Final PSL.8.27.2021.pdf

PDF 140 KB Posted

Attached to
Sacramento River Erosion Contract 1 Federal contract opportunity
Solicitation number
W9123822B0004
Issued by
Department of the Army Corps of Engineers Engineering District Sacramento

About this file

This document outlines a pre-solicitation notice for a firm-fixed price construction contract. The U.S. Army Corps of Engineers, Sacramento District will issue a solicitation to construct 1,150 feet of erosion protection measures along the Sacramento River, including a stone lens below the water, soil-rock mix and brush layering above, and transitions to existing grade. Planting benches and in-stream woody material will also be installed. All work must be completed by December 2022. The estimated value is between $5-10 million. The contract will be set aside for small businesses and awarded to contractors prequalified in the notice for earthwork, bank protection, or barge work. The solicitation is expected to issue on December 14, 2021 with bids due January 25, 2022. The contract will be conducted under NAICS code 237990 and product service code Y1LC.

View the file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Prequalified Sources List (PSL) for American River Common Features (ARCF) 2016

Sacramento River and American River Erosion Construction Contracts

August 27, 2021

1) As defined in Defense Federal Acquisition Regulation Supplement (DFARS) 236.272

Prequalification of Sources may be used when necessary to ensure timely and efficient performance of critical construction projects.

2) Pursuant to the United States Army Corps of Engineers (USACE) Acquisition Instruction

(UAI) 5136.272, the Chief of Contracting in the pay grade of General Schedule GS-15 is delegated by the Head of the Contracting Activity to authorize the use of prequalification by determining, in writing, that a construction project is of an urgency or complexity that requires prequalification.

3) On February 5, 2021, the Chief of Contracting, Sacramento District determined that it was in the best interest of the Government to use prequalification procedures in support of the USACE Bank Protection & Bank Stabilization – Erosion Construction Contracts.

4) On February 11, 2021, the Sacramento District posted the announcement of the

Prequalified Sources List (PSL) on www.SAM.gov.

5) Based on the procedures approved in the aforementioned determination and the minimum prequalification standards, the following list of prequalified contractors, is hereby established. The table below represents the companies individually approved for Earthwork, Biotechnical Bank Protection, and Barge Work.

http://www.sam.gov/

Prequalified Sources List (PSL) for American River Common Features (ARCF) 2016

Sacramento River and American River Erosion Construction Contracts

Earthwork Biotechnical Bank Protection

Barge Work

Ahtna Great Lakes

E&I JV

Ahtna Great Lakes

E&I JV

Anderson Dragline

Continental Heavy Civil Corp.

Continental Heavy Civil Corp.

Continental Heavy Civil Corp.

Fisher Anderson JV Decker Landscaping Fisher Anderson JV (Lind Marine)

Forgen Fisher Anderson JV Maloney-Odin JV (Vortex)

Maloney-Odin JV Ford Construction Odin (Vortex)

Nordic Forgen San Rafael Rock Quarry

Odin Landology Teichert-Odin JV (Vortex)

San Rafael Rock Quarry Maloney-Odin JV Steelhead Constructors Nordic

Sukut Odin Suulutaaq San Rafael Rock Quarry Teichert Steelhead Constructors

Teichert-Odin JV Sukut Suulutaaq

Teichert Teichert-Odin JV

6) Please note your Company will be required to maintain the “prequalified” team or a collaboration of contractors included on the PSL when bidding on projects issued against the PSL. Alternately, any firms not currently on the PSL can provide documentation at the time of bid submission demonstrating how they meet the minimum qualifications for the specific feature of work they would like to qualify for. New submissions will only be reviewed for the apparent low bidder. Additionally, all teaming arrangements must be supported by letters of commitment at the time of bid submission.