FINAL.pdf

PDF 5 MB Posted

Attached to
226-1027_Henderson Rd
Solicitation number
PE-77075-NONST-2027-000000019
Issued by
Barrow County, Georgia

About this file

Summary Unavailable

The government file provided (FINAL.pdf) could not be accessed or reviewed. To provide an accurate summary of the contract opportunity details, the actual content of the FINAL.pdf document is required. Please provide the document text or content so that a comprehensive summary addressing project scope, timeline, pricing, and other relevant contract details can be delivered.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BANKS COUNTY

CONSTRUCTION DOCUMENTS

FOR

2026 LRA RESURFACING OF

HENDERSON RD

SECTION 00020

Invitation to Bid

BANKS COUNTY, GEORGIA

RESURFACING OF HENDERSON RD

Sealed Bids for furnishing all materials, labor, tools, equipment, and appurtenances necessary for approximately 2.38 miles of recycled asphaltic concrete resurfacing on HENDERSON RD will be received by the Owner at the County Commission Office located at 150 Hudson Ridge, Suite 1, Homer, Georgia 30547, until 9:00 a.m., local time, on October 27th, 2026, and then at said office publicly opened and read aloud.

The Project consists of the following major elements:

Approximately 2.38 miles of patching, recycled asphaltic concrete resurfacing, striping and shoulder filling on HENDERSON RD.

All work shall be completed in accordance with Plans, Special Provisions, and the latest edition of the Georgia Department of Transportation Standard Specifications, applicable Supplemental Specifications, and the latest edition of the Manual on Uniform Traffic Control Devices (MUTCD).

The work will be awarded in one Contract.

The Instructions to Bidders, Bid, Contract Agreement, Drawings, Specifications and forms of Bid Bond, Performance Bond, Payment Bond and other Contract Documents may be examined and obtained at the following:

Julie Wofford, Deputy County Clerk Banks County

150 Hudson Ridge Road, Suite One Homer, GA 30547

706- 677-6800 jwofford@co.banks.ga.us

This Invitation to Bid shall be governed by the following schedule:

DATE ACTIVITY

October 6th Release of Invitation to Bid October 13th Deadline for q u e s t i o n s to b e e m a i l e d t o

Asst. County Clerk October 20th Answers to questions will be emailed to all bidders.

October 27th Bids Due by 9:00 am. No bids will be accepted after the due date and time. Bid opening at 9:15 am.

Questions & Addenda

Submit all questions concerning this bid by email to the Deputy County Clerk no later than 3:00 pm on October 13th, 2026, local time.

The Inquiries must be directed to:

Julie Wofford, Deputy County Clerk jwofford@co.banks.ga.us

No response to inquiries other than those emailed will be binding upon the County. T h e C o u n t y reserves the right to issue written addenda to any inquiries that alter the scope of the Invitation to Bid.

The County will mail addenda to all bidders no later than October 23rd, 2026, at 5:00 PM. A signed copy of any addenda shall accompany submitted bids.

General Information

Payments, Applications for Payment, Certificates for Payment, and retainage shall be in accordance with the provisions of the Contract Documents.

The successful Bidder for this Contract will be required to furnish a satisfactory Performance Bond and Payment Bond each in the amount of 100 percent of the Bid.

Each Bid must be accompanied by a Proposal Guaranty consisting of a bond, certified check, or negotiable instrument submitted with the bid as assurance that the Bidder, upon acceptance of his/her Bid, will execute such contractual documents as may be required within a specified time, in the amount of Five (5%) percent of the total Bid.

The Owner reserves the right to reject any or all Bids, to waive informalities and to readvertise.

By: Julie Wofford, Deputy County Clerk

END OF SECTION

SECTION 00100

Instructions to Bidders

1.01 CONTRACT DOCUMENTS

A. The Contract Documents include the Contract Agreement, Advertisement for Bids, Instructions to Bidders, Contractor's Bid (including all documentation accompanying the Bid and any post-Bid documentation required by the Owner prior to the Notice of Award), Bonds, all Special Conditions, General Conditions, Supplementary Conditions, Specifications, Drawings, and addenda, together with written amendments, change orders, field orders and the Engineer's written interpretations and clarifications issued in accordance with the General Conditions on or after the date of the Contract Agreement.

B. Shop drawing submittals reviewed in accordance with the General Conditions, geotechnical investigations and soils reports, and drawings of physical conditions in or relating to existing surface or subsurface structures at or contiguous to the site, are not Contract Documents.

C. The Contract Documents shall define and describe the complete work to which they relate.

1.02 DEFINITIONS

A. Where the following words or the pronouns used in their stead occur herein, they shall have the following meaning:

1. "Owner" shall mean Banks County, Georgia, party of the first part to the

Contract Agreement, or its authorized and legal representatives.

2. "Engineer" shall mean the County Engineer or his representative.

3. "Contractor" shall mean the party of the second part to the Contract

Agreement or the authorized and legal representative of such party.

4. "Work" and "Project" shall mean the entire completed construction required to be furnished under the Contract Documents.

5. "Contract Time" shall mean 180 consecutive calendar days as provided in the

Contract Agreement for completion of the Project, to be computed from the date of the Notice to Proceed. All patching shall be completed within 45 consecutive calendar days from the date of the Notice to Proceed.

00100-2

6. "Liquidated Damages" shall mean the sum of $500.00 which the Bidder agrees to pay for each consecutive calendar day beyond the completion date for the Project as defined in these Specifications. Liquidated Damages will end upon written notification from the Owner of final acceptance of the Project.

7. "Products" shall mean materials or equipment permanently incorporated into the Project.

8. "Provide" shall mean to furnish and install.

9. "Balanced Bid" shall mean a Bid in which each of the unit prices and total amounts bid for each of the listed items reasonably reflects the value of that item with regard to the entire job, considering the prevailing cost of labor, material, and equipment in the relevant market. A Bid is unbalanced when, in the opinion of the Owner, any unit prices or total amounts bid on any of the listed items do not reasonably reflect such values.

1.03 PREPARATION AND EXECUTION OF BID

A. Each Bid must be prepared to represent that it is based solely upon the materials and equipment specified in the Contract Documents.

B. Each Bid must be submitted on the Bid forms which are attached to the Contract

Documents. All blank spaces for Bid prices, both words and figures, must be filled in, in ink. In case of discrepancy, the amount shown in words will govern. All required enclosed certifications must be fully completed and executed when submitted.

C. Each Bid must be submitted in a sealed envelope, addressed to the Owner. Each sealed envelope containing a Bid must be plainly marked on the outside as, "Bid for Resurfacing on HENDERSON RD ".

D. The Bidder shall provide the Bidder’s Name and Address on the outside of the sealed envelope.

E. Any Bid submitted which does not contain the above information on the outside of the sealed envelope will not be opened and will be returned to the Bidder.

F. If forwarded by mail, the sealed envelope containing the Bid must be enclosed in another envelope addressed to the Owner at Banks County Attn: Deputy County Clerk, 150 Hudson Ridge Road, Suite One, Homer, GA 30547.

00100-3

G. Any and all Bids not meeting the aforementioned criteria for Bid submittal may be declared non-responsive and subsequently returned to the Bidder.

H. The Contractor, in signing a Bid on the whole or any portion of the Project, shall conform to the following requirements:

1. Bids which are not signed by the individuals making them shall have attached thereto a power of attorney evidencing authority to sign the Bid in the name of the person for whom it is signed.

2. Bids which are signed for a partnership shall be signed by all of the partners or by an attorney-in-fact. If a Bid is signed by an attorney-in-fact, there should be attached to the Bid a power of attorney executed by the partners evidencing authority to sign the Bid.

3. Bids which are signed for a corporation shall have the correct corporate name thereof and the signature of the president or other authorized officer of the corporation manually written below the corporate name following the wording "By ". Corporation seal shall also be affixed to the Bid.

4. The Bidder shall complete, execute, and submit all documents which are attached to these Contract Documents.

1.04 METHOD OF BIDDING

The unit or lump sum price for each of the several items in the Bid of each Bidder shall include its pro rata share of overhead and profit so that the sum of the products, obtained by multiplying the quantity shown for each item by the unit price, represents the total Bid. Any Bid not conforming to this requirement may be rejected. Additionally, Unbalanced Bids will be subject to rejection. Conditional Bids will not be accepted. The special attention of all Bidders is called to this provision, for should conditions make it necessary to revise the quantities, no limit will be fixed for such increased or decreased quantities nor extra compensation allowed.

1.05 BID MODIFICATIONS

Bid modification by telegraphic communication will not be allowed.

00100-4

1.06 RECEIPT AND OPENING OF BIDS

The Owner may consider a minor irregularity in any Bid not prepared and submitted in accordance with the provisions hereof and may waive any minor irregularities or reject any and all Bids. Any Bid may be withdrawn prior to the above scheduled time for the opening of Bids or authorized postponement thereof.

Any Bid received after the time and date specified shall not be opened.

1.07 SUBCONTRACTS

The Bidder is specifically advised that any person, firm, or other party to whom it is proposed to award a subcontract under this Contract must be disclosed to and must be acceptable to the Owner.

1.08 CONDITIONS OF THE PROJECT

A. Each Bidder must be informed fully of the conditions relating to the construction of the Project and the employment of labor thereon. Failure to do so will not relieve a successful Bidder of the obligation to furnish all material and labor necessary to carry out the provisions of the Contract. Insofar as possible, the Contractor, in carrying out the work, must employ such methods or means as will not cause any interruption of or interference with the work of any other Contractor.

B. The Bidder is advised to examine the location of the Project and to be informed fully as to its conditions; the conformation of the ground; the character, quality and quantity of the products needed preliminary to and during the prosecution of the work; the general and local conditions and all other matters which can in any way affect the work to be done under the Contract. Failure to examine the site will not relieve the successful Bidder of an obligation to furnish all products and labor necessary to carry out the provisions of the Contract.

C. The Bidder shall notify the Owner of the date and time Bidder proposes to examine the location of the Project. The Bidder shall confine examination to the specific areas designated for the proposed construction, including easements and public right-of-ways. If, due to some unforeseen reason, the Owner's proceedings for obtaining the proposed construction site (including easements), have not been completed, the Bidder may enter the site only with the express consent of the property owner. The Bidder is solely responsible for any damages caused by examination of the site.

00100-5

1.09 NOTICE OF SPECIAL CONDITIONS

If any special federal, state, county, or County laws, municipal ordinances, and the rules and regulations of any authorities having jurisdiction over construction of the Project, enclosed, herein referred to, or applicable by law to the Project, conflict with requirements of the Contract Documents, then the most stringent requirement prevails. All work shall be in accordance with Georgia Department of Transportation Standard Specifications for Construction of Roads and Bridges, latest edition.

The contract shall be completed in a total construction time of ONE hundred eighty (180) consecutive calendar days. All patching shall be completed within 45 consecutive calendar days from the date of the Notice to Proceed.

1.10 OBLIGATION OF BIDDER

By submission of a Bid, each Bidder warrants that Bidder has inspected the site and has read and is thoroughly familiar with the Contract Documents (including all addenda). The failure or omission of any Bidder to examine any form, instrument or document shall in no way relieve any Bidder from any obligation in respect to the Bid.

1.11 METHOD OF AWARD

A. The Contract will be awarded to the responsive, responsible Bidder submitting the

Bid which is in the best interest of the Owner as determined solely by the Owner.

Award will be made in part on the basis of the prices given in the Base Bid, not including alternates. Alternates may be awarded at the discretion of the Owner within 10 days after the Notice to Proceed.

B. The Bidder to whom the award is made will be notified. The Owner reserves the right to reject any and all Bids and to waive any minor irregularities in Bids received whenever such rejection or waiver is in the Owner's interest.

C. A responsive Bidder shall be one who submits a Bid in the proper form without qualification or intent other than as called for in the Contract Documents, and who properly completes all forms required to be completed and submitted at the time of the Bidding. The Bidder shall furnish all data required by these Contract Documents. Failure to do so may result in the Bid being declared non-responsive.

00100-6

D. A responsible Bidder shall be one who can fulfill the following requirements:

1. The Bidder shall maintain a permanent place of business. This requirement applies to the Bidder where the Bidder is a division of a corporation, or where the Bidder is 50 percent or more owned by a person, corporation or firm.

2. The Bidder shall demonstrate adequate construction experience and sufficient equipment resources to properly perform the work under and in conformance with the Contract Documents. This evaluation will be based upon a list of completed or active projects and a list of construction equipment available to the Bidder to perform the work. The Owner may make such investigations as deemed necessary to determine the ability of the Bidder to perform the work, and the Bidder shall furnish to the Owner all such information and data for this purpose as the Owner may reasonably request. The Owner reserves the right to reject any Bid if the evidence submitted by, or investigation of, such Bidder fails to satisfy the Owner that such Bidder is properly qualified to carry out the obligations of the Contract and to complete the Project contemplated therein.

3. The Bidder shall demonstrate financial resources of sufficient strength to meet the obligations incident to the performance of the work covered by these Contract Documents. The ability to obtain the required Performance and Payment Bonds will not alone demonstrate adequate financial capability.

1.12- INSURANCE

Insurance The Contractor shall be responsible for his work and every part thereof, and for all materials, tools, equipment, appliances, and properties of any and all description used in connection with this project.

The Contractor assumes all risks of direct and indirect damage or injury to the property of persons used or employed on or in connection with the work contracted for, and of all damage or injury to any person or property wherever located, resulting from any action, omission, commission or operation under the Contract, or in connection in any way whatsoever with the contracted work.

The Contractor shall, during the continuance of all work under the Contract, provide the following:

Maintain statutory Worker's Compensation and Employer's Liability insurance in an amount of not less than $1,000,000.00 to protect the Contractor from any liability or damages for any injuries (including death and disability) to any of its employees, volunteers, or sub-contractors, including any and all liability or damage which may arise by virtue or any statute or law in force within the State of Georgia, or which may be herein after enacted.

00100-7

The Contractor agrees to maintain Comprehensive General Liability insurance in an amount of not less than $1,000,000.00 per occurrence to protect the Contractor, its sub-contractors, and the interest of the County, against any and all injuries to third parties, including bodily injury and personal injury, wherever located, resulting from any action or operation under the Contract or in connection with the contracted work. The General Liability insurance shall also include the Broad Form Property Damage Liability endorsement, in addition to coverage for explosion, collapse, and underground hazards, where required.

The Contractor agrees to maintain Automobile Liability Insurance in an amount of not less than $500,000 per occurrence. Such insurance shall include coverage for owned, hired, and non-owned automobiles.

The Contractor further agrees to protect, defend, indemnify, and hold harmless the County, its commissioners, officers, agents, and employees from and against any and all liability incurred whatsoever as a result of the work performed pursuant to the terms of this Bid.

The Contractor shall notify the County, in writing, sixty (60) days prior to any change in insurance coverage, including cancellation, non-renewal, etc. The Contractor shall furnish a new certificate prior to any change or cancellation date. The failure of the Contractor to deliver a new and valid certificate shall result in suspension of all payments until the new certificate is furnished.

Additionally, contract work may be suspended until the new certificate is furnished to the County.

Insurance coverage required in these specifications shall be in force throughout the Contract term. Should the Contractor fail to provide acceptable evidence of current insurance within five (5) days of written notice at any time during the Contract term, the Owner shall have the absolute right to terminate the Contract without any further obligation to the Contractor.

Further, the Contractor shall be responsible for the cost of procuring the uncompleted portion of the Contract at the time of termination.

Contractual and other Liability insurance provided under this Contract shall not contain a supervision, inspection, or engineering services exclusion that would preclude the County from supervising and/or inspecting the project as to the end result. The Contractor shall assume all on-the-job responsibilities as to the control of persons under its direct employment and of the sub Contractors and any persons employed by the sub Contractor.

The Contractor and all sub Contractors shall comply with the Occupational Safety and Health Act of 1970, and amendments, as it may apply to this Contract.

If the Contractor does not meet the insurance requirements of the specifications, alternate insurance coverage satisfactory to the County may be considered. The Contractor shall be responsible for the costs of any and all alternate insurance coverage so obtained.

A “Certificate of Insurance” showing Banks County as the Certificate Holder must be provided prior and incorporated as part of the award contract.

1.13 Project Coordination

The Contractor shall employ and assign only qualified and competent personnel to perform any service or task involved in this project. The Contractor shall designate one such person as a Project Manager, and the Project manager shall be deemed to be the Contractor’s authorized

00100-8 representative, who shall be authorized to receive and accept any and all communications from the County. The County shall name a Project Manager who shall be authorized to generate, receive and accept communication as an authorized representative of the County.

The Contractor hereby agrees to replace any personnel or sub-contractor, at no cost or penalty to the County, if the County reasonably determines that the performance of any sub-contractor or personnel is unsatisfactory.

1.14 Accuracy of Work

The Contractor shall be responsible for the accuracy of the work performed and shall promptly correct its errors and omissions without additional compensation. Acceptance of the work by the County will not relieve the Contractor of the responsibility for subsequent correction of errors, the clarification of any ambiguities, or the costs associated with any additional work caused by negligent acts, errors, or omissions by the Contractor or latent defects in the products sold by the Contractor.

At any time during the execution of this project or during any phase of work performed by others based on data secured by the Contractor under this Agreement, the Contractor shall confer with the County for the purpose of interpreting the information supplied by the Contractor and to correct any errors or omissions. The above consultations, clarifications, and/or corrections shall be made without added compensation to the Contractor. The Contractor shall give immediate attention to these changes so there will be minimum delay to others. The Contractor shall be responsible for errors and omissions and save harmless the County and its agents as provided in this Agreement.

1.15 Ownership

Reports, plans, data, statistics, specifications, and other supporting records compiled or prepared in the performance of the Services required by this Contract, shall be the absolute property of the County and shall not be used by the Contractor for purposes unrelated to this Contract without the prior written approval of the County. Such original documents shall be turned over to the County upon completion of the contract except that Contractor shall have the right to retain copies of the same.

1.16 Severability/Cancellation

It is understood and agreed by the parties hereto that if any part, term, or provision of this Contract is held illegal or in conflict with any law of the State, the validity of the remaining portions or provisions shall not be affected, and the rights and obligations of the parties shall be construed and enforced as if the Contract did not contain the particular part, term, or provisions held to be invalid.

The COUNTY and the Contractor agree to resolve through negotiation or mediation prior to filing any cause of action. The venue for any litigation arising from this contract shall be Banks County, Georgia.

1.17 Drug Free Workplace

By submission of a Bid, the Contractor certifies that the provisions of Code Sections 5024-1 through 50-24-6 of the Official Code of Georgia Annotated, relating to the "Drug-free Workplace Act", have been complied with in full. The Contractor further certifies that:

1. A drug-free workplace will be provided for the Contractor's employees during

00100-9 performance of the contract; and

2. Each Contractor who hires a sub Contractor to work in a drug-free work place shall secure from that sub Contractor the following written certification:

3. As part of the subcontracting agreement with (Contractor's name), (Sub Contractor's name) certifies to the Contractor that a drug-free workplace will be provided for the sub Contractor's employees during the performance of this Contract pursuant to Paragraph (7) of Sub-section (b) of Code Section 50-24-3".

4. The Contractor further certifies that he will not engage in the unlawful manufacture, sale, distribution, dispensation, possession, or use of a controlled substance or marijuana during the performance of the Contract.

1.18 Assignment of Contractual Rights

It is agreed that the Contractor will not assign, transfer, convey, or otherwise dispose of a contract that may result from this bid or his right, title, or interest in or to the same, or any part thereof, without written consent of the County.

1.19 Indemnity

To the fullest extent permitted by law, the Contractor will indemnify, defend, and hold Banks County harmless from and against any and all claims, damages, losses, and expenses, including, but not limited to, fees and charges of attorneys and court and arbitration costs, arising out of or resulting from the negligent acts, negligent omissions, willful misconduct, or reckless misconduct of the Contractor or anyone for whom the Contractor is responsible.

1.20 Non-Collusive Bidding

By submitting a response to this Invitation to Bid, the Bidder represents and warrants that such bid is genuine and not a sham or collusive or made in the interest or on behalf of any person not therein named and that the Bidder has not directly or indirectly induced or solicited any other vendor to put in a sham bid, or any other person or company to refrain from submitting and that the Bidder has not in any manner sought by collusion to secure to that vendor any advantage over any other vendor.

1.21 Georgia Security and Immigration Compliance

To comply with the State of Georgia’s Security and Immigration Compliance Act, all contractors must comply with regulations by completing the provided affidavits relative to the Compliance Act. All applicable affidavits have been included with this Invitation to Bid and must be signed and provided with the Bid submission.

1.22 Appropriation of Funds

The initial contract and any continuation contract(s) shall terminate immediately and absolutely at any such time as there are no appropriated and otherwise unencumbered funds available to satisfy the County’s obligations under said contract(s)

00100-10

1.23 EMPLOYMENT OF LOCAL LABOR

Preference in employment on the Project shall, insofar as practical, be given to qualified local labor.

SECTION 00300

RESURFACING OF HENDERSON RD

THIS BID SUBMITTED TO:

Banks County Commissioners ATTN: Julie Wofford, Deputy County Clerk 150 Hudson Ridge Rd, Suite One Homer, GA 30547 706- 677-6800

(Hereinafter called “OWNER”)

THIS BID SUBMITTED BY:

(Name)

(Address)

(Telephone) (Hereinafter called “BIDDER”)

The undersigned Bidder, in compliance with your Invitation to Bid for the construction of this Project having examined the Contract Documents and the site of the proposed work, and being familiar with all of the conditions surrounding the construction of the proposed Project, including the availability of materials and labor, hereby propose to construct the Project in accordance with the Contract Documents.

The Bidder proposes and agrees, if this Bid is accepted, to contract with the Banks County in the form of Contract Agreement specified, to furnish all necessary products, machinery, tools, apparatus, means of transportation and labor necessary to complete the construction of the Work in full and complete accordance with the reasonably intended requirements of the Contract Documents to the full and entire satisfaction of the Banks County with a definite understanding that no money will be allowed for extra work except as set forth in the Contract Documents, for the following prices:

EXHIBIT A

(ESTIMATE ONLY)

(HENDERSON RD)

PAY

ITEM

DESCRIPTION UOM ESTIMATED

QUANTITY

UNIT

PRICE

TOTAL PRICE

150-1000 TRAFFIC CONTROL LS 1

210-0100 GRADING COMPLETE LS 1

231-1250 MISCELLANEOUS CONSTRUCTION, UNPAVED

ROADS, STREETS AND DRIVEWAYS EA 25

310-1101 GR AGGR BASE CRS, INCL MATL TN 75

402-1802 RECYCLED ASPH CONC PATCHING, INCLUDING

BITUM MATL & H LIME TN 1,800

402-3102

RECYCLED ASPH CONC. 9.5MM SUPERPAVE,

TYPE II, BLEND 1 INCL BITUM & MATL & H

LIME, 135 LBS/SY

TN 2,030

413-1000 TACK COAT GAL 3,360

415-5000

ASPH CONC OPEN GRADED CRACK RELIEF

INTERLAYER, GP 2 ONLY, INCL BITUM MATL &

H LIME, 110 LBS/SY

TN 1,620

652-2501 SOLID TRAFFIC STRIPE, 5 IN, WHITE LM 4.76

652-2502 SOLID TRAFFIC STRIPE, 5 IN, YELLOW LM 4.76

653-1704 THERMO SOLID TRAFFIC STRIPE 24” WHITE LF 24

TOTAL BID PRICE

ROAD LIST

(Estimate Only)

PR

IO

RI

TY

ROAD NAME

M

IL

EA

G

E

W

ID

TH

SQ

Y ds

TO

N

S O

F

PA

TC

HI

G

TO

S O

F O

G I

TO

N

S O

F

TO

PP

IN

G

1 HENDERSON RD 2.38 20 27,925 1800 1620 2030

STRIPING/MARKINGS

(ESTIMATE ONLY)

PR

IO

RI

TY

ROAD NAME

IL

EA

G

E

2-

SO

LI

D

TR

AF

FI

C

ST

RI

PE

, 5

IN

, W

HI

TE

LM

2-

S

O

LI

D

TR

AF

FI

C

ST

RI

PE

, 5

IN

, Y

EL

LO

W

LM

3-

T

HE

RM

O

S O

LI

D

TR

AF

FI

C

ST

RI

PE

, 2

IN

W

HI

TE

LF

1 HENDERSON RD 2.38 4.76 4.76 24

BID TOTAL

_____________________________________________ DOLLARS ($____________________)

The Bidder agrees hereby to commence Work under this Contract, with adequate personnel and equipment, on a date to be specified in a written order from the OWNER, and to fully complete WORK under this Contract within 180 consecutive calendar days (All patching shall be completed within 45 consecutive calendar days from the date of the Notice to Proceed) from and including said date. Bidder further agrees to pay as liquidated damages the sum of $500.00 for each consecutive calendar day thereafter required to complete all work as provided in the Instructions to Bidders.

The Bidder declares an understanding that the quantities shown for unit price items are subject to either increase or decrease, and that should the quantities of any of the items of Work be increased, The Bidder proposes to do the additional Work at the unit prices stated herein; and should the quantities be decreased, the Bidder also understands that payment will be made on the basis of actual quantities at the unit price bid and will make no claim for additional costs or anticipated profits for any decrease in quantities; and that actual quantities will be determined upon completion of Work, at which time adjustment will be made to the Contract amount by direct increase or decrease.

In case of discrepancies between the figures shown in the unit prices and the totals, the unit prices shall apply and the totals shall be corrected to agree with the unit prices. In case of discrepancies between written amounts and figures, written amounts shall take precedence over figures and the sum of all. Bid extensions (of unit prices) plus lump sum items shall take precedence over BID TOTAL.

All work shall be completed in accordance with Georgia Department of Transportation Construction Specifications Standards, Georgia Erosion and Sedimentation Control Act of 1975, as amended, Section 402 of the Federal Clean Water Act, NPDES GAR 100002, and applicable codes, ordinances, rules, regulations and laws of local authorities having jurisdiction.

The Bidder furthermore agrees that, in the case of a failure to execute the Contract Agreement and Bonds with ten days after receipt of conformed Contract Documents for execution, the attached Bid Bond accompanying this Bid and the monies payable thereon shall be paid into the funds of the Owner as liquidated damages for such failure.

BIDDER acknowledges receipt of the following addenda:

Addenda No. Date Received

BIDDER: _______________________________________________________________

By: _______________________________________________________________ (Name Signed) (Name Printed or Typed)

Title: _______________________________________________________________

Address: _______________________________________________________________

Phone: _______________________________________________________________

ATTEST: _______________________________________________________________

(Name Signed) (Name Printed or Typed)

Title: _______________________________________________________________

(SEAL)

NOTE: Attest for a corporation must be by the corporate secretary; for a partnership by another partner; for an individual by a Notary.

NOTE: If the Bidder is a corporation, the Bid shall be signed by an officer of the corporation; if a partnership, it shall be signed by a partner. If signed by others, authority for signature shall be attached.

The full names and addresses of persons or parties interested in the foregoing Bid, as principals, are as follows:

Name Address

:9

:9

:9

:9 :9

:9

:9

:9

:9

:9

:9 :9

:9

:9

:9

:9

:9

:9 :9

:9 :9

:9

:9

:9

:9

:9

:9

:9 :9

:9

:9

:9

:9

:9

:9 :9

:9

:9

:9

:9

:9

:9

:9

:9

:9

:9

:9

:9

�Ý

�Ý �Ý

�Ý

�Ý

�Ý

�Ý

�Ý

�Ý �Ý

�Ý

�Ý�Ý

�Ý

�Ý�Ý

�Ý�Ý

�Ý

�Ý

�Ý

�Ý �Ý�Ý

�Ý

�Ý

�Ý

�Ý

�Ý �Ý �Ý

�Ý

�Ý

�Ý

�Ý

�Ý�Ý

�Ý

�Ý

�Ý

�Ý

�Ý�Ý

�Ý�Ý

�Ý

�Ý

�Ý

�Ý

�Ý

�Ý

�Ý

�Ý �Ý

�Ý

�Ý

�Ý �Ý

�Ý �Ý

�Ý�Ý

�Ý

�Ý�Ý

�Ý

�Ý �Ý

�Ý

�Ý �Ý

�Ý�Ý

�Ý

�Ý �Ý

�Ý �Ý

�Ý å å

!H

Banks County Middle School

Banks County

PINEFIELD

CROSSROADS

ODIS

JEWELVILLE

HOLLINGSWORTH

BANKS

FIVE POINTS

H

UD

SO

N

R

IV

E R

H U

D S O

N R

I V

E R

H U

D S O

N R

IV

E

R

H U

D

SO

N

H U

D S O

N R

IV

E

R

HUDSON R

IV

E

R

H

IC

K O

R Y L

E V

E L C

R E

E K

H

IC

K O

R Y

L E

V E

L C

R E

E K

High School

PRUITT

CROSSROADS

Cemetery

HICKORY LEVEL C

R E

E K

GR OVE

GROVE CREEK

G A

R RISON CREEK

G R

O V

E C

R E

E K

G R O

V E C

R E E K

C ARLA

N

C

REEK

W E

B B

C R

E E

K

B

LACK CR

EEK

B E

AVERDAM

C R E

E K

LITTLE NAILS C R E

E

K

B R

A D

Y C

R E

E K

N

AILS C

R E E

K

M

IL

L CREEK

B U

G B

R A N C

H

CASH

C

RE E

K

T A

T E

S C

R E

E K

BLACK CREEK

N orfolk S outhern C orporation

N or fo lk Southern C orp o ra ti o n

C R

E E

K

RIVE

R

CROSSING

GROVE CREEK

POND Cemetery

Cemetery

N o r f o lk

S o u th e rn

C or poration

HOMER

POP. 1,141

ELEV. 830

MAYSVILLE

POP. 1,798

IN BANKS CO. 926

GILLSVILLE

POP. 235

IN BANKS CO. 28

LULA

POP. 2,758

IN BANKS CO. 158

ALTO

POP. 1,172

IN BANKS CO. 516

BALDWIN

POP. 3,279

IN BANKS CO. 741

Cemetery

30 2

Cemetery

Cemetery

8 2

180 180

1 46

10 4

1 1

2 5

40 6

8 8

3 14

2 18

3 8

3 1

33 5

1 2

1 1

2 6

4 3

SANDERS LAKE

RESERVOIR 25

RESERVOIR 51

HARDEN LAKE

RESERVOIR 21

RESERVOIR 15

TURK LAKE

RESERVOIR 59

SHADY

GROVE

POND

RESERVOIR 30

WYNN LAKE

RESERVOIR 17

RESERVOIR 28

RESERVOIR

SIX

CASH LAKE

GAILEY

RESERVOIR TWO

Mount Bethel Cemetery

Thomas Cemetery

Beaverdam Cemetery

Veal Cemetery

New Salem CemeteryMcDonald Cemetery

Grove Level Cemetery

Hebron Cemetery

Ellison Cemetery

Midway

Martin CemeteryMize Cemetery

Bush River Cemetery

Henderson Cemetery

Liberty Cemetery

Bethany Cemetery

Mount Pleasant

Wilmot Cemetery

Silver Shoal Cemetery

Hickory Flat

Antioch Cemetery

Nails Creek Silver Shoal Cemetery

Bethlehem Cemetery

Mount Olive Cemetery

Brown Cemetery

Peyton

Jordan Cemetery

Enon Cemetery

Union Hill

Cemetery

Damascus Cemetery

Wynn CemeteryWoodley Liberty Hill Cemetery

Harmony CemeteryWade Cemetery

Moss Cemetery

Leatherwood

Broad River Cemetery

Mountain View

Cemetery

WILSON SHOALS WMA

LAKE RUSSELL WMA

CHATTAHOOCHEE

NATIONAL FOREST

Gr ant Mill Rd

D un ca n Rd

Grove Level Rd

Lo ud en R id ge R d

Ro ck Sp rin g s

R d

P o o le R d

We lls Rd

C row e R d

Wilson Brid ge Rd

We lbo rn R d

Joh n M orris Rd

E d Re ed Rd

P a rs on C ir

Payne Rd

Mt Olivet R d

M o c c asin Gap Rd

Silver Shoals Rd

Gowd er R d

Fo rt

La m ar R d

Be l l

Rd

So aps to ne

R d

Sa m pl e Sc al es R d

Cemetery

W ilkinson Rd

R oc k Sp rin gs Rd

P a rso n C ir

Chitwood R d

Carnes Cir

P ritch e tt R d

Murray R d

H em bree Rd

O sca r Ruck e r R d

McDonald Cir

Quee n R d

Chatham R d

G ow de r R d

Borders Rd

Otis Brow n R d

Mt Sinai Rd

Indu strial Park Dr

Cau dell Rd

G ardiner Rd

M ccoy B rid g e R d

L o r d R d

D od d R d

Q u a il R d

Gi lls vil le Lak e Rd

Sp rin g R d

Grove Level Rd

Waln ut

D r

Li n e C hu rch Rd

B ol i n g R d

B ru ce Kesle r

R d

E d w a rd s R d

Mt O l ivet Rd

Yo n a h H om er R d

W rig ht s M ill Ln

Hebron R d

Hic ko ry C re ek Rd

D avid

Hill R d

Neal Rd

Mo ss M il l R d

Bellam y Rd

And re w s R d

Hen derson Rd

Gi b son Rd

Br ew er

R d

A p p le P ie Ridge Rd

W eb bs C re ek

Rd

R oy P o ol e Rd

W ils o n B rid g e R d

Y onah Homer Rd

M a rs hb ur n R d

A p p le P ie R id g e R d

Hicko ry Creek Rd

E nglish R d

Brown Bridge Rd

Link Rd

S an A nd re s

Ln

Carson Rd

G en e Cr an e R d

C h a r ity

Dr

H a w k in s R d

B re w e r R d

Durha m Rd

V a u g h n R d

Shep ard Rd

Ch urc h S t

Columbus Dr

Cain R d

W ils on B rid ge Rd

Mt Sinai Rd

D am a s c u s R d

Ber lin Rd

Audo bo n Trl

Prosp e ct R d

Wyn n L ake R d

Ty ler

Rd

Rucke r

Rd

Benne tt R d

N Co un ty Li ne R d

S h u b e rt L n

Mc clure

Rd

Charit y R d C ru m p R d

Mc eve r

R d

A n ti oc h R d

IN HABERSHAM CO. 2,538

ELEV. 1510

IN HABERSHAM CO. 656

ELEV. 1400

IN HALL CO. 2,600

ELEV. 1305

IN HALL CO. 207

ELEV. 950

IN JACKSON CO. 872

ELEV. 915

H A B E R S H A

C O U N T Y

S T E P H E N S

C O U N T Y

F R A N

K L I N

C O

U N

T Y

M A D I S

O N

C O U N T Y

J A C K S O N C O U N T Y

H A L L

C O

U N T Y

3780000 3780000

3785000 3785000

3790000 3790000

3795000 3795000

3800000 3800000

3805000 3805000

3810000 3810000

3815000 3815000

3820000 3820000

3825000 3825000

255000

255000

260000

260000

265000

265000

270000

270000

275000

275000

280000

280000

285000

285000

290000

290000

COUNTY MAP DISCLAIMER:

THE GEORGIA DEPARTMENT OF TRANSPORTATION MAKES NO REPRESENTATION OR WARRANTIES, IMPLIED OR EXPRESSED, CONCERNING THE ACCURACY, COMPLETENESS, RELIABILITY, OR SUITABILITY FOR ANY PARTICULAR PURPOSE OF THIS INFORMATION AND DATA CONTAINED IN THIS MAP.

WHILE EFFORTS HAVE BEEN MADE TO ENSURE THAT INFORMATION REPRESENTED ON THIS MAP IS AS ACCURATE AS POSSIBLE, THIS MAP REPRESENTS THE BEST AVAILABLE SPATIAL DATA AS OF DECEMBER 2012. IF THERE IS A DISCREPANCY BETWEEN THE DATA REPRESENTED ON THIS MAP AND THE WRITTEN RECORD OF THE STATE HIGHWAY SYSTEM AND COUNTY ROAD SYSTEM, THE OFFICIAL WRITTEN RECORD (PER STATE CODE 32-4-2) SHALL HAVE PRECEDENCE.

IN ADDITION, PLEASE NOTE THAT PROPOSED STATE ROUTE CORRIDORS OR EXISTING ROUTES THAT WERE DESIGNATED WITH TEMPORARY STATE ROUTE DESIGNATIONS AT

THE TIME OF MAP PRODUCTION MAY NOT BE REPRESENTED.

FOR ADDITIONAL INFORMATION OR ACCESS TO THE WRITTEN RECORDS, PLEASE CONTACT THE OFFICE OF TRANSPORTATION DATA AT (770) 986-1360 OR BY EMAIL AT OTDCustomerSrv@dot.ga.gov.

A LIST OF MAPS CREATED AND MAINTAINED BY THE DEPARTMENT OF TRANSPORTATION IS AVAILABLE. FOR MORE INFORMATION PLEASE VISIT http://www.dot.ga.gov.

ALL URBAN AREA BOUNDARIES AND TRANSPORTATION FEATURES INCLUDING ROUTES, BRIDGES, RAILROADS, AIRPORT RUNWAYS, HELIPADS AND SHIELDS ARE PROVIDED BY GEORGIA DEPARTMENT OF TRANSPORTATION. FOR MORE INFORMATION PLEASE VISIT http://www.dot.ga.gov.

THE URBAN AREA BOUNDARY (UAB) LINE WORK REPRESENTED ON THE MAP WAS CREATED IN 2003 FOR THE PURPOSE OF RECLASSIFYING ROADS BASED ON THE RESULTS OF THE 2000 CENSUS. THIS MAY IN SOME CASES RESULT IN DISCREPANCIES BETWEEN THE ALIGNMENT OF THE UAB LINE WORK AND THE MORE CURRENT DEPARTMENT OF

COMMUNITY AFFAIRS’ CITY LIMIT LINE WORK THAT HAS BEEN MODIFIED SINCE THAT TIME.

ALL HYDROGRAPHY FEATURES ARE PROVIDED FROM THE UNITED STATES GEOLOGICAL SURVEY NATIONAL HYDROGRAPHY DATASET. FOR MORE INFORMATION PLEASE VISIT http://nhd.usgs.gov.

ALL COUNTY AND CITY BOUNDARIES ARE PROVIDED BY THE GEORGIA DEPARTMENT OF COMMUNITY AFFAIRS. FOR MORE INFORMATION PLEASE VISIT http://www.dca.state.ga.us.

ALL STATE PROPERTY BOUNDARIES ARE PROVIDED BY THE GEORGIA DEPARTMENT OF NATURAL RESOURCES. FOR MORE INFORMATION PLEASE VISIT http://www.gadnr.org.

ALL HOSPITAL LOCATIONS ARE PROVIDED BY THE GEORGIA DEPARTMENT OF COMMUNITY HEALTH. FOR MORE INFORMATION PLEASE VISIT http://dch.georgia.gov.

ALL PUBLIC K-12 SCHOOL LOCATIONS ARE PROVIDED BY THE GEORGIA GIS DATA CLEARINGHOUSE. FOR MORE INFORMATION PLEASE VISIT http://www.gis.state.ga.us.

ALL NATIONAL PARK AND NATIONAL FOREST BOUNDARIES ARE PROVIDED BY THE NATIONAL PARK SERVICE. FOR MORE INFORMATION PLEASE CONTACT http://www.nps.gov.

ALL COMMUNITY LOCATIONS AND COUNTY SEAT LOCATIONS ARE PROVIDED BY THE UNITED STATES GEOLOGICAL SURVEY GEOGRAPHIC NAMES INFORMATION SYSTEM. FOR MORE INFORMATION PLEASE VISIT http://geonames.usgs.gov.

ALL FIRE STATION, LIBRARY, CORRECTIONAL FACILITY/LAW ENFORCEMENT, COURTHOUSE, COLLEGE, UNIVERSITY AND PRIVATE SCHOOL LOCATIONS PROVIDED BY THE GEORGIA DEPARTMENT OF COMMUNITY AFFAIRS. FOR MORE INFORMATION PLEASE VISIT http://www.dca.state.ga.us.

© 2013 GEORGIA DEPARTMENT OF TRANSPORTATION. ALL RIGHTS RESERVED. ANY REPRODUCTION IN PART OR IN WHOLE IS PROHIBITED UNLESS AUTHORIZED

BY THE GEORGIA DEPARTMENT OF TRANSPORTATION.

BANKS COUNTY 011

Coordinates shown in UTM meters and latitude/longitude degrees

County Population, Census 2010 18,395 Total County Mileage 466

1 77 6

MODER

ATION

J U S TI CE

W

I S

D

MO

C

O

NSTITUTIO

N

S T

A T

E O F G E

O

R G

I A

BAU()

B A

U(

BAU( )

ñ

KC

J d å

!H

:9

Ý

‚WC

‚RA

Mil. Res. Bound.

Mil. Res. Bound.

State Route Number

Urban Area Boundary

Helipad

School

Intermittent Stream

Perennial Stream

Courthouse

Scenic Byway

County Boundary

National/State Land

Lake

Unpaved Road

Community

Paved Road

City Boundary

Correctional Facilities/ Law Enforcement

Bridge

Library

Swamp/Marsh

Hospital

Railroad

Projected Alignment

Firestation

County Road Number

Divided Hwy

LEGEND

Airport Runway

Interstate Route Number

US Route Number

County Seat

Military Reservation

Cemetery

Welcome Center

Fish Hatchery

Weigh Station

POP. 1500

ELEV. 200

Population (2010 Census) Elevation

National Register Historical Place

P

6Public Road Number

Lighthouse

Rest Area

State Capitol

City Hall

0 1 20.5

SCALE IN MILES (1": 3/4 mile)

GENERAL HIGHWAY MAP

BANKS COUNTY

GEORGIA

PREPARED BY THE

DEPARTMENT OF TRANSPORTATION

OFFICE OF TRANSPORTATION DATA

IN COOPERATION WITH

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

83°20'0"W

83°20'0"W

83°25'0"W

83°25'0"W

83°30'0"W

83°30'0"W

83°35'0"W

83°35'0"W

83°40'0"W

83°40'0"W

34°30'0"N

34°30'0"N

34°25'0"N

34°25'0"N

34°20'0"N

34°20'0"N

34°15'0"N

34°15'0"N

34°10'0"N

34°10'0"N

BANKS COUNTY- 2022

todd.mcduffie Line todd.mcduffie Cross-Out todd.mcduffie Cross-Out todd.mcduffie Text Box

BANKS COUNTY- 2026 LRA PROJECT

HENDERSON RD

todd.mcduffie Text Box #1

HENDERSON RD

todd.mcduffie Cross-Out todd.mcduffie Cross-Out

Todd McDuffie Polygonal Line

ROADWAY TYPICAL

2’ SHOULDER FILLING 2’ SHOULDER FILLING

SHOULDER VARIES SHOULDER VARIES

HENDERSON RD

RETAIN EXISTING PAVEMENT AND MAINTAIN PROPER CROSS SLOPE. PATCHING AND RESURFACE FULL WIDTH WITH 110 LBS PER SQUARE YARD OF OGI (APPROX. 1”) OR AS DIRECTED BY ENGINEER. RESURFACE FULL WIDTH WITH 135 LBS PER SQUARE YARD RECYCLED ASPHALTIC CONCRETE 9.5MM SUPERPAVE, TYPE II, BLEND 1 INCL

BITUM & MATL & H LIME (APPROX 1 ¼”).

****ALL PATCHING WILL BE 4” IN DEPTH OR AS DIRECTED BY ENGINEER.

****SHOULDER FILLING AND GRASSING WILL BE PERFORMED BY CONTRACTOR.

ROADWAY WIDTH VARIES

RESURFACED AREA

EXISTING PAVEMENT

NOT TO SCALE

CONTRACT SPECIFIC SPECIAL PROVISIONS

1. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL MATERIAL TESTING AND

MIX DESIGNS AND PROVIDING APPROVED JOB MIX FORMULAS FOR ALL

ASPHALT. ALL TESTING FREQUENCIES AND METHODS MUST MEET THE

MINIMUM REQUIREMENTS SET FORTH IN THE GEORGIA DEPARTMENT OF

TRANSPORTATION STANDARD SPECIFICATIONS AND SAMPLING TESTING

AND INSPECTION GUIDELINES.

2. GRADING COMPLETE- ALL SHOULDER FILLING ACTIVITIES (INCLUDING

PLACING GR AGGR BASE AT MAILBOXES) WILL BE INCLUDED AND PAYED

FOR AS PART OF GRADING COMPLETE. THIS WILL INCLUDE MATERIAL

PLACEMENT AND ALL BMP’S(DAILY STABILIZATION, FIBER BONDED MATRIX,

PERMANENT GRASSING, ETC.). SHOULDER FILLING SHALL BE COMPLETED

WITHIN 30 DAYS AFTER COMPLETION OF RESURFACING ROADWAY.

3. 310-1101 GR AGGR BASE CRS- PLACE MATERIAL AT MAILBOXES BEFORE

SHOULDER FILLING. APPROXIMATE AREA WILL BE 2’ WIDTHX15’LENGTH

AND 4” DEPTH OR AS DIRECTED BY ENGINEER.

4. SHOULDER FILLING- MATERIAL WILL BE PROVIDED BY COUNTY LOCATED AT

127 HUDSON VALLEY DRIVE BEHIND BANKS COUNTY ADULT EDUCATION

CENTER. CONTRACTOR WILL BE REQUIRED TO LOAD AND HAUL TO

WORKSITE. CONTRACTOR SHALL SMOOTH AND GRASS/MULCH DIRT PIT

WHEN SHOULDER FILLING IS COMPLETE AS DIRECTED BY ENGINEER.

5. CONTRACTOR SHALL MAINTAIN POSITIVE DRAINAGE THROUGHOUT

PROJECT ENSURING ALL BMP’S ARE IN PLACE.

6. PERFORM ALL PATCHING AS DIRECTED BY ENGINEER, PRIOR TO LEVELING

AND RESURFACING OPERATIONS.

7. ALL DRAINAGE STRUCTURES WITHIN THE LIMITS OF THE PROJECT WILL BE

MAINTAINED THROUGHOUT THE DURATION OF THE PROJECT.

8. CONTRACTOR WILL BE RESPONSIBLE FOR FURNISHING AND INSTALLING

“LOW/SOFT SHOULDER” AND “ROAD WORK AHEAD” SIGNS PER MUTCD

AND SECTION 150, BEFORE ANY WORK BEGINS. LOW/SOFT SHOULDER

SIGNS WILL BECOME PROPERTY OF COUNTY.

9. REFLECTORIZED HIGH BUILD PAINT WILL BE USED TO STRIPE ROADWAY.

10. IN PREPARATION OF THE ROADWAY PRIOR TO RESURFACING, BLADE THE

EXISTING SHOULDERS NO LOWER IN ELEVATION THAN THE EXISTING

PAVEMENT OR SHOULDER. SHOULDER MATERIAL DISPLACED BY THE

CLEANING OPERATION PRIOR TO RESURFACING SHALL BE REMOVED AND

DISPOSED OF AT AN APPROVED DISPOSAL SITE OFF COUNTY RIGHT-OF-

WAY OR AS DIRECTED BY ENGINEER. THE COST OF THIS WORK SHALL BE

INCLUDED IN THE OVERALL BID PRICE.

11. CONTRACTORS ARE EXPECTED TO HAVE APPROPRIATELY

SIZED EQUIPMENT FOR THE CONTRACT AND SUFFICIENT

NUMBER OF HAULING TRUCKS AND MANPOWER TO KEEP

ASPHALT SPREADING AT A STEADY RATE. THE ASPHALT

SPREADER MUST BE EQUIPPED WITH SKIS TO ENSURE A

LEVEL DRIVE SURFACE. A ROLL PATTERN MUST BE SET UP

AND PROPER TYPES AND SIZES OF ROLLERS MUST BE USED IN

ACCORDANCE WITH GDOT SPECS. BANKS COUNTY RESERVES

THE RIGHT TO SHUT DOWN WORK IMMEDIATELY IF

EQUIPMENT IS INAPPROPRIATELY SIZED OR INSUFFICIENT

FOR THE JOB, OR ANY ASPECT OF THE JOB IS PROVING TO BE

DETRIMENTAL TO THE QUALITY OF THE FINISHED PRODUCT.

12. SEE 231 SPECIAL PROVISIONS BELOW FOR STREETS/DRIVEWAY

TIE-ENDS.

Section 104—Scope of Work

104.01 Intent of Contract

The intent of the Contract is to provide for the construction and completion in every detail of The Work described. The

Contractor shall furnish all labor, materials, equipment, tools, transportation, and supplies required to complete The Work in accordance with the Plans, Specifications, and terms of the Contract.

104.02 Special Work

Should any construction or conditions not thoroughly or satisfactorily stipulated and set forth by the Standard Specifications and Supplements thereto be anticipated on any proposed work, Special Provisions for such work will be included in the

Proposal and the Contract as a part thereof. Should any such Special Provisions contain requirements in conflict with the

Standard Specifications and Supplements thereto, the Special Provisions will govern.

104.03 Alteration of Plans or Character of Work

A. Authority to Make Changes

The Department reserves the right to make, at any time during the progress of The Work, such increases or decreases in quantities and such alterations in the details of construction, including alterations in the grade or alignment of the road or structure or both, as may be found necessary or desirable. Such increases or decreases and alterations shall not invalidate the contract nor release the Surety, and the Contractor agrees to perform The Work as altered, the same as if it had been a part of the original Contract.

Whenever an alteration in character of Work involves a substantial change in the nature of the design or in the type of construction or materially increases or decreases the cost of performance, a Supplemental Agreement acceptable to both parties shall be executed before work is started on such alteration, except that in the absence of a Supplemental

Agreement acceptable to both parties, the Engineer may direct that the Work be done by Force Account. Any Force

Account Agreement shall be in writing, specifying the terms of payment, signed by the State Construction Engineer and agreed to in writing by the Contractor.

All work shall be performed as directed and in accordance with the Specifications.

B. No Waiver of Contract

Changes made by the Engineer will not be considered to waive any of the provisions of the Contract, nor may the

Contractor make any claim for loss of anticipated profits because of the changes, or by reason of any variation between the approximate quantities and the quantities of work as done.

C. Certain Items Not Limited

The quantities of all types of excavation, embankment when a Pay Item, perforated underdrain pipe, ditch paving, subgrade treatment materials, stabilizers, extra depth of concrete including its reinforcement, piling, guard rail, asphaltic concrete leveling, erosion control items, traffic control items, slope paving, bridge rip-rap, filter fabric, or any other items that cannot conveniently be determined accurately until after the Work is in progress, and any increase or decrease in these quantities, whatever the amount, will be considered normal overruns or underruns. The Engineer has unlimited authority to increase or decrease these quantities.

D. Changes in Other Quantities

The Engineer may increase or decrease the quantities of any and all other Pay Items, without changing the Unit Prices

Bid, provided that the sum total of such changes, exclusive of changes in those items covered in Subsection 104.03.C, does not increase or decrease the original Contract amount by more than 20 percent.

E. Changes to Original Length or Cost of Project

The Engineer has the authority to extend or reduce the total length or total cost of the Project by as much as 20 percent.

The provisions of Subsection 104.03.C, covering overruns or underruns of certain Pay Items apply also to overruns or underruns in quantities resulting from an extension or reduction in the length of the Project. If the Project is extended in length, an Extension Agreement will be executed. If the Extension Agreement calls for Pay Items already in the

Contract, the Unit Prices for such Items will not be changed except as provided in Subsections 104.03.A, 104.03.B and

104.03.D. New work for which no Unit Prices have been Bid will be paid for as Extra Work as defined in Subsection

104.04.

F. Railroad Grade Separation Structures

Changes in design or construction features of railroad grade separation structures must be submitted to the Engineer of the railroad for approval. The Department will diligently expedite all correspondence with the railroad officials, but will not be responsible to the Contractor for any delay to the Contractor’s work resulting from delay in securing the necessary approval. The Engineer will give due consideration to such delays in determining the time for completion of the

Contract.

104.04 Extra Work

The Contractor shall perform unforeseen work, for which there is no price included in the Contract, whenever it is necessary or desirable in order to complete fully the work as contemplated. Such work shall be performed in accordance with the

Specifications and as directed, and will be paid for as provided in Subsection 109.05.

104.05 Maintenance During Construction

A. Contractor Maintenance

The Contractor shall maintain the project from the beginning of construction operations until maintenance acceptance or final acceptance of the project, except as otherwise provided in Subsection 104.05.B. This maintenance shall constitute continuous and effective work prosecuted day by day with adequate equipment and forces to the end that the roadway or structures are kept in satisfactory condition at all times. This includes signing, pavement markings, and traffic control devices as outlined in the Manual on Uniform Traffic Control Devices, Section 150, Project Plans and Special Provisions for Traffic Control. All existing guard rail, signs, pavement, pavement markings, bridge handrail, and other safety appurtenances shall also be maintained in a safe and satisfactory condition.

The Contractor shall not allow vegetative growth at any time to obstruct signs, delineation, traffic movements, or sight distance.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .