Final ESA 1 Report

2 KB Posted

Attached to
24-Inch Waterline Along Highway 3 From Fuqua Street to Dixie Farm Road (FM 1959)
Solicitation number
CSP-2026-0010
Issued by
Texas

About this file

This is a Final ESA 1 Report associated with the City of Houston's construction project for a 24-inch waterline along State Highway 3 from Fuqua Street to Dixie Farm Road (FM 1959) in Texas. The project encompasses construction services for water distribution infrastructure consisting of 8,287 linear feet of 24-inch diameter water line by open-cut installation, 385 linear feet of 24-inch diameter water line in 36-inch diameter steel casing by open cut, 115 linear feet of 24-inch diameter water line in 36-inch diameter steel casing within a Fault Hazard Zone, and 2,375 linear feet of 24-inch diameter water line in 36-inch diameter steel casing by trenchless construction methods. Specific response dates, due dates, site visit information, bidder's conference details, award dates, and contract term information are not available in the provided file content.

The file does not contain accessible pricing terms, set-asides, incumbent information, funding requirements, or other financial details due to the content being restricted and requiring JavaScript enablement to access www.beaconbid.com. Additional information regarding these salient contract elements would need to be obtained through the referenced Bid Opening link on the Strategic Procurement Division's website.

Text of this file

You need to enable JavaScript to access www.beaconbid.com

Other files

File Type Posted
Wetland Delineation —
Project manual —
Fault Study Ph 1 Report —
100%_plans w drawing number —
ESA Phase II —
CSP-2026-0010 - Solicitation —
Geotechnical Report —

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .