Final SOW_Boiler Plant Saftey Device Testing.docx

DOCX document 28 KB Posted

Attached to
H244--FY25 | Boiler Plant Safety Device Testing (Base +4)
Solicitation number
36C24225Q0173
Issued by

About this file

This Statement of Work details requirements for biannual boiler safety device testing, maintenance, inspection, and calibration services at the Northport VA Medical Center for two boilers (Boiler #3 - 20,000 lbs/hr and Boiler #4 - 40,000 lbs/hr). The work must comply with VHA Directive 1810 and VHA Boiler Safety Device Testing Manual (8th Edition), covering comprehensive testing of water level controls, pressure containment systems, fuel train safety devices, and burner/air train safety devices.

The period of performance includes a base period from February 1, 2025 to January 31, 2026, with four one-year option periods extending through January 31, 2030. The contractor must perform testing approximately every six months, with only one boiler being out of service at a time. Key requirements include furnishing all labor, materials, and equipment, providing detailed inspection reports within one week of testing, and immediately reporting any failures to the COR. The related sources sought notice indicates the government is considering various socioeconomic set-asides under NAICS code 238220 ($19.0M size standard), with limitations on subcontracting requiring the prime contractor to perform at least 50% of the work for services.

View the file

Other files

File Type Posted
36C24225Q0173.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

1.0 TITLE Boiler Plant Safety Device Testing

2.0 BACKGROUND

Boiler plant safety, reliability, efficiency, and equipment longevity are paramount concerns of Veterans Affairs Medical Center (VAMC) management. Boilers are extremely dangerous if not maintained properly. Malfunctioning burners or controls can cause catastrophic events resulting in injuries and death as well as massive property damage. Regular inspections, testing and calibration by expert technicians are an essential part of a program to address these concerns.

3.0 INTRODUCTION

The Northport VA Medical Center has a biannual requirement for boiler safety device maintenance, inspection, testing, and calibration on two boilers, named Boiler #3 and Boiler #4. This statement of work describes the requirements for the inspection, testing and calibration of the boiler plant safety devices by qualified technicians in accordance with VHA Directive 1810 and the VHA Boiler Safety Device Testing Manual (8th Edition).

4.0 EQUIPMENT

1. Boiler #3 – 20,000 lbs/hr, Keeler/STD-NB4470, Water tube, Nat Gas, SN-1461-3

2. Boiler #4 – 40,000 lbs/hr, Keeler/STD-NB4471, Water tube, Nat Gas, SN-1461-4

5.0 SCOPE

1. Technicians shall furnish all labor, materials, supplies, equipment, and transportation necessary to perform the required semi-annual maintenance specified by VHA Directive 1810 on Boiler Plant Safety Devices and accomplish the services contained within this contract. The VHA Boiler Plant Safety Device Testing Manual (8th or latest edition) will be used as the primary procedure to test all boiler safety devices.

2. Safety device identification and labeling including set point and normal operating range is to be determined and set prior to test.

3. The contractor shall ensure that all safety devices are plumbed correctly and in their correct place.

4. The contractor shall ensure the safety device set point is correct.

5. The contractor shall ensure the safety device activates at the correct set point.

6. The contractor shall ensure the safety device produces the required effect.

7. This scope includes, but is not limited to the following devices and systems for the boilers:

5.7.1 Water level Control

5.7.1.1 Four low water cutoffs

5.7.1.2 Two low water alarm

5.7.1.3 Two high water alarm

5.7.1.4 Two overflow drain system

5.7.2 Pressure Containment

5.7.2.1 One steam safety valve

5.7.2.2 Relief Valves (3 per boiler)

5.7.2.3 Two high steam pressure limit switches

5.7.2.4 Two boiler hydrostatic testing

5.7.2.5 Two high steam pressure cutout manual reset

5.7.2.6 Low atomizing media supply pressure

5.7.2.7 Low atomizing media burner pressure

5.7.3 Fuel Train Safety Devices

5.7.3.1 Two low pressure fuel cutoff switch

5.7.3.2 Two high pressure fuel gas cutoff switch

5.7.3.3 Two venting between automatic gas shutoff valves

5.7.3.4 Leak test of automatic gas shutoff valves

5.7.3.5 Two oil low atomizing media pressure and differential pressure switches

5.7.3.6 Two automatic fuel shutoff valve proof of closure switch

5.7.3.7 Two gas safety shutoff valve leak test

5.7.3.8 Two gas safety shutoff valve leak test

5.7.3.9 Main gas vent valve leak test

5.7.3.10 Two pilot gas shutoff valve leak test

5.7.3.11 Two Pilot gas shutoff valve leak test

5.7.3.12 Pilot gas vent

5.7.3.13 Two Gas safety shutoff valve proof of closure

5.7.4 Burner and Air Train Safety Devices

5.7.4.1 Two flame scanner

5.7.4.2 Two Low fire proving switch

5.7.4.3 Two Combustion air pressure switch

5.7.4.4 Two Combustion air flow

5.7.4.5 Two Purge air flow proving switch

5.7.4.6 Two Burner position switch

5.7.4.7 Two Forced draft motor interlock

5.7.4.8 Two Furnace pressure interlock

5.7.4.9 Two Outlet stack damper position interlock

5.7.4.10 Two Forced draft damper wide open pre-purge proving switch

5.7.4.11 Two Pre-purge and post-purge timer

5.7.4.12 Two Igniter timer and main flame ignition timer

5.7.4.13 Two Automatic fuel shutoff valve closure time after main flame failure

5.7.4.14 Automatic fuel shutoff valve closure time after pilot

5.7.4.15 Minimum pilot flame test

5.7.4.16 Two Control air pressure alarms

5.7.4.17 Two Flue gas re-circulation damper interlock with alarm/ makeup unit

8. All forced draft fan vortex dampers bushings shall be lubricated once a year with evidence provided to the Contracting Officer Representative (COR) in writing or as pictures.

6.0 GENERAL REQUIREMENTS

1. Contractor shall inspect all Boiler Safety Devices using the checklist provided in Statement of Work (SOW) Section 5.7.

2. Only one boiler at a time can be out of service for the inspection, testing, and calibration procedures.

3. All testing shall adhere to VHA Directive 1810 and VHA Boiler and Associated Plant Safety Device Testing, Eighth or latest edition. Where not defined, testing will be IAW good engineering and proven past practice accepted by industry standards and equipment manufactures.

6.3.1 Refer to Attachment “A” for the eighth edition of this safety device testing manual.

6.3.2 Refer to Attachment “B” for VHA Directive 1810

7.0 SCHEDULE

1. Work shall be completed twice annually, approximately every six months.

2. Contractor shall coordinate exact date and time of the testing with the VA COR prior to any work.

7.2.1 Work cannot be scheduled during heavy steam load periods.

7.2.2 Work must not interfere with boiler cleanings and inspections.

8.0 PERIOD OF PERFORMANCE

Base Period:February 1 ,2025 – January 31, 2026
Option Period 1:February 1 ,2026 – January 31, 2027
Option Period 2:February 1 ,2027 – January 31, 2028
Option Period 3:February 1 ,2028 – January 31, 2029
Option Period 4:February 1 ,2029 – January 31, 2030

9.0 PLACE OF PERFORMANCE

Northport VA Medical Center Boiler Plant building 203 79 Middleville Road Northport, NY 11768.

10.0 REPORTING

1. A detailed report of inspection for each safety device tested must be supplied to the COR within one week of when the testing was performed. At a minimum the following information will be delivered to the COR in a table:

10.1.1 The first column, labeled “Function,” did the device pass or fail.

10.1.2 The second column, labeled “Device,” list the device number and description in accordance with the VHA Boiler Plant Safety Devices Testing Manual, (8th Edition).

10.1.3 The third column, labeled “Deficiencies-Recommendations.”

10.1.4 The fourth column, labeled “Corrective Actions,” lists any corrective actions taken during the inspection.

10.1.5 The fifth column with the date tested.

10.1.6 The sixth column with the name of the person performing the test.

10.1.7 The seventh column will be for comments.

2. All failures must be immediately reported to the COR and the Boiler Plant Operator.

11.0 SAFETY PRECAUTIONS

1. The Contractor shall comply with all applicable Federal, State, and local legal requirements regarding workers health and safety. The requirements include but are not limited to, those found in Federal and State Occupational Safety and Health Act (OSHA) statutes and regulations, such as applicable provisions of Title 29, Code of Federal Regulations (CFR) Parts 1910 and 1926. Contractor is solely responsible for determining the legal requirements that apply to activities and shall ensure safe and healthful working conditions for its employees.

2. Contractor shall assume the responsibility to guard against causing of fires and/or explosions and to protect Government Property.

3. The Contractor shall perform the work in a manner consistent with the area security and fire safety regulations especially regarding exits and exit way access. Utility shutdowns shall not compromise security, communication, or fire safety for occupants.

4. No flammable liquids shall be stored or used in the medical center.

5. The Contractor shall receive from the COR a permit for all cutting, welding, and soldering 24 hours in advance. All permits shall be prominently displayed during all construction.

6. All necessary precautions shall be taken by the contractor to prevent accidental operation of any existing smoke detectors or sprinkler heads.

12.0 INFORMATION SECURITY / PRIVACY / RECORDS MANAGEMENT

1. This contract does not involve access to VA patient/employee information and does not involve access and/or connection to the VA information system.

2. The contractor shall complete VA Privacy Training for Personnel without Access to VA Computer Systems or Direct Access to or the Use of VA Sensitive Information.

12.2.1 The COR will provide training document 20939 which satisfies the “basic” privacy training requirement for contractor, volunteer, or other personnel. All contractor personnel performing work on this contract shall complete and return the training document to the COR prior to starting work.