Purchase and Install New Bathtubs and walls at selected houses.
USCG Rio Bayamon Housing
Statement of Work
1. Description Of Work:
The work includes furnishing all personnel, equipment, materials, tools, supervision, labor and other items necessary to perform the removal and disposition of the existing bathroom tubs, the existing tiles at E1, E-6, J-6 and T-7 houses (four houses). These bathtubs and tiles are located on the second floor of each house. The project includes the installation of new bathtubs and the new three wall system around the bathroom tubs. The houses are three bedrooms and non ADA.
2. The work consist of but is not limited to the following:
a) The existing tubs were tested for lead and exceed the existing threshold. See assessment report attachment for reference only.
b) Remove existing bathtub and wall tiles around the bathtub (4 each). The
Contractor shall clean the areas after the removal of the bathtubs and certify the spaces are lead free as required using a “Certified Lead Abatement Professional.”
c) Provide “Certified Lead Risk Assessor” that will certify that the spaces are free of lead and provide a report (see item i).
d) Provide, install, and test new bathtubs at E1, E6, J-6 and T-7 houses. The new bathtubs must be from a non-lead material and shall be individually tested for lead using the XRF test.
e) Provide and install new three wall system. See reference attachment for similar walls being use in other housing bathtubs or approved equal.
f) The contractor shall install new appurtenances as needed for the new bathtubs and walls.
g) The Contractor shall repair any damaged without additional cost to the
Government.
h) The Contractor shall provide recommendations and a final report of the work performed including any laboratory results.
i) The Contractor is encourage to request a “site visit” to verify existing conditions.
j) The Contractor shall protect the work areas as needed and keep them clean.
k) The Contractor shall comply with all local and federal environmental requirements including the removal and disposition of the existing bathtubs.
l) The Contractor shall provide a project schedule prior project start.
m) The Contractor shall provide submittals for the new items to be installed.
n) Two of the four houses are occupied by tenants. USCG plans to relocate and pay for the relocation of the tenants to a guest house or hotel. It is expected that the
Contractor have all materials, labor and coordination ready to reduce as possible the house downtime.
General Requirements:
The Contractor is responsible for verifying all dimensions, quantities and conditions at the job site before commence of work and before ordering materials.
a) Materials and work not specifically mentioned herein but necessary for the proper completion of the specified work shall be coordinated with the Project Officer.
Only a warranted Contracting Officer can authorize additional work not covered in this scope. In the event additional work is authorized, the Contracting Officer shall issue a modification to the contract. Contractor Qualifications: The contractor shall have demonstrated at least four (4) years experience in general construction and plumbing work.
b) Contractor shall be required to commence work under this contract within the next forty five days after notice to proceed (NTP) given by the Contracting Officer. The project shall be completed within 15 days after commencement for a total of 60 days. The 60 days will include the time for submittals review and approved and to complete all project records (closeout documents). Any weather delays shall be immediately notified to the Contracting Officer.
c) Contractor shall submit a schedule of activities prior project start and also a three
(3) week activity vision plan for the project.
d) The project is located at:
US Coast Guard Rio Bayamón Housing
e) Contractor shall request final inspection prior to departing the worksite. The Contractor shall request final inspection with at least 2 working days in advance for proper coordination and approval. The Contractor shall provide any materials, labor and equipment and others so as to provide a usable and complete project.
f) Contractor shall coordinate all work with the USCG Engineering Department (COR) at 787-729-4302, the Facilities Manager Engineer at X-4304. Notify the USCG Engineering Department with at last 3 working days in advance of work at the site to allow the USCG to provide notification to affected users. Do not interrupt utilities until authorized by USCG Engineering Department.
g) The Contractor is authorized to work from 7:00 am – 16:00 Monday to Friday.
For any Saturday, Sunday or Holiday work the Contractor shall submit a letter five days prior the work to the RBH personnel and coordinate verbally with them.
Contractor shall provide the Contracting Officer with of names of all personnel who will be working on the site. The Contractor shall fill the “Visitor Log Form” and send to the USCG CSO Mr.Rolon. The list shall be provided at least 10 days prior the project start. The contractor may submit a revised list at any time during the project. Only personnel on the approved listing will be allowed on the site. All personnel shall carry proper identification (ID) when on site. Proper ID is defined as either the individual’s driver’s license, or a passport issued ID. The identification must be laminated, and show facial picture of the individual.
Individuals without proper ID will be escorted off the Coast Guard premises.
h) Warranty Document: Document shall state the manufacturer and/or contractor shall repair or replace the complete component if deterioration is caused by defective materials or workmanship. Also included shall be a paragraph certifying that all work was performed according to manufacturer’s recommendations. In addition, warranty shall specify that in the event of any deficiency created by an “Act of God” or any other event, if the contractor with the same original product does the repairs, the contractor shall continue honoring the existing warranty. Document shall be submitted to the COR or Facilities Manager Engineer for record.
i) The Contractor shall comply with the Immigration and Nationality Act (INA).
j) Contractor shall clean job site daily and dispose debris outside of USCG property.
k) Contractor shall conduct his operations so as to cause the least possible interference with the normal operations, streets, driveways, parking areas and others.
l) Contractor shall store materials only in places where directed by the Contracting Officer. No fire and hazardous materials or flammable liquids shall be stored or otherwise maintained within a building or structure, except as approved, and in accordance with the local fire regulations.
m) Contractor shall comply with all safety requirements, personnel protective equipment (PPE) and OSHA Safety and Health Standards Digest, latest version, in all his activities and operations to perform the work. The Contractor shall comply with EM-385 and PROSHA requirements.
n) Cleaning up: All clothes, cotton, wastes, sanding disks, and other cleaning materials which might constitute a fire hazard shall be placed in a metal container or destroyed at the end of each workday. Upon completion of the work, all staging, containers, and debris shall be removed from the site.
Adjacent areas and surfaces negatively affected during the performance of this contract shall be left clean and returned to the original condition. The Contractor shall not use Coast Guard waste disposal facilities including garbage cans, trash piles or dumpster to dispose of cleaning materials.
o) Protection of Premises: The Contractor shall take all necessary precautions to protect the Government and private property from damage as a result of his operations. Existing property so damaged shall be promptly restored, repaired or replaced to its original condition by the Contractor at his own expense.
p) Storm Protection: Should warnings of wind of gale force or stronger be issued, the Contractor shall take every practicable precaution to minimize dangers to persons, to the work, and to adjacent property. These precautions shall include removing all loose materials, tools, and/or equipment from exposed locations, and removing or securing other temporary work.
q) Contractor shall coordinate all required work with the USCG Engineering Department, Oswald L Mora via e-mail at oswald.l.mora@uscg.mil, tel: 787-729- 4304.
END OF SECTION
mailto:oswald.l.mora@uscg.mil
OLMora Oval
OLMora Callout E-1
OLMora Callout E-6
OLMora Callout J-6
OLMora Callout T-7
OLMora Text Box Rio Bayamon Housing Project Location
TYPICAL VIEW OF POSITIVE COMPONENTS
OLMora Callout Existing bathtub and wall tiles (Typ).
Line
E-6, J-6
OLMora Text Box E-1
OLMora Text Box E-1, E-6 (3 bedroom- Cluster C) J-6 (3 bedroom-Cluster C) T-7 (3 bedroom-Cluster A)
T-7 - (3 bedroom-Cluster A)
SHOP DRAWING/MATERIAL APPROVAL REQUEST
NOTE: ALL ENTRIES WILL BE FILLED IN BY TYPEWRITER OR PEN INK PROJECT NO: __________
FROM: CONTRACTOR _________________________________________________
CONTRACT NUMBER:
70Z082-_____________________
TASK ORDER:
70Z082-_____________________
SUBMISSION NUMBER
DATE
MORE FORMS REQUIRED
NO YES
TYPE OF SUBMITTAL
NEW RESUBMITTAL OF #
GOVERNMENT USE ONLY
ITEM
NO
SPECIFICATION
SECTION AND
PARAGRAPH NO
DESCRIPTION OF MATERIAL APPROVED APPROVED
AS
NOTED
DIS
APPROVED INT
CONTRACTOR’S SIGNATURE CERTIFIES THAT SUBMITTAL HAS BEEN REVIEWED AND APPROVED IAW FAR 52.236- 21, SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION AND/OR 52.236-5 MATERIAL AND WORKMANSHIP, AND THAT MATERIALS COMPLY WITH THE FAR 52.255, BUY AMERICAN ACT CONSTRUCTION MATERIALS
NO OF COPIES TO
(CEU) _____________
BY (NAME AND TITLE)
SIGNATURE
COMMENTS
FOR GOVERNMENT USE ONLY
ENGINEER/COR COMMENTS
TO: COR/CONSTRUCTION MANAGER
RECOMMEND APPROVAL, APPROVAL AS NOTED. OR DISAPPROVAL AS INDICATED AND SUBJECT TO APPLICABLE
COMMENTS ABOVE.
TYPED NAME AND GRADE
SIGNATURE
DATE
CONTRACTING OFFICERS REPRESENTATIVE (COR)
TO: CONTRACTOR
1. APPROVED, APPROVED AS NOTED OR DISAPPROVED AS INDICATED AND SUJECT TO ANY APPLICABLE
COMMENTS ABOVE.
2. REQUEST PROMPT RESUBMITTAL OF DISAPPROVED ITEMS WITHIN 7-BUSINESS DAYS.
TYPED NAME AND GRADE SIGNATURE DATE
Revised 10/4/2017 RRH
1178 Ave Dos Palmas, Levittown, Toa Baja, PR 00949
Tel. 787.261.8165 Web. www.plugincorp.com Email. kcolon@plugincorp.com
AVONITE WET WALL SYSTEM
(¼” TH FOUNDATION ACRYLIC SURFACING)
COLOR MALT F1-7810
*PRODUCT DATA
VERTICAL WALL PANEL INSTALLATION
CEMENTITIOUS BACKER BOARDS PANELS
DUROCK CEMENT BOARD
PERMABASE CEMENT BOARD
FRONT VIEW
'' FINISH TRIM
RIGHT SIDE VIEW LEFT SIDE VIEW
SCALE: 3/8'' = 1'
SCALE: 3/8'' = 1'
SCALE: 3/8'' = 1'
LEFT
RIGHT
FRONT
FRONT
LEFT
RIGHT
TYPICAL BATHROOM WITH SHOWER
NTS
PLAN VIEW
SOLID POLIMER WALL PANEL
FINISH TRIM
INSIDE CORNER
" SOLID POLIMER WALL PANEL
SCALE: 1/2'' = 1'
FRONT
RIGHT
LEFT
5 1/4"
3"
4 1/4"
1"
R5/8"
1"
1/4"
5°
3 1/4"
4 3/8"
12"
1/2"
13/16"
R0.6250
5 1/4"
R1/4"
1"
2"
9/16"
2°
10°
2°
5°
1/2"
1 1/4"
R1 1/8"
THRESHOLD
SCALE: NTS
SCALE: NTS
SCALE: NTS
SCALE: NTS
3 7/16"
1"
TYP
4 1/4"
Threshold
Panel Platform
5 1/4"
18"
36"
R5/8"
15 1/4"
3"
3"
19 1/2"
16 1/2"
36"
1 1/2"
R5/8"
A
B
B
" SOLID POLIMER WALL PANEL
" SOLID POLIMER WALL PANEL
" CEMENTITUOS BACKER BOARD
CORNER SHELF DISH
2" FINISH TRIM
CORNER SHELF DISH
CORNER SHELF DISH
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
J. NAZARIO
AutoCAD SHX Text
DESIGNED BY:
AutoCAD SHX Text
DRAWING BY:
AutoCAD SHX Text
CHECKED BY:
AutoCAD SHX Text
AS SHOWN
AutoCAD SHX Text
SPF-1
AutoCAD SHX Text
DRAWING NO.
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
SHEET:
AutoCAD SHX Text
AutoCAD SHX Text
OF
AutoCAD SHX Text
AutoCAD SHX Text
REVISION:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DESCRIPTION:
AutoCAD SHX Text
PUERTO RICO 00953. TEL. (787) 870-8025 FAX. (787) 870-5928
AutoCAD SHX Text
#7 ANTONIO R. BARCELO STREET. SECOND FLOOR, TOA ALTA,
AutoCAD SHX Text
ENGINEERING AND CONSTRUCTION SERVICE CORPORATION
AutoCAD SHX Text
ORTI
AutoCAD SHX Text
GROUP
AutoCAD SHX Text
EMAIL MAOG@ORTIZGROUP.COM
AutoCAD SHX Text
FOR SHOWER AND BATHTUBS
AutoCAD SHX Text
SHOP DRAWINGS AND DETAILS
AutoCAD SHX Text
LOCATION:
AutoCAD SHX Text
500 CARR 177
AutoCAD SHX Text
USCG RIO BAYAMON HOUSING COMPLEX
AutoCAD SHX Text
BAYAMON, P.R. 00959
AutoCAD SHX Text
DRAWING DESCRIPTION:
AutoCAD SHX Text
PROJECT TITLE:
AutoCAD SHX Text
SOLID POLYMER WET WALL
AutoCAD SHX Text
AT SHOWER
AutoCAD SHX Text
DRAWING TITLE:
AutoCAD SHX Text
WALL REVETMENT AND SHOWER PAN
AutoCAD SHX Text
FINISH TRIM
AutoCAD SHX Text
CEMENTITOUS BAKER BOARD
AutoCAD SHX Text
SOLID POLIMER WALL PANEL
AutoCAD SHX Text
FINISH TRIM
AutoCAD SHX Text
SHOWER PAN
AutoCAD SHX Text
SHOWER PAN
AutoCAD SHX Text
MODELNUMBER
AutoCAD SHX Text
TRADENAME
AutoCAD SHX Text
PRODUCT
AutoCAD SHX Text
MATERIAL
AutoCAD SHX Text
EXISTING TILE
AutoCAD SHX Text
EXISTING SMOKE DETECTOR
AutoCAD SHX Text
MATERIAL
AutoCAD SHX Text
PRODUCT
AutoCAD SHX Text
TRADENAME
AutoCAD SHX Text
MODELNUMBER
AutoCAD SHX Text
14" SOLID POLIMER WALL PANEL
AutoCAD SHX Text
12' CEMENTITOUS BAKER BOARD
AutoCAD SHX Text
2"FINISH TRIM
AutoCAD SHX Text
CORNER SHELF DISH
AutoCAD SHX Text
CEMENTITOUS BAKER BOARD
AutoCAD SHX Text
12"CEMENTITOUS BAKER BOARD
AutoCAD SHX Text
%%UDRAIN
AutoCAD SHX Text
%%UTHRESHOLD
AutoCAD SHX Text
REINFORCEMENT
AutoCAD SHX Text
RIB FOR THRESHOLD
AutoCAD SHX Text
%%USHOWER PAN
AutoCAD SHX Text A
AutoCAD SHX Text
30/SEPT/2019
AutoCAD SHX Text
70Z08219CPACP1900
AutoCAD SHX Text
USCG BAYAMON HOUSING REPAIRS
TYPICAL BATHROOM WITH BATHTUB
NTS
FRONT
LEFT
RIGHT
FRONT VIEW
LEFT SIDE VIEW
RIGHT SIDE VIEW
SCALE:
" = 1' SCALE:
" = 1'
SCALE:
" = 1'
LEFT
RIGHT
FRONT
PLAN VIEW
" SOLID POLIMER WALL PANEL
2" FINISH TRIM
INSIDE CORNER
" SOLID POLIMER WALL PANEL
" CEMENTITOUS BAKER BOARD
SCALE:
" = 1'
FRONT
RIGHT
LEFT
" CEMENTITUOS BACKER BOARD
EXISTING CERAMIC TILES TO REMAIN
EXISTING CERAMIC
TILES TO REMAIN
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
J. NAZARIO
AutoCAD SHX Text
DESIGNED BY:
AutoCAD SHX Text
DRAWING BY:
AutoCAD SHX Text
CHECKED BY:
AutoCAD SHX Text
AS SHOWN
AutoCAD SHX Text
SPF-1
AutoCAD SHX Text
DRAWING NO.
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
SHEET:
AutoCAD SHX Text
AutoCAD SHX Text
OF
AutoCAD SHX Text
AutoCAD SHX Text
REVISION:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DESCRIPTION:
AutoCAD SHX Text
PUERTO RICO 00953. TEL. (787) 870-8025 FAX. (787) 870-5928
AutoCAD SHX Text
#7 ANTONIO R. BARCELO STREET. SECOND FLOOR, TOA ALTA,
AutoCAD SHX Text
ENGINEERING AND CONSTRUCTION SERVICE CORPORATION
AutoCAD SHX Text
ORTI
AutoCAD SHX Text
GROUP
AutoCAD SHX Text
EMAIL MAOG@ORTIZGROUP.COM
AutoCAD SHX Text
FOR SHOWER AND BATHTUBS
AutoCAD SHX Text
SHOP DRAWINGS AND DETAILS
AutoCAD SHX Text
LOCATION:
AutoCAD SHX Text
500 CARR 177
AutoCAD SHX Text
USCG RIO BAYAMON HOUSING COMPLEX
AutoCAD SHX Text
BAYAMON, P.R. 00959
AutoCAD SHX Text
DRAWING DESCRIPTION:
AutoCAD SHX Text
PROJECT TITLE:
AutoCAD SHX Text
SOLID POLYMER WET WALL
AutoCAD SHX Text
AT BATHTUB
AutoCAD SHX Text
DRAWING TITLE:
AutoCAD SHX Text
WALL REVETMENT AND SHOWER PAN
AutoCAD SHX Text
12" CEMENTITOUS BAKER BOARD
AutoCAD SHX Text
14" SOLID POLIMER WET WALL PANEL
AutoCAD SHX Text
CORNER SHELF DISH
AutoCAD SHX Text
2"FINISH TRIM
AutoCAD SHX Text
2"FINISH TRIM
AutoCAD SHX Text
2" FINISH TRIM
AutoCAD SHX Text
14"SOLID POLIMER WALL PANEL
AutoCAD SHX Text
CORNER SHELF DISH
AutoCAD SHX Text
MATERIAL
AutoCAD SHX Text
PRODUCT
AutoCAD SHX Text
TRADENAME
AutoCAD SHX Text
MODELNUMBER
AutoCAD SHX Text
CORNER SHELF DISH
AutoCAD SHX Text
BRASS
AutoCAD SHX Text
FAUCETS
AutoCAD SHX Text
TABORET
AutoCAD SHX Text K-T8224-4
AutoCAD SHX Text
VITREOUS CHINA
AutoCAD SHX Text
TOILET
AutoCAD SHX Text
SANTA ROSA
AutoCAD SHX Text K-3323
AutoCAD SHX Text
30/SEPT/2019
AutoCAD SHX Text
70Z08219CPACP1900
AutoCAD SHX Text
USCG BAYAMON HOUSING REPAIRS
| Shower Wall System submmittal for reference only.pdf |
| COMMENTS |
| FOR GOVERNMENT USE ONLY |
| WetWallSystems_MaterialsDatasheet_Coverpages.pdf (p.2-4) |
| Sheets and Views |
| Layout2 |
| Sheets and Views |
| Layout2 |
File details come from the government source that posted it. Updated .