FHWA-Congestion_Relief_Application_Template_Final.pdf
PDF 274 KB Posted
- Opportunity number
- FHWA-CRPP-27-001
About this file
This is an Application Template for the Fiscal Years 2025 and 2026 Congestion Relief Competitive Grant Program administered by the U.S. Department of Transportation Federal Highway Administration (FHWA). The template is a required component of complete applications and must be submitted along with allowable attachments and standard federal forms. Applications submitted without the completed template will be considered incomplete and will not be reviewed. The template guides applicants through six primary sections: Summary (limited to three pages), Project Information (three pages), Budget and Funding (three pages), Merit Criteria (six pages), Project Readiness (three pages), and Statutory and DOT Priority Considerations (three pages).
Applicants must provide detailed project information including the project name, location, eligible entity type (State or unit of local government), project scale (Local, Regional, Statewide, or Multi-State), total project cost from all sources, and the specific Congestion Relief Competitive Grant Program funding amount requested in year-of-expenditure dollars. The application requires demonstration of how projects meet three primary merit criteria: reducing highway congestion, reducing congestion-related costs and promoting economic competitiveness, and optimizing existing highway capacity through emerging transportation technologies. For projects involving tolling, applicants must provide verifiable evidence of State and local tolling authority, documentation of FHWA discussions, Federal planning compliance status under 23 U.S.C. §§ 134 and 135, and National Environmental Policy Act review status, along with a signed declaration ensuring toll revenues comply with 23 U.S.C. § 129(a)(3) requirements for debt service, operation and maintenance, return on investment, and other allowable uses. Project readiness assessment covers technical, financial, and permitting risk considerations, while the application also addresses statutory priority considerations for projects in urbanized areas experiencing high recurrent congestion and DOT selection priorities including reducing travel costs, improving freight mobility, deploying innovative congestion solutions, and repurposing specialized travel lanes.
Application Template
View the file
Other files
| File | Type | Posted |
|---|---|---|
| PKG00294583.pdf | ||
| FHWA-Congestion_Relief_NOFO_Final.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Fiscal Years 2025 and 2026
Congestion Relief Competitive Grant Program
Application Template
This is the Application Template for the Congestion Relief Fiscal Years (FY) 2025 and 2026
Notice of Funding Opportunity (NOFO).
Submission of this Application Template is required as part of a complete application package.
The Application Template, in conjunction with the allowable attachments and standard forms, should provide all information necessary for the U.S. Department of Transportation (DOT), Federal Highway Administration (FHWA) to determine if the project satisfies the eligibility requirements described in NOFO Section B and to evaluate the criteria specified in NOFO
Section F. DOT will consider applications submitted without the completed template as incomplete and will not review the submission. DOT encourages applicants to review the NOFO in its entirety to verify their project is eligible and their application includes all required information.
Tolling Instructions:
If an applicant does not have a suitable Federal tolling authority for the proposed project when it submits a Congestion Relief Competitive Grant Program application and would like to request authority with the submission of an application, the applicant must do so by explicitly stating via an attachment to the application that they are requesting tolling authority. The attachment must provide:
• Verifiable evidence that the applicant has State and local, as applicable, tolling authority;
• A summary of any discussions the applicant has had with FHWA regarding the
Federal tolling programs; and
• Information about the status of compliance with (a) the Federal planning requirements under 23 United States Code (U.S.C.) §§ 134 and 135, and (b) the
National Environment Policy Act review.
The application must include an attached declaration signed by the eligible entity that the use of toll revenues will comply with 23 U.S.C. § 129(a)(3), which requires public authorities with jurisdiction over a toll facility to ensure toll revenues are used only for:
• Debt service with respect to the projects on or for which the tolls are authorized, including funding of reasonable reserves and debt service on refinancing;
• A reasonable return on investment of any private person financing the project, as determined by the State or interstate compact of States concerned;
• Any costs necessary for the improvement and proper operation and maintenance of the toll facility, including reconstruction, resurfacing, restoration, and rehabilitation;
• If the toll facility is subject to a public-private partnership agreement, payments that the party holding the right to toll revenues owes to the other party under the public-private partnership agreement; and
• If the public authority certifies annually that the tolled facility is being adequately maintained, any other purpose for which Federal funds may be obligated by a State under Title 23.
I. Summary
Expand the response blocks as necessary but limit the Summary section of the application to three total pages in length.
Project Name:
Eligible Entity Applying to Receive Federal
Funding:
Entity Type:
State
☐ Unit of local government
Project Scale: ☐ Local ☐ Regional
☐ Statewide ☐ Multi-State
Total Project Cost: (from all sources) $
Congestion Relief Competitive Grant
Program funding request:
State(s) in which the project is located:
Lead Applicant Point of Contact information:
Tolling: The project involves tolling and the information requested under “Tolling
Instructions” at the top of this application form is attached to this application.
The project does not involve tolling.
Project Abstract: Summarize project work to be completed under the project and succinctly describe how the Congestion Relief Competitive Grant Program funds would be used to complete the project.
Attachments: Please list any attachments to this form, including letters of support. This includes any applicable State Department of
Transportation (State DOT) support letters as described in Section B.4 of the NOFO.
II. Project Information
Expand the response blocks as necessary but limit the Project Information section of the application to three total pages in length. [Applicants: Delete instructions shown below in italics prior to submittal.]
1 Project Name:
2 Location of facility and project area:
[Instructions: Provide State and County, name of the city, town, or jurisdiction, and route information as applicable.]
3 Public or Private
Parties:
[Instructions: If other parties are involved in delivering the project, disclose those entities and describe their role in the project. Also state whether a private or non-private entity will receive a direct and predictable financial benefit if the project is selected for award.]
4 Lead Applicant
Point(s) of Contact:
[Instructions: Name and contact information for the applicant (or
Lead Applicant where multiple entities are partnering for the project).]
5 Eligible Applicant
Type:
☐ State ☐ Metropolitan Planning Organization
☐ The project occurs in an urbanized area with a population of more than one million.
Population based on the 2020 Census: ____________
6 Project Background [Instructions: Provide a concise overview of the project scope.
Also note any key project planning and design activities that have occurred, and a description of any previously incurred costs.]
7 Attachments: Please list any attachments to this form, including letters of support.
This includes any applicable State DOT support letters as described in Section
B.4 of the NOFO.
III. Budget and Funding
Expand the response blocks as necessary but limit the Budget and Funding section of the application to three total pages in length. [Applicants: Delete instructions shown below in italic prior to submittal.]
1 Program Request
Amount:
Exact Congestion Relief Competitive Grant Program request amount in year-of-expenditure dollars: $____________
2 Other Federal
Funding:
Estimated total of other Federal funding, excluding Congestion Relief
Competitive Grant Program requested funding, in year-of-expenditure dollars: $_________
Other Federal programs and estimated amounts: (add lines as needed)
Program: _________________Amount: $____________
3 Future Project
Cost:
Provide the sum of the Congestion Relief Competitive Grant Program request, other Federal funds, and non-Federal funds as an estimate in year-of-expenditure dollars: $____________
4 Previously incurred project costs:
[Instruction: If costs have already been incurred for the project, such as planning or design costs, provide the total here.]
Amount: $____________
5 Total Project Cost: Estimate in year-of-expenditure dollars (sum of ‘previously incurred project costs’ and ‘future project cost’): $___________
6 Statement of Work: [Instruction: Include a detailed statement of work (SOW) for the project in sufficient detail to demonstrate the project budget is reasonable. In addition, include a project schedule demonstrating project delivery milestones through project close-out. As an option, the detailed SOW and schedule can be attached.]
☐ A detailed scope and schedule are attached separately. The file is named:
7 Grant Funds, Sources and Uses of
Project Funds
(Detailed Budget):
[Instruction: Include a detailed budget or attach separately. This budget must list the amount and percentage of both the Federal funding requested and any additional non-Federal funds, if any, that will be used to pay for the project. Additional lines can be added.
This list can be modified as needed.]
Activity: Cost:
Activity: Cost:
Activity: Cost:
Activity: Cost:
☐ A detailed budget is attached separately. The file is named:
IV. Merit Criteria
In the space below, describe how the project will meet the merit criteria and the associated objectives as found in Section F of the FYs 2025 and 2026 Congestion Relief Competitive Grant
Program NOFO. Where appropriate, reference attachments or other sections of the application.
Expand the response blocks as needed but limit the length of the merit criteria section of the application to six total pages in length.
Criterion #1: Reduce highway congestion
Criterion #2: Reduce costs associated with congestion and promote economic competitiveness
Criterion #3: Optimize existing highway capacity including through emerging transportation technologies
V. Project Readiness
In the space below, describe how the project will meet the project readiness element considerations and the associated elements as found in Section F of the FYs 2025 and 2026
Congestion Relief Competitive Grant Program NOFO. Where appropriate, reference attachments or other sections of the application. Expand the response blocks as needed but limit the length of the project readiness section of the application to three total pages in length.
Readiness: Technical Assessment
Readiness: Financial Completeness Assessment
Readiness: Permitting Risk Assessment
VI. Statutory and DOT Priority Considerations
In the space below, describe how the project will meet the statutory priority considerations in
Section F of the FYs 2025 and 2026 Congestion Relief Competitive Grant Program NOFO.
Where appropriate, reference attachments or other sections of the application. Expand the response blocks, as needed, but limit the length of this section of the application to three total pages in length. FHWA will utilize information from other areas of the application and the overall evaluation process to assess the applicant’s responsiveness to the DOT selection considerations, listed in Section F of the NOFO.
Statutory Priority Considerations
Indicate whether the following statement applies to the project:
☐ The project is located in an urbanized area experiencing a high degree of recurrent congestion. (23
U.S.C. § 129(d)(5)(B))
☐ The project does not meet this requirement.
Statutory Priority Considerations Briefly describe below how the project meets the statutory priority consideration, as applicable.
DOT Selection Priorities
Check all that apply to the project (DOT will utilize information in other portions of the application to determine responsiveness to the other Selection Priorities listed in the NOFO):
☐ The project will reduce travel costs for families or improve access to economic opportunities.
☐ The project will improve intermodal or multimodal freight mobility or supply chain efficiency.
☐ The project deploys innovative solutions to congestion relief without limiting vehicle capacity or creating artificial chokepoints.
☐ The project will repurpose existing specialized travel lanes for bicycles, buses, or pedestrians for general purpose use by single-occupant motor vehicles and will meet the Congestion Relief program purpose, will reduce congestion on the facility, will address safety consistent with the merit criteria described in Section F of this NOFO, and will comply with applicable Federal requirements, including the Clean Air Act and criteria under 23 U.S.C. 217(e).
☐ None of the above apply to the project.
DOT Selection Priorities: Briefly describe below how the project meets the checked DOT priorities.
File details come from the government source that posted it. Updated .