Summary: RFB 605 2600000575 - Electrical Maintenance District 6

This is a Request for Bid (RFB) solicitation issued by the Kentucky Transportation Cabinet (KYTC) Division of Purchases on behalf of KYTC District 6 for electrical maintenance and repair services covering eleven counties in northern Kentucky (Boone, Bracken, Campbell, Carroll, Gallatin, Grant, Harrison, Kenton, Owen, Pendleton, and Robertson). The scope of work encompasses field construction, troubleshooting, and repair of traffic signals, flashing beacons, school flashers, and roadway and bridge lighting systems. The solicitation requires bidders to furnish detailed staffing plans, vehicle documentation (VINs for all bucket and line trucks not exceeding 12 years old), and employee qualifications including electrical contractor licenses, electrician certifications (IMSA Level 1 and 2, IMSA Roadway Lighting Level I), and various work zone traffic control certifications. The written question deadline is May 8, 2026 at 4:00 PM, with responses posted by May 12, 2026 at 4:00 PM. Electronic bids close on May 19, 2026 at 1:30 PM Eastern Time with a tentative award date of June 1, 2026. The initial contract term runs from June 1, 2026 through May 31, 2027, with four optional one-year renewal periods available at mutual agreement.

Pricing is the sole award criterion (100 points), with the lowest-cost responsive and responsible bidder receiving the contract. The solicitation establishes maximum hourly rates for electricians ($66.00), laborers ($40.00), and equipment operators ($55.00), with on-call rates capped at $10.00 per electrician per hour. Prices are firm for the first twelve months, with subsequent increases limited to documented industry-wide changes. All bid submissions must be made electronically through the Kentucky eProcurement System (https://vss.ky.gov); email and hard copy submissions are not accepted. Bidders must enter $0.01 for price with actual bid prices on an attached bid sheet. Kentucky resident bidder preference applies under KRS 45A.490-494, and preferences for qualified bidders (15% bonus points) and Kentucky Correctional Industries (20% bonus points) apply. Vendors must provide Certificates of Insurance with $1,000,000 minimum general liability coverage and $1,000,000 automobile liability coverage, and must comply with all state employment, tax, and workers' compensation laws.

View the file

Other files

File Type Posted
How to Submit an Online Response - March 2023.pdf PDF
Bid Sheet Electrical Maintenance D6.xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Document ID: RFB 605 2600000575 Page: 1

Commonwealth of Kentucky

SOLICITATION

Modification: No Version #:

TITLE: Electrical Maintenance District 6

Date Issued:

05/01/2026 Record Date:

05/01/2026

Solicitation Closes Date:

05/19/2026 Time:

13:30

Solicitation No:

RFB 605 2600000575

Online Bidding Prohibited: No

For Information Call:

LATASHA CHENAULT

502-782-5673

Bid Receiving Location:

Bid Receiving

See Terms & Conditions for Bid Submission Instructions

Other KY

Vendor Customer Number:

Vendor Name:

Phone Number:

Fax Number:

Email Address:

Ordering

Address:

City, State, Zip:

Contact Name:

Contact Email:

Contact Phone Number:

Payment

Address:

City, State, Zip:

Contact Name:

Contact Email:

Contact Phone Number:

Ownership Type

__ Sole Proprietorship __ Partnership __ Corporation __ Other_________________________

SIGNATURE OF AUTHORIZED AGENT IS REQUIRED UNLESS RESPONSE

IS SUBMITTED ELECTRONICALLY. FAILURE TO SIGN SHALL RENDER

THE BID INVALID.

Signature X_________________________________________ FEIN#____________________ Date____________

All offers subject to all terms and conditions contained in this solicitation.

Document ID: RFB 605 2600000575 Page: 2

Line Items

Commodity Group: Default Commodity Group

Line CL Description Quantity UOM Unit Cost Line Total or Contract Amnt

1 District 6 Electrical Maintenance 0.00000 ITM

Comm Code Comm Description Manufacturer Model # Manuf Part #

96883 Traffic Signal Maintenance and Repair

Extended Description District 6 Electrical Maintenance

***ONLY ONLINE BIDS WILL BE ACCEPTED FOR THIS RFB.*** Emailed and hard copies delivered by any method WILL NOT BE ACCEPTED.

*On this line, Bidders must enter $0.01 for price and zero (0) for delivery in the e-procurement system.* To do this, see attached document How to Respond to an Online Bid through the Kentucky Vendor Self Service site (updated).pdf.

*ALL actual BID PRICES must be entered on attached Bid Sheet and submitted as an attachment in the e-procurement system.*

*Please enter contact person, phone number, and email address on the bid sheet.* Vendors should review and update, if necessary, all addresses and contact persons for their account prior to bid submission. This information will carry forward to a contract if awarded, therefore please ensure all information is correct.

See Terms and Conditions and specifications.

Shipping Information KYTC District 6 - Covington District Office

421 Buttermilk Pike

Covington KY 41017-0130

Billing Information KYTC District 6 - Covington District Office

421 Buttermilk Pike

Covington KY 41017-0130

Document ID: RFB 605 2600000575 Page: 3

Submission Checklist

The following items will be required to be submitted with bid:

Item Vendor with the lowest price will receive the highest evaluated score.

ELECTRONIC BID SUBMISSION

Bid responses shall be received by electronic submission in the eProcurement system.

Link: https://vss.ky.gov

An electronic bid shall be authorized by the proper agent of the firm by the act of submitting it electronically through the eProcurement system.

Bid information MUST be completed online. Response must contain all required information for the Solicitation.

All bidders MUST be registered in the Commonwealth eProcurement System via the Vendor Self Service System at https://vss.ky.gov

Allow 24 – 48 hours to complete Vendor Registration. Vendors must be logged in to their Vendor Self Service (VSS) account in order to submit a response. Registrations completed the day of bid closing must be completed by the Vendor in the VSS portal. The Customer Resource Center is not able to complete registrations and activate accounts on the same day. Closing dates will not be extended for Vendors not registered by the date/time of the bid closing. Vendor Self Registration Guides are provided at https://finance.ky.gov/eProcurement/Pages/doing-business-with-the-commonwealth.aspx

All bidders are cautioned to begin their electronic submission in sufficient time to complete before the closing date and time. Delays due to technical difficulties or document upload impediments shall not be justification for acceptance of a late bid or proposal. Vendor attention to this advisory is encouraged. If you need assistance, please contact the Customer Resource Center (CRC) by email at Finance.CRCGroup@ky.gov or phone 502-564-9641 or toll-free 877-973-HELP (4357).

BID PRICES SUBMITTED ON COMPANY QUOTE FORMS ARE DISCOURAGED. COMPANY TERMS AND

CONDITIONS AND/OR SALES AND USE AGREEMENTS OFTEN CONFLICT WITH STANDARD SOLICITATION

REQUIREMENTS AND MAY RESULT IN REJECTION OF BID OFFER.

Online bid responses must be in an “Accepted” status and shall be assigned a date and time stamp from the eProcurement system at the time of final acceptance and formal submission by the vendor. The system will not allow submission of an online response after the published date and time for closing.

An offer may be modified or withdrawn by electronic or written notice ONLY if received prior to the bid closing date and time. An electronic offer may be modified by applying the appropriate electronic signature and following the procedure in the state’s eProcurement signature.

PUBLIC BID READINGS

Any person wishing to hear a bid reading may call the conference line at 866-830-9434, Participant Code 21327950, at 3:00 pm, Eastern Time on the bid closing date.

BID SUBMISSION CHECKLIST

The vendor MUST include the following with the bid submission. If the items below are not submitted with the bid, the Commonwealth MUST deem the bid non-responsive and SHALL NOT be considered for award.

_____ BID INFORMATION – COMPLETED (See Section 5.00)

_____ BID SHEET (ATTACHED)

All other items MUST be submitted prior to award however, vendors are strongly encouraged to include with bid submission.

Document Phase Document Description Page 4

2600000575 Final Electrical Maintenance District 6 Total Pages: 52 https://vss.ky.gov https://vss.ky.gov https://finance.ky.gov/eProcurement/Pages/doing-business-with-the-commonwealth.aspx https://finance.ky.gov/eProcurement/Pages/doing-business-with-the-commonwealth.aspx mailto:Finance.CRCGroup@ky.gov

_____ CERTIFICATE OF AUTHORITY – REGISTRATION WITH SECRETARY OF STATE BY FOREIGN

ENTITY (See Section 2.26)

_____ REQUIRED AFFIDAVIT(S) (See Attachments A, B, C, etc. as applicable)

_____ REQUIRED VINs (Section 1.08)

_____ EMPLOYEE QUALIFICATIONS (Section 1.09)

_____ CERTIFICATE OF INSURANCE (See Section 1.27)

PLEASE READ THIS SOLICITATION AND ITS INSTRUCTIONS IN ITS ENTIRETY.

This is a Request for Bid (RFB).

Vendors shall comply with the terms and conditions stated in the solicitation.

Any efforts to negotiate these terms and conditions SHALL NOT be accepted and SHALL cause the bid to be deemed non-responsive.

Vendors should review and comply with the general bidding requirements listed under “Procurement Laws, Preference, Regulations and Policies” and “Response to Solicitation” located on the eProcurement Web page at https://finance.ky.gov/eProcurement/Pages/procurement-laws-regulations-and-policies.aspx and https://finance.ky.gov/eProcurement/Pages/doing-business-with-the-commonwealth.aspx respectively. The vendor must comply with all applicable statutes, regulations and policies related to this procurement.

Section 1 - Scope of Work – Service

1.00 - SPECIFICATIONS OF SERVICES REQUIREMENTS

MILEAGE IS INCIDENTAL TO THIS CONTRACT AND IS NO LONGER A PAY ITEM.

ANY TRAFFIC CONTROL BY THE CONTRACTOR SHALL BE INCIDENTAL TO THE WHOLE

CONTRACT.

ELECTRICAL MAINTENANCE AND REPAIR CONTRACT

1.01 Scope of Work

The scope of this contract shall include, but not be limited to, the following type of work:

Field construction, troubleshooting, and repair of:

Traffic signals Flashing beacons School flashers.

Roadway, aviation, bridge, pedestrian, bridge, rest area, weight station, intersection, tunnel, and navigation lighting

1.02 Locations

Document Phase Document Description Page 5

2600000575 Final Electrical Maintenance District 6 Total Pages: 52 https://finance.ky.gov/eProcurement/Pages/procurement-laws-regulations-and-policies.aspx https://finance.ky.gov/eProcurement/Pages/doing-business-with-the-commonwealth.aspx

All work on this contract shall take place in the following counties: Boone, Bracken, Campbell, Carroll, Gallatin, Grant, Harrison, Kenton, Owen, Pendleton, and Robertson counties.

The Contractor shall provide technical expertise, labor, working equipment, and all tools necessary for the work associated with this contract. The contractor shall be licensed by Department of Housing, Building, & Construction as an Electrical Contractor. The Contractor should have at least a three (3) person crew for all work on this contract.

One employee on the crew shall be a License Electrician per the Department of Housing, Building, & Construction.

The Contract Manager shall have the final decision on the number of vehicles, persons for each crew, and number of crews actively working in the district.

All electrical work shall be conducted or supervised by a licensed electrician. Non-electrical work may be supervised by personnel without an electrical license. If questions arise, the Contractor Manager shall make the final determination as to what work needs to be supervised by a licensed electrician, the Contract Manager may require the replacement of an individual who is not performing satisfactorily.

1.03 Electrical Traffic Control Devices Work

The Contractor’s vehicles per signal job shall consist of two vehicles per 3 person crew. If other vehicles are needed, the contractor shall get prior approval from the Contract Manager to add any other vehicles for each crew. The Contractor shall use bucket trucks with a maximum working height in the range of 30 feet when doing signal work on this contract. If a larger bucket truck is required for signal work, the Contractor shall get prior approval from the Contract Manager before larger bucket trucks will be allowed to be used on this contract.

By the end of the initial contract term, the Contractor shall be able to furnish one person in addition to the Electrician for each field crew who is certified in IMSA Level I (field or construction) and ACI Level 1 Concrete Field Testing.

1.04 Lighting Work

The Contractor’s vehicles per lighting job shall consist of a service and bucket truck per crew. If other vehicles are needed, the contractor shall get prior approval from the Contract Manager to add any other vehicles for each crew.

The Contractor shall use bucket trucks with a maximum working height in the range of 50 feet when doing lighting work on this contract. If a larger bucket truck is required for lighting work, the Contractor shall get prior approval from the Contract Manager before larger bucket trucks will be allowed to be used on this contract.

By the end of the initial contract term, the Contractor shall be able to furnish one person for each field crew who is certified in IMSA Roadway Lighting Level I.

1.05 Standards

All work shall be completed in a professional manner and meet the requirements of the local utility, any supplied drawings or plans, and the latest editions of the National Electrical Code, the Manual on Uniform Traffic Control Devices, and the Kentucky Department of Highways’ Standard Specifications for Road and Bridge Construction including all current supplemental standard specifications and special notes (with the exception of Section 109) and the Division of Highway Design Standard Drawings.. All work shall be done in accordance with the Division of Traffic Operations’ specifications for signals and lighting. The Contractor shall be responsible for conforming to all OSHA and KOSHA safety requirements for all work performed.

The Division of Traffic Operations’ specifications for signals and lighting can be found at:

Traffic Design Standards and Tools | KYTC

The Kentucky Department of Highways’ Standard Specifications for Road and Bridge Construction can be found at:

Document Phase Document Description Page 6 https://transportation.ky.gov/TrafficOperations/Pages/Design-Services-Branch-Standards-and-Tools.aspx http://transportation.ky.gov/Construction/Pages/Standard-Specification-with-Supplemental-Specification- Included.aspx

The Manual on Uniform Traffic Control Devices can be found at:

http://mutcd.fhwa.dot.gov

The Division of Highway Design for standard drawings of various items can be found at:

https://transportation.ky.gov/Highway-Design/Pages/Standard-Drawings.aspx

106 PUBLIC INFORMATION

The Contractor shall notify the Contract Manager three business days in advance of any planned work that might significantly impact traffic flow in case the District wants to relay this information to the public.

1.07 TERMINATION OF CONTRACT

In the event the contract is terminated for any reason, the Contractor shall be paid for the work performed or services rendered up to and including the date of cancellation.

In the event the parties cannot reach a mutual agreement as to the amount of work performed or services rendered then, the matter shall be submitted to the Secretary of the Kentucky Transportation Cabinet for review. The decision by the Secretary of the Kentucky Transportation Cabinet shall be final and binding on both parties.

1.08 DOCUMENTATION OF VEHICLE QUALIFICATIONS

All bucket trucks and line trucks shall not be more than 12 years old at time of award. Prior to award the Contractor shall submit VIN’s of all bucket trucks and line trucks that will be used on this contract. If the contractor will be using a rental truck, the Contractor shall submit VIN’s for verification of the age requirement. The Contractor shall submit the titles to the Contract Manager for all bucket trucks and line trucks that are used on this contract before any truck can be used on this contract. The Contract Manager may require the replacement of any equipment that is not performing satisfactorily.

1.09 DOCUMENTATION OF EMPLOYEE QUALIFICATIONS:

The Contractor shall submit the following information:

# Proof of Electrical Contractor license issued by Department of Housing, Building, & Construction.

# Proof of electrician license issued by Department of Housing, Building, & Construction for each crew.

# Staffing plan # Proof of certification for the International Municipal Signal Association (IMSA) Level 1 and 2(Field or

Construction) for all Electricians. - All IMSA certifications shall be valid and up to date # Diplomas # Work Zone Traffic Control Supervisor Qualification – WZTCS. Contractor is required to have at least one.

Qualifications shall be current within 5 years.

# ACI Level 1 Concrete Field Testing Qualification # Work Zone Traffic Control Technician Qualification –WZTCT. Each crew shall have one WZTCT initially and all members of the crews shall have qualifications within 6 months. Qualifications shall be current within 5 years.

# Flagging credentials - All employees shall have this requirement. Qualifications shall be current within 5 years.

See the following websites for qualifying classes:

Document Phase Document Description Page 7 http://transportation.ky.gov/Construction/Pages/Standard-Specification-with-Supplemental-Specification-Included.aspx http://transportation.ky.gov/Construction/Pages/Standard-Specification-with-Supplemental-Specification-Included.aspx http://mutcd.fhwa.dot.gov https://transportation.ky.gov/Highway-Design/Pages/Standard-Drawings.aspx http://www.kyt2.com/training/course/work-zone-traffic-control-supervisor-qualification/work-zone-qualification-training http://www.kyt2.com/training/course/work-zone-traffic-control-technician-qualification/work-zone-qualification-training

Kentucky Transportation Center:

https://kyt2.uky.edu/training/work-zone-qualification-training-program

American Traffic Safety Services Association:

https://www.atssa.com/Training/Certification

Kentucky Laborers’ Joint Apprenticeship & Training Trust Fund:

https://www.kltf.org/construction-classes#traffic-control-technician

Kentucky Concrete Association https://kyconcrete.org/

# Any other supporting documentation requested for each employee initially assigned to the contract.

The Contractor shall submit all information necessary to verify experience and training. This staffing plan shall be submitted with their bid. The Cabinet shall verify all credentials prior to award of contract.

The field crews shall be comprised of personnel on the original approved staffing plan, or with future approved personnel. Substituting less experienced personnel after award of contract may result in termination of the contract.

Field crews shall submit credentials to the Contract Manager, including IMSA, WZTCT, WZTCS, ACI certifications (including contact info) prior to beginning work. Anytime that new crews or personnel are added, credentials shall be supplied to the Contract Manager prior to work commencing. Documentation of credentials will be required for each new employee added to the contract.

1.10 Employee QUALIFICATIONS

Electricians shall meet all of the following qualifications:

# Licensed electrician issued by the Department of Housing, Building, & Construction # IMSA Level 2(field or construction) certification - shall be renewed with IMSA. All electricians shall have this certification within 6 months of the start of the contract. Proof of certification shall be sent to the Contract Manager upon renewal of contract. If certification is not presented, the contract will not be renewed.

# IMSA Roadway Lighting Level I certification. All electricians shall have this certification within six months of the start of the contract. Proof of certification shall be sent to the Contract Manager upon renewal of contract. If certification is not presented, the contract will not be renewed.

# Work Zone Traffic Control Technician Qualification. All electricians shall have this certification within 6 months of the start of the contract.

# Flagging credentials # ACI Level 1 Concrete Field Testing. All electricians shall have this certification within 6 months of the start of the contract.

# Sufficient documented experience and training in the fields of traffic electronics, telecommunications, sensors, wireless data and related technologies # Individual shall be knowledgeable of the electrical safety codes and National Electrical Code.

# Individual shall be familiar with the equipment being serviced and shall be capable of replacing components, rebooting equipment, and initial troubleshooting.

The electrician shall perform the following tasks:

# Correspond with the Contract Manager to coordinate staffing levels with upcoming work # Correspond with the Contract Manager upon receiving work orders to determine scope of work # Coordinate with the Contract Manager to procure necessary materials or pick up spare parts # Coordinate traffic control measures with the Contract Manager and district personnel # Coordinate with electrical, telephone, and other utilities for location of services

Document Phase Document Description Page 8

2600000575 Final Electrical Maintenance District 6 Total Pages: 52 https://kyt2.uky.edu/training/work-zone-qualification-training-program https://www.atssa.com/Training/Certification https://www.kltf.org/construction-classes#traffic-control-technician https://kyconcrete.org/

# Supervise and/or perform traffic control work # Perform on-site management of installation tasks # Perform initial or simple field troubleshooting # Coordinate with equipment manufacturers to resolve problems # Perform field device replacement, calibration, installation and rebooting # Perform installation tasks # Perform device rebooting # Perform inspection, inventory and testing # Perform preventative maintenance # Perform coaxial and fiber terminations # Perform inspections and quality control functions # Manage the Laborer(s) and Equipment Operator # Complete/Review daily field sheets # Review monthly billing reports for accuracy # Provide technical support and training for the Laborer(s) # Provide technical information to the Contract Manager # Act as primary contact between the Contractor and the Contract Manager # Perform shipping and receiving functions for warranty replacement # Confirm delivery of Class A concrete and prepare concrete cylinders for testing # Deliver concrete cylinders to Contract Manager for District Materials testing.

Laborers and equipment operators shall have the following certifications and qualifications:

# Work Zone Traffic Control Technician Qualification. All laborers and equipment operators shall have this certification within 6 months of the start of the contract.

# Flagging credentials

Laborers shall have experience in basic electrical construction practices. Laborers shall be competent to operate all tools and light equipment. Individuals shall be supplied with additional tools and equipment as necessary.

Equipment operators shall be licensed (CDL) to transport and operate heavy equipment. Equipment operators shall be physically and mentally competent to operate equipment in a safe and efficient manner. Individuals shall be supplied with additional tools and equipment as necessary.

1.11 EQUIPMENT FOR ELECTRICIAN

Electricians shall be equipped with and familiar with the operation of the following equipment as a minimum:

# Complete set of electronic and electrical hand tools # Soldering pen # Voltmeter # Coaxial stripping and crimping tools for video and RF cable # Cable Locator # Wire Tracer # FR clothing and accessories # Laptop computer with modem and internet, email access (one per crew and for on-call services) o Windows 11 device with USB and WIFI capability o Ethernet port/USB-to-Ethernet adapter o Web browser o Admin rights on your computer

Document Phase Document Description Page 9 http://www.kyt2.com/training/course/work-zone-traffic-control-technician-qualification/work-zone-qualification-training

# Cellular telephone with KY statewide coverage (one per crew) # Digital Camera (one per crew) # Global Positioning System (GPS) receiver (one per crew) # Clamp-on ground resistance tester

Individuals shall be supplied with additional tools and equipment as necessary.

1.12 QUANTITY

There is no guarantee of the quantity mentioned in this invitation, and the Cabinet is obligated only to the extent of the needed services during the term of the contract.

1.13 WORK ORDERS

The Contract Manager shall provide a written work order via email for all work. We recommend that a delivery order in EMARS is created for each work assignment before the end of the require work. This work order will contain the following information:

Location of work Description of work Special instructions or revised installation details Priority and expected response time

The Contractor shall coordinate with the Contract Manager via email before beginning work to resolve any questions about the work order. If additional work is not assigned through a work order, but necessary to complete the original work order, the contractor shall email the contract manager with a list of the work done each day that includes the following:

Location of work Description of work

1.14 WORK/TIME POLICY

It is anticipated that some repair tasks will occur outside of normal working hours. We estimate that this work will not exceed 12% of the total hours per individual. The Contractor shall be responsible for providing the labor and equipment necessary to conduct such work at the contract price.

The contractor shall be restricted to normal work hours of between 8:00 am to 4:30 pm, 5 days a week. If any deviation is required, there shall be approval from the Contract Manager. The Contract Manager has the right to deviate the hours to accommodate inspection schedules and needs of the District. Contractor shall not perform work orders on holidays and/or holiday weekends without prior approval from Contract Manager or designee, excluding emergency work orders. Contractor shall not perform work orders during active KYTC snow and ice operations without prior approval from Contract Manager or designee. The Contractor can see this information on the GOKY.KY.gov website.

1.15 RESPONSE TIMES

Routine Work Upon notification by the Contract Manager, the Contractor and all necessary equipment shall be on-site at the job site and working within five (5) working days.

Emergency Work Emergency work shall consist of situations where malfunctioning, downed, or damaged equipment is creating an immediate safety hazard.

Emergency work may include, but is not limited to, the following:

Document Phase Document Description Page 10

Traffic signal in roadway Signal/lighting pole in the roadway Luminaire hanging from a pole Signal head hanging from span Fire caused by a short circuit at signal/lighting installations Report of navigation/aviation light outage Damaged signal or lighting cabinet/pole/service

The Contractor shall be readily available to the Contract Manager at all times in case of an emergency situation, either through a cell phone equipped with voice mail or other suitable means. Once contacted, the Contractor shall immediately mobilize to respond to emergency work and be on-site with all necessary equipment and working within four (4) hours. Emergency work orders will be billed at normal hourly or bid item rates.

1.16 INVOICING AND FIELD SHEETS

A daily field report shall be submitted for each construction work site and shall include a detailed description of the work performed each day. The daily field report shall include details of all bid items or hourly items used for each work site each day. Maintenance, troubleshooting, or inspection at multiple sites in a single day may be combined on a single field report with the approval of the Contract Manager. To reduce confusion, the daily field report shall only include information related to billing and shall not include information that the Contractor needs for their own purposes (such as daily time reporting).

The Contractor shall submit monthly invoices, including original daily field reports and detail summary spreadsheets. Invoice quantities shall equal the sum of the daily field reports. The Contract Manager shall have the final decision of what items and hourly will be paid on the monthly invoice. This decision will be based on the contractor’s daily reports, KYTC designee daily reports, and the work orders that are finished during the time period for this monthly invoice. Field report summary spreadsheets shall be delivered in an Excel format agreed upon by the Contractor and Contract Manager. We require that the contractor use an excel spreadsheet (given to Contractor upon award) to complete daily field reports on the computer that each electrician is required to have. The contractor can submit an alternative way to digitally do this daily field sheet. This alternative shall be submitted in your documentation and will be approved/disapproved by KYTC Traffic Operations. This alternative shall have at least a way to do daily field reports and add all daily field reports digitally for the final report for the invoice. This alternative shall be accessible to the Contract Manager.

The Contractor shall notify the Contract Manager of any work conducted by a non-licensed individual that the Contractor feels should qualify for the electrician pay rate. The Contractor shall notify the Contract Manager for approval of such situations before the non-licensed individual does any work as an electrician. When electrician pay is approved for non-licensed individuals, the Contractor shall be required to send the Contract Manager proof that non-licensed employees received electrician pay rate for qualifying work.

Common examples where unlicensed employees would be paid electrician pay include the following activities:

Possible electrician’s activities to be paid as an electrician:

pulling wire pushing wire resplicing wire placing conduit (pvc or rigid) in ground or above ground connecting conduit (pvc or rigid) connecting wiring in signal/ped head/detectors hanging a signal head/ped head/detector troubleshooting a loop amp/controllers/load switch/conflict monitor

Document Phase Document Description Page 11 reinstalling loop amp/controllers/load switch/conflict monitor cleaning filter in electrical cabinet replacing light bulb in cabinet connecting wiring for led modules/luminaires installing grounding bushing troubleshooting grounding system installing ground rod installing wire from ground rod to device placing wiring in saw slot for loops replacing fuses replacing fans replacing power supplies replacing thermostat replacing traffic or lighting cabinet new service replacing service installing camera replacing camera installing antenna replacing antenna installing surge arrestor connecting communication cable making connections for communication cables installing detection pucks in pavement installing luminaire heads installing navigation/aviation lights merging loops/wire testing grounding resistance installing photocell

Document Phase Document Description Page 12 replacing photocell replacing roadway luminaire ballast troubleshooting/replacing internal components of lighting cabinet troubleshooting lighting circuits installation/replacing disconnect diagnostic testing (voltage, resistance, amperage, etc.)

replacing HM pole breakers replacing HM fixture ballast kits lowering HM fixtures

The Contractor shall submit field reports for every traffic signal or lighting location they respond to while being on-call. The field report shall include all materials, hours worked at each signal, AVL verification report, and all equipment used by the Contractor. A separate report detailing the date, time of notification, intersection, reported issue & source of reported issue, findings of investigation, materials/equipment replaced/used, time left intersection, and the name and signature of technician.

1.17 MATERIALS

The Cabinet will provide all materials except for bid items that are listed as furnish and install.

The Contractor shall pick up materials at the Frankfort Equipment Warehouse, pole yard, district maintenance yard, or other location as required by the Contract Manager. This mileage shall be incidental to the whole contract.

Contractor personnel that transport materials will be paid hourly for the equipment operator and laborer bid items for personnel (maximum of two individuals), and the Contractor will be paid hourly for the vehicle that is used to transport materials. If the vehicle used does not require a CDL to drive, the District will only pay hourly for two laborers instead of what is stated above. When the Contractor picks up materials from the district maintenance yard, they shall not be paid for hourly bid items (including equipment and personnel).

The Contractor may have to maintain a stock of material to facilitate on-call first response. This stock will be determined by the Contract Manager and will be given to the Contractor the day they are notified. All materials shall be signed for by the Contractor. The Contractor shall be responsible for the safe storage of this equipment and the replacement of any equipment damaged or lost. All unused material shall be returned to the Cabinet at the end of the on-call time period. If the Contractor runs out of materials, it is the responsibility of the Contractor to contact the Contract Manager/designee to acquire more materials. The stock of equipment may include items such as controllers, detectors, load switches, relays, flashers, conflict monitors, LEDs and power supplies. The Contract Manager will determine the extent of the Contractor’s stock. The Contractor is responsible for providing the Contract Manager a list of all materials and locations of the materials that were used during the on-call period.

This information is required for tracking materials and auditing purposes.

1.18 REMOVAL OF EXISTING EQUIPMENT

Removal of all existing equipment shall be paid for on an hourly basis except if included in the bid item. The transport of materials that are deemed recyclable/salvageable by the Contract Manager to Cabinet-owned facilities shall be paid for on an hourly basis and the mileage shall be incidental to the whole contract. The transport of disposable materials (as determined by the Contract Manager) shall be incidental to this Contract. Contractor personnel that transport materials will be paid hourly for the equipment operator and laborer bid items for personnel (maximum of two individuals), and the Contractor will be paid hourly for the vehicle that is used to transport materials. If the vehicle used does not require a CDL to drive, the District will only pay hourly for two laborers

Document Phase Document Description Page 13 instead of what is stated above. The Cabinet will not pay for any support vehicles that do not transport the materials or any personnel that is over the maximum set forward in this contract.

This includes all materials removed from the project site except for any plastic materials (does not include traffic signals or blankout signs) or wood poles. All plastic materials or wood poles shall be properly disposed of by the contractor off the project. All materials minus the exceptions shall be returned to the Cabinet as directed by the Contract Manager. The Contract Manager shall dispose of all materials per the Cabinet’s policy.

1.19 RECORDS RETENTION

The Contractor shall maintain books, documents, papers, electronic accounting records, and other evidence pertaining to costs incurred and make such materials available at their respective offices at all reasonable times during the contract period and for five (5) years from the date of final payment under the contract for inspection by the Cabinet, and copies thereof shall be furnished if requested. The Cabinet has the right to audit these records at any time.

1.20 COMMUNICATIONS

The Contractor shall maintain daily communication with the Contract Manager to coordinate work and materials required.

1.21 DAMAGE TO EXISTING FACILITIES

The Contractor shall coordinate with the applicable underground location services and local utilities before beginning any excavation task. The Contractor shall be responsible for all costs to repair any public or private underground or overhead infrastructure damaged during construction.

1.22 WORKMANSHIP/WARRANTY

All work shall be performed in a professional manner. Work areas shall be cleaned up upon completion of the task. Cleanup shall include removal of all trash and debris in the work area. The Contractor shall warrant that all workmanship complies fully with the requirements of the contract specifications. Should any defects appear within six months after the project is completed due to inferior workmanship, the Contractor warrants that they will do immediately whatever is necessary to remedy the defects without additional cost to the Cabinet.

The Contractor shall notify the Contract Manager of existing material that is damaged, defective, or worn immediately upon identification of such material. This includes any worn signal mounting hardware, damaged wiring, bad splices, etc.

1.23 POLE HANDHOLE COVERS, TRANSFORMER BASE DOORS, AND JUNCTION BOX LIDS

The Contractor shall reinstall all pole handhole covers, transformer base doors, and junction box lids for traffic control devices and lighting installations during any tasks. The contractor shall reinstall pole handhole covers/doors, transformer base doors, and junction box lids upon completion of work on each individual item and prior to leaving the work site. If the pole handhole covers, transformer base doors, and junction box lids are missing or cannot be reinstalled through conventional methods due to damage, the Contractor shall contact the Contract Manager with details of each location so that replacements can be ordered. The Contractor shall attempt to secure damaged pole handhole covers, transformer base doors, and junction box lids until replacements are received. Any labor, equipment or materials used to reinstall or attempt to secure pole handhole covers/doors, transformer base doors, and junction box lids shall be incidental. If replacement pole handhole covers/doors, transformer base doors, and junction box lids become available prior to completion of all required tasks on the work site, the contractor shall install these items at no additional cost to KYTC. The Contract Manager will make the final determination on when a project is called complete. If the replacement is received after the project is called complete, the contractor will be paid for hourly and equipment used to reinstall the item.

Notify the contract manager if the junction box is badly damaged.

Document Phase Document Description Page 14

1.24 END OF CONTRACT

At the end of the contract period all work shall be stopped. No payments for work shall be paid after the date that the contract ends. The Contract Manager shall only schedule work that can be done by the end of the contract ending date. If the Contractor is still on the job, the Contractor shall be paid for the work that he has already done but shall not be paid for work that is done after the contract ending date.

1.25 LIQUIDATED DAMAGES

The Contract Manager shall notify the Contractor by email of any of the conditions listed below. The Contractor shall complete all repairs within stated time frames and notify the Contract Manager by email upon completion of requested work. The contract manager is responsible for how the liquidated damages are applied and may consider a weather-related event or District-provided material delay for extension of the days involved in the liquidated damages.

The Contractor will be subject to liquidated damages of $500 per day per occurrence until item is completed for the following conditions:

If the installation of a full signal is not completed within 28 days

If the installation of one loop, piezoelectric sensor, and in ground or above ground sensor is not completed within 1 business day.

If the installation of any steel strain pole base is not completed within 4 business days.

If the installation of a luminaire base, pedestrian pedestal base and pad is not completed within 1 business day.

If the on-call individual does not arrive at the first signal within 2 hours of being called, District will enact an additional $500 liquidated damage for each additional hour until the individual arrives.

If the Contractor does not have all necessary/working equipment on-site for work orders within five (5) business days.

If the Contractor provides a bucket truck or line truck that is older than 12 years.

If the Contractor does not have all necessary/working equipment on-site for emergency work within four hours, District will enact an additional $500 liquidated damage for each additional hour until the necessary equipment arrives.

If the Contractor does not complete all items on work order before the Contractor leaves the district.

If the Contractor receives additional work orders while he is in the district, the Contractor shall remain in the district until all work orders are complete.

If additional equipment that is needed to complete a work order and requested by the Contract Manager is not on site within 3 business days.

If equipment is not in working condition, the Contract Manager can request that the equipment be replaced/fixed within 3 business days.

Restoration of disturbed areas to original condition after work order completion within 3 business days.

If the replacement door plan is not received within 2 months of the issued work order.

If the installation of all the replacement doors are not installed within 2 months of the issued work order.

If inspected work is found to not be in compliance with all applicable standards and is not corrected within 3 business days.

If pole handhole covers, transformer base doors, and junction box lids are not reinstalled/secured or not reported to the Contract manager that it is missing. This will be for each pole handhole covers, transformer base doors, and junction box.

1.26 BILLING – GENERAL

Labor and equipment hours shall be billed for:

Preventative Maintenance Tasks Troubleshooting of Electronic Equipment Tasks Removal of Existing Equipment (outlined in Removal of Existing Equipment Section) Material/Equipment pick-up from Cabinet owned facilities outside of the district (outlined in Materials Section)

Document Phase Document Description Page 15

Labor and equipment hours (Lines 1-11) shall not be billed for the installation of any material listed as a bid item (lines 12-93)

Labor and equipment hours (Lines 1-11) shall not be billed for any individual providing on-call bid item duties (Lines 94, 95, and 96).

There shall be no electrician, equipment operator, or laborer hours billed for any bid item because of supervision.

Any mileage incurred by the Contractor shall be incidental to the whole contract.

Any traffic control by the Contractor shall be incidental to the whole contract, including setups that require Law Enforcement Officers as requested by the Contract Manager.

For work billed by the hour, the Cabinet will commence counting time for paying the Contractor at the time he arrives at the work site. The Cabinet will end counting time for paying the Contractor at the time he leaves the work site.

Example:

The electrician spends one hour troubleshooting a short in a traffic signal span. He spends three hours pulling in 60 feet of new cable to a signal head. The quantities billed would be one hour of electrician time and 60 feet of cable.

ITEM 1- Electrician

A maximum hourly rate has been set for this line item. The unit price shall not exceed $66.00.

Electrician pay shall be paid to licensed electricians and to employees performing electrical work under the supervision of a licensed electrician. See invoicing and field sheets for common examples where unlicensed employees would be paid electrician pay.

ITEM 2- LABORER

A maximum hourly rate has been set for this line item. The unit price shall not exceed $40.00.

ITEM 3- EQUIPMENT OPERATOR

A maximum hourly rate has been set for this line item. The unit price shall not exceed $55.00.

EQUIPMENT – GENERAL

Equipment bid items shall be used for preventive maintenance, equipment repair, and installation of equipment and material not listed under material bid items.

Equipment shall be maintained in good working condition, safe, reliable, and mechanically sound. All bucket trucks and line trucks shall not be more than 12 years old. The contractor shall submit the title to the contract manager for all bucket trucks and line trucks that are used on this contract. Equipment shall have at least two supplemental yellow flashing warning lights. Equipment shall have current safety certificates for use in the State of Kentucky.

Equipment may be owned, rented, or subcontracted as required. The Contract Manager may require the replacement of any unit not performing effectively.

Hand tools and small power tools are incidental to the contract.

Equipment hours shall not be billed for any equipment provided during on-call bid items.

Document Phase Document Description Page 16

ITEM 4- SERVICE VEHICLE

Unit shall be capable of transporting equipment, tools, and individuals.

This can only be billed when:

# travelling to Central Office warehouse to pick up or drop-off materials, or # transporting materials from Central Office warehouse to the district, or # employees are being paid hourly and there is no other equipment (Line Items 5-11) that is eligible for reimbursement at an hourly rate.

Approval of Project Manager is required, prior to starting work, if more than one service vehicle is required for hourly work.

ITEM 5- 30’ BUCKET TRUCK

Unit shall have a working height of thirty (30) feet.

ITEM 6- 50’ BUCKET TRUCK

Unit shall have a working height of fifty (50) feet.

ITEM 7- SKID STEER LOADER

Unit shall be minimum of 80 HP and equipped with a bucket and shall include transporting of this item.

ITEM 8-FLATBED TRUCK

Unit shall be three quarter tons to five ton.

ITEM 9-AIR COMPRESSOR

Unit shall have tools including jackhammer and shall include transporting of this item.

ITEM 10-AERIAL LIFT DEVICE

Unit shall be capable of lifting personnel to a height of 130’ Unit shall be capable of lowering and erecting high mast lighting structures up to 120’ in height. If item needs to be transported, this is incidental to this item.

ITEM 11-1 ½ TON LINE TRUCK

Unit shall be equipped with 9”, 18”, 24”, and 36” rock augers. Unit shall also include a pole trailer that carries a 45’ pole.

CONDUIT – GENERAL

Conduit shall include furnishing and installing conduit, couplings, fittings, elbows, tees, clamps, grounding bushing, bushing (bell type for pvc) , weatherheads (installed on conduit or poles), plug/text plugs, duct seal, warning tape, bonding straps, and any other associated material required for installation above or below ground or on a structure.

The Cabinet will supply the banding and banding straps, but the Contractor shall install these items. All PVC conduits shall be schedule 80. This item includes all equipment, labor and electrician supervisor hours needed to perform these tasks.

RIGID STEEL CONDUIT

ITEM 12- FURNISH AND INSTALL CONDUIT – ½ INCH TO 1 INCH RIGID STEEL

ITEM 13- FURNISH AND INSTALL CONDUIT – 1 ¼” INCH RIGID STEEL

ITEM 14- FURNISH AND INSTALL CONDUIT- 2 INCH RIGID STEEL

ITEM 15- FURNISH AND INSTALL CONDUIT – 2 ½ INCH TO 4 INCH RIGID STEEL

Document Phase Document Description Page 17

PVC CONDUIT

ITEM 16- FURNISH AND INSTALL CONDUIT – ½ INCH TO 1 INCH PVC

ITEM 17- FURNISH AND INSTALL CONDUIT – 1 ¼” INCH PVC

ITEM 18- FURNISH AND INSTALL CONDUIT – 2” INCH PVC

ITEM 19- FURNISH AND INSTALL CONDUIT – 2 ½ INCH TO 4 INCH PVC

FLEXIBLE CONDUIT

ITEM 20- FURNISH AND INSTALL CONDUIT – ¾ INCH TO 2 INCH FLEX

ROADWAY CONDUIT CROSSING

ITEM 21- INSTALL 2” RS ROADWAY CONDUIT CROSSING

Roadway conduit crossing shall include labor and equipment required for installation of furnished rigid steel conduit under paved surface via pushing or open cutting. All open cutting shall be pre-approved by the contract manager.

This item shall include saw cutting, excavation, pushing, backfilling and the restoration of disturbed areas. This item includes furnishing and installing reinforcing steel, concrete and asphalt as required. The furnishing of conduit is included in this item. This item includes all equipment, labor and electrician supervisor hours needed to perform these tasks.

ITEM 22- INSTALL 3” TO 4” RS ROADWAY CONDUIT CROSSING

Roadway conduit crossing shall include labor and equipment required for installation of furnished rigid steel conduit under paved surface via pushing or open cutting. All open cutting shall be pre-approved by the contract manager.

This item shall include saw cutting, excavation, pushing, backfilling and the restoration of disturbed areas. This item includes furnishing and installing reinforcing steel, concrete and asphalt as required. The furnishing of conduit is included in this item. This item includes all equipment, labor and electrician supervisor hours needed to perform these tasks.

DIRECTIONAL BORING

ITEM 23- 2” RS DIRECTIONAL BORING

Directional boring shall include labor and equipment required to install furnished rigid steel conduit where trenching or pushing is not feasible. Equipment shall be capable of boring a hole under roadway to accommodate a 2” diameter steel pipe. This item includes excavation, equipment, labor, supporting tools and restoration of disturbed areas. The furnishing of conduit is included in this item. This item includes all equipment, labor and electrician supervisor hours needed to perform these tasks.

ITEM 24- 3” TO 4” RS DIRECTIONAL BORING

Directional boring shall include labor and equipment required to install furnished conduit where trenching or pushing is not feasible. Equipment shall be capable of boring a hole under roadway to accommodate a 3” to 4” diameter steel pipe. This item includes excavation, equipment, labor, supporting tools and restoration of disturbed areas. The furnishing of conduit is included in this item. Conduit can be from 3 inch and 4-inch rigid steel conduit.

This item includes all equipment, labor and electrician supervisor hours needed to perform these tasks.

WIRE OR CABLE – GENERAL

Wire and cable includes the installation of wire or cable in new/existing conduit, cabinet, poles, and overhead, raceway or in saw slot. This item includes the furnishing and installation of lashing wire, connectors and any other hardware required. This item includes the installation of cable rings that will be supplied by the cabinet. Also included in this item are furnishing splices and terminations required to connect wire or cable to equipment and the

Document Phase Document Description Page 18 connection of terminated wire or cable to equipment. Equipment may include but not be limited to the contents of cabinets or enclosures, as listed below, poles, junction boxes, signal heads, pedestrian detectors and ground rods.

Splices and terminations shall be watertight and installed to the satisfaction of the Kentucky Transportation Cabinet.

The contractor shall have any tools necessary to properly splice or terminate wire or cable. Splices may include but not be limited to butt splices or wire nuts. Wire terminations may include, but not be limited to circular lugs, spade lugs or Deutsch plugs (supplied by the cabinet). Cable terminations may include, but not be limited to BNC, N, S, DB-9, DB-25, Modular, Terminal Strip, Circular, Spade lugs and other similar connectors as required. This item also includes removal of old wire or cable during the installation of new wire (or using old wire to pull new wire at the same time). This item includes the cleaning or clearing out of existing conduit so that the wire can be installed and includes all equipment, labor and electrician supervisor hours needed to perform these tasks. If the existing wire is used to pull in the new wire, no hourly can be charged.

ITEM 25- INSTALL WIRE - # 4 OR SMALLER (DOES NOT INCLUDE LOOP WIRE)

ITEM 26- INSTALL WIRE - # 2 OR LARGER

ITEM 27- INSTALL WIRE – LOOP WIRE (IMSA 51-7)

ITEM 28- INSTALL CABLE – SIGNAL CABLES 3C, 5C, AND 7C (IMSA 19-1)

ITEM 29- INSTALL LOOP LEAD-IN CABLE (IMSA 19-2)

ITEM 30- INSTALL CABLE –…