Final_RFB_605_2400000379_1_SO_FORM.PDF
PDF 4 MB Posted
- Attached to
- District 5 Highway Sweeping-REBID
- Solicitation number
- RFB-605-2400000379-1
- Issued by
- Breathitt County, Kentucky
About this file
This document is a Request for Bid (RFB) issued by the Kentucky Transportation Cabinet Division of Purchases for District 5 highway sweeping services. The scope of work includes sweeping portions of the roadway as designated, removing and disposing of all accumulated foreign matter and debris, and maintaining and controlling traffic. The contract will be for an initial period beginning upon award and expiring January 1, 2025, with four optional one-year renewal periods. Bids are due by February 14, 2024 at 1:30 PM Eastern Time and will only be accepted electronically through the Kentucky Vendor Self Service website. Vendors are encouraged to review the work locations and conditions prior to submitting a bid, but pricing information cannot be discussed with agency representatives during the site visit.
The contract will be awarded based on a best value ranking approach, with 95% of the score based on price and 5% based on response time. A reciprocal preference will be given to Kentucky resident bidders. Vendors are required to comply with various Commonwealth laws and regulations, including maintaining required insurance coverage and submitting necessary affidavits. Payment will be based on the actual quantities of work performed, with a penalty for failure to complete work by the contracted due date.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| How to Submit an Online Response - March 2023.pdf | ||
| Final Highway Sweeping Work Location D5 Sheet 2023 2024 LSIORB.xlsx | XLSX spreadsheet | |
| Sweeping Ramps 2023.csv.pdf | ||
| District Map (1).pdf | ||
| Annual Affidavit for Bidders, Offerors and Contractors - Jan 2023.docx | DOCX document | |
| Ramp and Ramp Bridges.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Document ID: RFB 605 2400000379 Page: 1
Commonwealth of Kentucky
SOLICITATION
Modification: No Version #:
TITLE: District 5 Highway Sweeping-REBID
Date Issued:
01/30/2024 Record Date:
01/30/2024
Solicitation Closes Date:
02/14/2024 Time:
13:30
Solicitation No:
RFB 605 2400000379
Online Bidding Prohibited: No For Information Call:
LANESSIA MCCOURT
502-782-3979
Bid Receiving Location:
Bid Receiving
See Terms & Conditions for Bid Submission Instructions
Other KY
Vendor Customer Number:
Vendor Name:
Phone Number:
Fax Number:
Email Address:
Ordering
Address:
City, State, Zip:
Contact Name:
Contact Email:
Contact Phone Number:
Payment
Address:
City, State, Zip:
Contact Name:
Contact Email:
Contact Phone Number:
Ownership Type
__ Sole Proprietorship __ Partnership __ Corporation __ Other_________________________
SIGNATURE OF AUTHORIZED AGENT IS REQUIRED UNLESS RESPONSE
IS SUBMITTED ELECTRONICALLY. FAILURE TO SIGN SHALL RENDER
THE BID INVALID.
Signature X_________________________________________ FEIN#____________________ Date____________
All offers subject to all terms and conditions contained in this solicitation.
Document ID: RFB 605 2400000379 Page: 2
Line Items
Commodity Group: Default Commodity Group
Line CL Description Quantity UOM Unit Cost Line Total or Contract Amnt
1 Highway Sweeping w/ Operator D5 1755.02400 MI
Comm Code Comm Description Manufacturer Model # Manuf Part #
97542 Machinery and Heavy Hardware Rental or Lease
Extended Description ***ONLY ONLINE BIDS WILL BE ACCEPTED FOR THIS RFB.*** Emailed and hard copies delivered by any method WILL NOT BE ACCEPTED.
See attached document "How to Respond to an Online Bid through the Kentucky Vendor Self Service site (updated).pdf".
Please enter contact person, phone number and email in the Comments Section.
Vendors should review and update, if necessary, all addresses and contact persons for their account prior to bid submission. This information will carry forward to a contract if awarded, therefore please ensure all information is correct.
Refer to attached map outline and work location spreadsheet for # of cycles and miles information. Quantities based on the multiple cycles of highway sweeping. Department will measure highway sweeping operation by the number of sweeping miles. The Unit of measure MI is lane miles (sweeping miles).
Between cycles, KYTC will make an effort to manage the large debris and foreign matter that is known to collect on the shoulders etc., however the vendor will be required to collect debris and foreign matter prior to sweeping, during the actual cycle and dispose of it per the contract.
Vendor will pick up and remove all foreign matter and debris from the roadway by hand, brooming, or suction process from designed areas. Dispose of the foreign matter and the debris at a location (s) outside of the highway rights of ways. Perform highways sweeping by the work locations (s) per item and conditions as set forth Provide and utilize a truck mounted mobile vacuum sweeper possessing the following capabilities:
-MININMUM 4 CUBIC YARD HOPPER WITH FLUSHING
-CURB AND REAR BROOM CAPACITY
-A DUST SUPPRESSION SYSTEM
- UNIT SHALL BE NEWER THAN 5 YEARS OF AGE.
Escort vehicle to be a 62 mph rated impact truck mounted attenuator with arrow board as required by the MUTCD manual (current edition). A link to the Manual on Uniform Traffic Control Devices can be found at: http://mutcd.fhwa.dot.gov
Unit of measurement shall be per lane mile (sweeping miles) Sweeping unit shall be equivalent to Elgin Road Wizard or Tymco 500X.
VENDOR'S PROPOSED MAKE AND MODEL:________________________________________
Line CL Description Quantity UOM Unit Cost Line Total or Contract Amnt
2 Highway Sweeping w/Operator - LSIORB 82.82400 MI
Comm Code Comm Description Manufacturer Model # Manuf Part #
97542 Machinery and Heavy Hardware Rental or Lease
Extended Description Sweeping -LSIORB area
Refer to attached map outline and work location spreadsheet for # of cycles and miles information. Quantities based on the multiple cycles of highway
Document ID: RFB 605 2400000379 Page: 3 sweeping. Department will measure highway sweeping operation by the number of sweeping miles. The Unit of measure MI is lane miles (sweeping miles).
Between cycles, KYTC will make an effort to manage the large debris and foreign matter that is known to collect on the shoulders etc., however the vendor will be required to collect debris and foreign matter prior to sweeping, during the actual cycle and dispose of it per the contract.
Vendor will pick up and remove all foreign matter and debris from the roadway by hand, brooming, or suction process from designed areas. Dispose of the foreign matter and the debris at a location (s) outside of the highway rights of ways. Perform highways sweeping by the work locations (s) per item and conditions as set forth Provide and utilize a truck mounted mobile vacuum sweeper possessing the following capabilities:
-MININMUM 4 CUBIC YARD HOPPER WITH FLUSHING
-CURB AND REAR BROOM CAPACITY
-A DUST SUPPRESSION SYSTEM
- UNIT SHALL BE NEWER THAN 5 YEARS OF AGE.
Escort vehicle to be a 62 mph rated impact truck mounted attenuator with arrow board as required by the MUTCD manual (current edition). A link to the Manual on Uniform Traffic Control Devices can be found at: http://mutcd.fhwa.dot.gov
Unit of measurement shall be per lane mile (sweeping miles)
VENDOR'S PROPOSED MAKE AND MODEL:________________________________________
Shipping Information KYTC Project Site
Project Site
N/A KY
Billing Information KYTC District 5 - Louisville District Office
8310 Westport Road
Louisville KY 40242
Document ID: RFB 605 2400000379 Page: 4
Submission Checklist
The following items will be required to be submitted with bid:
Item Bidder with the lowest delivery price receives the maximum score.
Bidder with the lowest response will receive maximum score.
This is a REBID of RFB 2400000332
NEW – Vendor Self Service website has changed as of March 26, 2023.
The new link is https://vss.ky.gov.
Vendors will continue to use the same login credentials.
Instructions for How to Submit an Online Response are attached to this solicitation and also posted on the website.
ELECTRONIC BID SUBMISSION
Bid responses shall be received by electronic submission in the eProcurement system.
Link: https://vss.ky.gov
An electronic bid shall be authorized by the proper agent of the firm by the act of submitting it electronically through the eProcurement system.
Bid information MUST be completed online. Response must contain all required information for the Solicitation. All bidders MUST be registered in the Commonwealth eProcurement System via the Vendor Self Service System at https://vss.ky.gov
Allow 24 – 48 hours to complete Vendor Registration. Vendors must be logged in to their Vendor Self Service (VSS) account in order to submit a response. Registrations completed the day of bid closing must be completed by the Vendor in the VSS portal. The Customer Resource Center is not able to complete registrations and activate accounts on the same day. Closing dates will not be extended for Vendors not registered by the date/time of the bid closing. Vendor Self Registration Guides are provided at https:// finance.ky.gov/eProcurement/Pages/doing-business-with-the-commonwealth.aspx
All bidders are cautioned to begin their electronic submission in sufficient time to complete before the closing date and time. Delays due to technical difficulties or document upload impediments shall not be justification for acceptance of a late bid or proposal. Vendor attention to this advisory is encouraged. If you need assistance, please contact the Customer Resource Center (CRC) by email at Finance.CRCGroup@ky.gov or phone 502-564-9641 or toll-free 877-973-
HELP (4357).
BID PRICES SUBMITTED ON COMPANY QUOTE FORMS ARE DISCOURAGED. COMPANY TERMS
AND CONDITIONS AND/OR SALES AND USE AGREEMENTS OFTEN CONFLICT WITH STANDARD
SOLICITATION REQUIREMENTS AND MAY RESULT IN REJECTION OF BID OFFER.
Online bid responses must be in an “Accepted” status and shall be assigned a date and time stamp from the eProcurement system at the time of final acceptance and formal submission by the vendor. The system will not allow submission of an online response after the published date and time for closing.
An offer may be modified or withdrawn by electronic or written notice ONLY if received prior to the bid closing date and time. An electronic offer may be modified by applying the appropriate electronic signature and following the procedure in the state’s eProcurement signature.
PUBLIC BID READINGS
In-person public bid readings have been discontinued by the KYTC Division of Purchases. We now offer public bid readings via telephone.
Document Description Page 5
2400000379 District 5 Highway Sweeping-REBID https://vss.ky.gov https://vss.ky.gov https://vss.ky.gov https://finance.ky.gov/eProcurement/Pages/doing-business-with-the-commonwealth.aspx https://finance.ky.gov/eProcurement/Pages/doing-business-with-the-commonwealth.aspx mailto:Finance.CRCGroup@ky.gov
Any person wishing to hear a bid reading may call the conference line at 866-830-9434, Participant Code 21327950, at 3:00 pm, Eastern Time on the bid closing date.
BID SUBMISSION CHECKLIST
The vendor MUST include the following with the bid submission. If the items below are not submitted with the bid, the Commonwealth MUST deem the bid non-responsive and SHALL NOT be considered for award.
_____ BID INFORMATION – COMPLETED (See Section 5.00)
_____ VENDOR BID SHEET (Attached)
All other items MUST be submitted prior to award however, vendors are strongly encouraged to include with bid submission.
_____ CERTIFICATE OF AUTHORITY – REGISTRATION WITH SECRETARY OF STATE BY FOREIGN
ENTITY (See Section 2.26)
_____ REQUIRED AFFIDAVIT(S) (See Attachments A, B, C, etc. as applicable)
_____ CERTIFICATE OF INSURANCE (See Section 1.03)
_____ EQUIPMENT SPECIFICATION/PRODUCT LITATURE
PLEASE READ THIS SOLICITATION AND ITS INSTRUCTIONS IN ITS ENTIRETY.
This is a Request for Bid (RFB).
Vendors shall comply with the terms and conditions stated in the solicitation.
Any efforts to negotiate these terms and conditions SHALL NOT be accepted and SHALL cause the bid to be deemed non-responsive.
The General Conditions and Instructions for Solicitations and Contracts shall be incorporated by reference in each solicitation and resulting contract. Therefore, it is the bidder's responsibility to access and read these General Conditions at: : https://finance.ky.gov/office-of-the-secretary/office-of-policy-and-audit/Pages/Finance-Policies.aspx scroll down to Procurement Services- Procurement , double click on the file named FAP 110-10-00 General Conditions and Instructions for Solicitations and Contracts or request a copy by contacting the KYTC Division of Purchases buyer named in Section 3.01. Every person submitting a bid to the Commonwealth shall be deemed to have assented to these conditions by the act of bidding.
Section 1 - Scope of Work - Service
1.00#Specifications of Commodity and/or Service Requirements
Master Agreement for highway sweeping on various routes for the Kentucky Transportation Cabinet Department of Highways in District Five (Bullitt, Jefferson and Shelby Counties).
Perform all work identified within this Solicitation in accordance with the Kentucky Department of Highways Standard Specifications for Road and Bridge Construction, Current Edition, and with the applicable Special Provisions, except as described herein.
Document Description Page 6
2400000379 District 5 Highway Sweeping-REBID https://finance.ky.gov/office-of-the-secretary/office-of-policy-and-audit/Pages/Finance-Policies.aspx https://finance.ky.gov/office-of-the-secretary/office-of-policy-and-audit/Pages/Finance-Policies.aspx
The term "Department", as applied to this Master Agreement Contract will be understood to be synonymous with the terms, "Commonwealth of Kentucky, Transportation Cabinet, or Department of Highways". The term "Vendor" will be understood to be synonymous with the term "Contractor".
Scope of Work
Perform all work identified within this Solicitation in accordance with the Kentucky Department of Highways Standard Specifications for Road and Bridge Construction, Current Edition and with the applicable Special Provisions, except as designated herein.
A link to the Manual on Uniform Traffic Control Devices can be found at: http://mutcd.fhwa.dot.gov
A link to the Standard Drawings can be found at:
https://transportation.ky.gov/Highway-Design/Pages/Standard-Drawings-2020.aspx
A link to the Standard Specifications can be found at: https://transportation.ky.gov/Construction/Pages/ Kentucky-Standard-Specifications.aspx
The work shall consist of the following:
1. Sweeping portions of the roadway as designated on the work location sheet attached to the solicitation; all ramps shown on attached sheets are included with this project and are included in payment by the centerline mile of mainline and shall not be paid separately.
2. Removal of all accumulated foreign matter and debris from the highway shoulders;
3. Disposal of all accumulated foreign matter and debris at an approved site(s) off right- of-way;
4. Maintenance and control of traffic
5. Any other work as identified within this Solicitation.
Definitions:
Sweeping
The pickup of all foreign matter and debris from designated areas through a brooming and suction process and the disposal of such foreign matter and debris at a site(s) off of the rights-of-way
Foreign Matter
Any material not intentionally attached or bonded to its resident surface, which is not required for the operation or maintenance of the highway including, but not limited to, any loose aggregates, rubber or any other accumulated material (e.g. dead animals and vehicle components).
Document Description Page 7 http://mutcd.fhwa.dot.gov https://transportation.ky.gov/Highway-Design/Pages/Standard-Drawings-2020.aspx https://transportation.ky.gov/Construction/Pages/Kentucky-Standard-Specifications.aspx https://transportation.ky.gov/Construction/Pages/Kentucky-Standard-Specifications.aspx
Paved, Pavement
A bituminous asphalt concrete or Portland cement concrete surface including shoulders and medians as opposed to an aggregate or earth surface
Traffic Lane
A lane designated and marked for the normal use of vehicular travel
Roadway
The entire portion of the highway intended for normal or emergency use of vehicular traffic including all traffic lanes, shoulders, medians, gores and entrance and exit ramps
Gore Points
The area between main line traffic lanes and ramp traffic lanes, which is not otherwise classified as a paved shoulder
Right-of-Way
The entire portion of the highway within the boundaries of access fences or access control lines where no fences exist
Cycles of Work
Perform the work on each cycle of this Master Agreement Contract as noted on the included Work Location Sheets and as directed by the Department. Perform the number of cycles of work on each route or route segment of this Contract as noted on the included Work Location Sheets and as directed by the Department.
Bidders should acknowledge that the measurement for each cycle type is as follows:
3 Cycle Routes – Measured from Entrance to Exit of Rest Area – Payment covers sweeping of all paved areas within the Rest Area.
6 Cycle Routes – Measured only for length of barriers and curbs to be swept and not full length of route.
Distance shown per cycle is the total for Cardinal and Non-Cardinal Combined.
All other Routes – Measured as Centerline mile and includes cleaning of all areas listed, including all entrance/exit ramps to the termini at surface road (See attached chart for length of ramps included).
Distance shown per cycle is the total for Cardinal & Non-Cardinal Combined.
Cycles of highway sweeping may be reduced or increased as directed by the Department when situations exist where conditions of foreign matter and debris are limited or where conditions of foreign matter are extensive. Cycles of sweeping may also be increased on certain routes or route segments to accommodate special events that may occur throughout the year. Any partial cycles will be performed at the unit bid price for sweeping.
Document Description Page 8
Where a construction project is in progress, or where a construction project is awarded during the period of the Contract that interferes with work operations, the construction project will have priority. No claim will be allowed for interruptions to the schedule or operations of this Contract.
When directed by the Department, perform work operations on this Contract on an area that had previously been skipped due to the construction contractor’s operations. No additional compensation will be allowed for returning to accomplish this work.
A full or partial cycle or cycles on a specific route or route segment may be deleted from the Master Agreement by the Department, without invalidating the remainder of this Master Agreement. No additional compensation will be made for anticipated profit on such elimination of a cycle.
General Service Requirements
The equipment shall be furnished in good mechanical working condition, fully operational with at least one
(1) operator per vehicle and with all maintenance and repairs including fuel and lubrication necessary for its operation.
The equipment and the operator will be under the supervision of and subject to direction of the Department, who shall direct the time and place for the use of such equipment.
The Transportation Cabinet and all its officers, agents and employees shall be held harmless from all suits, actions, or claims of any character brought on account of any injury or damages sustained by any person or property from any actions or for any negligence in performance of the above named equipment.
Nothing in this proposal is to be construed as any agency relationship between the parties.
Comply with all applicable federal, state and local laws, ordinances and regulations governing safety, provide all safeguards needed for employees and equipment, and secure any and all permits and licenses that may be required.
Notification by Delivery Order to begin highway-sweeping work operations on each cycle of this Master Agreement will be made prior to the date scheduled for the cycle to begin. Follow-up notification will be made by Telephone, Text, or E-mail at the discretion of the Contractor.
Provide to the Chief District Engineer or their representative a notification of the day and time work will begin on the requested Transportation Delivery Order and of each subsequent day work will be performed so that the work can be inspected. Failure to provide this notification will result in non-payment of any work for that day.
The locations of the designated areas for highway sweeping are as identified on the work location sheets attached to this solicitation.
Bidders are encouraged to inspect the project where work is to be performed and to satisfy themselves as to all general and local conditions that may affect the cost of performance of the
Document Description Page 9 contract, to the extent that such information is reasonably attainable. In no event shall a failure to inspect the project constitute grounds for a claim after the award of a contract.
Any Contractor (Vendor) that desires to review the work involved by scheduling a visit to the project should contact the District Representative at the District location identified:
Andrew Mitchell
District Five- Louisville
8310 Westport Road
Louisville, KY 40242
Phone: (502)-210-5400 office Email: Andrew.Mitchell@ky.gov
Pricing information shall not be made known or discussed in any form to agency representatives during the project visit. Failure to comply with this restriction shall be cause for the rejection of a bid. All questions are to be directed to the Transportation Buyer identified in the Solicitation.
Specifications of Service Requirements
Highway Sweeping
Highway sweeping operations will include, but not be limited to, the items of work identified below.
Perform sweeping operations:
1. Along all concrete median barrier walls for the full length of the wall and along the full length of all barrier walls and curb lines of all ramps. All areas shall be swept the width of the truck.
2. Along the curb line of all bridges paralleling and adjacent to the traffic lanes.
3. Along the curb line of all paved traffic islands located at intersecting streets or routes and located at the end of interchange ramps.
4. Along the full length and width of all paved mountable medians.
5. On all paved gore areas where interchange ramps converge and diverge from the thru traffic lanes for the full width of the gore.
6. Along the curb lines of all overhead bridges at designated interchanges.
7. Along the full length and width of all designated paved shoulder areas including paved shoulder areas underneath guardrails where no barrier wall exists.
Document Description Page 10 mailto:Andrew.Mitchell@ky.gov
8. Along all curbline and shoulders of all paved areas at the designated Rest Area locations.
9. Along the full length and width of all designated paved Park and Ride parking areas.
10. Along the full length and width of all paved areas at designated Loadometer Stations.
Disposal of Foreign Matter and Debris
Between cycles, KYTC will make an effort to manage the large debris and foreign matter that is known to collect on the shoulders etc., however the vendor will be required to collect debris and foreign matter prior to sweeping, during the actual cycle and dispose of it per the contract.
Pickup and remove all foreign matter and debris from the roadway by hand or brooming and/or a suction process from designated areas. This foreign matter and debris shall include all items located within the designated areas where highway sweeping is to occur, with the exception of motor vehicles. Dispose of the foreign matter and the debris at a location(s) outside of the highway rights-of-way. Dispose of all waste materials in a manner that meets local, state, and federal regulations. The Department will make no payment for disposal sites.
Remove from the drainage structures, any foreign matter deposited or pushed into the structure, by the highway sweeping operation.
If the sweeper is unable to unload debris at the work site, no payment will be made for the time taken to haul material to a disposal site.
Perform all debris and foreign matter disposal activity as incidental to the highway sweeping operation.
Equipment
Provide highway debris removal and sweeping equipment that is in good working condition and that is suitable to perform and complete the required work on this Master Agreement within the specified time frame. Provide sweeping equipment units equipped such that all work is accomplished within the current standards as established by state and local laws, regulations, or regulations for noise and pollution controls. Provide all equipment accessory items necessary for the efficient operation and completion of the work.
Provide truck mounted, mobile, broom sweeping equipment units capable of sweeping either right or left shoulders of the roadway when traveling with the flow of traffic. Units must meet the following criteria:
Document Description Page 11
Minimum of a 4 cubic yard hopper
Equipped with a dust suppression system
Have curb and rear broom capacity
Unit shall be newer than 5 years old
Minimum 26,000 GVW
Provide a truck equipped with a Flashing Arrow Board and a 62 MPH Impact Attenuating Device to be utilized as an escort vehicle for the Sweeper Unit during highway sweeping operations. This vehicle shall be equipped with a 500 gallon water tank and pumping device to transfer water from one vehicle to another. Operate this escort vehicle at a distance of approximately two-hundred (200) feet behind the slow moving sweeping operation. Provide this unit to be the first item of equipment to be encountered by the traveling public.
Provide a truck that will travel ahead of the sweeping unit for manual collection of debris and foreign matter that is too large or incapable of being captured by the sweeping unit.
Place the Company Name, address, and phone number on each vehicle in a location on the unit that is visible to the public. Use lettering that is a minimum of three inches (3") in height.
Vendor shall provide the Department a listing of all drivers and current CDL licenses.
All equipment shall conform to all prevailing Occupational Safety and Health (OSHA) regulations. Require all operators and other employees to wear safety vests that conform to OSHA regulations on the job site at all times.
Perform highway sweeping operations in a manner such that interference with passing traffic in the traveled roadway is kept to a minimum and in a manner so as not to create a hazard to traveling motorists.
Park or store equipment that is idle or not in use, such as during break times, lunch time, or overnight, away from the outside shoulder of the roadway in an inconspicuous location and as directed by the Engineer.
Begin highway sweeping operations on the project at the point designated by the Department and proceed in the same general direction in a continuous manner until the work is completed.
Maintain and Control Traffic:
Document Description Page 12
Perform Highway Sweeping Operations in accordance to these Terms and Conditions for traffic control.
Maintain traffic and furnish all traffic control devices and all materials that conform to these Terms and Conditions and the Manual on Uniform Traffic Control Devices (MUTCD), the Standard Drawings or Sepia Drawings, Current Editions, and the Standard Specifications for Road and Bridge Construction, Current Edition.
Provide strobe lights for sweeping equipment and all work zone support vehicles that:
A. Covers a 360F0B0 effective area
B. Utilize 360F0B0 optics
C. Have a minimum height of 4 inches
D. Produce a minimum of 60 single flashes or 120 double flashes per minute and 12 joules per main flash
E. Amber in color
F. Penetrate bright sunlight, haze, fog, smog, and darkness
Provide flags that are fluorescent red/orange in color, 24 inches by 24 inches in size, and that are made of a heavy-duty nylon reinforced coated vinyl material that has weighted edges.
Furnish all traffic control devices in new or in like new condition at the beginning of the work and maintain the devices in like new condition until the completion of the work.
Require employees on the job site at all times to wear safety vests that conform to OSHA regulations.
Equip all designated work zone vehicles (tractors, service trucks, and vehicles for supervisory personnel) with flashing lights, warning strobe lights, and fluorescent red/orange flags. Equip other equipment entering or leaving the designated work zone with warning strobe lights that are visible in all directions at all times.
Maintain the flow of traffic in all lanes at all times, except when prohibited by narrow shoulders or medians. In the event the flow of traffic is hampered during highway sweeping operations because of a narrow shoulder or median, utilize appropriate measures to maintain an adequate flow of traffic as directed by the Engineer.
The Department will not allow lane closures or shoulder closures for the purpose of transferring foreign or debris from one piece of equipment to another, for refueling, for refilling with water or for any other reason.
Provide and utilize water to control dust on swept areas except during times of freezing temperatures.
Change the direction of travel on the project only at interchanges. Do not use existing maintenance crossovers to change direction of travel.
Document Description Page 13
Do not perform any highway sweeping operations on any portion of the project between the hours of 6:00 A.M. – 9:00 A.M. or between the hours of 3:00 P.M. – 6:00 P.M. during the normal workweek, (Monday through Friday). Do not perform any highway sweeping operations on project route segments I-64 MP 000-007 or I-65 MP 131-138 between the hours of 10:00 A.M. – 7:00 P.M. on Saturday or Sunday.
Due to overnight truck parking at the Rest Areas (I-64 & I-65), sweeping of the Truck Parking portion of these locations should only be completed between the hours of 8:00 AM & 9:00 PM.
Failure to comply with this requirement will result in an immediate suspension of all work operations and will result in the assessment of a penalty of $250.00 for each occurrence. Operations will remain suspended until approval has been granted by the Department for work operations to resume.
Coordinate the work with other projects that may be in progress within or in the near vicinity of this project. The traffic control of those projects may affect this project and the traffic control of this project may affect those projects. Coordinate the work on this project with the work of the other contractors. The Department will determine the relative priority to give to work phasing on the various projects when there is a conflict.
Perform the “Maintain and Control Traffic” item of work as incidental to all other items of work included in this Master Agreement Contract.
1.02– Insurance Requirements
The successful bidder shall be responsible for maintaining this coverage through the entire contract term:
1. Contractor’s General Liability Insurance with limits of liability of $1,000,000.00 per occurrence.
2. Kentucky worker's compensation insurance in accordance with the requirements of KRS 45A.480 and KRS Chapter 342.
The successful bidder shall furnish an ACORD Certificate within ten (10) days of notice of intent to award with:
A. The certificate holder listed as:
Kentucky Transportation Cabinet Division of Purchases 4th Floor East 200 Mero Street Frankfort, KY 40622
B. The Endorsement indicating the Commonwealth and its agents as an Additional Insured for the contract resulting from this solicitation.
C. The contract number in the Description of Operations box.
Failure to furnish said certificates or to indicate the contract number shall be grounds for cancellation of the contract.
The successful bidder shall provide an up-to-date copy of the certificate upon renewal of the policy.
Failure to do so shall result in cancellation of the contract.
The insurance shall be endorsed to state that coverage shall not be suspended, voided, cancelled by either party, reduced in coverage limits, except after thirty (30) days prior written notice by certified mail, return receipt requested, has been given to the agencies.
Document Description Page 14
The insurance coverage shall be in compliance with the laws of the Commonwealth of Kentucky and shall be placed with a licensed resident or non-resident agent who represents insurance companies authorized to do business in Kentucky. A list of authorized companies can be found at http://insurance.ky.gov/ company. Failure to meet this requirement may result in the bid being deemed non-responsive.
The insurer shall have an AM Best rating of B+ or higher. Visit www.ambest.com for verification. Failure to meet this requirement may result in the bid being deemed non-responsive.
Section 2 - Terms and Conditions of the Contract
2.00 – Scope of the Contract
The Kentucky Transportation Cabinet Division of Purchases issues this solicitation on behalf of the District 5 to award a master agreement contract for: Eq Rental Highway Sweeping D-5 Jefferson/Bullitt/ Shelby Co
2.01 - Contract Components and Order of Precedence
The Commonwealth’s acceptance of the offer indicated by the issuance of an Award by the KYTC Division of Purchases shall create a valid Master Agreement consisting of the following:
1. The written Master Agreement between the Parties;
2. Any Addenda to the Solicitation;
3. Any provisions of the Solicitation and all attachments thereto;
4. The Bidder’s response to the Solicitation, and
5. The Kentucky Revised Statutes KRS 45A.
In the event of an inconsistency between provisions of the solicitation, the inconsistency shall be resolved by giving precedence in the following order: (a) the Specifications; (b) other provisions of the Solicitation, whether incorporated by reference or otherwise; (c) Contract or Master Agreement Terms and Conditions;
(d) FAP 110-10-00 – General Conditions and Instructions for Solicitations and Contracts.
2.02 - Initial Contract Period
The Master Agreement will be for the initial period beginning upon award and expiring January 1,2025.
2.03 - Optional Renewal Period
This Master Agreement may be extended at the completion of the initial contract period for four (4) additional one-year periods. This extension must have the written approval of the vendor and the KYTC Division of Purchases. The Commonwealth of Kentucky reserves the right to renegotiate any terms and/ or conditions as may be necessary to meet requirements for the extended period. The vendor will be advised of any proposed revisions prior to the renewal periods. In the event proposed revisions cannot be agreed upon, either party shall have the right to withdraw without prejudice from either exercising the option or continuing the contract in an extended period.
2.04 - Divisions/Agencies to Be Served
This contract shall be for use by the following Divisions/Agencies of the Kentucky Transportation Cabinet:
District 5
No shipments or services are authorized until an official Delivery Order has been fully processed by an authorized agency.
2.05 - Quantity Basis of Contract
Any and all quantities mentioned in this solicitation are purely estimates and are not to be implied nor inferred as being guarantees. The State is obligated to buy only that quantity needed by its agencies during the term of the contract. Requirements may exceed the quantities shown and the contractor will be required to furnish all requirements shown on Delivery Orders dated during the life of the contract.
Document Description Page 15
2400000379 District 5 Highway Sweeping-REBID http://insurance.ky.gov/company http://insurance.ky.gov/company http://www.ambest.com
2.06 - Exception to Required Use of Contract
The establishment of this Master Agreement is not intended to preclude the use of similar products when requested by the agency. The Commonwealth of Kentucky reserves the right to acquire large requirements through other competitive processes.
2.07 - Basis of Price Revisions
PRICE ADJUSTMENTS: Unless otherwise specified, the prices established by the Master Agreement shall be firm for the contract period subject to the following:
A. Price Increases: A price increase will not be allowed during the first twelve (12) months of the contract.
Only one price increase will be allowed during the contract period. The price increase must be based on industry wide price changes. The contract holder must request in writing a price increase at least thirty
(30) days prior to the effective date, and shall provide firm proof that the price increase(s) is justified. The KYTC Division of Purchases may request additional information or justification. If the price increase is denied, the contract holder may withdraw from the contract without prejudice upon written notice and approval by the KYTC Division of Purchases. Notice of withdrawal must be provided a minimum of forty-five (45) days prior to the effective date however the vendor must continue service at the contract prices until a new contract can be established (usually within sixty (60) days).
B. Price Decreases: The contract price shall be reduced to reflect any industry wide price decreases. The contract holder is required to furnish the KYTC Division of Purchases with notice of any price decreases as soon as such decreases are available.
C. Extended Contract Periods: If the contract provides for an optional renewal period, a price adjustment may be granted at the time the contract is renewed, subject to price increase justification as required “A.
Price Increases”. One (1) additional price increase may be granted during the extended contract period.
This price increase will not be allowed during the first six (6) months of the extended contract period and will be subject to the conditions in “A” above.
2.08 - Addition or Deletion of Items or Services
The KYTC Division of Purchases reserves the right to add new and similar items, with the consent of the vendor, to the contract. If an addition is agreeable to both parties, the KYTC Division of Purchases will issue a Modification. Until such time as the vendor receives a Modification, the vendor shall not accept Delivery Orders from any agency referencing such items or services.
2.09 - Changes and Modifications to the Contract
During the period of the contract, a modification shall not be permitted in any of its conditions and specifications, unless the contractor receives electronic or written approval from the KYTC Division of Purchases. If the contractor finds at any time that existing conditions make modification in requirements necessary, the contractor shall report the matter promptly to the KYTC Division of Purchases for consideration and decision. All contract modifications shall be subject to the provisions of 200 KAR 5:311.
2.10 - Reduction in Contract Worker Hours/Employee Furlough
The Kentucky General Assembly may allow for a reduction in contract worker hours in conjunction with a budget balancing measure for some professional and non-professional service contracts. If under such authority the agency is required by Executive Order or otherwise to reduce contract hours, the contract will be reduced by the amount specified in that document. The reduction of hours may be applicable to those contract workers that provide a service in state government buildings on a regularly scheduled basis, such as janitorial, security guard, mailing services, and food services. These services will be reduced in hours only in those circumstances where the buildings will be closed. A notification will be sent to the contract holder in advance of any scheduled reduction in contract hours.
2.11 - Basis of Shipment
Quotations of unit prices on this solicitation shall be F.O.B. Destination Freight Prepaid and Allowed to the receiving agency. The vendor shall be fully responsible for all shipments and freight charges involved to the ordering agency. The responsibility for filing freight claims lies with the vendor.
Document Description Page 16
2.12 Delivery Orders for Services
No services are authorized until an official Delivery Order has been fully processed by an authorized agency or payment has been made via Pro-Card.
Penalties assessed for delays in response or completion time will be calculated based on the date of the Delivery Order and the response/completion time stated in Section 2.13
Payment shall be made against the actual quantities of work performed. The Delivery Order shall be modified to adjust quantities if needed.
Any work assigned prior to contract expiration will be considered cancelled if the work has not been initiated at the time of expiration. There will be no claim for damages allowed by reason of cancellation thereof.
If additional time is needed to complete assigned work, please send a request to the Division of Purchases two weeks prior to expiration date. Per Section 2.28, this extension shall not exceed ninety
(90) days.
2.13 - Notices
The Division of Purchases Buyer identified below shall be the sole point of contact throughout the procurement process. All communications, oral and written (regular, express, or electronic mail) concerning this procurement shall be submitted to:
Lanessia McCourt
Division of Purchases
Kentucky Transportation Cabinet
Phone: 502-782-3979
E-mail: lanessia.mccourt@ky.gov
From the issue date of this solicitation until a Contractor(s) is selected and the selection is announced, Offerors are not permitted to communicate with any Commonwealth staff concerning this solicitation
After the award of a contract, all programmatic communications are to be made to the Agency Contact Person identified in the contract document with a copy to the Division of Purchases Buyer.
After the Award of a contract, all communications of a contractual or legal nature are to be made to the KYTC Division of Purchases Buyer.
2.14 – Response
Response at the earliest possible date is desired.
The Vendor agrees that when delivery is not made within the contracted due date, $1,000.00 per day shall be deducted from the Vendor’s invoice for each day the Vendor fails to meet the contracted delivery date.
The Vendor is not responsible for, and shall not be penalized for delays in its delivery when caused by factors or events outside Vendor’s control, including but not limited to acts or omissions of the Commonwealth or third parties, acts of civil or military authority, civil disturbance, war, terrorism, pandemics, explosions, fire, floods, tornadoes or other natural disasters or acts of God.
2.15 - Inspection
Document Description Page 17
All supplies, equipment and services shall be subject to inspection or tests by the Commonwealth prior to acceptance. In the event supplies, equipment or services are defective in material or workmanship or otherwise not in conformity with specified requirements, the Commonwealth shall have the right to reject the items or services or require acceptable correction at the vendor’s expense.
2.16 - Invoices
Invoices, if required, shall be prepared and transmitted to the agency receiving the goods or services.
One copy shall be marked "original" unless otherwise specified. Each invoice shall contain at least the following information:
a. Contract and Delivery Order number;
b. Item numbers;
c. Description of supplies or services;
d. Sizes;
e. Quantities;
f. Service Dates;
g. Unit prices; and
h. Extended totals.
2.17 - Payments
The vendor shall be paid, upon the submission of proper invoices to the receiving agency at the prices stipulated for the supplies delivered and accepted, or services rendered. Unless otherwise specified, payment will not be made for partial deliveries accepted. Payments will be made within thirty (30) working days after receipt of goods and vendor’s invoice in accordance with KRS 45.453 and KRS 45.454. A penalty payment of one percent (1%) per month shall be added to the amount due the vendor for each full or partial month that the payment exceeds 30 working days.
2.18 - Vendor’s Report
The vendor(s) may be asked to furnish the KYTC Division of Purchases, a report showing volume which has been sold to the Commonwealth and its using agencies each six (6) months of the contract period.
The report will include political subdivisions and university purchases. This report may be the vendor’s computer printout sheet or form. This shall apply to all items, which are to become a part of this contract.
This report must reference usage by brief description, product number or other format designated by the KYTC Division of Purchases.
2.19 - Post Contract Agreements
The Master Agreement shall represent the entire agreement between the parties. Prior negotiations, representations, or agreements, either written or oral, between the parties hereto relating to the subject matter hereof shall be of no effect upon this contract. Unless, contractually provided, the Commonwealth shall not be required to enter into nor sign further agreements, leases, company orders or other documents to complete or initiate the terms of the contract. Any such documents so obtained will be non-binding on the State and be cause for breach of contract.
2.20-Subcontracts
The contractor is permitted to make subcontract(s) with any other party for furnishing any of the work or services herein. The contractor shall be solely responsible for performance of the entire contract whether or not subcontractors are used. The Commonwealth shall not be involved in the relationship between the prime contractor and the subcontractor. Any issues that arise as a result of this relationship shall be resolved by the prime contractor.
All references to the contractor shall be construed to encompass both the contractor and any subcontractors of the contractor.
The vendor shall notify the Commonwealth of any planned use of subcontractors in regards to the resulting contract. If the KYTC Division of Purchases is provided evidence of the vendor making such an arrangement without submitting the proper information prior to use of the subcontractor, the contract may be cancelled immediately.
Document Description Page 18
All payments will be made directly to the contracted vendor. It is the vendor’s responsibility to make payment to the subcontract. Payments shall not be made to the subcontractor by the Commonwealth.
Subcontractors having nonpayment issues that could not be resolved with the Vendor, should report in detail these incidents to the buyer of record for this solicitation.
The Vendor shall ensure that all contractors or subcontractors comply with all applicable Federal, State, and Local laws, regulation, mandates, and terms of this solicitation and resulting contract.
2.21 - Service Performance
All services performed under contract shall be in accordance with the terms and conditions of the contract. It will be the agency’s responsibility to ensure that such services rendered are performed and are acceptable.
The relationship between the State and the Contractor is that of client and independent Contractor. No agent, employee, or servant of the Contractor or any of its subcontractors shall be or shall be deemed to be an employee, agent, or servant of the State for any reason. The Contractor will be solely and entirely responsible for its acts and the acts of its agents, employees, servants and subcontractors during the performance of this Contract.
Deviations of services performed will not be made without the written approval of the KYTC Division of Purchases. Problems that arise under any aspect of performance should first be resolved between the vendor and the agency. If such problems and/or disagreements cannot be resolved they should be referred to the KYTC Division of Purchases for mediation.
2.22 - Assignment
The vendor shall not assign this Master Agreement in whole or in part to another vendor at any time during the initial or optional renewal terms of the contract, without the consent, guidance and approval of the Commonwealth. Any assignment hereunder entered into, subsequent to the execution of the contract with the prime vendor, must be annotated and approved by the Commonwealth. Any purported assignment without this consent shall be null and void.
2.23 – Ethics Compliance
Contractor certifies that contractor and its employees will not offer or provide gifts to KYTC employees in excess of $25.00 in any single calendar year as defined in KRS 11A.045 (1) and KYTC General Administration and Personnel Policy GAP-808. Moreover, contractor certifies that contractor and its employees will not offer any ticket to a sporting event to a KYTC employee without being reimbursed the face value amount for said ticket as defined in KRS 11A.045 (2).
It is agreed and understood that non-compliance with the above provisions may result in the suspension of vendor procurement participation, contract termination, and/or debarment.
2.24 - Termination of Contracts
A contract may be terminated for default by the vendor, for the convenience of the Commonwealth, or for lack of appropriation in accordance with 200 KAR 5:312.
2.25 - Endorsements
The Contractor shall not refer to the Award of Contract in commercial advertising in such a manner as to state or imply that the firm or its services are endorsed or preferred by the Commonwealth of Kentucky.
2.26 - Registration with the Secretary of State by a Foreign Entity
Pursuant to KRS 45A.480(1)(b), an agency, department, office, or political subdivision of the Commonwealth of Kentucky shall not award a state contract to a person that is a foreign entity required by KRS 14A.9-010 to obtain a certificate of authority to transact business in the Commonwealth (“certificate”) from the Secretary of State under KRS 14A.9-030.
For all foreign entities required to obtain a certificate of authority to transact business in the Commonwealth, if a copy of the certificate is not received within the time specified by the Division of Purchases, the foreign entity’s solicitation response may be deemed non-responsive. If the foreign entity
Document Description Page 19 is not required to obtain a certificate as provided in KRS 14A.9-010, the foreign entity should identify the applicable exception in its solicitation response. Foreign entity is defined within KRS 14A.1-070.
Vendors are required to remain in active and good standing during the life of the contract.
Businesses can register with the Secretary of State at https://onestop.ky.gov/Pages/default.aspx
2.27 - Discrimination
Discrimination (because of race, religion, color, national origin, sex, sexual orientation, gender identity, age, or disability) is prohibited. This section applies only to contracts utilizing federal funds, in whole or in part. During the performance of this contract, the contractor agrees as follows:
1. The contractor will not discriminate against any employee or applicant for employment because of race, religion, color, national origin, sex, sexual orientation, gender identity or age. The contractor further agrees to comply with the provisions of the Americans with Disabilities Act (ADA), Public Law 101-336, and applicable federal regulations relating thereto prohibiting discrimination against otherwise qualified disabled individuals under any program or activity. The contractor agrees to provide, upon request, needed reasonable accommodations. The contractor will take affirmative action to ensure that applicants are employed and that employees are treated during employment without regard to their race, religion, color, national origin, sex, sexual orientation, gender identity, age or disability. Such action shall include, but not be limited to the following; employment, upgrading, demotion or transfer; recruitment or recruitment advertising; layoff or termination; rates of pay or other forms of compensations; and selection for training, including apprenticeship.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .