Final Location Sheet D5 Sweeping 1-9-25 Version.xlsx
XLSX spreadsheet 17 KB Posted
- Attached to
- Eq Rental Highway Sweeping D-5
- Solicitation number
- RFB-605-2500000376-2
- Issued by
- Breckinridge County, Kentucky
About this file
This is a location sheet detailing highway sweeping work requirements for District 5 in Kentucky, covering multiple routes across Jefferson, Bullitt, and Shelby counties. The document outlines specific sweeping locations, frequencies, and mileage for various interstate highways (I-65, I-64, I-264, I-265, I-71) and state routes (KY 841), with work descriptions including sweeping of curblines, bridges, barrier walls, rest areas, and overhead bridges. The contract specifies a maximum completion time of 21 calendar days for full sweeping cycles and 5 calendar days for designated partial sweeping cycles, with locations requiring either 3, 6, or 12 cycles per year.
The total sweeping mileage is broken down by location, with detailed measurements for each segment and anticipated total miles per year. Notable segments include I-264 with the highest annual mileage at 553.32 miles (46.11 miles per cycle), and specific sections managed by LSIORB (Louisville-Southern Indiana Ohio River Bridges). The work encompasses various types of sweeping, including rest area maintenance, full-width sweeping, and specific structural elements like bridges and barrier walls, with some sections requiring sweeping of all paved areas outside the roadway.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Highway Sweeping Work Location Sheet |
| District 5 |
| Route | County | Project Number | From | To | Sweeping Miles (Miles Paid) | Anticipated # of Cycles/YR | Anticipated Total Miles/YR (Sweeping Miles X # of cycles) | Work Description including incidentals |
| 3 Cycle Locations | ||||||||
| (Miles measured from begin to end of RA Ramps) | ||||||||
| I-65 | Bullitt | FE01 015-0065 | Rest Area Exit Ramp | Rest Area Entrance Ramp | 0.698 | 3 | 2.094 | Sweep all pavement areas at the Rest Area |
| 112-114 | (MP 113.650) | (MP 112.952) |
| I-64 | Shelby | FE01 106-0064 | Rest Area Exit Ramp | Rest Area Entrance Ramp | 0.72 | 3 | 2.16 | Sweep all pavement areas at the Rest Area |
| 028-029 | (MP28.250) | MP28.970 |
| Subtotal | 1.418 | |||||||
| 6 Cycle Locations | ||||||||
| (Miles for length of cleaning ONLY) | ||||||||
| KY 841 | Jefferson | FE01 056-0841 | US 31W | I-65 | ||||
| 000-010 | (MP 0.000) | (MP 10.000) | 2.45 | 6 | 14.7 | Sweep curblines, bridges & barrier walls |
| I-265 | Jefferson | FE01 056-0265 | I-65 | I-71 | 12.833 | 6 | 76.998 | Sweep curblines, bridges & barrier walls (Added 5.278 miles for new barrier wall and bridges along IMOVE project) |
| 010-035 | (MP 10.000) | (MP 35.000) |
| Subtotal | 15.283 | |||||||
| 12 Cycle Locations | ||||||||
| (Miles for Centerline Mile, Cardinal and Non-Cardinal paid seperately; all other work incidental according to contract and descriptions below) | ||||||||
| I-264 | Jefferson | FE01 056-0264 | I-64 | I-71 | 46.11 | 12 | 553.32 | Sweep curblines , Bridges, barrier walls and |
| 000-024 | (MP 0.000) | (MP 23.055) | overhead bridges at KY 864, KY 1703, KY 1932 | |||||
| I-64 , US 60 and US 42 |
| I-64 | Jefferson | FE01 056-0064 | Mellwood Bridge (Eastside) | 0.047 mile West of Browns Lane | 10.348 | 12 | 124.176 | Sweep all bridges and tunnels |
| 006-012 | (MP 6.701) | (MP 11.875) |
| I-64 | Jefferson | FE01 056-0064 | 0.700 mile East of I-264 | 1.0 miles West of I-265 | 9.946 | 12 | 119.352 | Sweep curblines , Bridges, barrier walls and |
| 012-018 | (MP 12.943) | (MP 17.916) | overhead bridges at Blankenbaker Parkway | |||||
| (KY 913) |
| I-64 | Jefferson | FE01 056-0064 | English Station Rd Bridge | Shelby Co Line | 8.802 | 12 | 105.624 | Sweep curblines, bridges & barrier walls |
| 019-024 | (MP 19.573) | (MP 23.974) |
| I-65 | Bullitt | FE01 015-0065 | Hardin Co Line | 0.672 mile North of Hardin Co Line | 1.344 | 12 | 16.128 | Sweep curblines, bridges & barrier walls |
| 103-104 | (MP 103.308) | (MP 103.980) |
| I-65 | Bullitt | FE01 015-0065 | Beginning of the Roadway Bridge | End of the Railroad Bridge | 0.274 | 12 | 3.288 | Sweep curbline of the railroad bridge and the roadway bridge |
| 112-113 | (MP 112.517) | (MP 112.654) |
| I-65 | Bullitt | FE01 015-0065 | 0.2 Mile South of KY 480 | 0.2 Mile North of KY 44 | 3.088 | 12 | 37.056 | Sweep curblines, bridges, barrier walls and |
| 115-117 | (MP 115.321) | (MP 116.865) | the overhead bridges at KY 44, KY 245 and KY1526 |
| I-65 | Bullitt | FE01 015-0065 | Beg. Of Barrier Wall | End of Barrier Wall | 0.138 | 12 | 1.656 | Sweep the barrier wall ( NORTHBOUND ONLY) |
| 118-119 | (MP 118.180) | (MP 118.042) |
| I-65 | Jefferson | FE01 056-0065 | 0.8 Mile North of the | 0.245 Mile South of the | 14.778 | 12 | 177.336 | Sweep curblines, bridges, barrier walls and |
| 123-132 | Bullitt County Line | Phillips Lane Bridge | overhead bridges at I-265, KY 1065, KY 1631 | |||||
| (MP 123.900) | (MP 131.289) | and all ramp bridges at I-265 |
| I-71 | Jefferson | FE01 056-0071 | I-64 | I-264 | 9.932 | 12 | 119.184 | Sweep bridges and curblines |
| 000-005 | (MP 0.000) | (MP 4.966) |
| I-64 | Shelby | FE01 106-0064 | Beg. Of Barrier Wall | End of Barrier Wall | 17.802 | 12 | 213.624 | Sweep curblines, bridges barrier walls and |
| 023-033 | (MP 23.974) | (MP 32.875) | overhead bridges at KY 1848 and KY 55 |
| I-65 | Jefferson | FE01 056-0065 | 0.254 Mile South of the | South End Ali Bridge | 8.582 | 12 | 102.984 | Sweep all paved areas outside of roadway |
| 131-136 | Phillips Lane Bridge | (MP 135.58) | ||||||
| (MP 131.289) |
| I-64 | Jefferson | FE01 056-0064 | Sherman Minton Bridge | River Road Bridge | 9.976 | 12 | 119.712 | Sweep all paved area outside of roadway |
| 000-005 | (MP 0.000) | (MP 4.988) |
Subtotal 141.12
Sweeping Paid for by LSIORB
| I-64 | Jefferson | FE01 056-0064 | River Road Bridge | Mellwood Bridge (Eastside) | 3.426 | 12 | 41.112 | Sweep all paved area outside of roadway |
| 005-007 | (MP 4.988) | (MP 6.701) |
| I-65 | Jefferson | FE01 056-0065 | South End Ali Bridge | North End of River Bridges | 3.476 | 12 | 41.712 | Sweep all paved areas outside of roadway |
| 136-138 | (MP 135.58) | (MP 137.318) |
Subtotal 6.902
| Maximum time to complete a Full Sweeping Cycles : 21 Calendar Days |
| Maximum time to complete a Designated Partial Sweeping Cycle: 5 Calendar Days |
File details come from the government source that posted it. Updated .