property from damage as a result of his operations. Existing property so damaged shall be promptly restored, repaired or replaced to its original condition by the Contractor at his own expense.

p) Storm Protection: Should warnings of wind of gale force or stronger be issued, the Contractor shall take every practicable precaution to minimize dangers to persons, to the work, and to adjacent property. These precautions shall include removing all loose materials, tools, and/or equipment from exposed locations, and removing or securing other temporary work.

q) Contractor shall coordinate all required work with the USCG Engineering Department, Oswald L Mora via e-mail at oswald.l.mora@uscg.mil, tel: 787-729- 4304.

END OF SECTION

mailto:oswald.l.mora@uscg.mil

OLMora Oval

OLMora Callout E-1

OLMora Callout E-6

OLMora Callout J-6

OLMora Callout T-7

OLMora Text Box Rio Bayamon Housing Project Location

TYPICAL VIEW OF POSITIVE COMPONENTS

OLMora Callout Existing bathtub and wall tiles (Typ).

Line

E-6, J-6

OLMora Text Box E-1

OLMora Text Box E-1, E-6 (3 bedroom- Cluster C) J-6 (3 bedroom-Cluster C) T-7 (3 bedroom-Cluster A)

T-7 - (3 bedroom-Cluster A)

SHOP DRAWING/MATERIAL APPROVAL REQUEST

NOTE: ALL ENTRIES WILL BE FILLED IN BY TYPEWRITER OR PEN INK PROJECT NO: __________

FROM: CONTRACTOR _________________________________________________

CONTRACT NUMBER:

70Z082-_____________________

TASK ORDER:

70Z082-_____________________

SUBMISSION NUMBER

DATE

MORE FORMS REQUIRED

NO YES

TYPE OF SUBMITTAL

NEW RESUBMITTAL OF #

GOVERNMENT USE ONLY

ITEM

NO

SPECIFICATION

SECTION AND

PARAGRAPH NO

DESCRIPTION OF MATERIAL APPROVED APPROVED

AS

NOTED

DIS

APPROVED INT

CONTRACTOR’S SIGNATURE CERTIFIES THAT SUBMITTAL HAS BEEN REVIEWED AND APPROVED IAW FAR 52.236- 21, SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION AND/OR 52.236-5 MATERIAL AND WORKMANSHIP, AND THAT MATERIALS COMPLY WITH THE FAR 52.255, BUY AMERICAN ACT CONSTRUCTION MATERIALS

NO OF COPIES TO

(CEU) _____________

BY (NAME AND TITLE)

SIGNATURE

COMMENTS

FOR GOVERNMENT USE ONLY

ENGINEER/COR COMMENTS

TO: COR/CONSTRUCTION MANAGER

RECOMMEND APPROVAL, APPROVAL AS NOTED. OR DISAPPROVAL AS INDICATED AND SUBJECT TO APPLICABLE

COMMENTS ABOVE.

TYPED NAME AND GRADE

SIGNATURE

DATE

CONTRACTING OFFICERS REPRESENTATIVE (COR)

TO: CONTRACTOR

1. APPROVED, APPROVED AS NOTED OR DISAPPROVED AS INDICATED AND SUJECT TO ANY APPLICABLE

COMMENTS ABOVE.

2. REQUEST PROMPT RESUBMITTAL OF DISAPPROVED ITEMS WITHIN 7-BUSINESS DAYS.

TYPED NAME AND GRADE SIGNATURE DATE

Revised 10/4/2017 RRH

1178 Ave Dos Palmas, Levittown, Toa Baja, PR 00949

Tel. 787.261.8165 Web. www.plugincorp.com Email. kcolon@plugincorp.com

AVONITE WET WALL SYSTEM

(¼” TH FOUNDATION ACRYLIC SURFACING)

COLOR MALT F1-7810

*PRODUCT DATA

VERTICAL WALL PANEL INSTALLATION

CEMENTITIOUS BACKER BOARDS PANELS

DUROCK CEMENT BOARD

PERMABASE CEMENT BOARD

FRONT VIEW

'' FINISH TRIM

RIGHT SIDE VIEW LEFT SIDE VIEW

SCALE: 3/8'' = 1'

SCALE: 3/8'' = 1'

SCALE: 3/8'' = 1'

LEFT

RIGHT

FRONT

FRONT

LEFT

RIGHT

TYPICAL BATHROOM WITH SHOWER

NTS

PLAN VIEW

SOLID POLIMER WALL PANEL

FINISH TRIM

INSIDE CORNER

" SOLID POLIMER WALL PANEL

SCALE: 1/2'' = 1'

FRONT

RIGHT

LEFT

5 1/4"

3"

4 1/4"

1"

R5/8"

1"

1/4"

5°

3 1/4"

4 3/8"

12"

1/2"

13/16"

R0.6250

5 1/4"

R1/4"

1"

2"

9/16"

2°

10°

2°

5°

1/2"

1 1/4"

R1 1/8"

THRESHOLD

SCALE: NTS

SCALE: NTS

SCALE: NTS

SCALE: NTS

3 7/16"

1"

TYP

4 1/4"

Threshold

Panel Platform

5 1/4"

18"

36"

R5/8"

15 1/4"

3"

3"

19 1/2"

16 1/2"

36"

1 1/2"

R5/8"

A

B

B

" SOLID POLIMER WALL PANEL

" SOLID POLIMER WALL PANEL

" CEMENTITUOS BACKER BOARD

CORNER SHELF DISH

2" FINISH TRIM

CORNER SHELF DISH

CORNER SHELF DISH

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

J. NAZARIO

AutoCAD SHX Text

DESIGNED BY:

AutoCAD SHX Text

DRAWING BY:

AutoCAD SHX Text

CHECKED BY:

AutoCAD SHX Text

AS SHOWN

AutoCAD SHX Text

SPF-1

AutoCAD SHX Text

DRAWING NO.

AutoCAD SHX Text

SCALE:

AutoCAD SHX Text

SHEET:

AutoCAD SHX Text

AutoCAD SHX Text

OF

AutoCAD SHX Text

AutoCAD SHX Text

REVISION:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

DESCRIPTION:

AutoCAD SHX Text

PUERTO RICO 00953. TEL. (787) 870-8025 FAX. (787) 870-5928

AutoCAD SHX Text

#7 ANTONIO R. BARCELO STREET. SECOND FLOOR, TOA ALTA,

AutoCAD SHX Text

ENGINEERING AND CONSTRUCTION SERVICE CORPORATION

AutoCAD SHX Text

ORTI

AutoCAD SHX Text

GROUP

AutoCAD SHX Text

EMAIL MAOG@ORTIZGROUP.COM

AutoCAD SHX Text

FOR SHOWER AND BATHTUBS

AutoCAD SHX Text

SHOP DRAWINGS AND DETAILS

AutoCAD SHX Text

LOCATION:

AutoCAD SHX Text

500 CARR 177

AutoCAD SHX Text

USCG RIO BAYAMON HOUSING COMPLEX

AutoCAD SHX Text

BAYAMON, P.R. 00959

AutoCAD SHX Text

DRAWING DESCRIPTION:

AutoCAD SHX Text

PROJECT TITLE:

AutoCAD SHX Text

SOLID POLYMER WET WALL

AutoCAD SHX Text

AT SHOWER

AutoCAD SHX Text

DRAWING TITLE:

AutoCAD SHX Text

WALL REVETMENT AND SHOWER PAN

AutoCAD SHX Text

FINISH TRIM

AutoCAD SHX Text

CEMENTITOUS BAKER BOARD

AutoCAD SHX Text

SOLID POLIMER WALL PANEL

AutoCAD SHX Text

FINISH TRIM

AutoCAD SHX Text

SHOWER PAN

AutoCAD SHX Text

SHOWER PAN

AutoCAD SHX Text

MODELNUMBER

AutoCAD SHX Text

TRADENAME

AutoCAD SHX Text

PRODUCT

AutoCAD SHX Text

MATERIAL

AutoCAD SHX Text

EXISTING TILE

AutoCAD SHX Text

EXISTING SMOKE DETECTOR

AutoCAD SHX Text

MATERIAL

AutoCAD SHX Text

PRODUCT

AutoCAD SHX Text

TRADENAME

AutoCAD SHX Text

MODELNUMBER

AutoCAD SHX Text

14" SOLID POLIMER WALL PANEL

AutoCAD SHX Text

12' CEMENTITOUS BAKER BOARD

AutoCAD SHX Text

2"FINISH TRIM

AutoCAD SHX Text

CORNER SHELF DISH

AutoCAD SHX Text

CEMENTITOUS BAKER BOARD

AutoCAD SHX Text

12"CEMENTITOUS BAKER BOARD

AutoCAD SHX Text

%%UDRAIN

AutoCAD SHX Text

%%UTHRESHOLD

AutoCAD SHX Text

REINFORCEMENT

AutoCAD SHX Text

RIB FOR THRESHOLD

AutoCAD SHX Text

%%USHOWER PAN

AutoCAD SHX Text A

AutoCAD SHX Text

30/SEPT/2019

AutoCAD SHX Text

70Z08219CPACP1900

AutoCAD SHX Text

USCG BAYAMON HOUSING REPAIRS

TYPICAL BATHROOM WITH BATHTUB

NTS

FRONT

LEFT

RIGHT

FRONT VIEW

LEFT SIDE VIEW

RIGHT SIDE VIEW

SCALE:

" = 1' SCALE:

" = 1'

SCALE:

" = 1'

LEFT

RIGHT

FRONT

PLAN VIEW

" SOLID POLIMER WALL PANEL

2" FINISH TRIM

INSIDE CORNER

" SOLID POLIMER WALL PANEL

" CEMENTITOUS BAKER BOARD

SCALE:

" = 1'

FRONT

RIGHT

LEFT

" CEMENTITUOS BACKER BOARD

EXISTING CERAMIC TILES TO REMAIN

EXISTING CERAMIC

TILES TO REMAIN

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

J. NAZARIO

AutoCAD SHX Text

DESIGNED BY:

AutoCAD SHX Text

DRAWING BY:

AutoCAD SHX Text

CHECKED BY:

AutoCAD SHX Text

AS SHOWN

AutoCAD SHX Text

SPF-1

AutoCAD SHX Text

DRAWING NO.

AutoCAD SHX Text

SCALE:

AutoCAD SHX Text

SHEET:

AutoCAD SHX Text

AutoCAD SHX Text

OF

AutoCAD SHX Text

AutoCAD SHX Text

REVISION:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

DESCRIPTION:

AutoCAD SHX Text

PUERTO RICO 00953. TEL. (787) 870-8025 FAX. (787) 870-5928

AutoCAD SHX Text

#7 ANTONIO R. BARCELO STREET. SECOND FLOOR, TOA ALTA,

AutoCAD SHX Text

ENGINEERING AND CONSTRUCTION SERVICE CORPORATION

AutoCAD SHX Text

ORTI

AutoCAD SHX Text

GROUP

AutoCAD SHX Text

EMAIL MAOG@ORTIZGROUP.COM

AutoCAD SHX Text

FOR SHOWER AND BATHTUBS

AutoCAD SHX Text

SHOP DRAWINGS AND DETAILS

AutoCAD SHX Text

LOCATION:

AutoCAD SHX Text

500 CARR 177

AutoCAD SHX Text

USCG RIO BAYAMON HOUSING COMPLEX

AutoCAD SHX Text

BAYAMON, P.R. 00959

AutoCAD SHX Text

DRAWING DESCRIPTION:

AutoCAD SHX Text

PROJECT TITLE:

AutoCAD SHX Text

SOLID POLYMER WET WALL

AutoCAD SHX Text

AT BATHTUB

AutoCAD SHX Text

DRAWING TITLE:

AutoCAD SHX Text

WALL REVETMENT AND SHOWER PAN

AutoCAD SHX Text

12" CEMENTITOUS BAKER BOARD

AutoCAD SHX Text

14" SOLID POLIMER WET WALL PANEL

AutoCAD SHX Text

CORNER SHELF DISH

AutoCAD SHX Text

2"FINISH TRIM

AutoCAD SHX Text

2"FINISH TRIM

AutoCAD SHX Text

2" FINISH TRIM

AutoCAD SHX Text

14"SOLID POLIMER WALL PANEL

AutoCAD SHX Text

CORNER SHELF DISH

AutoCAD SHX Text

MATERIAL

AutoCAD SHX Text

PRODUCT

AutoCAD SHX Text

TRADENAME

AutoCAD SHX Text

MODELNUMBER

AutoCAD SHX Text

CORNER SHELF DISH

AutoCAD SHX Text

BRASS

AutoCAD SHX Text

FAUCETS

AutoCAD SHX Text

TABORET

AutoCAD SHX Text K-T8224-4

AutoCAD SHX Text

VITREOUS CHINA

AutoCAD SHX Text

TOILET

AutoCAD SHX Text

SANTA ROSA

AutoCAD SHX Text K-3323

AutoCAD SHX Text

30/SEPT/2019

AutoCAD SHX Text

70Z08219CPACP1900

AutoCAD SHX Text

USCG BAYAMON HOUSING REPAIRS

Shower Wall System submmittal for reference only.pdf
COMMENTS
FOR GOVERNMENT USE ONLY
WetWallSystems_MaterialsDatasheet_Coverpages.pdf (p.2-4)
Sheets and Views
Layout2
Sheets and Views
Layout2

File details come from the government source that posted it. Updated .