FINAL Encl 1 SOW_FY25 BOA_ Water Couplers.docx
DOCX document 17 KB Posted
- Attached to
- SSBN Water Couplers
- Solicitation number
- P277
About this file
This is a Statement of Work (SOW) for FY25 establishing requirements for SSBN (ballistic missile submarine) water couplers under a Blanket Order Agreement (BOA) with the Department of the Navy Strategic Systems Programs.
The SOW outlines the supply and delivery of water couplers specifically designed for SSBN applications, detailing technical specifications, performance requirements, and quality standards necessary for submarine water systems. The document establishes delivery schedules, inspection and testing protocols, and conformance requirements to ensure compatibility with existing naval systems. The work falls under a pre-solicitation phase for solicitation number P277, indicating this is advance notification of upcoming procurement activity. Contractors responding to this opportunity will need to demonstrate capability to meet stringent military-grade specifications for submarine components, comply with all applicable Navy quality assurance standards, and adhere to delivery timelines established by the contracting officer. The BOA structure allows for multiple orders against the agreement during the fiscal year, with specific order requirements to be issued as needed by Strategic Systems Programs.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| FINAL Sources Sought Notice (SSN) FY25 Water Couplers 20260608.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CLIN 0001 – U.S. Water Coupler Procurement – (Completion) The Contractor shall procure and deliver Water Couplers and necessary ancillary equipment as production and system spares in support of the U.S. SSBN program. All efforts shall be performed in accordance with the T9001C checklist dated March 24, 2025, Fire Control Type, Production Phase.
In support of these efforts, the Contractor shall:
1. Procure and deliver (1) U.S. Water Coupler Material Kit 1.
2. Procure and deliver (1) U.S. Water Coupler Material Kit 2.
3. Generate and deliver Water Coupler Procurement report, documenting successful receipt and verification of Water Couplers.
The Contractor shall:
1. Deliver monthly Financial Status Report.
2. Conduct quarterly in-progress reviews through completion.
CLIN 0002 – UK Water Coupler Procurement – (Completion) The Contractor shall procure and deliver Water Couplers and necessary ancillary equipment as production and system spares in support of the UK SSBN program. All efforts shall be performed in accordance with the T9001C checklist dated March 24, 2025, Fire Control Type, Production Phase.
In support of these efforts, the Contractor shall:
1. Procure and deliver (1) UK Water Coupler Material Kit.
2. Generate and deliver Water Coupler Procurement report, documenting successful receipt and verification of Water Couplers.
The Contractor shall:
1. Deliver monthly Financial Status Report.
2. Conduct quarterly in-progress reviews through completion.