Final_RFB_605_2500000463_2_SO_FORM.PDF
PDF 596 KB Posted
- Attached to
- Equip Rental w/operator D2 FHWA
- Solicitation number
- RFB 605 2500000463 2
- Issued by
- Kentucky
About this file
This is a Request for Bid (RFB) document issued by the Commonwealth of Kentucky, Kentucky Transportation Cabinet, Division of Purchases, for equipment rental services with operators in Highway District 2. The solicitation seeks pricing for twelve line items including excavators with various attachments (bucket/grapple, hammer, and long-reach boom), tandem dump trucks, dozers (small and large), skid steer loaders, light plants, grinding attachments, motor graders, escort trucks, and wheeled loaders. All equipment must be furnished with qualified operators and in excellent mechanical condition. Quantities are estimated at 50, 25, 50, 25, 25, 25, 25, 25, 10, 25, 25, and 25 hours respectively, with pricing on an hourly basis. The equipment may be requested on an as-needed basis throughout Highway District 2, which includes eleven counties (Caldwell, Christian, Daviess, Hancock, Henderson, Hopkins, McLean, Muhlenberg, Ohio, Union, and Webster). The bid closing date is February 26, 2025, at 1:30 PM Eastern Time, with a tentative award date of March 5, 2025. The initial contract period runs from award through February 28, 2026, with optional renewal for four additional one-year periods. Vendors must provide response time guarantees with routine work response and emergency response times of 48 hours, with emergency mobilization compensation of $750 per equipment piece delivered within 24 hours.
The evaluation will be based on best value using a ranking approach with pricing weighted at 95 points and response time at 5 points, with the lowest price bidder receiving maximum points. Vendors must submit bids electronically through the Kentucky Vendor Self Service (VSS) system at https://vss.ky.gov; online bids only will be accepted. All equipment must meet Federal Highway Administration (FHWA) eligibility requirements, with Davis-Bacon Act wage determinations applicable. Vendors are required to maintain $1,000,000 general liability insurance and Kentucky workers' compensation insurance, with the Commonwealth and its agents listed as additional insureds. The solicitation includes federal compliance requirements including Buy America/Build America Buy America Act (BABA) compliance, DBE certification with a 0% goal, and non-collusion and non-discrimination certifications. Required affidavits must be submitted including those regarding campaign finance compliance, resident bidder status, employee immigration status, and subcontractor compliance. An addendum dated February 13, 2025, addressed questions regarding equipment location and delivery scope. Mobilization and demobilization costs are the vendor's responsibility, with equipment to be delivered to job sites and transported away at no expense to the Transportation Cabinet, and the vendor responsible for all tolls.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Document ID: RFB 605 2500000463 Page: 1
Commonwealth of Kentucky
SOLICITATION MODIFICATION
Modification: Yes Version #: 2
TITLE: Equip Rental w/operator D2 FHWA
Date Issued:
02/13/2025 Record Date:
02/13/2025
Solicitation Closes Date:
02/26/2025 Time:
13:30
Solicitation No:
RFB 605 2500000463
Reason for Modification
Addendum #1 2/13/2025 Addendum to answer questions received.
Closing date will remain 2/26/25. No other changes
Online Bidding Prohibited: No For Information Call:
ALLAN COLDIRON
502-782-3981
Bid Receiving Location:
Bid Receiving
See Terms & Conditions for Bid Submission Instructions
Other KY
Vendor Customer Number:
Vendor Name:
Phone Number:
Fax Number:
Email Address:
Ordering
Address:
City, State, Zip:
Contact Name:
Contact Email:
Contact Phone Number:
Payment
Address:
City, State, Zip:
Contact Name:
Contact Email:
Contact Phone Number:
Ownership Type
__ Sole Proprietorship __ Partnership __ Corporation __ Other_________________________
SIGNATURE OF AUTHORIZED AGENT IS REQUIRED UNLESS RESPONSE
IS SUBMITTED ELECTRONICALLY. FAILURE TO SIGN SHALL RENDER
THE BID INVALID.
Signature X_________________________________________ FEIN#____________________ Date____________
All offers subject to all terms and conditions contained in this solicitation.
Document ID: RFB 605 2500000463 Page: 2
Line Items
Commodity Group: Default Commodity Group
Line CL Description Quantity UOM Unit Cost Line Total or Contract Amnt
1 Excavator w/Bucket and Grapple w/ Operator FHWA ER Eligible
50.00000 HOUR
Comm Code Comm Description Manufacturer Model # Manuf Part #
97534 Earth Moving Equipment (Graders, Dozers, Loaders, etc.) Rent
Extended Description ***ONLY ONLINE BIDS WILL BE ACCEPTED FOR THIS RFB.*** Emailed and hard copies delivered by any method WILL NOT BE ACCEPTED.
See attached document How to Respond to an Online Bid through the Kentucky Vendor Self Service site (updated).pdf.
Please enter contact person, phone number and email in the Comments Section.
Vendors should review and update, if necessary, all addresses and contact persons for their account prior to bid submission. This information will carry forward to a contract if awarded, therefore please ensure all information is correct.
Excavator must be a minimum of 145 HP and equipped with a dirt and rock bucket or a grapple attachment.
2 Excavator w/Hammer with Operator FHWA ER Eligible
25.00000 HOUR
Excavator must be a minimum of 145 HP and equipped with a hoe-ram/rock hammer/impact breaker with minimum 5000ft/lbf (Impact Energy Class).
3 Excavator w/Long Reach Boom with Operator
50.00000 HOUR
Excavator must be a minimum 150 HP and equipped with a minimum 60 ft long reach boom with 1 CY minimum bucket.
Document ID: RFB 605 2500000463 Page: 3
4 Tandem Dump Truck with Operator FHWA
Tandem Dump Truck with Operator. Dump truck must be a minimum tandem axle with a minimum 15 CY capacity bed, for On/Off Highway use.
5 Small Dozer/Crawler with Operator FHWA
Dozer must be a minimum of 80 HP equipped with an angle/tilt corner cutting blade.
6 Large Dozer/Crawler with Operator FHWA
Dozer must be a minimum 125 HP equipped with an angle/tilt corner cutting blade
7 Skid Steer Loader with Operator FHWA ER Eligible
Skid Steer must be equipped with tracks and available attachments, including bucket, forks, grapple, and milling.
Document ID: RFB 605 2500000463 Page: 4
8 Light Plant FHWA ER Eligible 25.00000 HOUR
Light Plant must have a minimum of 4 lights, able to extend a minimum of 30 feet from the ground level, and diesel powered.
9 4 foot Grinding Attachment with Operator
10.00000 HOUR
Grinding Attachment must have a minimum of 4 foot working width to be used to grind bushes, tree limbs, and trees up to 5 inches in diameter.
Attachment to be used with Line Item 3 when needed.
10 Motor Grader with Operator FHWA ER
Motor Grader must be a minimum of 125 HP equipped with a minimum 12 foot mold board.
11 Escort Truck with Operator FHWA ER Eligible 25.00000 HOUR
Truck must be a minimum 3/4 ton, 4WD, and be equipped with flashing safety lights for following motor grader during snow and ice events.
Document ID: RFB 605 2500000463 Page: 5
12 Wheeled Loader with Operator FHWA ER
Articulating Style Wheeled Loader with a minimum 3.5 CY Bucket.
Shipping Information Various Shipping
See Extended Description
Various KY
Billing Information KYTC District 2 - Madisonville District Office
1840 North Main Street
Madisonville KY 42431
Document ID: RFB 605 2500000463 Page: 6
Submission Checklist
The following items will be required to be submitted with bid:
Item Price Response
Addendum #1 2/13/2025
Addendum to answer questions received.
Q-Can you confirm if all equipment will be used within District 2, primarily around the Madisonville, KY area? Additionally, will specific delivery locations be provided upon award, or can you offer an approximate scope of where the equipment will be needed?
A-The equipment w/operator can be requested for any of the counties covered by District 2 which includes the following counties: Caldwell, Christian, Daviess, Hancock, Henderson, Hopkins, McLean, Muhlenberg, Ohio, Union, & Webster Counties.
Equipment w/operator is requested on a as needed basis.
ELECTRONIC BID SUBMISSION
Bid responses shall be received by electronic submission in the eProcurement system.
Link: https://vss.ky.gov
An electronic bid shall be authorized by the proper agent of the firm by the act of submitting it electronically through the eProcurement system.
Bid information MUST be completed online. Response must contain all required information for the Solicitation.
All bidders MUST be registered in the Commonwealth eProcurement System via the Vendor Self Service System at https://vss.ky.gov
Allow 24 – 48 hours to complete Vendor Registration. Vendors must be logged in to their Vendor Self Service (VSS) account in order to submit a response. Registrations completed the day of bid closing must be completed by the Vendor in the VSS portal. The Customer Resource Center is not able to complete registrations and activate accounts on the same day. Closing dates will not be extended for Vendors not registered by the date/time of the bid closing. Vendor Self Registration Guides are provided at https://finance.ky.gov/eProcurement/Pages/doing-business-with-the-commonwealth.aspx
All bidders are cautioned to begin their electronic submission in sufficient time to complete before the closing date and time. Delays due to technical difficulties or document upload impediments shall not be justification for acceptance of a late bid or proposal. Vendor attention to this advisory is encouraged. If you need assistance, please contact the Customer Resource Center (CRC) by email at Finance.CRCGroup@ky.gov or phone 502-564-9641 or toll-free 877-973-HELP (4357).
BID PRICES SUBMITTED ON COMPANY QUOTE FORMS ARE DISCOURAGED. COMPANY TERMS AND
CONDITIONS AND/OR SALES AND USE AGREEMENTS OFTEN CONFLICT WITH STANDARD SOLICITATION
REQUIREMENTS AND MAY RESULT IN REJECTION OF BID OFFER.
Online bid responses must be in an “Accepted” status and shall be assigned a date and time stamp from the eProcurement system at the time of final acceptance and formal submission by the vendor. The system will not allow submission of an online response after the published date and time for closing.
An offer may be modified or withdrawn by electronic or written notice ONLY if received prior to the bid closing date and time. An electronic offer may be modified by applying the appropriate electronic signature and following the procedure in the state’s eProcurement signature.
Document Phase Document Description Page 7
2500000463 Final Equip Rental w/operator D2 FHWA Total Pages: 42 https://vss.ky.gov https://vss.ky.gov https://finance.ky.gov/eProcurement/Pages/doing-business-with-the-commonwealth.aspx https://finance.ky.gov/eProcurement/Pages/doing-business-with-the-commonwealth.aspx mailto:Finance.CRCGroup@ky.gov
PUBLIC BID READINGS
Any person wishing to hear a bid reading may call the conference line at 866-830-9434, Participant Code 21327950, at 3:00 pm, Eastern Time on the bid closing date.
BID SUBMISSION CHECKLIST
The vendor MUST include the following with the bid submission. If the items below are not submitted with the bid, the Commonwealth MUST deem the bid non-responsive and SHALL NOT be considered for award.
_____ BID INFORMATION – COMPLETED (See Section 5.00)
All other items MUST be submitted prior to award however, vendors are strongly encouraged to include with bid submission.
_____ CERTIFICATE OF AUTHORITY – REGISTRATION WITH SECRETARY OF STATE BY FOREIGN
ENTITY (See Section 2.26)
_____ REQUIRED AFFIDAVIT(S) (See Attachments A, B, C, etc. as applicable)
_____ CERTIFICATE OF INSURANCE (See Section 1.03)
_____ NON COLLUSION CERTIFICATION (Section 1.04 E)
_____ BUY AMERICA/BABA (Section 1.04 F)
_____ DBE CERTIFICATION (Section 1.04 G)
_____ EQUIPMENT SPECIFICATION/PRODUCT LITERATURE
PLEASE READ THIS SOLICITATION AND ITS INSTRUCTIONS IN ITS ENTIRETY.
This is a Request for Bid (RFB).
Vendors shall comply with the terms and conditions stated in the solicitation.
Any efforts to negotiate these terms and conditions SHALL NOT be accepted and SHALL cause the bid to be deemed non-responsive.
Vendors should review and comply with the general bidding requirements listed under “Procurement Laws, Preference, Regulations and Policies” and “Response to Solicitation” located on the eProcurement Web page at https://finance.ky.gov/eProcurement/Pages/procurement-laws-regulations-and-policies.aspx and https://finance.ky.gov/eProcurement/Pages/doing-business-with-the-commonwealth.aspx respectively. The vendor must comply with all applicable statutes, regulations and policies related to this procurement.
Section 1 - Scope of Work - Service
1.00 - Specifications of Service Requirements
Document Phase Document Description Page 8
2500000463 Final Equip Rental w/operator D2 FHWA Total Pages: 42 https://finance.ky.gov/eProcurement/Pages/procurement-laws-regulations-and-policies.aspx
The equipment shall be furnished in excellent mechanical working condition, in good general appearance, (free of human graphic art), and be approved for use by Department personnel. The equipment shall be furnished fully operated with one (1) operator (with the exception of the light plants) and with all maintenance and repairs including fuel and lubrication necessary for its operation.
The vendor is not required to own all pieces of equipment, but must be able to readily provide each piece on contract when requested.
The rental rate is to be paid by the Transportation Cabinet only during the time that the above named equipment is in actual use on the job. The vendor will be guaranteed a minimum of eight (8) hours per each work order to the vendor.
The equipment and the operator will be under the supervision and subject to the orders of the Transportation Cabinet, who shall direct the time and place for the use of such equipment.
The Department will provide traffic control necessary for the safe operation in accordance with the Manual on Uniform Traffic Control Devices.
The Transportation Cabinet and all its officers, agents and employees shall be held harmless from all suits, actions, or claims of any character brought on account of any injury or damages sustained by any person or property from any actions or for any negligence in performance of the above named equipment. Nothing in this proposal is to be construed as any agency relationship between the parties.
Projects assigned prior to contract expiration will be considered cancelled if the work has not been initiated at the time of expiration. If additional time is needed to complete the assigned work, please send a request to the Division of Purchases two weeks prior to the expiration date. This extension shall not exceed ninety (90) calendar days.
1.01 – Routine Work
Response Time
Vendor shall be able to provide equipment and operator within __ calendar day(s)following notification by District personnel. This notification shall be in the form of a Delivery Order received by email or fax.
Should vendor fail to make delivery within the guaranteed response period, they agree and further authorize the Commonwealth to deduct damages from the invoice in the amount of $1,000 for each day the service is withheld.
Mobilization/Demobilization
The equipment will be delivered to the place of beginning of operation with no expense to the Transportation Cabinet, and upon completion of the work the equipment will be transported away from the place of operations without expense to the Transportation Cabinet.
It is understood that an order may include more than one work site and that the vendor is also responsible for all mobilization expenses between each work site. The Department will only consider multiple work sites on a single delivery order if they are all within a 5-mile radius. There are no minimum hours guaranteed per works site when multiple work sites are included in a delivery order.
The vendor shall be responsible for all tolls for his equipment when the travel involves a toll road.
1.02 – Emergency Work
Document Phase Document Description Page 9
Response Time
The Vendor guarantees to begin work within 48 hours following notification by the Chief District Engineer or his/ her designee that an emergency situation exists. This notification may be in the form of a phone call, but an official Delivery Order shall follow as soon as possible.
An “emergency” is defined as – A situation which creates a threat or impending threat to public health, welfare, or safety such as may arise by reason of fires, floods, tornadoes, other natural or man-caused disasters, epidemics, riots, enemy attack, sabotage, explosion, power failure, energy shortages, transportation emergencies, equipment failures, state or federal legislative mandates, or similar events. (Per KRS 45A.095)
The vendor shall provide at least two phone numbers where they can be reached 24 hours a day.
Emergency Contact Person/Phone: _________________________________________ Emergency Contact Person/Phone: _________________________________________
Failure to be reached by District personnel may result in the immediate cancellation of the Master Agreement.
The vendor shall notify the District immediately of any changes to the emergency contacts and/or numbers.
Mobilization/Demobilization
The vendor shall be paid $750.00 in emergency mobilization costs for each piece of required equipment that is delivered to the work site and begins work within 24 hours of notification.
Should the vendor fail to respond to an Emergency as defined above within 48 hours of the notification they agree and further authorize the Commonwealth to deduct damages from the invoice in the amount of $1000.00 per day for each day the service is withheld or not provided. The vendor further understands that KYTC may use alternative methods to fulfill the equipment rental needs during an emergency situation.
Failure to respond in seventy-two (72) hours after emergency notification may result in the immediate cancellation of the Master Agreement.
1.03– Insurance Requirements
The successful bidder shall be responsible for maintaining this coverage through the entire contract term:
1. Contractor’s General Liability Insurance with limits of liability of $1,000,000.00 per occurrence.
2. Kentucky worker's compensation insurance in accordance with the requirements of KRS 45A.480 and KRS Chapter 342.
The successful bidder shall furnish an ACORD Certificate within ten (10) days of notice of intent to award with:
A. The certificate holder listed as:
Kentucky Transportation Cabinet Division of Purchases 4th Floor East 200 Mero Street Frankfort, KY 40622
B. The Endorsement indicating the Commonwealth and its agents as an Additional Insured for the contract resulting from this solicitation.
C. The contract number in the Description of Operations box.
Document Phase Document Description Page 10
Failure to furnish said certificates or to indicate the contract number shall be grounds for cancellation of the contract.
The successful bidder shall provide an up-to-date copy of the certificate upon renewal of the policy. Failure to do so shall result in cancellation of the contract.
The insurance shall be endorsed to state that coverage shall not be suspended, voided, cancelled by either party, reduced in coverage limits, except after thirty (30) days prior written notice by certified mail, return receipt requested, has been given to the agencies.
The insurance coverage shall be in compliance with the laws of the Commonwealth of Kentucky and shall be placed with a licensed resident or non-resident agent who represents insurance companies authorized to do business in Kentucky. A list of authorized companies can be found at http://insurance.ky.gov/company. Failure to meet this requirement may result in the bid being deemed non-responsive.
The insurer shall have an AM Best rating of B+ or higher. Visit www.ambest.com for verification. Failure to meet this requirement may result in the bid being deemed non-responsive.
1.04 - Federal Language
Funds from the Federal Highway Administration will be used to make payment against the resulting contract. The following clauses shall apply:
A. KYTC Standard Specifications
Except as provided herein, conform to all requirements of the Transportation Cabinet’s Current Standard Specifications for Road and Bridge Construction. Section references herein are to the Cabinet’s Current Standard Specifications for Road and Bridge Construction.
The Standard Specifications can be found at: https://transportation.ky.gov/Construction/Pages/Kentucky-Standard- Specifications.aspx
B. FHWA 1273
https://www.fhwa.dot.gov/programadmin/contracts/1273/1273.pdf
C. PROJECT WAGE RATES
The contractor shall use the Davis Bacon Act Wage Determinations for highway construction that are effective 10 calendar days prior to the submission of the bid. The project wage determinations can be found at the following link.
https://sam.gov/content/wage-determinations
Select Domain – Select Construction State – Kentucky County – Leave blank DBA Construction Type – Highway
Locality 1 – KY20250040 Locality 2 – KY20250107 Locality 3 – KY20250038 Locality 4 – KY20250039
The Davis Bacon Act Wage Determinations will be updated upon execution of a renewal of the Master Agreement at which time the contractor may ask for price adjustments based on Section 2.07.
Document Phase Document Description Page 11
2500000463 Final Equip Rental w/operator D2 FHWA Total Pages: 42 http://insurance.ky.gov/company http://www.ambest.com https://transportation.ky.gov/Construction/Pages/Kentucky-Standard-Specifications.aspx https://transportation.ky.gov/Construction/Pages/Kentucky-Standard-Specifications.aspx https://www.fhwa.dot.gov/programadmin/contracts/1273/1273.pdf https://sam.gov/content/wage-determinations
D. PROHIBITION ON TELECOMMUNICATIONS EQUIPMENT OR SERVICES
In accordance with the FY 2019 National Defense Authorization Act (NDAA), 2 CFR 200.216, and 2 CFR 200.471, Federal agencies are prohibited, after August 13, 2020, from obligating or expending financial assistance to obtain certain telecommunications and video surveillance services and equipment from specific producers. As a result of these regulations, contractors and subcontractors are prohibited, on projects with federal funding participation, from providing telecommunication or video surveillance equipment, services, or systems produced by:
Huawei Technologies Company or ZTE Corporation (or any subsidiary or affiliate of such entities)
Hytera Communications Corporation, Hangzhou Hikvision Digital Technology Company, or Dahua Technology Company (or any subsidiary or affiliate of such entities)
E. NON COLLUSION CERTIFICATION
Per KRS 45A.325, “Any agreement or collusion among bidders or prospective bidders which restrains, tends to restrain, or is reasonably calculated to restrain competition by agreement to bid at a fixed price, or to refrain from bidding, or otherwise, is prohibited.”
Per 23 USC 112 (c) “The Secretary shall require as a condition precedent to his approval of each contract awarded by competitive bidding pursuant to subsection (b) of this section, and subject to the provisions of this section, a sworn statement, executed by, or on behalf of, the person, firm, association, or corporation to whom such contract is to be awarded, certifying that such person, firm, association, or corporation has not, either directly or indirectly, entered into any agreement, participated in any collusion, or otherwise taken any action in restraint of free competitive bidding in connection with such contract.”
The attached Non-Collusion Certification must be submitted to Division of Purchases prior to award of contract.
F. BUY AMERICA REQUIREMENT/ Build America, Buy America Act (BABA)
BUY AMERICA REQUIREMENT.
Follow the “Buy America” provisions as required by 23 U.S.C. § 313 and 23 C.F.R. § 635.410. Except as expressly provided herein all manufacturing processes of steel or iron materials including but not limited to structural steel, guardrail materials, corrugated steel, culvert pipe, structural plate, prestressing strands, and steel reinforcing bars shall occur in the United States of America, including the application of:
• Coating,
• Galvanizing,
• Painting, and
• Other coating that protects or enhances the value of steel or iron products.
The following are exempt, unless processed or refined to include substantial amounts of steel or iron material, and may be used regardless of source in the domestic manufacturing process for steel or iron material:
• Pig iron,
• Processed, pelletized, and reduced iron ore material, or
• Processed alloys.
Document Phase Document Description Page 12 https://www.law.cornell.edu/definitions/uscode.php?width=840&height=800&iframe=true&def_id=23-USC-1264422296-293024739&term_occur=999&term_src=
The Contractor shall submit a certification stating that all manufacturing processes involved with the production of steel or iron materials occurred in the United States.
Produce, mill, fabricate, and manufacture in the United States of America all aluminum components of bridges, tunnels, and large sign support systems, for which either shop fabrication, shop inspection, or certified mill test reports are required as the basis of acceptance by the Department.
Use foreign materials only under the following conditions:
1) When the materials are not permanently incorporated into the project; or
2) When the delivered cost of such materials used does not exceed 0.1 percent of the total Contract amount or $2,500.00, whichever is greater.
The Contractor shall submit to the Engineer the origin and value of any foreign material used.
BUILD AMERICA, BUY AMERICA (BABA)
Contractor shall comply with the Federal Highway Administration (FHWA) Buy America Requirement in 23 C.F.R. § 635.410 and all relevant provisions of the Build America, Buy America Act (BABA), contained within the Infrastructure Investment and Jobs Act, Pub. L. No. 117-58, §§ 70901-52 enacted November 15, 2021. The BABA requires iron, steel, manufactured products, and construction materials used in infrastructure projects funded by federal financial assistance to be produced in the United States. Comply with 2 C.F.R § 184.
BABA permits FHWA participation in the Contract only if domestic steel and iron will be used on the Project.
To be considered domestic, all steel and iron used, and all products manufactured from steel and iron must be produced in the United States and all manufacturing processes, including application of a coating, for these materials must occur in the United States. Coating includes all processes that protect or enhance the value of the material to which the coating is applied. This requirement does not preclude a minimal use of foreign steel and iron materials, provided the cost of such materials does not exceed 0.1% of the total contract amount under the Contract or $2,500.00 whichever is greater.
BABA permits FHWA participation in the Contract only if all “construction materials” as defined in the Act are made in the United States. The Buy America preference applies to the following construction materials incorporated into infrastructure projects: non-ferrous metals; plastic and polymer-based products (including polyvinylchloride, composite building materials, and polymers used in fiber optic cables); glass (including optic glass); Fiber optic cable; optical fiber; lumber; engineered wood; and drywall. Contractor will be required to use construction materials produced in the United States on this Project. The Contractor shall submit a certification stating that all construction materials are certified to be BABA compliant.
Finally, BABA permits the continuation of FHWA’s current general applicability waivers for manufactured products, raw materials, and ferryboat parts, but these waivers are subject to reevaluation, specifically the general applicability waiver for manufactured products.
The Contractor has completed and submitted, or shall complete and submit, to the Cabinet a Buy America/ Build America, Buy America Certificate prior to the Cabinet issuing the notice to proceed, in the format below. After submittal, the Contractor is bound by its original certification.
A false certification is a criminal act in violation of 18 U.S.C. § 1001. The Contractor has the burden of proof to establish that it is in compliance.
At the Contractor’s request, the Cabinet may, but is not obligated to, seek a waiver of Buy America requirements if grounds for the waiver exist under 23 C.F.R. § 635.410(c) or will comply with the applicable Buy America requirements if a waiver of those requirements is not available or not pursued by the Cabinet.
Please refer to the Federal Highway Administration’s Buy America webpage for more information.
Document Phase Document Description Page 13
Buy America # Construction Program Guide # Contract Administration # Construction # Federal Highway Administration (dot.gov)
The Certificate of Compliance must be submitted to Division of Purchases prior to award of contract.
G. DISADVANTAGED BUSINESS ENTERPRISE PROGRAM
It is the policy of the Kentucky Transportation Cabinet (“the Cabinet”) that Disadvantaged Business Enterprises (“DBE”) shall have the opportunity to participate in the performance of highway construction projects financed in whole or in part by Federal Funds in order to create a level playing field for all businesses who wish to contract with the Cabinet. To that end, the Cabinet will comply with the regulations found in 49 CFR Part 26, and the definitions and requirements contained therein shall be adopted as if set out verbatim herein.
The Cabinet, contractors, subcontractors, and sub-recipients shall not discriminate on the basis of race, color, national origin, or sex in the performance of work performed pursuant to Cabinet contracts. The contractor shall carry out applicable requirements of 49 CFR 26 in the award and administration of federally assisted highway construction projects. The contractor will include this provision in all its subcontracts and supply agreements pertaining to contracts with the Cabinet.
Failure by the contractor to carry out these requirements is a material breach of its contract with the Cabinet, which may result in the termination of the contract or such other remedy as the Cabinet deems necessary.
DBE GOAL
The Disadvantaged Business Enterprise (DBE) goal established for this contract, as listed below, is the percentage of the total value of the contract.
The contractor shall exercise all necessary and reasonable steps to ensure that Disadvantaged Business Enterprises participate in a least the percent of the contract as set forth above as goals for this contract.
OBLIGATION OF CONTRACTORS
Each contractor prequalified to perform work on Cabinet projects shall designate and make known to the Cabinet a liaison officer who is assigned the responsibility of effectively administering and promoting an active program for utilization of DBEs.
If a formal goal has not been designated for the contract, all contractors are encouraged to consider DBEs for subcontract work as well as for the supply of material and services needed to perform this work.
Contractors are encouraged to use the services of banks owned and controlled by minorities and women.
CERTIFICATION OF CONTRACT GOAL
Contractors shall include the following certification in bids for projects for which a DBE goal has been established.
BIDS SUBMITTED WHICH DO NOT INCLUDE CERTIFICATION OF DBE PARTICIPATION WILL NOT BE ACCEPTED. These bids will not be considered for award by the Cabinet and they will be returned to the bidder.
“The bidder certifies that it has secured participation by Disadvantaged Business Enterprises (“DBE”) in the amount of 0% percent of the total value of this contract and that the DBE participation is in compliance with the requirements of 49 CFR 26 and the policies of the Kentucky Transportation Cabinet pertaining to the DBE Program.”
The attached DBE Certification Form must be submitted to Division of Purchases prior to award of contract.
DBEs utilized in achieving the DBE goal must be certified and prequalified for the work items at the time the bid is submitted.
Document Phase Document Description Page 14
DBE PARTICIPATION PLAN
Lowest responsive bidders must submit the DBE Plan/ Subcontractor Request, form TC 14-35 DBE, within 5 days of the letting. This is necessary before the Awards Committee will review and make a recommendation. The project will not be considered for award prior to submission and approval of the apparent low bidder’s DBE Plan/ Subcontractor Request.
The DBE Participation Plan shall include the following:
1. Name and address of DBE Subcontractor(s) and/or supplier(s) intended to be used in the proposed project;
2. Description of the work each is to perform including the work item, unit, quantity, unit price and total amount of the work to be performed by the individual DBE. The Proposal Line Number, Category Number, and the Project Line Number can be found in the “material listing” on the Construction Procurement website under the specific letting;
3. The dollar value of each proposed DBE subcontract and the percentage of total project contract value this represents. DBE participation may be counted as follows;
a) If DBE suppliers and manufactures assume actual and contractual responsibility, the dollar value of materials to be furnished will be counted toward the goal as follows:
• The entire expenditure paid to a DBE manufacturer;
• 60 percent of expenditures to DBE suppliers that are not manufacturers provided the supplier is a regular dealer in the product involved. A regular dealer must be engaged in, as its principal business and in its own name, the sale of products to the public, maintain an inventory and own and operate distribution equipment; and
• The amount of fees or commissions charged by the DBE firms for a bona fide service, such as professional, technical, consultant, or managerial services and assistance in the procurement of essential personnel, facilities, equipment, materials, supplies, delivery of materials and supplies or for furnishing bonds, or insurance, providing such fees or commissions are determined to be reasonable and customary.
b) The dollar value of services provided by DBEs such as quality control testing, equipment repair and maintenance, engineering, staking, etc.;
c) The dollar value of joint ventures. DBE credit for joint ventures will be limited to the dollar amount of the work actually performed by the DBE in the joint venture;
4. Written and signed documentation of the bidder’s commitment to use a DBE contractor whose participation is being utilized to meet the DBE goal; and
5. Written and signed confirmation from the DBE that it is participating in the contract as provided in the prime contractor’s commitment.
AFTER PROJECT AWARD AND BEFORE NOTICE TO PROCEED/WORK ORDER IS ISSUED (SEE
SECTION 103.06, STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION
Prime Contractors awarded a federally funded project with a DBE Goal greater than zero will be required to submit DBE Subcontract Agreement Form, TC 14-36, along with the attached FHWA 1273 and Certificate of Liability Insurance for each DBE Firm submitted as part of the previously approved DBE Utilization Plan (TC 14-35). A signed quote or purchase order shall be attached when the DBE subcontractor is a material supplier or broker.
The Certificate of Liability Insurance submitted must meet the requirements outlined in Section 107.18 of the Standard Specifications for Road and Bridge Construction.
Document Phase Document Description Page 15
Changes to APPROVED DBE Participation Plans must be approved by the Cabinet. The Cabinet may consider extenuating circumstances including, but not limited to, changes in the nature or scope of the project, the inability or unwillingness of a DBE to perform the work in accordance with the bid, and/or other circumstances beyond the control of the prime contractor.
CONSIDERATION OF GOOD FAITH EFFORTS REQUESTS
If the DBE participation submitted in the bid by the apparent lowest responsive bidder does not meet or exceed the DBE contract goal, the apparent lowest responsive bidder must submit a Good Faith Effort Package to satisfy the Cabinet that sufficient good faith efforts were made to meet the contract goals prior to submission of the bid.
Efforts to increase the goal after bid submission will not be considered in justifying the good faith effort, unless the contractor can show that the proposed DBE was solicited prior to the letting date. DBEs utilized in achieving the DBE goal must be certified and prequalified for the work items at the time the bid is submitted. One complete set (hard copy along with an electronic copy) of this information must be received in the Division of Contract Procurement no later than 12:00 noon of the tenth calendar day after receipt of notification that they are the apparent low bidder.
Where the information submitted includes repetitious solicitation letters it will be acceptable to submit a sample representative letter along with a distribution list of the firms solicited. Documentation of DBE quotations shall be a part of the good faith effort submittal as necessary to demonstrate compliance with the factors listed below which the Cabinet considers in judging good faith efforts. This documentation may include written subcontractors’ quotations, telephone log notations of verbal quotations, or other types of quotation documentation.
The Good Faith Effort Package shall include, but may not be limited to information showing evidence of the following:
1. Whether the bidder attended any pre-bid meetings that were scheduled by the Cabinet to inform DBEs of subcontracting opportunities;
2. Whether the bidder provided solicitations through all reasonable and available means;
3. Whether the bidder provided written notice to all DBEs listed in the DBE directory at the time of the letting who are prequalified in the areas of work that the bidder will be subcontracting;
4. Whether the bidder followed up initial solicitations of interest by contacting DBEs to determine with certainly whether they were interested. If a reasonable amount of DBEs within the targeted districts do not provide an intent to quote or no DBEs are prequalified in the subcontracted areas, the bidder must notify the Disadvantaged Enterprise Business Liaison Officer (DEBLO) in the Office for Civil Rights and Small Business Development to give notification of the bidder’s inability to get DBE quotes;
5. Whether the bidder selected portions of the work to be performed by DBEs in order to increase the likelihood of meeting the contract goals. This includes, where appropriate, breaking out contract work items into economically feasible units to facilitate DBE participation, even when the prime contractor might otherwise perform these work items with its own forces;
6. Whether the bidder provided interested DBEs with adequate and timely information about the plans, specifications, and requirements of the contract;
7. Whether the bidder negotiated in good faith with interested DBEs not rejecting them as unqualified without sound reasons based on a thorough investigation of their capabilities. Any rejection should be so noted in writing with a description as to why an agreement could not be reached;
8. Whether quotations were received from interested DBE firms but were rejected as unacceptable without sound reasons why the quotations were considered unacceptable. The fact that the DBE firm’s quotation for the work is not the lowest quotation received will not in itself be considered as a sound reason for rejecting the quotation as
Document Phase Document Description Page 16 unacceptable. The fact that the bidder has the ability and/or desire to perform the contract work with its own forces will not be considered a sound reason for rejecting a DBE quote. Nothing in this provision shall be construed to require the bidder to accept unreasonable quotes in order to satisfy DBE goals;
9. Whether the bidder specifically negotiated with subcontractors to assume part of the responsibility to meet the contract DBE goal when the work to be subcontracted includes potential DBE participation;
10. Whether the bidder made any efforts and/or offered assistance to interested DBEs in obtaining the necessary equipment, supplies, materials, insurance and/or bonding to satisfy the work requirements of the bid proposal; and
11. Any other evidence that the bidder submits which may show that the bidder has made reasonable good faith efforts to include DBE participation.
FAILURE TO MEET GOOD FAITH REQUIREMENT
Where the apparent lowest responsive bidder fails to submit sufficient participation by DBE firms to meet the contract goal and upon a determination by the Good Faith Committee based upon the information submitted that the apparent lowest responsive bidder failed to make sufficient reasonable efforts to meet the contract goal, the bidder will be offered the opportunity to meet in person for administrative reconsideration. The bidder will be notified of the Committee’s decision within 24 hours of its decision. The bidder will have 24 hours to request reconsideration of the Committee’s decision. The reconsideration meeting will be held within two days of the receipt of a request by the bidder for reconsideration.
The request for reconsideration will be heard by the Office of the Secretary. The bidder will have the opportunity to present written documentation or argument concerning the issue of whether it met the goal or made an adequate good faith effort. The bidder will receive a written decision on the reconsideration explaining the basis for the finding that the bidder did or did not meet the goal or made adequate Good Faith efforts to do so.
The result of the reconsideration process is not administratively appealable to the Cabinet or to the United States Department of Transportation.
The Cabinet reserves the right to award the contract to the next lowest responsive bidder or to rebid the contract in the event that the contract is not awarded to the low bidder as the result of a failure to meet the good faith requirement.
SANCTIONS FOR FAILURE TO MEET DBE REQUIREMENTS OF THE PROJECT
Failure by the prime contractor to fulfill the DBE requirements of a project under contract or to demonstrate good faith efforts to meet the goal constitutes a breach of contract. When this occurs, the Cabinet will hold the prime contractor accountable, as would be the case with all other contract provisions. Therefore, the contractor’s failure to carry out the DBE contract requirements shall constitute a breach of contract and as such the Cabinet reserves the right to exercise all administrative remedies at its disposal including, but not limited to the following:
• Suspension of Prequalification;
• Disallow credit toward the DBE goal;
• Withholding progress payments;
• Withholding payment to the prime in an amount equal to the unmet portion of the contract goal; and/or
• Termination of the contract.
PROMPT PAYMENT
Document Phase Document Description Page 17
The prime contractor will be required to pay the DBE and Non-DBE Subcontractors within seven (7) working days after he or she has received payment from the Kentucky Transportation Cabinet for work performed or materials furnished.
CONTRACTOR REPORTING
All contractors must keep detailed records and provide reports to the Cabinet on their progress in meeting the DBE requirement on any highway contract. These records may include, but shall not be limited to payroll, lease agreements, cancelled payroll checks, executed subcontracting agreements, etc. Prime contractors will be required to complete and submit a signed and notarized Affidavit of Subcontractor Payment (TC 18-7) and copies of checks for any monies paid to each DBE subcontractor or supplier utilized to meet a DBE goal. These documents must be completed and signed within 7 days of being paid by the Cabinet.
Payment information that needs to be reported includes date the payment is sent to the DBE, check number, Contract ID, amount of payment and the check date. Before Final Payment is made on this contract, the Prime Contractor will certify that all payments were made to the DBE subcontractor and/or DBE suppliers.
******* IMPORTANT *******
Please mail the original, signed and completed TC (18-7) Affidavit of Subcontractor Payment form and all copies of checks for payments listed above to the following address:
Office for Civil Rights and Small Business Development
200 Mero Street 6th Floor West
Frankfort, KY 40622
The prime contractor should notify the KYTC Office for Civil Rights and Small Business Development seven (7) days prior to DBE contractors commencing work on the project. The contact in this office is Mr. Tony Youssefi.
Mr. Youssefi’s current contact information is email address – tyousseffi@ky.gov and the telephone number is (502) 564-3601.
DEFAULT OR DECERTIFICATION OF THE DBE
If the DBE subcontractor or supplier is decertified or defaults in the performance of its work, and the overall goal cannot be credited for the uncompleted work, the prime contractor may utilize a substitute DBE or elect to fulfill the DBE goal with another DBE on a different work item. If after exerting good faith effort in accordance with the Cabinet’s Good Faith Effort policies and procedures, the prime contractor is unable to replace the DBE, then the unmet portion of the goal may be waived at the discretion of the Cabinet.
H. NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL EMPLOYMENT
OPPORTUNITY (Executive Order 11246)
1. The Offeror's or Bidder's attention is called to the "Equal Opportunity Clause" and the "Standard Federal Equal Employment Specifications" set forth herein.
2. The goals and timetables for minority and female participation, expressed in percentage terms for the Contractor's aggregate work force in each trade on all construction work in the covered area, are as follows:
GOALS FOR MINORITY IN EACH TRADE See Attachment for goal by location
GOALS FOR FEMALE PARTICIPATION IN EACH TRADE 6.9%
These goals are applicable to all the Contractor's construction work (whether or not it is Federal or federally- assisted) performed in the covered area. If the contractor performs construction work in a geographical area located outside of the covered area, it shall apply the goals established for such geographical area where the work is actually performed.
Document Phase Document Description Page 18
With regard to this second area, the contractor also is subject to the goals for both its federally involved and non-federally involved construction.
The Contractor's compliance with the Executive Order and the regulations in CFR Part 60-4 shall be based on its implementation of the Equal Opportunity Clause, specific affirmative action obligations required by the specifications set forth in 41 CFR 60-4, 3(a), and its efforts to meet the goals. The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade, and the contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from Contractor to Contractor or from project to project for the sole purpose of meeting the Contractor's goals shall be a violation of the contract, the Executive Order and the regulations in 41 CFR Part 60-4. Compliance with the goals will be measured against the total work hours performed.
3. The Notification of Construction Contract Award Portal (NCAP) is OFCCP’s preferred method for receiving construction contract award notifications. The NCAP can be found on OFCCP’s website at https://www.dol.gov/ agencies/ofccp/ncap. Users who prefer not to use the portal maintain the option to send their notifications via mail, email and facsimile to the OFCCP Regional office in which the work will be performed. The Contractor shall provide written notification to the Director of the Office of Federal Contract Compliance Programs within ten (10) working days of award of any construction subcontract in excess of $10,000.00 at any tier for construction work under the contract resulting from this solicitation. The notification must include: Prime Contract Number (issued by the federal agency or applicant); Name of Awarding Federal Agency, Applicant or Contractor; Contracting Officer, Applicant Representative or Contractor Representative Submitting Notification with name, phone number, email address; Contractor Awarded Contract or Subcontract with name, address, phone number, email address, EIN, dollar amount of the contract, estimated start date of the contract, estimated completion date of the contract, geographical area in which the contract is to be performed (state, county’s city (if applicable)).
The notification shall be mailed to:
Regional Director
Office of Federal Contract Compliance Programs
61 Forsyth Street, SW, Suite 7B75
Atlanta, Georgia 30303-8931
Main Number: 404-893-4545 Fax: 404-893-4546
Regional Director Contact: OFCCP-SE@dol.gov
Construction Award Email: OFCCP-SE-ConstructionAward@dol.gov
4. As used in this Notice, and in the contract resulting from this solicitation, the "covered area" is The
Commonwealth of Kentucky.
Section 2 - Terms and Conditions of the Contract
2.00 – Scope of the Contract
The Kentucky Transportation Cabinet Division of Purchases issues this solicitation on behalf of the Highways District 2 to award a master agreement contract for: Equipment Rental with Operator – District 2 FHWA ER
2.01 - Contract Components and Order of Precedence
The Commonwealth’s acceptance of the offer indicated by the issuance of an Award by the KYTC Division of Purchases shall create a valid Master Agreement consisting of the following:
1. The written Master Agreement between the Parties;
Document Phase Document Description Page 19
2500000463 Final Equip Rental w/operator D2 FHWA Total Pages: 42 http://www.dol.gov/agencies/ofccp/ncap http://www.dol.gov/agencies/ofccp/ncap mailto:OFCCP-SE@dol.gov mailto:OFCCP-SE-ConstructionAward@dol.gov
2. Any Addenda to the Solicitation;
3. Any provisions of the Solicitation and all attachments thereto;
4. The Bidder’s response to the Solicitation, and
5. The Kentucky Revised Statutes KRS 45A.
In the event of an inconsistency between provisions of the solicitation, the inconsistency shall be resolved by giving precedence in the following order: (a) the Specifications; (b) other provisions of the Solicitation, whether incorporated by reference or otherwise; (c) Contract or Master Agreement Terms and Conditions; (d) FAP 110-10-00 – General Conditions and Instructions for Solicitations and Contracts.
2.02 - Initial Contract Period
The Master Agreement will be for the initial period beginning upon award and expiring 02/28/2026.
2.03 - Optional Renewal Period
This Master Agreement may be extended at the completion of the initial contract period for four (4) additional one-year periods. This extension must have the written approval of the vendor and the KYTC Division of Purchases.
The Commonwealth of Kentucky reserves the right to renegotiate any terms and/or conditions as may be necessary to meet requirements for the extended period. The vendor will be advised of any proposed revisions prior to the renewal periods. In the event proposed revisions cannot be agreed upon, either party shall have the right to withdraw without prejudice from either exercising the option or continuing the contract in an extended period.
2.04 - Divisions/Agencies to Be Served
This contract shall be for use by the following Divisions/Agencies of the Kentucky Transportation Cabinet:
Highways District 2
No shipments or services are authorized until an official Delivery Order has been fully processed by an authorized agency.
2.05 - Quantity Basis of Contract
Any and all quantities mentioned in this solicitation are purely estimates and are not to be implied nor inferred as being guarantees. The State is obligated to buy only that quantity needed by its agencies during the term of the contract. Requirements may exceed the quantities shown and the contractor will be required to furnish all requirements shown on Delivery Orders dated during the life of the contract.
2.06 - Exception to Required Use of Contract
The establishment of this Master Agreement is not intended to preclude the use of similar products when requested by the agency. The Commonwealth of Kentucky reserves the right to acquire large requirements through other competitive processes.
2.07 - Basis of Price Revisions
PRICE ADJUSTMENTS: Unless otherwise specified, the prices established by the Master Agreement shall be firm for the contract period subject to the following:
A. Price Increases: A price increase will not be allowed during the first twelve (12) months of the contract. The price increase must be based on industry wide price changes.