Fiber Laser SoN- 6Jun24.pdf

PDF 75 KB Posted

Attached to
PKA- Fiber Laser 3KW- McConnell AFB
Solicitation number
F2Z00C4074A001
Issued by

About this file

This document is a Statement of Need (SON) for a 3kW fiber laser to replace an existing CNC plasma machine at the 22nd ARW Innovation Lab at McConnell AFB, Kansas.

The SON specifies that the contractor shall provide a fully enclosed 3kW fiber laser with a minimum working space of 48in x 48in, 3-axis (X,Y,Z) operation, and Wi-Fi capabilities. The laser system shall include a machine-mounted monitor connected to a Windows computer with CYP-CUT laser interface pre-installed. The contractor shall provide a minimum 1-year warranty covering all parts, including the fiber laser source, with repairs/replacements at no cost to the government. Delivery is required within 120 days of contract award, and the contractor shall complete installation, setup, and on-site training on machine safety, setup, and basic software functions.

The related federal contract opportunity is a pre-solicitation for the 3kW fiber laser, with Solicitation Number F2Z00C4074A001 and the opportunity name "PKA- Fiber Laser 3KW- McConnell AFB". The Department of the Air Force Air Mobility Command is the responsible agency.

View the file

Other files

File Type Posted
SS- Fiber Laser.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

04 June 2024

Statement of Need

3kw Fiber Laser

McConnell AFB, Kansas

1. Overview

1.1 The 22nd ARW Innovation Lab is need of an enclosed fiber laser to replace the CNC plasma machine that has been processed through DRMO.

2. Description

2.1 The contractor shall provide a 3kw fiber laser that is fully enclosed with a minimum working space of 48in x 48in. The unit needs to have 3 axis (X,Y and Z axis) operation along with Wi-Fi capabilities. There will be a machine mounted monitor connected to Windows computer with CYP-CUT laser interface pre-installed.

3. Warranty

3.1 The contractor shall provide a minimum of 1 year warranty on all parts to include the fiber laser source. Any defect not caused by government damage or misuse will be repaired/replaced by the contractor at no cost to the government.

4. Delivery

4.1 The contractor shall complete delivery of each line item no later than 120 days from date of award.

5. Installation

5.1 The contractor shall complete installation and setup of the fiber laser after all the equipment has been moved to the final location inside the Innovation Lab. The contractor shall ensure that the fiber laser system is fully functional. The contractor shall remove any packing materials after installation is complete.

5.2 The contractor will provide on-site training that includes machine safety, set-up and basic software function.