QUALITY ASSURANCE SURVEILLANCE PLAN
For: The Consolidated Mail Outpatient Pharmacy (CMOP) facility of the Department of Veterans Affairs located in Leavenworth Kansas.
Contract Number: TBD
Contract Description: Provide comprehensive onsite technical support for the Department of Veterans Affairs (VA) Consolidated Mail Outpatient Pharmacy (CMOP) located in in Leavenworth KS. Technical support shall include on-site personnel to maintain automated equipment systems.
Contractor’s name: TBD
1. PURPOSE
a. This Quality Assurance Surveillance Plan (QASP) provides a systematic method to evaluate performance for the stated contract requirement. This QASP explains the following:
i. What will be monitored
ii. How monitoring will take place
iii. Who will conduct the monitoring
iv. How monitoring efforts and results will be documented
b. This QASP does not detail how the contractor accomplishes the work. Rather, the QASP is created with the premise that the contractor is responsible for management and quality control actions to meet the terms of the contract. It is the Government’s responsibility to be objective, fair, and consistent in evaluating performance.
c. This QASP is a “living document” and the Government may review and revise it on a regular basis. However, the Government shall coordinate changes with the contractor. Copies of the original QASP and revisions shall be provided to the contractor and Government officials implementing surveillance activities.
2. GOVERNMENT ROLES AND RESPONSIBILITIES
The following personnel shall oversee and coordinate surveillance activities.
a. Contracting Officer (CO) - The CO shall ensure compliance with the contract terms, and shall safeguard the interests of the United States in the contractual relationship. The CO shall also assure that the contractor receives impartial, fair, and equitable treatment under this contract. The CO is ultimately responsible for the final determination of the adequacy of the contractor’s performance.
Assigned CO: TBD Organization or Agency: Network Contracting Office 15, CMOP Acquisitions
b. Contracting Officer’s Representative (COR) - The COR is responsible for technical administration of the contract and shall assure proper Government surveillance of the contractor’s performance. The COR shall keep a quality assurance file. The COR is not empowered to make any contractual commitments or to authorize any contractual changes on the Government’s behalf.
Assigned COR’s: TBD
3. CONTRACTOR REPRESENTATIVES
The following individuals will serve as the “Contractor’s” employees’ program manager for this contract.
a. Program Manager – TBD
b. Alternate Program Manager - TBD
c. Title: TBD
4. PERFORMANCE STANDARDS
a. Performance standards define desired services. The Government performs surveillance to determine if the contractor exceeds, meets, or does not meet these standards.
b. The Performance Work Statement includes performance standards. The Government shall use these standards to determine contractor performance and shall compare contractor performance to the Acceptable Quality Level (AQL).
Task #
Location In
PWS
Indicator
Standard
Acceptable Quality Level
Method of Surveillance
6.2
Staffing levels
Contracted numbers of positions filled TBD
COR to track with contractor
6.6
Record Keeping
Maintain a record keeping system
100%
100% inspection
6.3
Training & Orientation
Compliance with initial and annual training requirements
Random monitoring of current personnel and 100% of new personnel
7.1 & 7.3 Reporting
Provide timely reporting as per performance work statement
Review of contractor reports or records
5. METHODS OF QA SURVEILLANCE
Various methods exist to monitor performance. The COR shall use the surveillance methods listed below in the administration of this QASP.
a. Random Monitoring-Random monitoring shall be conducted if and when on- going quality assurance measures dictate
b. Internal and External Customer Feedback-Customer feedback may be obtained from either the results of formal customer surveys or random customer complaints or feedback.
c. Review of operation logs, databases, or metrics
d. Review of data reported through quality and safety program
e. Review of contractor reports or records
f. Audit or review by third party-Third party audits or reviews shall be conducted if and when on-going quality assurance measures dictate
g. 100% inspection-This level of inspection may be accomplished by automated monitoring and documentation features built into the production computer and related information systems. Each month, the COR shall review the generated documentation and document summary results.
h. Periodic Inspection- Periodic shall be conducted if and when ongoing quality assurance measures dictate.
7. DOCUMENTING PERFORMANCE
a. ACCEPTABLE PERFORMANCE: The Government shall document positive performance. Any report may become a part of the supporting documentation for any contractual action.
b. UNACCEPTABLE PERFORMANCE: When unacceptable performance occurs, the COR shall inform the Contracting Officer. This will normally be in writing unless circumstances necessitate verbal communication. In any instance of unacceptable performance the COR shall document the discussion and place it in the COR file.
c. When the COR determines formal written communication is required, the COR shall prepare a Contract Discrepancy Report (CDR), and present it to the contractor's program manager through the contracting officer (CO).
d. The contractor shall acknowledge receipt of the CDR in writing. The CDR will specify if the contractor is required to prepare a corrective action plan to document how the contractor shall correct the unacceptable performance and avoid a recurrence. The CDR will also state how long after receipt the contractor has to present this corrective action plan to the COR. The Government shall review the contractor’s corrective action plan to determine acceptability.
e. Any CDRs may become a part of the supporting documentation for any contractual action deemed necessary by the CO.
8. FREQUENCY OF MEASUREMENT
a. Frequency of Measurement: During contract performance, the COR will periodically analyze whether the negotiated frequency of surveillance is appropriate for the work being performed. Reports will be completed on a quarterly basis and a copy will be provided to the contractor.
b. Frequency of Performance Assessment Meetings: The COR shall meet with the contractor as established by the local CMOP to assess performance and shall provide a written assessment.
Signatures:
Contractor Program Manager
Contracting Officer’s Representative
TBD
Contracting Officer