Title: Air Traffic Control Tower

Classification Code: Y – Construction of Structures and Facilities

NAICS: 236220 – Commercial and Institutional Building Construction

Is this a Recovery and Reinvestment Act Action?: No

Response Date: 8 May 2020

Solicitation Number: W9126G20B0040

Agency: Department of the Army Office: U.S. Army Corps of Engineers Location: U.S. Army Engineer District, Fort Worth

Synopsis:

FOR JBSA-Lackland AFB, San Antonio, Texas: Construct a new FY 18 MCAF, PN KELL123018, Air Traffic Control Tower, Lackland AFB, Joint Base San Antonio (JBSA), Texas.

The control tower includes air traffic control radio and landline consoles, precision approach status indicators, and work space for air traffic controllers and staff members. The project scope includes the control tower cab with associated communications and air traffic control equipment. The control tower cab provides space for up to nine personnel working in the tower cab. Facility include training room, tower simulator training room, crew briefing room, office space for the tower chief controller, assistant chief controller, TERPS specialist, training NCO, Airfield Operations Flight Commander, and administrative personnel.

Construction includes reinforced concrete pile foundation and slab floor, masonry walls and standing seam metal roof. This project includes an elevator, a catwalk surrounding the tower cab as well as utilities, site improvements, pavements, special foundations, a backup power generator and all other work necessary to provide a complete and usable facility. Associated demolition includes two facilities, the existing ATCT Building 1160, and Admin Building 1161.

Other supporting work including but not limited to: water, sewer, gas, electrical, communications, site drainage and final grading must be provided to support the Air Traffic Control Tower complex

DFARS 236.204 Disclosure of the magnitude of construction projects. (i) Between $10,000,000 and $25,000,000.

The IFB is anticipated to be issued on or about 22 May 2020, and bids will be due on or about 6 July 2020. Public bid opening procedures are applicable for this solicitation. A firm-fixed price contract is anticipated to be awarded using Invitation for Bid procedures. Anticipated contract award date on or about 23 September 2020. The period of performance will be 540 days from award. This announcement will be a Total Small Business Set-Aside. The wages and benefits of service employees (see FAR 22.10) performing under this contract must be at least equal to those determined by the Department of Labor under the Davis-Bacon Act. After solicitation issuance, contractors may view and/or download this solicitation and all amendments at the following internet address: https://beta.sam.gov/ (beta.SAM). Plans and specifications will not be https://beta.sam.gov/ made available in paper format or on compact disc. It is the Bidder’s responsibility to monitor the beta.SAM website for amendments to the solicitation. You must be registered with the System Award for Management (SAM), to receive a Government contract award. You may register with SAM at https://www.sam.gov/.

The Primary Point of Contact for this project is SFC Deltori J. Thompkins, USACE Contract Specialist, (817) 886-1271; email deltori.j.thompkins@usace.army.mil . The Government reserves the right to use only the Internet as notification of any amendments to this solicitation.