BRAND_NAME_ETNAE.pdf
PDF 73 KB Posted
- Attached to
- Electric Transmission & North America Electric Generation Project Database Subscription Federal contract opportunity
- Solicitation number
- FERC17Q0052
About this file
FERC-17-Q-0052 BRAND NAME ETNAE.pdf
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FERC-17-Q-0052_1.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Brand Name Justification.
PROJECT NAME:
The C Three Group, LLC {C Three)
1. ORGANIZATION:
Federal Energy Regulatory Commission Office of the Executive Director
I
Shante Collier-Haygood/Office of Energy Projects 888 1st Street, NE Washington, DC 20426
2. NATURE AND/OR DESCRIPTION OF ACTION BEING APPROVED:
C Three provides energy infrastructure and utility operational market research. It offers empirically-based analysis on energy infrastructure and markets. C Three's Electric Transmission Projects and Pipeline and Processing Facilities provide energy infrastructure data in a searchable format. It also provides industry experts who could verify research information for staff.
3. DESCRIPTION OF REQUIREMENT & VALUE:
DESCRIPTION: The C Three Group provides Cloud based, continuously updated databases of all conceptual, proposed, planned, and under construction electric transmission, electric generation and natural gas pipeline projects in North America. Each infrastructure project has its individual profile which includes type of project, ownership history, cost, project scale, key vendors, key permits, current status and a running history of the project. All pertinent news articles are attached to the profile. All projects are updated at least once a year, with larger projects updated on a quarterly basis. Over 1,000 data sources are tapped to provide information, including federal, state, and local permitting agencies, the owners or project managers. News sources such as the Wall Street Journal, New York Times, Bloomberg, and industry trade publications are also used. Over 15,000 hours per year are spent to keep the information current.
DEMONSTRATE PROPOSED CONTRACTOR'S UNIQUE QUALIFICATIONS:
After searching for similar software products, we find no comparable software available. C Three provides the necessary electric transmission, generation, and natural gas pipeline data needed by the OEP Staff. The service also provides custom reports on current state of the energy infrastructure.
SOURCES SOUGHT EFFORTS:
C Three data is used as a research tool regularly by OEP staff for the state of energy infrastructure.
C Three also provides great user support and allows users to have direct access to their industry experts.
DESCRIPTION OF MARKET RESEARCH CONDUCTED & RESULTS:
After researching various options, C Three provides the necessary database useful for OEP staff.
Technical & Requirements Certification:
I certify that the supporting data under my cognizance that are included in this document are accurate and complete to the best my knowledge and belief.
Energy Infrastructure Analyst Office of Energy Projects/Energy Infrastructure Policy Group
*See Attached Applicable FAR Reference 11.104, 11.105, 6.302-1, 6.303-1, & 6.303-2
*11.104 Use of brand name or equal purchase descriptions.
(a) While the use of performance specifications is preferred to encourage offerors to propose innovative solutions, the use of brand name or equal purchase descriptions maybe advantageous under certain circumstances.
(b) Brand name or equal purchase descriptions must include, in addition to the brand name, a general description of those salient physical, functional, or performance characteristics of the brand name item that an "equal" item must meet to be acceptable for award. Use brand name or equal descriptions when the salient characteristics are firm requirements.
*11.105 Items peculiar to one manufacturer.
Agency requirements shall not be written so as to require a particular brand name, product, or a feature of a product, peculiar lo one manufacturer, thereby precluding consideration of a product manufactured by another company, unless-
(a) The particular brand name, product, or feature is essential to the Government's requirements, and market research indicates other companies' similar products, or products lacking the particular feature, do not meet, or cannot be modified to meet, the agency's needs;
(b) The authority to contract without providing for full and open competition is supported by the required justifications and approvals (see 6.302-1); and
(c) The basis for not providing for maximum practicable competition is documented in the file when the acquisition is awarded using simplified acquisition procedures.
*6.302·1 Only one responsible source and no other supplies or services will satisfy agency requirements.
(a) Authority.
(1) Citations: 10 U.S.C. 2304(c} (1) or 41 U.S.C. 253(c) (1).
(2) When the supplies or services required by the agency are available from only one responsible source, or, for DOD, NASA, and the Coast Guard, from only one or a limited number of responsible sources, and no other type of supplies or services will satisfy agency requirements, full and open competition need not be provided for.
(i) Supplies or services may be considered to be available from only one source if the source has submitted an unsolicited research proposal that-
(A) Demonstrates a unique and innovative concept (see definition at 2.101), or, demonstrates a unique capability· of the source to provide the particular research services proposed;
(BJ Offers a concept or services not otherwise available to the Government; and
(C) Does not resemble 1he substance of a pending competitive acquisition. (See 10 U.S.C. 2304(d)(1)(A) and 41 U.S.C. 253(d)(1)(A).)
(ii) Supplies may be deemed to be available only from the original source in the case of a follow-on contract for the continued development or production of a major system or highly specialized equipment, including major components thereof, when it is likely that award to any other source would result in-
(A) Substantial duplication of cost to the Government that is not expected to be recovered through competition; or
(B) Unacceptable delay.> in fulfilling the agency's requirements. (See 10 U.S.C. 2304(d)(1)(B) or 41 U.S.C. 253 (d)(1)(B).)
(iii) For DOD, NASA, and the Coast Guard, services may be deemed to be available only from the original source in the case of follow-on contracts for the continued provision of highly specialized services when it is likely that award to any other source would result in-
(A) Substantial duplication of cost to the Government that is not expected to be recovered through competition; or
(B) Unacceptable delay in fulfilling the agency's requirements. (See 10 U.S.C. 2304(d)(1)(B).)
(b) Application. This authority shall be used, if appropriate, in preference to the authority in 6.302-7; it shall not be used when any of the other circumstances is applicable. Use of this authority may be appropriate in situations such as the following (these examples are not intended to be all inclusive and do not constitute authority in and of themselves):
(1) When there is a reasonable basis to conclude that the agency's minimum needs can only be satisfied by
(i) Unique supplies or services available from only one source or only one supplier with unique capabilities; or
(ii) For DOD, NASA, and the Coast Guard, unique supplies or services available from only one or a limited number of sources or from only one or a limited number of suppliers with unique capabilities.
(2) The existence of limited rights in data, patent rights, copyrights, or secret processes; the control of basic raw material; or similar circumstances, make the supplies and services available from only one source (however, the mere existence of such rights or circumstances does not in and of itself justify the use of these authorities) (see Part 27).
(3) When acquiring utility services (see 41. 101), circumstances may dictate that only one supplier can furnish the service (see 41.202); or when the contemplated contract is for construction of a part of a utility system and the utility company itself is the only source available to work on the system.
(4) When the agency head has determined in accordance with the agency's standardization program that only specified makes and models of technical equipment and parts will satisfy the agency's needs for additional units or replacement items, and only one source is available.
(c) Application for brand' name descriptions. An acquisition that uses a brand name description or other purchase description to specify a particular brand name, product, or featu."8 of a product, peculiar to one manufacturer does not provide for full and open competition regardless of the number of sources solicited. It shall be justified and approved in accordance with FAR 6.303 and 6.304. The justification should indicate that the use of such descriptions in the acquisition is essential to the Government's requirements, thereby precluding consideration of a product manufactured by another company. (Brand name or equal descriptions, and other purchase descriptions that permit prospective contractors to offer products other than those specifically referenced by brand name, provide for full and open competition and do not require justifications and approvals to support their use.)
(d) Limitations.
(1) Contracts awarded 11sing this authority shall be supported by the written justifications and approvals described in 6.303 and 6.304.
(2) For contracts awarded using this authority, the notices required by 5.201 shall have been published and any bids and proposals must have been considered.
*6.303 Justifications.
6.303-1 Requirements.
(a) A contracting officer shall not commence negotiations for a sole source contract, commence negotiations for a contract resulting from an unsolicited proposal, or award any other contract without providing for full and open competition unless the contracting officer-
(1) Justifies, if required in 6.302, the use of such actions in writing;
(2) Certifies the accuracy and completeness of the justification; and
(3) Obtains the approval required by 6.304.
'recommendation for other than full and open competition.
(c) Justifications required by paragraph (a) of this section may be made on an individual or class basis. Any justification for contracts awarded under the authority of 6.302-7 shall only be made on an individual basis. LN11enever justification made and approved on a class basis, the contracting officer must ensure that each: contract action taken pursuant to the authority of the class justification and approval s within the scope of the class justification and approval and shall document the contract fife for each contract action accordingly.
(d) the authority of 6.302-3(a)(2)(i) or 6.302-7 is being cited as a basis for not providing for full and open competition in an acquisition that would otherwise be subject to the Trade Agreements Act (see Subpart 25.4), the contracting officer must forward a copy of the justification, in accordance with agency procedures, to ,'he agency's point of contact with the Office of the United States Trade Representative.
(e) The justifications for contracts awarded under the authority cited in 6.302-2 may be prepared and approved within a reasonable time after contract award when preparation and approval prior to award would unreasonably delay the acquisitions.
6.303-2 Content.
(a) Each justification should contain sufficient facts and rationale to justify the use of the specific authority cited. As a minimum, each justification shall include the following information:
(1) Identification of the agency and the contracting activity, and specific identification of the document as a "Justification for other than full and open competition.
(2) Nature and/or description of the action being approved.
(3) A description of the supplies or services required to meet the agency's needs (including the estimated value).
(4) An identification of title statutory authority permitting other than full and open competition.
(5) A demonstration that.' the proposed contractor's unique qualifications or the nature of the acquisition requires use of the authority cited.
(6) A description of effo1ts made to ensure that offers are solicited from as many potential sources as is practicable, including whether a notice was or will be publicized as required by Subpart 5.2 and, if not, which exception under 5.202 applies.
(7) A determination by tl1e contracting officer that the anticipated cost to the Government will be fair and reasonable.
(8) A description of the market research conducted (see Part 10) and the results or a statement of the reason market research was not conducted.
(9) Any other facts supporting the use of other than full and open competition, such as:
(i) Explanation of why technical data packages, specifications, engineering descriptions, statements of work, or purchase descriptions suitable for full and open competition have not been developed or are not available.
(ii) IN1len 6.302·1 is cited for follow-on acquisitions as described in 6.302-1(a)(2)(ii), an estimate of the cost to the Government that would be duplicated and how the estimate was derived.
(iii) When 6.302-2 is cited, data, estimated cost, or other rationale as to the extent and nature of the harm to the Government.
(10) A listing of the sources, if any, that expressed, in writing, an interest in the acquisition.
(11) A statement of the actions, if any, the agency may take to remove or overcome any barriers to competition before any subsequent acquisition for the supplies or services, required.
(12) Contracting officer certification that the justification is accurate and complete to the best of the contracting officer's knowledge and belief.
(b) Each justification shall include evidence that any supporting data that is the responsibility of technical or requirements personnel (e.g., verifying the Government's minimum needs or schedule requirements or other rationale for other than full and open competition) and which form a basis for the justification have been certified as complete and accurate by the technical or requirements personnel.
6.304 Approval of the justification.
(a) Except for paragraph (b) of this section, the justification for other than full and open competition shall be approved in writing•
(1) For a proposed contract not exceeding $500,000, the contracting officer's certification required by 6.303-2(a)(12) will serve as approval unless a higher approving level is established in agency procedures.
(2) For a proposed contract over $500,000 but not exceeding $10,000,000, by the competition advocate for the procuring activity designated pursuant to
6.501 or an official described in paragraph (a)(3) or (a){4) of this section. This authority is not delegable.
(3) For a proposed contract over $10,000,000 but not exceeding $50,000,000, by the head of the procuring activity, or a designee who
(i) If a member of the armed forces, is a general or flag officer; or
(ii) If a civilian, is serving in a position in grade GS 16 or above under the General Schedule (or in a comparable or higher position under another schedule).
(4) For a proposed contract over $50,000, 000, by the senior procurement executive of the agency designated pursuant to the OFPP Act (41 U.S.C. 414(3)) in accordance with agency procedures. This authority is not delegable except in the case of the Under Secretary of Defense for Acquisition. Technology, and Logistics, acting as the senior procurement executive for the Department of Defense.
(b) Any justification for a contract awarded under the authority of 6.302-7, regardless of dollar amount, shall be considered approved when the determination required b; 6.302-7(c)(1) is made.
(c) A class justification for other than full and open competition shall be approved in writing in accordance with agency procedures.
The approval level shall be determined by th·7 estimated total value of the class.
(d) The estimated dollar value of all options shall be included in determining the approval level of a justification.
| DEMONSTRATE PROPOSED CONTRACTOR'S UNIQUE QUALIFICATIONS: |
| SOURCES SOUGHT EFFORTS: |
| DESCRIPTION OF MARKET RESEARCH CONDUCTED & RESULTS: |