FINAL ADDENDUM NO 1 S70180.pdf

PDF 207 KB Posted

Attached to
S70180 Nawiliwili Harbor, Pier 1, Replace Fenders, Kauai
Solicitation number
B26002837
Issued by
Kauai County, Hawaii

About this file

This Addendum No. 1 document was issued by the State of Hawaii Department of Transportation Harbors Division on May 22, 2026, in response to bidder questions regarding Job S70180 for the replacement of three fenders at Pier 1 of Nawiliwili Harbor in Kauai. The addendum clarifies key project requirements and solicitation terms through responses to eleven requests for information (RFIs) submitted by prospective bidders. According to the RFI responses, both union and non-union contractors may participate in the bidding process, no permits are required for the project, and the Buy America Act does not apply. The existing pier supports a live load capacity of 1,000 psf and accommodates container forklifts. Bidders should assume no hazardous materials are present in the elements designated for demolition and that sufficient onsite storage space will be available for all replacement fenders, though storage may not be immediately adjacent to the project site. Work phasing will be determined by fenders rather than by structural bents, and the exact contractor laydown area and final work schedule will be established during the pre-construction meeting following contract award.

The wage scale for the project is referenced in the project specifications, and Hawaii prevailing wage requirements apply to all workers. The RFI responses confirm that competitive bidding should proceed without accounting for permit delays, hazardous materials remediation, or phased fender delivery constraints, as the State will provide necessary accommodations onsite. Bidders are instructed to acknowledge receipt of this addendum by recording the receipt date on page P-4 of the proposal form submitted through the HIePRO system by the May 28, 2026, deadline.

View the file

Other files

File Type Posted
FINAL SPECIFICATIONS w NTB S70180.pdf PDF
FINAL PLANS S70180.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NAWILIWILI HARBOR, PIER 1,

REPLACE FENDERS, KAUAI, HAWAII

JOB S70180

ADDENDUM NO. 1

5/22/2026

STATE OF HAWAII

DEPARTMENT OF TRANSPORTATION

HARBORS

ADDENDUM NO. 1

TO SPECIFICATIONS AND PROPOSALS

FOR

NAWILIWILI HARBOR

PIER 1

REPLACE FENDERS

KAUAI, HAWAII

JOB S70180

May 22, 2026

The following is provided for information:

I. RESPONSES TO REQUESTS FOR INFORMATION (RFI’S/QUESTIONS)

The attached Responses to Requests for Information (RFI’s/Questions) is provided for information.

Please acknowledge receipt of this ADDENDUM NO. 1 by recording the date of its receipt in the space provided on PAGE P-4 of the Proposal.

NIKO SALVADOR

Engineering Program Manager, Harbors

RESPONSES TO RFI

NAWILIWILI HARBOR, PIER 1, ADDENDUM NO. 1

REPLACE FENDERS, KAUAI, HAWAII 5/22/2026

JOB S70180 PAGE 1 OF 3

NAWILIWILI HARBOR

PIER 1

REPLACE FENDERS

KAUAI, HAWAII

JOB S70180

RESPONSES TO REQUESTS FOR INFORMATION (RFI’S/QUESTIONS)

The following Responses to Requests for Information is provided for information.

1. QUESTION: Are you requiring union labor for this project, or can both union and non-union contractors participate?

RESPONSE: Both union and non-union Contractors may bid this project.

2. QUESTION: Have all permits been secured for this project? If all permits have been secured, can a copy of the permits be shared with prospective bidders?

RESPONSE: No permits are required.

3. QUESTION: Is a 401 WQC permit required? If yes, has this permit been secured? If this permit has been secured, can a copy of the Water Quality Monitoring Plan be shared with all prospective bidders?

RESPONSE: A 401 WQC permit is not required.

4. QUESTION: If no permits have been secured but have been submitted, for the purpose of developing competitive pricing can prospective bidders suppose that permits for this project will be in hand on or before the 90 days stipulated in the bidding documents between bid date and contract award?

RESPONSE: No permits are required.

RESPONSES TO RFI

NAWILIWILI HARBOR, PIER 1, ADDENDUM NO. 1

REPLACE FENDERS, KAUAI, HAWAII 5/22/2026

JOB S70180 PAGE 2 OF 3

5. QUESTION: What are the current loading restrictions of the existing pier lot? Can information on the maximum allowed load provided to bidders?

RESPONSE: The existing pile-supported pier was designed for 1,000 psf live load and container forklifts.

6. QUESTION: Is the presence of any known hazardous substances (creosote, lead-based paint, asbestos, etc) known on the elements called out for demolition? For the purpose of preparing a competitive bid, can prospective bidders safely assume that none of these substances are present in all items called for demolition? Should prospective bidders account for testing of items called for demolition by an accredited lab?

RESPONSE: Assume no hazardous materials are present.

7. QUESTION: Is this project subject to the Buy America Act?

RESPONSE: No.

8. QUESTION: Can the wage scale for this project be made known to all prospective bidders?

RESPONSE: See project Specifications.

9. QUESTION: For the purpose of preparing competitive bids, what is the maximum number of bents prospective bidders should factor in for phasing of work?

RESPONSE: Exact phasing will be established at the pre-construction meeting, after award. Assume phasing will be by fenders, not by bents.

10. QUESTION: For the purpose of preparing a competitive bid – can the location of the

Contractor laydown area be provided?

RESPONSE: Exact laydown area will be established at the pre-construction meeting, after award. In recent past projects, tenants and Contractors have had no issues coordinating a laydown area.

NAWILIWILI HARBOR, PIER 1,

REPLACE FENDERS, KAUAI, HAWAII

JOB S70180

RESPONSES TO RFI

ADDENDUM NO. 1

5/22/2026

11. QUESTION: For the purpose of preparing a competitive bid – can prospective bidders assume that DOT will allow for space to store 100% of the replacement fenders onsite?

Or should bidders account for parceled shipment of new fenders due to storage restrictions?

RESPONSE: Yes, assume space to store all new fenders can be provided at the harbor, though space may not be adjacent to the project site.