FINAL PWS JUL 23 Stormwater Contract.pdf
PDF 372 KB Posted
- Attached to
- AMENDMENT 0001 Federal contract opportunity
- Solicitation number
- W912PB23R3036_AMENDMENT_0001
About this file
This is an amendment to a solicitation issued by the Department of the Army Materiel Command Army Contracting Command. The solicitation is for compliance services to support the U.S. Army Garrison Ansbach's stormwater pollution prevention program. Required services include annual sampling and analysis of stormwater discharge points, sanitary sewer systems, industrial wastewater, and water production wells to ensure compliance with German and U.S. environmental regulations. The contractor must also provide quarterly site inspections and annual updates to Ansbach's Stormwater Pollution Prevention Plan. Reporting requirements include submission of sampling results and quarterly/annual summary reports. The performance period is one base year with four optional one-year periods of performance. The solicitation was issued to small businesses holding 8(a) program contracts.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SOLICITATION W912PB23R3036 STORMWATER COMPLIANCE.pdf | ||
| ELIN STORMWATER COMPLIANCE.xlsx | XLSX spreadsheet | |
| SOLICITATION AMENDMENT 0001 W912PB23R3036 STORMWATER COMPLIANCE.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Annex A—Overarching Performance Work Statement (PWS)
Base Operations and Maintenance Contract
Stormwater Compliance Support
At
USAG Ansbach, Germany
30 January 2023
Table of Contents
1.0 INTRODUCTION…………………………………………………..…………………………4
1.1 Background…………………...…………………………………..……………………4
1.2 Objectives……………………………………………...…………..…………………..4
1.3 Climatic Conditions…………...………………………………..……………………...5
1.4 Facility Access…………...……….………………………………......…….…………5
1.5 Traffic Flow.……………………….………………………………………….…..……5
1.6 Drainage…………………………………………………………………………………5
1.7 Restoration of Landscape Damage……………………………………......………...5
1.8 Dust Suppression……………………………………………………………......…….5
1.9 Utility Location…………………………………………………………………...……..5
1.10 Excavation Permits…………………………..………...………………...…………...5
2.0 REQUIREMENTS……………………………………………….…………………………….5
2.1 Description of Services………………………………………………………………...5
2.2 General Information…………………………………………………………….....…..5
2.3 Emergency Services.…………….………………………………...…….……………7
2.4 Contract Administration and Management...…………………………………….….7
2.5 Work Management
2.6 Maintain As-Builts…………………………………………………………………….11
2.7 Historic Property or Archeological Site…………………………………………….11
2.8 Security………………………………………..………………………………………11
2.9 Security Training……………………………………………………………………..12
2.10 Safety……..………………………..………………………….………………………13
2.11 Training, Physical Requirements, or other Expertise Required…………………14
2.12 Environmental Requirements……………………..………………………………...14
3.0 PERFORMANCE REQUIREMENTS AND STANDARDS………………………………15
3.1 Quality Assurance……………………………..…………………………………….15
3.2 Quality Control Plan……………………………………………………………...….15
3.3 Customer Feedback Program
4.0 PERFORMANCE TASK REQUIREMENTS……………………………...………………16
5.0 COMMON LEVELS OF SUPPORT (CLS)……………………………………..………
5.1 Basic Service…………………………………………………………………………18
5.2 Tasks…………………………………………………………………………………..18
6.0 DELIVERABLES………………………………………….………………..………………..26
7.0 RELATED DOCUMENTS………..…………………...………….………………………...29
7.1 Definitions and Acronyms……………………………………….......……………...29
7.2 Applicable Directives, Publications…………..……………..………...….………..33
7.3 Technical Exhibit (TE) Index…………….…………………………………….……34
7.4 Government-Furnished Facilities (GFF) and Equipment (GFE)…………………..…….35
7.5 Contractor-Furnished Material (CFM)/Property (CFP)/Equipment (CFE)……….……..36
7.6 U.S. Department of Labor Wage Determination (DOL WD)……….………………..…...37
7.7 Enterprise Contractor Manpower Reporting Application (ECMRA).………….....……...38
7.8 ECMRA Reporting Labor Hours…………………………………..………………….…….38
1.0 Introduction.
This is a non-personal services contract to provide Base Operation and Support Services for the U.S. Army Garrison Ansbach, Germany. The Government will not exercise any supervision or control over the contract service providers. The Contractor shall perform to the standards specified in this Performance Work Statement (PWS). Contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government. The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary as defined in this
PWS.
1.1 Background.
Final Governing Standards for Germany (FGS-G) Chapter 4 (Wastewater) requires monitoring and sampling to be performed at all facilities discharging to sewage treatment plants or waters of Germany. This is a firm-fixed price task order to provide sampling support to the US Army Garrison (USAG) Ansbach. Work includes sampling, analysis, inspections, and reporting required for USAG Ansbach to fully comply with FGS requirements and Host Nation (HN) laws. The task order includes support for USAG Ansbach’s stormwater pollution prevention program, including updating the Garrison’s Stormwater Pollution Prevention Plan (SWPPP) and annual SWPPP training.
In performing the work under this task order, the Contractor shall furnish all personnel, services, equipment, materials, facilities, and other requirements necessary for, or incidental to, this Performance Work Statement (PWS). It is the Contractor’s responsibility to comply with all applicable laws and regulations and to fulfill the requirements of this PWS in a manner that is consistent with any applicable orders or permits, all existing agreements or guidance for the Installation, and the Contractor’s base contract.
The Stormwater Pollution Prevention Plan (SWPPP), US Army Garrison, updated in 2022, is an engineering and management strategy to improve the quality of stormwater runoff and minimize impacts to receiving waters. The SWPPP satisfies FGS standards and is updated annually.
Locations requiring support under this task order include all DoD property associated with the USAG Ansbach. Refer to StormwaterW Monitoring Analysis and Sampling Plan (SWMP)P and tasks for additional details. Some exact locations may be identified by the USAG Ansbach after award.
1.2 Objectives.
The Contractor shall ensure all work accomplished in the performance of this PWS meets all
Commented [PHLMCUI2R1]: Fixed.
Commented [SYU4CSB(1]: Please spell out abbreviations and add into Part 2, Acronyms samplingmaintenance and repair standardsreporting requirements; consistent with the original equipment manufacturer’s recommendations; all applicable Federal, State, and local laws, regulations, and directives to include, but not limited to, the applicable publications listed in Section 7.0, Related Documents.
1.2.1 The Contractor shall ensure all work in support of mission requirements tendered to the Government for acceptance conforms to the measurable performance standards of quality, timeliness, and quantity specified in the PWS of this contract. Without additional expense to the Government, the Contractor shall obtain/ensure subcontractors obtain all licenses, and permits required to perform this work under this contract. The intent is to establish work requirements that are performance-based and results oriented. This approach is intended to allow the Contractor to determine the best and most cost effective ways to fulfill base operations and their component needs, emphasizing innovation and commercial best practices.
1.3 Climatic Conditions. N/A
1.4 Facility Access.
The Contractor shall ensure access to facilities in consultation with the Contracting Officer Representative (COR).
1.5 Restoration of Landscape Damage.
Trees or other landscape features, and irrigation systems damaged by the Contractor’s operations shall be restored to the original state at no additional cost to the Government.
2.0 Requirements
2.1 Description of Services. See Section 5.0 for the specific Common Level of Support
(CLS).
2.1.1 Non-Personal Services.
The personnel rendering the services are not subject; either by the contract’s terms or by the manner of its administration, to the supervision and control usually prevailing in relationships between the Government and its employees. Non-personal service contracts are authorized by the Government in accordance with (IAW) Federal Acquisition Regulation (FAR) Subpart 37.104, under general contracting authority, and do not require specific statutory authorization.
2.2 General Information.
2.2.1 Transition (Phase In/Phase Out). Phase In/Phase Out will not be utilized for the performance of this contract.
Commented [SYU4CSB(3]: This contract is about sampling of water? Recommend to revise to the current requirement.
Commented [PHLMCUI4R3]: Corrected some of the language to fit the activity.
2.2.2 Phase-out. N/A
2.2.3 Place of Performance and Hours of Operation.
2.2.3.1 Place of Performance (expanded description).
The work to be performed under this requirement will be performed throughout the entire area occupied by USAG Ansbach. A map of USAG Ansbach is located at Technical Exhibit (TE) 1A- G.
2.2.3.2 Hours of Operation.
The Contractor shall conduct business, between the hours of 0730 to 1600, Monday through Friday, excluding Federal holidays or when the Government facilities are closed due to local or national emergencies, administrative closings, or similar Government directed facility closings.
The Contractor shall maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS when the Government facility is not closed for the above reasons. A Directorate of Publ ic Work (DPW) Work Reception (WR) will be operated 24 hours a day, 7 days a week and be capable of response to DMOs and/or customer requests outside of standard working hours.
2.2.3.3 Installation Closures.
When an unforeseen installation closure occurs on a regularly scheduled day of work, the Contractor shall reschedule the work to be performed the following day unless the following day is a Saturday, Sunday, a recognized Federal holiday, and when routine work is not scheduled for that day; or reschedule the work for the next business day following the closure.
2.2.3.4 Inclement Weather Delay N/A
2.2.3.5 The Contractor shall coordinate with DPW in preparation for and during emergency operations situations such as inclement weather, flood, active shooter, fire or other emergency situations. The Contractor may be called upon to deliver a wide variety of services to the installation through an emergency DMO/PWO in support of emergency response. The Contractor shall be required to provide all normal services during an emergency response unless otherwise directed by the KO, however emergency response requirements will take precedence over normal DMO/PWO activities.
2.2.3.6 Federal Holidays.
The Contractor’s performance shall not be required on the Federal US and German public holidays listed below. Holidays occurring on weekends will be observed as directed by the Federal calendar (5 U.S.C. 6103).
Commented [SYU4CSB(5]: Shall the contractor provide work on Host Nation Holidays? Recommend to add a statement into the PWS (Contractor shall (or shall not) provide work Host Nation Holidays and insert the HN Holidays).
Commented [PHLMCUI6R5]: Adjusted to include local holidays
1) US Federal Holidays 2) German Holidays (Bavaria) New Year’s Day, 1 January Epiphany, 6 January Martin Luther King Jr. Day, 3rd Monday in January Good Friday, varies
President’s Day, 3rd Monday in February Easter Monday, varies
Memorial Day, last Monday in May Labor Day, 1 May
Juneteenth, 19 June Ascension Day, varies
Independence Day, 4 July Whit Monday, varies Labor Day, 1st Monday in September Assumption Day, 15 August
Columbus Day, 2nd Monday in October Day of German Unity, 3 October
Veteran’s Day, 11 November All Saints Day, 1 November
Thanksgiving Day, 4th Thursday in November Second Christmas Day, 26 December Christmas Day, 25 December The Contractor’s performance shall not be required on the Federal public holidays listed below. Holidays occurring on weekends will be observed as directed by the Federal calendar (5 U.S.C. 6103).
New Year’s Day Labor Day
Martin Luther King Jr.’s Birthday Columbus Day
President’s Day Veteran’s Day
Memorial Day Thanksgiving Day
Independence Day Christmas Day
2.2.3.7 Travel/Temporary Duty. N/A
2.3 Emergency Services.
2.3.1 Emergency Medical Treatment.
The Contractor or their employees shall immediately notify their supervisor of any accident requiring emergency medical treatment. The Contractor shall notify the designated Government representative/Contracting Officer’s Representative (COR) no later than (NLT) two (2) hours of the incident. The Contractor shall be responsible for the emergency medical treatment services for Contractor personnel. However, the Government will provide, on an emergency basis, medical services for injuries incurred while an employee is performing under the contract. The Contractor shall reimburse the Government for emergency medical services provided, upon receipt of invoice from the medical facility. Reimbursement shall be made to the US Government.
2.3.2 Accident Reporting.
The Contractor shall comply with Operational Safety and Health Administration (OSHA) and
Commented [SYU4CSB(7]: Please add the Juneteenth holiday into the PWS.
Formatted: Default Paragraph Font Formatted: Not Expanded by / Condensed by
German Unfallverhuetungsvorschriften (UVV) for record keeping and reporting of all accidents resulting in death, injury, occupational disease, or adverse environmental impact. The Contractor shall provide a verbal report to the KO or designated Government representative/COR within one (1) hour of each such occurrence. A completed typed original plus one (1) copy of ENG Form 3394 United States Army Corps of Engineers Accident Investigation Report (or equivalent reporting form) shall be delivered to the designated Government representative/COR within five (5) business days of occurrence, whenever an accident involving personal injury or Government owned property occurs (Deliverable A001).
2.4 Contract Administration and Management.
2.4.1 Post Award Conference/Performance Evaluation Meetings.
The Contractor shall attend the post award conference convened by the Contracting Activity or Contract Administration Office as agreed upon and stated in the contract award document. The COR and DPW management will meet monthly with the Contractor to review the Contractor's performance. Written minutes of meetings will be recorded by the Contractor and signed by both the Project Manager (PM) and the COR. The written minutes willshall be distributed within five (5) business days after the meeting (Deliverable A002). If the Government does not concur with any portion of the minutes, recorded by the Contractor, the non-concurrence shall be provided in writing by the KO/COR within two (2) workdays following receipt of the minutes.
Notwithstanding the Contractor’s responsibility for total management during the performance of this contract, the administration of the contract requires maximum coordination and cooperation between the Government and the Contractor.
2.4.2 The following provides the roles and their respective authority during the performance of the contract:
2.4.2.1 Contracting Officer (KO).
The KO is the only person authorized to make any changes in any of the requirements listed on this PWS; notwithstanding any provisions contained elsewhere in this contract, said authority remains solely with the KO. In the event the Contractor makes any change at the direction of any person other than the KO, the change will be considered to have been made without authority and solely at the risk and expense of the Contractor. All contract administration will be effected by the KO. Communications pertaining to contractual administrative matters shall be addressed to the KO. No changes in or deviations from the terms and conditions shall be effected without a written modification to the contract, executed by the KO authorizing such changes. The KO will approve all submittals and plans required in this PWS.
2.4.2.2 Contracting Officer’s Representative (COR).
The KO will appoint a COR during the performance of this requirement. Additional Government personnel may be designated to assist in contract oversight IAW (Army Regulation) AR 70-13, Management and Oversight of Service Acquisitions. Other surveillance personnel may be designated as COR and shall be trained and appointed IAW Department of Defense Instruction (DoDI) 5000.72, Department of Defense (DoD) Standard for Contracting Officer’s Representative (COR) Certification. The COR will provide assistance in identification and resolution of problems, conflicts in priority, subtask requirement definitions, and other operations type problems. The COR will perform IAW the responsibilities and duties identified in the appointment letter.
2.4.2.3 COR Authority.
A letter of designation will be issued to the COR by the KO. A copy of the letter will be sent to the Contractor. The letter of designation states the responsibilities and limitations of the COR, especially with regard to changes in cost, price estimates, or changes in delivery dates. The COR is not authorized to change any of the terms and conditions with regard to cost, quantity, or schedule of the resulting order.
2.4.2.4 COR or Designated Government Representative Functions.
The COR or designated Government representative shall monitors all technical aspects of the contract and assists in contract administration. The COR or designated Government representative is authorized to perform the following functions: assure the Contractor performs the technical requirements of the contract; perform inspections necessary in connection with contract performance; maintain written and oral communications with the Contractor concerning technical aspects of the contract; issue written interpretations of technical requirements; monitor, document, and report Contractor's performance and notify both the KO and Contractor of any deficiencies; coordinate availability of Government-Furnished Property, and provides direction or assistance for site entry requests of Contractor personnel.
2.4.2.4.1 The Contractor shall not in any way represent the United States (U.S.)
Government, or that it has the authority to contract or procure supplies for the account of the United States of America (USA).
2.4.3 Contractor Key Personnel.
Shall be designated in writing to the COR at the start of the contract. These individuals designated as key personnel shall be able to understand, speak, read, and write the English language.
2.4.3.1 Project Manager.
Shall be designated in writing to the COR at the start of the contract. These individuals designated as key personnel shall be able to read, write, and speak the English and German languages with proficiency level B2 or higher.
The following personnel are considered key personnel by the Government: Project Manager, Alternate Project Manager.
The Contractor shall provide a Project Manager who shall be responsible for the performance of the work. The name of this person and an Alternate Project Manager, who shall act for the Contractor when the Project Manager is absent shall be provided in writing to the Contracting Officer no later than five (5) business days after contract award. The Project Manager and Alternate Project Manager shall have full authority to act for the Contractor on all contract matters relating to daily operation of this contract. The Project Manager or Alternate Project Manager shall be available between normal working hours from 0730 – 1600 on Monday through Friday of non-holidays.
The Contractor shall provide a Project Manager (PM) who is responsible for the performance of the work. The PM shall have full authority to act for the Contractor on all contract matters relating to daily operation of the contract. The PM shall have a baccalaureate degree from an accredited College or University and five (5) years of experience in base support management or a contract similar in scope and breadth to this solicitation. The name of the PM shall be provided to the KO and shall be present and on-site and available during normal duty hours. In the circumstances when the PM is not available, the Contractor shall designate an alternate who can perform the same duties during the absence.
2.4.4 Contractor Requirements.
2.4.4.1 U.S. Residency. N/A
2.4.4.2 Common Access Card (CAC). N/A
2.4.4.3 Qualification Standards. N/A
2.4.4.4 Contractor Identification.
The Contractor shall ensure that personnel be identified as a Contractor to distinguish themselves (e.g., badge, company logo, or uniform) from Government employees. The Contractor shall ensure all correspondence and reports produced are marked as Contractor products or that Contractor participation is disclosed. Contractor owned/leased vehicles and equipment should be identified.
2.4.4.5 Standards of Conduct.
Contractor personnel’s conduct shall not reflect discredit upon the Government. The Contractor shall ensure all personnel present a professional appearance while working on the Government installation. The Contractor’s employees shall observe and comply with all local policies and procedures concerning fire, safety, environmental protection, sanitation, security, and possession of firearms or other lethal or illegal weapons or substance. The Contractor shall ensure all Contractor employees, providing services under this contract, conduct themselves and perform services in a professional, safe, and responsible manner. The Contractor shall remove, from the job site, any employee for reasons of misconduct or security. The Contractor shall ensure employee conduct complies with 41 USC 423, Procurement Integrity. The Contractor shall also ensure that no Contractor employees conduct political related activities or events on the installation. The removal of such a person shall not relieve the Contractor of the requirement to provide personnel to perform adequate and timely service.
2.4.4.6 Contractor Hiring Restrictions.
The Contractor shall not hire or sub-contract with off-duty or former Government employees whose employment would result in a conflict with AR 600-50, Standards of Conduct.
2.4.5 Business Relations.
The Contractor shall successfully integrate and coordinate all activity needed to execute the requirement of this PWS. The Contractor shall manage the timeliness, completeness, and quality of problem identification to a degree acceptable to the Government. The Contractor shall provide to the COR corrective action plans, timely identification of issues, and effective management of subcontractors. The Contractor shall ensure customer satisfaction and professional and ethical behavior of all Contractor personnel.
2.5 Work Management.
Applicable to all CLS’. All coordination requirement in this section and inherent to this Contract shall take into consideration the DPW WR and their operations. Work requirements and timelines shall include coordination with the DPW WR.
2.5.1 Coordination.
As a part of the work scheduling process, the Contractor shall coordinate all work with the Building/Facility Manager in charge of the facility where the work is to be done.
2.5.2 Work Status.
The status of all assigned work shall be available to the designated Government representative/COR within one (1) day of Contractor receipt of request during normal working hours, and three (3) days at all other times.
2.5.3 General Fund Enterprise Business System (GFEBS). N/A
2.5.4 Work Standards.
The technical specifications within this PWS define the quality of maintenance and repair accomplished under this Contract. When a standard is not directed, the Contractor shall perform required work to meet industry trade customs and practices and manufacturer's recommendations. If floors, cabinets, appliances, foundations, and other items are removed in order to gain access to the system component to be repaired, the Contractor shall return any repaired area to a condition comparable to the original construction after work is completed.
Any Government- or occupant-owned property damaged by the Contractor shall be repaired or replaced immediately at contractor’s expense.
2.6 Maintain As-Builts. N/A
2.7 Historic Property or Archaeological Site. N/A
2.8 Security
2.8.1 Access and General Protection/Security Policy and Procedures.
The Contractor and all associated subcontractors employees shall comply with applicable installation, facility, and local security policies and procedures.
2.8.2 Rules, regulations, direction, and requirements issued by the Commander apply to the Contractor. The Contractor shall become acquainted with and comply with all Government regulations as posted, or as required by the KO. Regulations, manuals, and technical documents applicable to this Contract are listed in Section 6.0 of this PWS. Control for classified publications requirements can be located in AR 380-5, Department of The Army Information Security Program, and secured in a filing type cabinet with a built-in locking device with tumblers and General Services Administration (GSA) approved security container.
2.8.3 Government Vehicles. N/A
2.8.4 Contractor Vehicle Registration. Currently there is no requirement to register Contractor owned vehicles with the Provost Marshal or DES. However, the Contractor shall maintain a list of all Contractor-owned or operated vehicles and trailers operating on the installation at all time. The list may be used in case of emergency and/or other contingency.
Evidence of vehicle ownership and vehicle liability insurance must be presented upon application of vehicle registration.
2.8.4.1 Contractor and all associated subcontractors employees shall comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by DES) IAW Army Directive 2014-05.
2.8.5 Contractor and Vendor Access.
USAG Ansbach privately-owned vehicles or motorcycles or Contractor or vendor-furnished vehicles and equipment must enter the Installation through the designated secure access control points (ACP).
2.9 Security Training.
2.9.1 Anti-Terrorism (AT) Level I Training.
IAW AR 525-13, Antiterrorism, all Contractor employees, including sub-contractor employees, requiring access to Army installations, facilities, or controlled access areas shall complete Antiterrorism (AT) Level I awareness training within 30 calendar days after contract start date or effective date of incorporation of the requirement into the contract, whichever applies. The Contractor shall submit certificates of completion for each affected contract employee and subcontractor employee to the designated Government Representative/COR within 30 calendar days after completion of training by all employees and subcontractor personnel on a recurring annual basis. AT Level I awareness training is available at the following site:
http://jko.jten.mil. (Deliverable A003).
2.9.2 iWATCH Training.
The Contractor shall brief the local iWATCH program (training standards provided by the Rock Island’s ATO) to all of Contractor’s employees and associated subcontractors. This training is used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the USAG Ansbach, Police Department and the COR. The Contractor shall complete the training within 30 calendar days after contract award and within 30 calendar days of new employees commencing performance and send to the KO or designated Government representative/COR via both electronic and paper copy within 30 calendar days of completion. Documentation to be used by the COR to satisfy this requirement can be found at:
http://www.myarmyonesource.com/familyprogramsandservices/iwatchprogram/default.aspx (Deliverable A004).
2.9.3 Operational Security (OPSEC) Awareness Training.
IAW AR 530-1, Operations Security, Contractor employees shall complete Level I OPSEC Awareness training within 30 calendar days after contract award and within five (5) calendar days of new employees commencing performance. Completion certificates will be made available to Government within ten (10) business of completion or upon request from the Government. All Contractor personnel shall complete Level I OPSEC Awareness training annually. Level I OPSEC training is available at the following website:
http://cdse.edu/catalog/elearning/GS130.html . (Deliverable A005).
2.10 Safety.
The Contractor shall safeguard and maintain all Government and Contractor property, as well as provide for the safety and well-being of personnel employed under this contract. The Contractor shall comply with AR 385-10, The Army Safety Program.
2.10.1 Safety Plan.
The Contractor shall develop and implement a safety plan for its employees. The Contractor shall submit the safety plan to the COR for review and acceptance within 30 business days after contract award. Revisions shall be submitted to the COR five (5) business days prior to the effective date of change (Deliverable A006).
2.10.2 Occupational Safety and Health (OSHA).
The Contractor shall comply with the Occupational Safety and Health Administration (OSHA) standards and all pertinent provisions 29 CFR Part 1910, Part 1917.152, Part 1915.501-509, and Part 1926; Federal and State environmental regulations; DoD and DA regulations and instructions, AR 385-10; and the U.S. Army Corps of Engineers’ Safety and Health Requirements Manual (EM-385-1-1). The Contractor shall comply with all applicable Federal, State, and local laws, regulations, and directives. The Contractor shall establish medical surveillance, industrial hygiene, and individual protective equipment programs sufficient to meet requirements delineated in OSHA standards.
2.11 Training, Physical Requirements, or other Expertise Required.
2.11.1 Certified.
The Contractor shall ensure all its employees and associated subcontractors are certified or licensed in the specific areas as required.
2.12 Environmental Requirements.
2.12.1 Green Procurement.
Section 6002 of the Resource Conservation and Recovery Act of 1976 (RCRA) requires the use of recycled and recovered products identified in the EPA’s Comprehensive Procurement Guidelines. The Contractor shall use these recycled or recovered products unless they cannot be procured within a reasonable period of time not to exceed seven (7) business days; at prices not to exceed five (5) percent of prevailing rates; or the product(s) does not meet technical or performance standards. EPA Guidelines are the minimum requirement. The Contractor shall use materials and products commonly used in industry. The Contractor shall maintain records and submit an annual report to the COR, along with the annual certification required by FAR 52.223-9 (Certification and Estimate of Percentage of Recovered Material Content for EPA Designated Items), upon completion of the base year and each option year.
2.12.2 Environmental Compliance.
The Contractor shall comply with all Federal, State, local, and installation environmental laws, rules and plans. The Contractor shall use, store and dispose of all materials, chemicals, and equipment used in the performance of services on the installation IAW with industry standards, local, Federal and State laws, and according to manufacturers’ recommendations. The Contractor shall be financially liable for all fines and associated costs for non-compliance with local, Federal and State laws regarding hazardous waste management including but not limited to: hazardous materials spillage, improper handling and transportation and improper waste disposal. The Contractor shall make all environmental and hazardous material records available the next duty day upon request from the designated Government representative/COR.
3.0 Performance Requirements and Standards.
3.1 Quality Assurance.
The Government will evaluate the Contractor’s performance under the contract IAW the Government’s Quality Assurance Surveillance Plan (QASP). The Performance Requirements Summary (PRS) defines the criteria of how the Contractor’s performance will be evaluated, the frequency of surveillance, and the items to be inspected. Although the Government will develop a QASP, Government surveillance of Contractor performance is not limited to the QASP, or the performance objectives, outlined in the PRS. The Government retains the right to evaluate all services required by the contract. The Government will perform inspections and tests in a manner that will not unduly delay the work.
3.2 Quality Control Plan (QCP).
Quality control is the responsibility of the Contractor. The Contractor shall develop, implement and maintain an effective quality control program which shall be documented in a QCP to ensure services are performed IAW this PWS. The Contractor shall develop and implement procedures to identify, prevent, and ensure no recurrence of defective services. The Contractor’s QCP is the means by which they assure themselves that the work conforms to contract requirements. The basic principle of the plan is that the Contractor is responsible for quality control. The plan shall include a description of the inspection system to address services listed in this PWS, and a description of the methods to be used for identifying and preventing defects in the quality of services performed. The plan shall include a description of the Contractor’s inspection system to include specifics as to areas to be inspected on a scheduled and unscheduled basis, frequency of inspections, and the title and organizational placement of the Contractor’s inspectors. No lead person or first line supervisor shall be considered a Quality Control Inspector. The Contractor shall develop, maintain, and submit a QCP to the COR for acceptance within 30 business days after contract award. The Contractor shall submit any proposed changes in the QCP to the COR for written approval five (5) business days prior to implementation (Deliverable A007).
3.2.1 Quality Control Files.
The Contractor shall maintain files of all inspections or tests conducted by the Contractor, to include any corrective actions taken. These files shall be subject to Government review at the COR’s discretion during the contract term, to include any extensions of contract term. The Quality Control Files will be the property of the Government and shall be turned over to the Government upon completion or termination of the contract.
3.3 Customer Feedback Program. N/A
4.0 Performance Task Requirements, Standards and Acceptable Quality Levels (AQLs)
Required Services
Performance Standard Acceptable Quality Level (AQL)
Method of Surveillance
# 1. PWS,
paragraph 5.2.1.1,
5.2.1.4 Stormwater
Outfall Sampling
Conduct annual storm water sampling and analysis of 66 direct discharge points per the USAG SWMPSampling and analysis of 66 locations listed in SWMP once annually
Bavarian self-monitoring ordinance (Eigenüberwachungsver ordnung)All locations sampled and required reporting completed
100% Inspection Compliance Zero Deviation from standardUsing
COR
Inspection Checklist
#2. PWS,
paragraph 5.2.1.2 - 5.2.1.3 PFAS Sampling, Katterbach Creek and Milmersbach Creek
Sampling and analysis for PFAS shall occur monthly at three sample locations discharging to Katterbach CreekSampling and analysis of 3 locations mo anthlynd perform quarterly PFAS sampling and analysis at five discharge locations to Milmersbach Creek listed in Katterbach Creek Discharge Permit monthly
Katterbach Creek Discharge Permit All locations sampled and required and reporting completed Milmersbach Creek Discharge Permit
100% Compliance Zero Deviation from standard100% Inspection Using COR Inspection Checklist
#310 PWS,
paragraph 5.2.4 Reporting
After each sample event, the Contractor shall provide sampling protocols and analytical results to USAG Ansbach COR within ten (10) days. The Contractor shall also provide quarterly reports
Bavarian self-monitoring ordinance (Eigenüberwachungsver ordnung), locally issues discharge permits, Ansbach Sewer Water Regulation (AWEAN
100% Compliance Zero Deviation from standard100% Inspection Using COR
Commented [SYU4CSB(8]: The PRS table is used to communicate to the contractor the most critical or high risk tasks from the PWS (3-5 items).
Please take a look at the PRS table and remove items that are not considered “critical”. Also remove items that are stated as an entire part of the PWS (only critical tasks should be listed in the table – copy & paste from PWS paragraph)
Commented [PHLMCUI9R8]: The table has now been updated. Included only the highest risk tasks and copy & pasted from the PWS.
Formatted Table Commented [SYU4CSB(10]: The AQL is always the standard of the PWS (as an example the Clean Water Act (CWA) or other applicable directives, regulations etc.). Please revise the PRS table to the current AQL that have been listed in the PWS.
Commented [PHLMCUI11R10]: Updated to include the standards, as stated in the PWS.
Commented [SYU4CSB(12]: When shall the contractor provide the sampling protocols to the COR?
Recommend to provide a timeline (e.g. within ten (10) days after the sample has been taken place).
Commented [PHLMCUI13R12]: Added to the PWS.
to the USAG Ansbach COR for all samples except for PFAS. For PFAS sampling at Katterbach, a semi-annual report is required. For PFAS sampling at Milmersbach, an annual report is required.Analytical results of each sampling event, quarterly reports for all non- PFAS events. Semi-annual reports for PFAS at Katterbach Creek, annual reports for PFAS at Milmersbach Creek
Entwässerungssatzung 2015), Wastewater Ordinance (Abwasserverordnung – AbwV), All reports complete and 100% resolution of comments on report
Inspection Checklist
5.0 Common Levels of Support (CLS)
The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the CLS functions of the Base Operations specified below. This shall be done IAW all the terms, conditions, general and special provisions, specifications, drawings, attachments, and exhibits contained herein or incorporated by reference.
The Contractor shall ensure that all work meets or exceeds the specifications for the listed
CLS.
CLS Service Title Attachment No.
505 Compliance Services Attachment 1
5.1 Basic Service
The Contractor shall conduct sampling, analysis, inspection, and reporting to ensure USAG Ansbach compliance with the SWMP and applicable permits and requirements. The SWMP provides locations and templates for monitoring requirements, as well as legal basis (permits) for monitoring requirements. In addition to laboratory analyses, work shall include outfall visual inspection of structure condition and analysis of physicochemical parameters, including: visual parameters (color, turbidity, odor, floating solids or oily films) and field parameters (water temperature, pH, electric conductivity, dissolved oxygen, redox potential).
Formatted: Left, Space Before: 0.4 pt
Formatted: Space Before: 0.4 pt Formatted: Left, Space Before: 0.4 pt
Formatted: Left, Indent: Left: 0", Line spacing: Multiple
1.15 li, Widow/Orphan control Formatted: Indent: Left: 0", Line spacing: Multiple 1.15 li, Widow/Orphan control
5.2 Tasks
5.2.2 Task 1: Stormwater Sampling and Analysis
The below sections describe work for storm water sampling and analysis. Table 1 includes additional details on locations, access, required effort, frequency, and analyses. See Task 4 for reporting requirements.
5.2.1.1 Storm Water Outfalls
In accordance with the USAG Storm Water Discharge Sampling, Analysis and Monitoring Plan (SWMP) 2020, including Annex D and E, the Contractor shall conduct annual storm water sampling and analysis of all identified outfallsThere are 66 direct discharge points per the USAG SWMP.
. The SWMP is included in this PWS as Attachment 1. These sampling events only cover the requirements of the respective permit and legally required self-monitoring parameters in accordance with Bavarian self-monitoring ordinance (Eigenüberwachungsverordnung). There are 66 direct discharge points per the USAG SWMP.
5.2.1.2 Per- and Polyfluoroalkyl Substances (PFAS), Katterbach Creek For the three (3) sampling points at storm water outlets into Katterbach Creek, as required by the City of Ansbach and listed in Permit “2018-11-14_174-111_Stadt Ansbach_UWA v.14.11.2018” Section 1.4.8 (PS105009A, PS103004, and PS103001) and outlined in SWMP, PFAS sampling shall be conducted according to the Bavarian State Office for Environment Guideline (Guidelines for the Preliminary Evaluation of PFAS Contamination in Water and Soils) for the assessment of PFAS contamination in soil and groundwater. Sampling and analysis for PFAS shall occur monthly at three sample locations discharging to Katterbach Creek. Sample locations are accessible by an off-post gravel road. Contractor should assume sSome sample locations may require access by walking.
5.2.1.3 Per- and Polyfluoroalkyl Substances (PFAS), Milmersbach Creek In accordance with requirements outlined by Host Nation correspondence (Landratsamt Ansbach, March 2019) and discharge permits for Milmersbach Creek issue by the Nuernberg State Building Authority (2010), the Contractor shall perform quarterly PFAS sampling and analysis at the outletfive discharge locations to Milmersbach Creek. PFAS sampling mustshall be according to the Bavarian Guideline for the assessment of PFAS contaminations in soil and groundwater. Sample locations are both on-post and off-post and accessible by asphalt public road. In addition, quarterly flow rates must alsoshall be measured concurrent with quarterly PFAS sampling.
5.2.1.4 Dry Weather Sampling
The Contractor shall conduct annual dry weather sampling, analysis, and monitoring at storm water discharge points in support of the storm water illicit discharge program (locations listed in SWMP). The intent of this sampling is to identify groundwater infiltration into storm water pipes. The Contractor shall visit all discharge points during dry weather conditions (at least ten [10] preceding days without precipitation) to check for outflowing water. This water shall be sampled as technically feasible (i.e., sufficient volume of water available for sampling) and shall be analyzed. A sampling plan mustshall be prepared and coordinated with the CENAU PM andthe USAG POC prior to sampling. Sampling parameters shall be those under the SWMP and Bavarian self-monitoring requirements, and additionally including PFAS.
A total of 66 discharge points shall be inspected. The Contractor may assume that sampling will be feasible at 20 out of the 66 total locations, although the number of samples could vary between 15-25 samples. At these locations, grab samples of the discharging water shall be obtained and analyzed. An electronic summary report shall be provided to the USACE PM and GarrisonCOR after each sampling event, and a summary of results will be included.
Table 1: Task 1 Sampling and Analysis
Description Number of Sample Points
Access Details Required Efforts
Frequency Analyses
Stormwater Outfall Sampling
Locations listed in
SWMP
On USAG Property.
Partially accessible by off-road trails or by walking.
Sampling & analysis
Annually Varies slightly per location, see
SWMP.
Includes:
TOC, BOD, NH4-
N, NO3-N, NO2-N,
Total Phosphorus, Hydrocarbons
PFAS
Sampling, Katterbach
Locations listed in Katterbach Creek discharge permit
Accessible by off-post dirt road or by walking
PFAS Monthly Per City of Ansbach Permit and Bavarian State Guidelines
PFAS
PFAS
Sampling, Milmersbach
Outlet to
Milmersbach Creek, locations listed in 2010 permit
Outlet to Milmersbach Creek.
Accessible by off-post road.
On-post access near main gate.
PFAS
Flow Rate
Quarterly Per permit and Bavarian State Guidelines
PFAS
Dry Weather Sampling
66 points for inspection; 20 samples assumed feasible for sampling.
Locations are on USAG Property, inside and outside the fence line;
partially
Inspection, sampling, & analysis.
Annually TOC, BOD, NH4-
N, NO3-N, NO2-N,
Total Phosphorus, Hydrocarbons.
PFAS
Points listed in the
SWMP
accessible by off-road trails or by walking
5.2.2 Task 2: Sanitary Sewer Sampling and Analysis
The below sections describe work for sanitary waste water sampling and analysis. Table 2 includes additional details on locations, access, required effort, frequency, and analyses. See Task 4 for reporting requirements.
5.2.2.1 Sanitary Sewer
In accordance with the Bavarian Self-Monitoring Ordinance, Ansbach Sewer Water Regulation (AWEAN Entwässerungssatzung 2015), and the SWMP (Attachment 1), the Contractor shall conduct annual sewage sampling and analysis at all waste water discharge points.
Fourteen to 18 sampling points across USAG Ansbach shall be sampled. This includes sampling points in Storck Barracks, Illesheim, although there is no requirement for sampling in the ordinance. The Contractor shall sample and analyze for the parameters listed in Section 15 (3) of the City of Ansbach (AWEAN) sewage water ordinance. One (1) of the fourteen sanitary sewer samples shall also be analyzed for chlorine and sediments.
Parameters to be analyzed with their maximum values:
Temperature 35° C pH-value 6.5 – 9.5 (as far as discharge permit does not requires a different value)
Settleable solids
(after 1 hour settling time)
0.5 ml/l
Inorganics (solved and unsolved in μg/l Antimony (Sb) 100 Arsenic (As) 100 Barium (Ba) 3000 Lead (Pb) 100 Cadmium (Cd) 50 Chromium total (Cr) 500 Chromium VI (Cr+6) 100 Chromate 80 Cobalt (Co) 500 Copper (Cu) 500 Molybdenum (Mo) 500 Nickel (Ni) 500 Mercury (Hg) 10 Selenium (Se) 100 Silver (Ag) 2000 Thallium (Tl) 10 Vanadium (V) 200 Zinc (Zn) 2000 Tin (Sn) 500
Aluminum (Al) 10000
Organics in μg/l Benzo[a]pyrene 0.1 Total Hydrocarbons 2000 BTEX-Aromatics total 50 Benzene 10 Volatile CHCs, total 50 Chlorobenzene total 10 Polychlorinated Biphenyl (PCB) 0.5 Total PAH 2
5.2.2.2 Industrial Wastewater
Per Wastewater Ordinance (Abwasserverordnung – AbwV) for industrial wastewater discharges and permit for Water Jet Cutter Building 6500, two (2) semi-annual sampling events (four (4) samples total) of industrial wastewater shall be performed at water jet cutter equipment at Building 6500, Storck Barracks. The following parameters will be analyzed:
Parameter Unit Limit
Zinc mg/l 2
Nickel mg/l 0.5
Copper mg/l 0.5
Chromium mg/l 0.5
5.2.2.3 Total Petroleum (TPH) Sampling at Wash Racks
Per Wastewater Ordinance (Abwasserverordnung – AbwV), the Contractor shall perform quarterly Total Petroleum Hydrocarbon (TPH) sampling, analysis, and reporting for six (6) permitted wash racks at the sampling point after the attached oil-water separators. Sample locations are on-post and require additional access control to airfields and motor pools.
Table 2: Task 2 Sampling and Analysis
Description Number of Sample Points
Access Details Required Efforts
Frequency Analyses
Sanitary Sewer Sampling
14-18 On USAG Property Sample locations are accessible by an off-post gravel road and by walking
Sampling & analysis
Annually Metals, CrVI, Aromatic Hydrocarbons, Chlorobenzene, High Volatile Halogenated Hydrocarbons, PAH, PCB. One sample for chlorine and sediments.
Per SWMP and Ansbach Sewer Regulation
Industrial Waste Water
2 On USAG Property
Sampling & analysis
Semi- Annually
Metals (Zn, Ni, Cu, Cr) at Storck Barracks
In Building 6500, Storck
Barracks
TPH
Sampling, Wash Racks
6 On USAG Property Sample locations are on-post and require additional access control to airfields and motor pools.
Sampling & analysis
Quarterly TPH
5.2.3 Task 3: Water Production Well and Outfall Sampling and Analysis The below sections describe work for sanitary wastewater sampling and analysis. Table 3 includes additional details on locations, access, required effort, frequency, and analyses. See Task 4 for reporting requirements.
5.2.3.1 Chlorinated Hydrocarbons (CHC), Bismarck Kaserne
The Contractor shall conduct quarterly CHC sampling and analysis at water production wells at Bismarck Kaserne and take flow measurements to provide capacity data in support of an industrial water production system in accordance with Permit #25676. Flow capacity measurements shall occur monthly and involves a simple flow rate measurement at the collector well (spring) downstream of the system. CHCs sampling shall occur quarterly at six
(6) different well and spring points associated with the system.
The six (6) sample points are in close proximity and sampled either from an existing tap in the system or directly from the waterbody. Points #1-#3 are valves on the system (at the inlet, after 1st filter, and after 2nd filter). Point #4 is at the collector well. Point #5 is at the outfall into a Hirnbach Creek. Point #6 is just downstream of the system at the pond. No specialized sampling equipment (e.g. pumps, tools) is required. The Contractor shall coordinate access to the treatment system with the designated USAG POC.
5.2.3.2 Chlorinated Hydrocarbons (CHC), Storck Barracks
The Contractor shall conduct annual sampling and analysis for CHC at two (2) industrial water production wells (Brunnen #1 and #4) at Storck Barracks, in accordance with permit from 20OCT2005. The two (2) sample points are in close proximity and are sampled either from an existing tap in the system or directly from the waterbody. No specialized sampling equipment (e.g. pumps, tools) is required. The Contractor shall coordinate access to the treatment system with the designated USAG POC.
NOTE: If any sampling results are found to exceed limits or regulated values, the Contractor is to immediately (shall within one [1] work day of receiving the results,) notify the COR and Chief/EMD and CENAU PM of these findings via telephone withincluding a follow-up email.
Table 3: Task 3 Sampling and Analysis Description Number of
Sample Points
Access Details Required Efforts
Frequency Analyses
CHC Sampling and Flow Measurements at Water Productions Wells, Bismarck Kaserne
6 locations quarterly per permit
On USAG property.
Require access coordination with USAG POC. Locations outside fence line are accessible by an off-post gravel road and require walking.
CHC
sampling & analysis; flow measurement
Monthly Flow Measurement
Quarterly sampling
CHC
CHC Sampling at Water Productions Wells, Storck Barracks
2 locations annually per permit
On USAG property.
Easily accessible by an off-post gravel road.
Inspection, sampling & analysis
Annually CHC
5.2.4 Task 4: Reporting
After each sample event, the Contractor shall provide sampling protocols and analytical results to USAG Ansbach COR within ten (10) days.
The Contractor shall also provide quarterly reports to the USAG Ansbach COR for all samples except for PFAS. The Quarterly Report will contain separate sections for each type of sampling defined in Tasks 1-3 subtasks. Reports shall discuss the garrison compliance status, findings, deficiencies, and needed future actions. The intent of quarterly reporting is to describe the status and progress toward tasks, summarize sample results in comparison to prior sample events and host nation criteria, and identify issues that may have arisen throughout the year. If any sample results are higher than action levels, the Government must be informed within one (1) business day.