Attachment_A_Savannah_seminar_slides.pdf
PDF 39 MB Posted
- Solicitation number
- FERC-15-R-0001
About this file
Attachment A-Savannah Seminar Slides
View the file
Other files
| File | Type | Posted |
|---|---|---|
| FERC-15-R-0001_0001.docx | DOCX document | |
| Attachment_B_Guidance_Manual_for_Environmental_Report_Preparation.pdf | ||
| FERC-15-R-0001.pdf | ||
| ATTCH_1__Performance_Questionnaire__Edit.pdf | ||
| Attachment_C_OCI.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Federal Energy Regulatory Commission ENVIRONMENTAL REVIEW and COMPLIANCE
FOR NATURAL GAS FACILITIES
SAVANNAH, GEORGIA ● AUGUST 26-28, 2014
THE ROAD TO SUCCESS
Course Materials Prepared by
Unless otherwise stated, photos provided by Natural Resource Group, LLC (NRG) and Media Elements provided with NRG’s licensed Microsoft® software.
T H E R O A D T O S U C C E S S E N V I R O N M E N T A L R E V I E W a n d C O M P L I A N C E
F O R N A T U R A L G A S F A C I L I T I E S S A V A N N A H , G E O R G I A ● A U G U S T 2 6 - 2 8 , 2 0 1 4
* Lunch will not be provided ‡ This session is geared towards participants that are new to the industry who may not be familiar with basic pipeline construction practices, equipment, and terminology.
Seminar Schedule
Day 1 8:00 am – 12:00 pm Environmental Review for Natural Gas Facilities
12:00 pm – 1:00 pm Lunch*
1:00 pm – 5:00 pm Environmental Review for Natural Gas Facilities
Day 2 8:00 am – 11:55 am Environmental Review for Natural Gas Facilities
11:55 am – 12:55 pm Lunch* (Note: Introduction to Construction video starts at 12:20)
12:20 pm – 12:50 pm Introduction to Construction: INGAA Video ‡
12:50 pm – 5:10 pm Environmental Compliance for Natural Gas Facilities
Day 3 8:00 am – 11:55 am Environmental Compliance for Natural Gas Facilities
11:55 am – 12:55 pm Lunch*
12:55 pm – 3:00 pm Environmental Compliance for Natural Gas Facilities
Environmental Review for Natural Gas Facilities
Welcome
Program Overview
Introduction to FERC
The FERC Process
Section 7: New Construction and Abandonment Projects
Process Preparation
Pre‐Filing Process
7(c) Application, Exhibit F‐1, Environmental Report
NEPA Review
Countdown to Construction
Section 2.55: Exclusion Projects
Types of Projects
E N V I R O N M E N T A L R E V I E W a n d C O M P L I A N C E
F O R N A T U R A L G A S F A C I L I T I E S
Notification Requirements
Reporting Requirements
Section 157, Subpart F: Blanket Certificate Projects
Types of Projects
Notification Requirements
Reporting Requirements
Environmental Compliance for Natural Gas Facilities
Construction
Environmental Compliance Management Program
Defining Project Work Areas and Access Routes
Clearing and Grading
Temporary Erosion and Sediment Control Installation
Trenching and Blasting
Stringing, Bending, and Welding
Lowering‐In and Backfill
Other Resource Protection Measures
Hazardous Materials Management and Spill Prevention and Response
Natural Resources
Cultural Resources
Specialized Construction
Residential Areas
Winter Construction
Wetland Crossings
Waterbody Crossings
Construction (continued)
Hydrostatic Testing
Cleanup and Restoration
Permanent Erosion and Sediment Control Installation
Post‐Construction
Maintenance, Monitoring, and Reporting
Closing Remarks
A C R O N Y M S a n d A B B R E V I A T I O N S
Abbreviation Definition
AA Automatic Authorization
Application Application for a Certificate of Public Convenience and Necessity
ATWS Additional Temporary Work Space
BLM Bureau of Land Management
CEII Critical Energy Infrastructure Information
Certificate Certificate of Public Convenience and Necessity
CFR Code of Federal Regulations
CM Compliance Monitor
COE U.S. Army Corps of Engineers
Commission or FERC Federal Energy Regulatory Commission
CP Certificate Proceeding dBA Decibels of the A‐weighted Scale
DOE Department of Energy
DOT Department of Transportation
EA Environmental Assessment
EFH Essential Fish Habitat
EI Environmental Inspector
EIA Energy Information Administration
EIS Environmental Impact Statement
EPA Environmental Protection Agency
EPAct Energy Policy Act of 2005
ERP Emergency Response Plan
FONSI Finding of No Significant Impact
FS U.S. Forest Service
FWS U.S. Fish and Wildlife Service
GIS Global Information System
GPS Global Positioning System
HDD Horizontal Directional Drill
INGAA Interstate Natural Gas Association of America
Ldn Day‐Night Equivalent Sound Level
Leq (d) Daytime Equivalent Sound Level
Leq (n) Nighttime Equivalent Sound Level
LNG Liquefied Natural Gas
MOU Memorandum of Understanding
MP Milepost
MSDS Material Safety Data Sheet
NEPA National Environmental Policy Act
NFPA National Fire Protection Act
NMFS National Marine Fisheries Service
NOI Notice of Intent
NPDES National Pollutant Discharge Elimination System
NPS National Park Service
NRCS Natural Resources Conservation Service
NRHP National Register of Historic Places
NRI Nationwide Rivers Inventory
NSA Noise Sensitive Area
NTP Notice to Proceed
NWP Nationwide Permit
OEP Office of Energy Projects
OGC Office of General Counsel
PCB Polychlorinated Biphenyls
PEM Palustrine Emergent
PF Pre‐Filing
PFO Palustrine Forested
PHMSA Pipeline and Hazardous Materials Safety Administration
Plan Upland Erosion Control, Revegetation, and Maintenance Plan
PM Project Manager
PN Prior Notice ppm Parts Per Million
Procedures Wetland and Waterbody Construction and Mitigation Procedures
PSS Palustrine Scrub‐Shrub
RFP Request for Proposal
RMP Resource Management Plan
ROW Right‐of‐Way
RR Resource Report
SHPO State Historical Preservation Office(r)
SIP State Implementation Plan
SPCC Spill Prevention, Control and Countermeasure
SSI Sensitive Security Information
SSURGO Soil Survey Geographic Database
STATSGO State Soil Geographic Database
SWPPP Storm Water Pollution Prevention Plan
T&E Threatened and Endangered
THPO Tribal Historic Preservation Officer
TSCA Toxic Substances Control Act
USGS U.S. Geological Survey
WRP Wetland Reserve Program
WSA Water Suitability Assessment
C D ● T A B L E O F C O N T E N T S
Code of Federal Regulations
Federal Energy Regulatory Commission (FERC)
18 CFR 2.55 – Exclusions
Appendix A, Guidance for Determining Construction Area for Replacements
18 CFR 153, Subpart B – Section 3 Project Applications
18 CFR 157, Subpart A – Section 7 Project Applications / Landowner Notifications / Pre- Filing
18 CFR 157, Subpart F – Blanket Certificate Projects (current as of April 4, 2014)
18 CFR 284.11 – Environmental Compliance for Section 311 Natural Gas Policy Act Projects
18 CFR 380 – NEPA Regulations / Exhibit F-1, Environmental Report
Appendix A, Minimum Filing Requirements
18 CFR 385, Subpart T – Filing Requirements
Subpart V – Off-the-Record Communications
18 CFR 388 – Information Requests / Critical Energy Infrastructure Information (CEII)
Guidance Documents
Environmental Document Preparation
1. Application Submission Guidelines
2. Draft Guidance for Filing Resource Reports 11 and 13 for LNG Facility Applications
3. Draft Preferred Submittal Format Guidance for Resource Report 13
4. Draft Seismic Design Guidelines and Data Submittal Requirements for LNG Facilities
5. Guidance Manual for Environmental Report Preparation
6. Guidelines for Reporting on Cultural Resources Investigations for Pipeline Projects
7. Handbook for Using Third-Party Contractors to Prepare Environmental Documents for Natural Gas Facilities and Hydropower Projects
8. Guidance for Applicant-Prepared Draft Environmental Assessments for Certain Proposed Natural Gas Projects
Energy Policy Act (EPAct)
1. Agency To-Do List – Agency Responsibilities Under the Federal Energy Regulatory Commission’s New Regulations
2. Applicant To-Do List
C D ● T A B L E O F C O N T E N T S
3. Early Coordination of Federal Authorizations and Related Environmental Reviews Required in Order to Site Electric Transmission Facilities (Memorandum of Understanding)
4. Guidance for Federal and State Agencies for the Processing of Federal Authorizations in Cooperation with the FERC
5. Interagency Agreement on Early Coordination of Required Environmental and Historic Preservation Reviews
6. Processes for the Environmental and Historic Preservation Review of Proposed Interstate Natural Gas Facilities
Landowner Guidance and Stakeholder Outreach
1. An Interstate Natural Gas Facility on My Land? What do I Need to Know?
2. Blanket Certificate Program – Notice to Landowners
3. Ideas for Better Stakeholder Involvement in the Interstate Natural Gas Pipeline Planning Pre-Filing Process
4. Your Guide to Electronic Information at FERC
Environmental Compliance
1. Research of Wetland Construction and Mitigation Activities for Certificated Section 7(c) Pipeline Projects
2. Upland Erosion Control, Revegetation, and Maintenance Plan (FERC Plan)
3. Wetland and Waterbody Construction and Mitigation Procedures (FERC Procedures)
FERC Filing Guidance
1. Federal Energy Regulatory Commission Submission Guidelines
2. Federal Energy Regulatory Commission eFiling v7.0 User Guide
Other Documents
1. Memorandum of Understanding Between the Federal Energy Regulatory Commission and the U.S. Department of the Interior United States Fish and Wildlife Service Regarding Implementation of Executive Order 13186, “Responsibilities of Federal Agencies to Protect Migratory Birds”
F E R C S T A F F B I O S
Dave Swearingen dave.swearingen@ferc.gov
202.502.6173
Dave Swearingen is a Branch Chief in the Federal Energy Regulatory Commission's (FERC or Commission) Office of Energy Projects, Division of Gas – Environment and Engineering (DG2E). He recently served as the Division’s Interagency Coordinator, with responsibility for presenting FERC natural gas environmental policies and the Division’s environmental review process to agencies and outside groups.
Dave graduated from Louisiana State University with a Bachelor’s degree in Zoology and went on to earn a Master’s degree in Marine Biology from the University of North Carolina at Wilmington, specializing in coral reef ecology. Dave is a Gulf War veteran and has taught biology and ecology‐related classes at the community college and university levels. Dave has been with the FERC since 1999.
Dave’s expertise in biology/ecology has led to numerous successful consultations and impact evaluations under the Migratory Bird Treaty Act and the Endangered Species Act.
Dave has also managed several major interstate natural gas pipeline projects that required extensive multi‐state environmental review and interagency coordination, including the 713‐mile‐long Rockies Express West Pipeline Project and the 677‐mile‐long Ruby Pipeline Project.
David Hanobic
202.502.8312 david.hanobic@ferc.gov
David Hanobic serves as the Outreach Coordinator for FERC’s Office of Energy Projects, DG2E. DG2E is responsible for the environmental review of interstate natural gas certificate applications for the construction and operation of facilities under Section 7(c) of the Natural Gas Act (NGA), and applications for import and export authorization under Section 3 of the NGA, including liquefied natural gas (LNG) import facilities. David advises the natural gas industry; federal, state, and local agencies; and other stakeholders on the Commission’s Pre‐Filing Process and Outreach initiatives. He has managed National Environmental Policy Act document preparation and monitored environmental compliance on numerous pipeline and LNG projects.
David joined the FERC in 2004 as an environmental biologist. David has a Bachelor of Science Degree in Biology from the Lock Haven University of Pennsylvania.
Danny Laffoon
202.502.6257 danny.laffoon@ferc.gov
Danny Laffoon is the Compliance Manager for FERC’s Office of Energy Projects, DG2E. Danny provides oversight of DG2E’s post‐certificate compliance program and advises stakeholders regarding laws, regulations, and policy affecting natural gas facility construction and compliance techniques.
Danny joined the FERC in 2004 as an Environmental Biologist. He has directed NEPA document preparation and monitored environmental compliance on numerous pipeline and LNG projects. Danny has a Bachelor of Science degree in Fisheries and Wildlife from Virginia Tech in Blacksburg, Virginia.
F E R C S T A F F B I O S
Eric Tomasi eric.tomasi@ferc.gov
202.502.8097
Eric Tomasi is an environmental engineer and the technical expert for air quality, noise and pipeline safety with FERC’s Office of Energy Projects, DG2E. In his role with the Commission, Eric provides guidance to industry and stakeholders for noise and air quality requirements and is designated as the primary lead for all natural gas facility noise complaints.
Eric joined FERC in 2001 as an environmental engineer. He has directed NEPA document preparation and monitored environmental compliance on numerous major natural gas pipeline projects. Prior to his employment at FERC, Eric worked as a regulatory compliance manager for a hazardous waste facility. Eric has a Bachelor of Science in Aerospace Engineering from Boston University, Boston Massachusetts, and undertook graduate studies at the University of Florida in Gainesville, Florida.
C O U R S E I N S T R U C T O R B I O S
Larry Brown larry.brown@nrg‐llc.com
401.278.4301
Larry Brown is a Principal at Natural Resource Group, LLC (NRG) specializing in project management of interstate natural gas pipeline projects and preparation of documents necessary to comply with the NEPA and other federal and state regulations. Larry has 19 years of experience working on FERC‐regulated pipeline projects. This experience includes managing, providing senior review, and/or authoring sections of numerous permit applications and more than 20 FERC Environmental Impact Statements (EISs) and Environmental Assessments (EAs). Larry has also managed environmental field surveys, environmental compliance programs during construction, and conducted environmental inspection and post‐construction monitoring.
Tim Drake tim.drake@nrg‐llc.com
612.337.3365
Tim Drake is a senior consultant at NRG specializing in routing, construction, restoration, and environmental inspection issues related to linear projects. Tim has extensive experience working with clients to develop and support environmental inspection and compliance programs. He has worked closely with project engineers, construction supervision teams, and agency regulators to develop and implement project plans and techniques to construct through sensitive resource areas including trout streams, wetlands, and national forests. Tim’s responsibilities have also included the preparation of wildlife, surface water quality, and wetland sections of the Environmental Reports for FERC 7(c) applications.
Jennifer Lee jennifer.lee@nrg‐llc.com
503.525.5152
Jennifer Lee is a senior consultant at NRG, specializing in the preparation of FERC 7(c) Environmental Report Applications; third‐party EISs; and federal, state, and local permits necessary for the construction and operation of natural gas and petroleum pipelines and LNG facilities. She has extensive experience with the FERC Pre‐Filing Process, and has worked on behalf of both applicants and regulators on natural gas‐related projects. Jennifer also manages feasibility studies and third‐party EISs for other linear energy facilities including electric transmission line projects. She has worked on behalf of numerous state and federal agencies, including the FERC, USFS, BLM, and FWS. Her areas of expertise include land use analysis, alternatives analysis, and document preparation.
C O U R S E I N S T R U C T O R B I O S
Brian Cole brian.cole@nrg‐llc.com
980.297.7274
Brian Cole, a senior consultant at NRG, has performed multiple roles for natural gas pipeline projects since 2002 and has experience working on behalf of both applicants and the FERC to develop, permit, and implement project plans and programs. Brian has supported and managed environmental compliance inspection programs for FERC regulated projects in more than 20 states, and has served as the Compliance Manager on large projects utilizing FERC’s Third Party Monitoring Program. He has also served as an Environmental Inspector on linear projects ranging from a few miles to more than 100 miles in length, as well as natural gas storage facilities and LNG terminals.
Janelle Rieland janelle.rieland@nrg‐llc.com
612.347.7140
Janelle Rieland is a senior consultant at NRG specializing in FERC Environmental Report Applications as well as federally threatened and endangered species.
Janelle has experience working on behalf of both the FERC and applicants on FERC 7(c) and 7(b) applications in both the Pacific Northwest and Gulf Coast regions. She has worked closely with FERC staff, agency personnel, and the applicant to facilitate section 7 consultation under the Endangered Species Act.
Janelle’s experience on FERC 7(c) projects also includes the preparation of wildlife, vegetation, wetland, surface water, and sociology sections of Environmental Reports and Environmental Impact Statements.
P R O G R A M O V
ER
V
IEW
The Road to Success Environmental Review and Compliance for Natural Gas Facilities
Page | 1‐1
The Road to Success
Environmental Review for Natural Gas Facilities
PROGRAM OVERVIEW
Page | 1‐2
Course Instructors ● FERC Staff
Public Outreach
Dave Hanobic
Outreach Coordinator
(202) 502‐8312
David.Hanobic@ferc.gov
Danny Laffoon
Compliance Manager
(202) 502‐6257
Danny.Laffoon@ferc.gov
Construction Compliance
Eric Tomasi
Senior Environmental Engineer
(202) 502‐8097
Eric.Tomasi@ferc.gov
Air and Noise
David Swearingen
Chief, Gas Branch 4
(202) 502‐6173
Dave.Swearingen@ferc.gov
Environmental Review
Course Instructors
Larry Brown
(401) 278‐4301
Larry.Brown@nrg‐llc.com
Environmental Review
Tim Drake
(612) 337‐3365
Tim.Drake@nrg‐llc.com
Facilitator/Environmental Compliance Facilitator/Environmental Compliance
Page | 1‐3
Brian Cole
(980) 297‐7274
Brian.Cole@nrg‐llc.com
Course Instructors
Environmental Compliance
Jennifer Lee
(503) 525‐5152
Jennifer.Lee@nrg‐llc.com
Environmental Review
Janelle Rieland
(612) 347‐7140
Janelle.Rieland@nrg‐llc.com
Environmental Review
Paul Friedman
Senior Technical Expert
(202) 502‐8059
Paul.Friedman@ferc.gov
Cultural
Terry Turpin
Branch Chief
(202) 502‐8558
Terry.Turpin@ferc.gov
LNG Engineering
FERC Technical Leads
T&E
Medha Kochhar
Biological Resource Manager
(202) 502‐8964
Medha.Kochhar@ferc.gov
Page | 1‐4
FERC Technical Leads
Michael McGehee
Director, Pipeline Certificates
(202) 502‐8962
Michael.McGehee@ferc.gov
Certificates & Rates
Josh Hurwitz
Attorney Advisor
(202) 502‐6668 Josh.Hurwitz@ferc.gov
Dispute Resolution Division
Joanne Wachholder
Interagency Coordinator
(202) 502‐8056
Joanne.Wachholder@ferc.gov
NEPA & Agency Outreach
Safe Travels
• Emergency alert system
• Exits
• Meeting location
• Safety moment
Page | 1‐5
Course Agenda
• Introduction to FERC
• The FERC Process
– Section 7: New Construction and Abandonment Projects
– Section 2.55: Exclusion Projects
– Section 157, Subpart F: Blanket Certificate Projects
• Construction
• Post‐Construction
Smooth(er) Ride
• Participate with an open mind
• Ask questions
• Observe break times
• “Disconnect”
– Turn off cell phones and other media devices
• Keep side discussions to a minimum
• Know your traffic signals
Page | 1‐6
Questions
• During this seminar you may email or text the instructors with questions
– E: David.Hanobic@ferc.gov/C: 570‐660‐0456
– Danny Laffoon C: 540‐239‐2489
– E: Tim.Drake@nrg‐llc.com
IN
TR
O D U C
TIO
N
TO
FER
C
Page | 2‐1
INTRODUCTION TO FERC
Organization
• Independent Federal regulatory agency
– Decisions subject to review by Federal courts
• The “Commission”
– Commissioners are nominated by the President and confirmed by the Senate
– Chairman is nominated by the President
– Only three commissioners can be from the same political party
Page | 2‐2
FERC Organization
Commissioner Clark
Vacant Commissioner Moeller
Commissioner Bay
Chairman LaFleur
Office of the Director
Jeff C. Wright, Director Ann F. Miles, Deputy Director
Energy Infrastructure Policy Group
Ann F. Miles, Advisor
Management and Operations
Chrystal Martin, Assistant Director
Division of Gas Environment and Engineering
Rich McGuire, Acting Director
Division of Pipeline Certificates
Michael McGehee, Director John Wood, Deputy Director
Division of Hydropower Licensing Vince Yearick, Director
Nicholas Jayjack, Deputy Director
Division of Hydropower Administration & Compliance
Heather E. Campbell, Acting Director
Division of Dam Safety & Inspections
William H. Allerton, Director David Capka, Deputy Director
Certificates Branch 1 Richard Foley, Chief
Certificates Branch 2 Pamela Boudreau, Chief
Gas Branch 1 Shannon Jones, Chief
Gas Branch 2 Alisa Lykens, Chief
Gas Branch 3 James Martin, Chief
Gas Branch 4 David Swearingen, Chief
LNG Engineering & Compliance Branch Terry Turpin, Chief
West Branch Timothy Welch, Chief
Mid‐Atlantic Branch John Smith, Chief
Midwest Branch Timothy Konnert, Chief
New England Branch Robert Easton, Chief
Northwest Branch Jennifer Hill, Chief
South Branch David Turner, Chief
Project Review Charles Cover, Chief
Aquatic Resources Branch
T.J. LoVullo, Chief
Land Resources Branch
Robert Fletcher, Chief
Engineering Resources Branch Kelly Houff, Chief
Environmental Review Branch
Steve Hocking, Chief
Portland Regional Office Douglas Johnson, Regional Engineer
Washington Office Paul Shannon, Chief
Atlanta Regional Office Wayne King, Regional Engineer
Chicago Regional Office John Zygai, Regional Engineer
New York Regional Office Gerald Cross, Regional Engineer
San Francisco Regional Office
Frank Blackett, Regional Engineer
Office of Energy Projects (OEP)
Page | 2‐3
Regulated Industries Natural Gas
• Interstate pipeline facilities and gas storage (transportation and sale)
– Certification of new, expanded, and abandoned facilities
– Related environmental review and compliance
– Siting authority, rates and tariffs
*Natural Gas Act Authority
Regulated Industries LNG Terminals – NGA Section 3
• Interstate, import, and export
– U.S. Department of Energy – Public Interest Determination
– FERC – Impact of Facilities & Location
• Applicant must receive Public Interest determination for Export before engaging with
FERC
• Compliance Inspections
Page | 2‐4
U.S. LNG Facilities
FERC Regulated Terminals
FERC Regulated Peakshavers / Storage
State Regulated Facilities
FERC Regulated Terminals
FERC Regulated Peak Shavers / Storage
State Regulated Facilities
Regulated Industries Electric Power
• Wholesale rates for interstate transmission
• Interstate electric transmission
– Reliability of high voltage systems
– Siting and permitting* Within DOE‐designated energy corridors As authorized by EPAct
*Subject to recent federal court decisions
Page | 2‐5
Regulated Industries Oil & Oil Products Pipelines
• Interstate transportation and wholesale rates and tariffs
– Crude/Petroleum products
(diesel, gasoline, jet fuel)
– Natural Gas Liquids
(propane, butane, ethane) *Interstate Commerce Act authority
*No siting authority
Regulated Industries Hydroelectric
• Non‐Federal projects
– Licensing and relicensing
– Safety inspection
– Related environmental review and compliance
Page | 2‐6
What Doesn’t FERC Regulate?
• Pipeline safety standards
• Natural gas producers
• Local natural gas distribution or gathering pipelines
• Siting of oil, oil products, and natural gas liquids pipelines
• LNG Intrastate Commerce – not FERC
• The National Environmental Policy Act of 1969
– Federal agencies must consider the effects of their actions on the human environment
• EPAct 2005 – amended the Natural Gas Act
– FERC is always the lead agency for NEPA
– FERC coordinates all other federal authorizations, sets the schedule
CEQ regulations for implementing NEPA ‐ 40 CFR 1500‐1508 FERC’s regulations implementing NEPA ‐ 18 CFR 380
FERC & NEPA
Page | 2‐7
Roles & Responsibilities
• FERC’s DG2E Staff
– Manage the NEPA process for natural gas facilities
– Make recommendations to the Commission to avoid, minimize and mitigate impacts
– Monitor compliance
• Other FERC offices
– OGC: legal matters
– DPC: policy, precedents, regulations
– OEMR: tariffs, rates, terms and conditions of service
• Cooperating Agencies
– NEPA responsibility or special expertise
TH
E FER
C P R O C
ESS ●
SEC
TIO
N P R O
JEC
TS
Page | 3‐1
THE FERC PROCESS
THE FERC PROCESS
Section 7 – New Construction and Abandonment Projects
Page | 3‐2
PROCESS PREPARATION
Project Concept
• Determine project purpose and need
• Conduct “open season” to determine market interest
• Identify a base project
– Pipeline alignment
– Aboveground facility locations
– Interconnects
Page | 3‐3
Project Planning
• Begin public outreach efforts
• Identify and contact agencies
– Potential resource issues
– Applicable permits
• Develop project execution plans and schedules (e.g., plan field surveys)
Pre‐Filing Process
• Begin project review prior to Application (reg site)
• Pre‐Filing is required for
– All LNG terminals and associated pipelines
– Projects proposing an Applicant‐Prepared Draft EA
– “Strongly recommended” for certain natural gas facility projects
Refer to FERC’s new guidance document “Guidelines for Applicant‐Prepared Draft Environmental Assessments”
Page | 3‐4
Objectives of Pre‐Filing Process
• More interactive NEPA/ permitting process
– No shortcuts
• Be more proactive and explore options for outreach
• Identify/resolve problems and have “no surprises”
• Transparency in the Pre‐ Filing review process
• Earlier, more direct interaction between
– FERC
– Other agencies
– Landowners
– Applicant
• Procedures are designed to encourage cooperation with federal, state, tribal, and local authorities
FERC staff are an advocate for the process, not the project
Pre‐Filing vs. Traditional Filing Pre‐Filing
• Must initiate process at least 6 months prior to filing a 7(c) Application
• Provides opportunity for identification of stakeholders concerns early in the process
• Minimize post‐Application data requests
• Typically results in fewer “surprises”
Traditional
• No time restrictions on submitting 7(c) Application
• Agencies may be reluctant to engage in discussions/consultations until 7(c) Application is filed
• May require additional work to satisfy requirements of other Federal agencies
Ex‐parte rules governing off‐the‐record communications do not apply during Pre‐Filing
Page | 3‐5
Pre‐Filing Meeting
• Introduce project to FERC
• Discuss environmental and non‐ environmental requirements
• Discuss status of ongoing activities (e.g., public outreach)
• Determine regulatory path and NEPA document options
• Submit drafts
– Pre‐Filing Request Letter
– RFP for third‐party contractors to prepare NEPA document
Regulatory Path
Section 3 Exportation/Importation
15 USC §717b
Section 7(b) Abandonment
15 USC §717f (b)
Section 7(c) New Construction
15 USC §717f (c)
§2.55 Exclusions
18 CFR § 2.55
§157 Blanket Certificates
18 CFR § 157, Subpart F
Natural Gas Act FERC Regulations
Page | 3‐6
NEPA Documents Categorical Exclusion
Actions that will not individually or cumulatively have a significant effect on human environment
Routine activities
Environmental Assessment
Projects that do not pose a significant effect on human environment
Projects where significance of effect on human environment is unknown
Environmental Impact Statement
Complex projects
Projects with significant effects on human environment
18 CFR §380
Agency Pre‐Filing Participation Request Letter
• Introduce the project and provide a map
• Request participation in the Pre‐Filing process
Page | 3‐7
Federal Agency Coordination
• FERC's NEPA review must demonstrate compliance with other Federal laws
• Assistance with required consultations may be delegated to the Applicant
Some agencies and tribal groups may request government‐to‐ government consultations
EIS Pre‐Filing Environmental Review Process
Public Input Opportunities
Public Input Opportunities
Public Input Opportunities
Page | 3‐8
Pre‐Filing Request
• Zoning and property availability (LNG)
• Reason for requesting Pre‐Filing
• Project description, maps, and drawings
• Proposed project schedule
For illustration purposes only. Examples can be found on eLibrary.
Proposed Project Schedule
Page | 3‐9
Pre‐Filing Request
• Other Federal and state agency involvement
– Applicable authorizations or consultations
–Willingness to participate in Pre‐Filing
– Proposed Application submittal and authorization schedule
Federal and State Agency Permits and Approvals
Page | 3‐10
Pre‐Filing Request
• Interested parties and stakeholders contacted
• Proposals
– Third‐party contractors to prepare NEPA document or
– Submit an Applicant‐ Prepared Draft EA
• Work completed to date
Refer to FERC’s guidance document “Handbook for Using Third‐ Party Contractors to Prepare Environmental Documents”
Status of Work To Date
Land
•Tax and title records searches
•Landowner contacts
•Survey permissions
Public Outreach
•Community contacts
•Governmental contacts
•Open houses
•Other communications
Engineering
•Civil survey plans
•Routing
•Facility design
Environmental
•Agency contacts
•Environmental analyses
•Plans for biological, cultural, and paleo surveys
Page | 3‐11
Pre‐Filing Request
• Acknowledgment that a complete Application and Environmental Report will be provided
• Public outreach plan description
• Letter of Intent and Preliminary WSA certification (LNG)
• DOE authorization (LNG)
PRE‐FILING
PROCESS
18 CFR §157.21
Page | 3‐12
Pre‐Filing Approval Letter
• PF docket number assigned
• Issuance of docket number opens the public record
• Third‐party NEPA document consultant selected
Public Record
• Project‐related submittals, reports, comments, and communications are posted to eLibrary
• Ex‐parte rules governing off‐ the‐record communications do not apply during Pre‐Filing
• Record will include materials for all associated docket numbers (i.e., CP docket number)
• Basis for Commission decisions
FERC Online eComment eRegister eFiling eSubscription eService eLibrary www.ferc.gov/docs‐filing/elibrary.asp
Page | 3‐13
Pre‐Filing Clock
Identify locations for open houses and agency meetings
DAYS
The clock starts when the PF approval notice is issued
Execute contract for third‐ party NEPA contractor and inform stakeholders about the project
DAYS
Submit updated mailing list and file draft RR 1, and summary of alternatives considered
DAYS
File WSA (LNG only) and 7(c) Application
DAYS
Open Houses
• Open to the public
• Sponsored and hosted by Applicant
• Informal setting
• FERC or the third‐party NEPA document contractor will attend
• General discussions are not part of the public record
• FERC site review
Number and locations of open houses are project specific
Page | 3‐14
Description of Proposed Facilities
(Public)
Topo Maps, Alignment Sheets, Plot Plans
(Public/CEII)
RR 1: General Project Description
Construction and Restoration Methods
(Public)
18 CFR §380.12(c)
Non‐jurisdictional Facilities (Public)
Purpose and Need (Public)
Land Requirements (Public)
RR 1: General Project Description
Future Expansion or Abandonment Plans
(Public)
Required Permits and Authorizations
(Public)
Affected Landowners – 18 CFR §157.6(d)(2) (Privileged)
18 CFR §380.12(c)
Schedule (Public)
Page | 3‐15
Topographic Map Minimum Scale: 1:24,000/1:25,000 covering 0.5‐mile‐wide corridor
Key Elements: all project facilities, work areas, and access roads; mileposts
For illustration purposes only. Examples can be found on eLibrary.
Photo‐Based Alignment Sheet Minimum Scale: 1:6,000 covering 0.5‐mile‐wide corridor Key Elements: all project facilities, work areas, and access roads;
temporary and permanent ROW; mileposts; resources and features crossed; property boundaries; tract numbers
Page | 3‐16
ROW Cross‐Section Drawing Minimum Scale: none Typical Drawings: temporary and permanent ROW configurations; collocation, overlap, and offsets; road, railroad, utility, waterbody, and wetland crossings
For illustration purposes only. Examples can be found on eLibrary.
Right‐of‐Way Orientation and Overlap
Facility/County Mileposts Length (mi.)
Existing ROW
Relationship of Proposed Pipeline to
Existing ROW
Overlap of Proposed ROW with Existing ROW (ft.)
30‐inch pipeline
Calumet County 59.5 – 60.5 1.0 ATC Power Line West 50
61.6 – 62.9 1.3 ATC Power Line North 50
65.0 – 66.3 1.3 ATC Power Line West 50
79.1 – 80.0 0.9 ANR Pipeline West 25
80.0 – 82.2 2.2 ANR Pipeline East 25
20‐inch pipeline
Brown County 93.4 – 96.3 2.9 ATC Power Line Southwest 30
96.7 – 96.9 0.2 South Overland Road
East 0
Total 9.8 (69.3%)
For illustration purposes only. Examples can be found on eLibrary.
Additional Options May Include:
‐ Insert additional line items for greenfield segments to avoid gaps in mileposts ‐ Insert additional column identifying applicable ROW configuration drawing
Page | 3‐17
Plot Plan/Site Plan Minimum Scale: 1:3,600 Key Elements: non‐linear construction areas, temporary and permanent disturbance, access roads, mileposts, associated non‐jurisdictional facilities, fence line, facility configuration
For illustration purposes only. Examples can be found on eLibrary.
RR 10: Alternatives
R o u te
A lt e rn at iv e s
N o ‐A ct io n e rn at iv e •Consequences
•Environmental impacts avoided
•Energy alternatives
•Energy conservation
Sy st e m e rn at iv e s •Alternative new pipeline system
•Existing pipeline system(s)
•Alternative configurations
•Additional compression
•Existing system interconnections
•Major route alternatives
•Route variations or deviations
•Landowner and stakeholder requests
Si te e rn at iv e •Major aboveground facility sites
18 CFR §380.12(l)
Page | 3‐18
System Alternative Map Minimum scale: none Key Elements: proposed route and facility locations, alternate systems/configurations
For illustration purposes only. Examples can be found on eLibrary.
Major Route Alternative Map Minimum scale: none Key Elements: proposed route and facility locations, alternate route and facility locations
Page | 3‐19
Major Route Alternatives Comparison Table
Comparison Item Unit Preferred Route Alt. 1 Route Alt. 2
Facility Requirements Pipeline Length miles 172 206 218 Greenfield Construction miles 2.5 17.4 23.1 Compression hp 41,200 36,700 36,100 Land Requirements Construction acres 2,080 2,508 2,651 Operation acres 1,255 1,510 1,590 Environmental Considerations Waterbodies no. 125 132 158 Wetlands acres 8.9 20.9 21.8 Wildlife Management Areas no. 0 2 1 Forested Areas acres 14.3 15.6 15.6 Developed Land acres 20.6 19.2 21.3
For illustration purposes only. Examples can be found on eLibrary.
FERC Comments
• FERC will issue comments on draft RRs
• FERC may require written response and/or
• May require comments to be incorporated into next round of RRs
Page | 3‐20
Notice of Intent
• NOI is start of NEPA process
• Indicates type of NEPA document to be prepared
• Issuance of NOI starts scoping period
• Announces close of scoping period
Notice of Intent
• Requests agencies to indicate if they will act as cooperating agencies
• Identifies stakeholders/ mailing list
Page | 3‐21
Cooperating Agency Request Letter
• Federal, state, and local agencies with jurisdiction and/or special expertise regarding environmental issues identified
Notice of Intent
• Announces public meeting dates and locations
Page | 3‐22
Scoping Meetings
• Includes public scoping meetings and interagency coordination meetings
• Sponsored and hosted by FERC
• More formal setting
• Included as part of public record
– Public scoping meeting transcripts
– Interagency meeting notes
Company may be asked to arrive an hour before start of scoping meeting
Interagency Coordination Meetings
• Applicant provides a project status update
• FERC identifies agency roles and responsibilities for NEPA review
• Agencies identify issues and concerns
Page | 3‐23
Agency Roles and Responsibilities
FERC
• Be the lead Federal agency responsible for complying with NEPA
• Establish and maintain schedule for Federal authorizations
• Coordinate all Federal authorizations and agency comments
• Compile agency actions and decisions into a consolidated record
Other Federal Agencies
• Participate in Pre‐Filing process as specified in
– Interagency MOU (2002)
– EPAct (2005)
FERC Guidance Document
Agency Roles and Responsibilities
Page | 3‐24
NEPA Scoping Clock The clock starts when NEPA scoping period has concluded
Respond to open house, interagency meeting, and scoping meeting comments
DAYS
Submit draft RRs 1 – 12 60
DAYS
Resource Reports
• General Project Description
•Water Use and Quality
• Fish, Wildlife, and Vegetation
• Cultural Resources
• Socioeconomics
• Geological Resources
• Soils
Page | 3‐25
Resource Reports
• Land Use, Recreation, and Aesthetics
• Air and Noise Quality
• Alternatives
• Reliability and Safety
• PCB Contamination
• Engineering and Design Material (LNG)
Refer to FERC’s guidance document “Guidance Manual for Environmental Report Preparation”
Resource Report Requirements
• Existing conditions
• Direct and indirect impacts
– Construction
– Operation
– Abandonment
– Cumulative
• Proposed mitigation measures
– Applicant‐committed
– Agency‐ recommended
• Applicable agency correspondence
• Reference list
FERC may require a revised set of draft resource reports if the first drafts are not complete which can have significant schedule impacts
18 CFR §380.12(c)
Page | 3‐26
RR 2: Water Use and Quality
Wetlands
• Federal jurisdiction
• State jurisdiction
• Modifications to FERC Procedures
18 CFR §380.12(d)
• Aquifers
• Wellhead protection areas
• Springs
• Public and private wells
Groundwater
• Waterbodies
• Canals
• Public watersheds
• Reservoirs
• FERC defined
• COE defined
• Modifications from FERC Procedures
Surface Waters
Related Federal Authorizations
* CWA Clean Water Act
• CWA, Section 401 Water Quality Certification
– Issued by state
• CWA, Section 402 NPDES Permit(s)
– Issued by state or EPA
– Construction Stormwater Permit
– Discharge Permit
• CWA, Section 404 NWP or Individual Permit
– Issued by COE
• Rivers and Harbors Act, Section 10
– Issued by COE with NWP or Individual Permit
• 33 U.S.C. Section 408 Modification of harbor or river improvements
– Issued by COE
Page | 3‐27
Data Collection Field surveys are primary source of data
• Section 10 Navigable Waters
COE
• Wild and Scenic Rivers
• Nationwide Rivers Inventory
NPS
• Groundwater resources
• Outstanding/exceptional value waters
• Coldwater fisheries
• 303(d) waters
State Environmental Department
Waterbody Crossing Table
MP
Waterbody Crossing Special Designation
Timing Restriction
Blasting Name Type
Length (feet)
Method State Water Quality
Classification
Fishery Type
Other
0.1 Big Creek Per. 105 HDD A, B, C Coldwater State T&E, Major
Jun. 1 – Sept. 30
0.9 Old Creek Inter. 10 Open‐cut 303(d) Yes
1.5 Tide River Per. 286 HDD A, B, D Navigable, Federal T&E, NRI, Major
2.4 Ale Creek Eph. 2 Open‐cut
3.7 Farm Pond Pond 139 Open‐cut Major
5.3 Fish Creek Per. 28 Open‐cut A,D Warmwater Jun. 1 –
Nov. 30
Page | 3‐28
Wetland Crossing Table
ID Type
MP Crossing Construction Impact
(acres) Operation Impact
(acres)
Enter Exit Length (feet)
Method Area
Affected
Forested Area
Affected
Permanent Cover
Conversion
Permanent Loss
Forested Area
Affected
W1 PEM 0.1 0.2 528 Open‐cut 0.9 0.0 0.0 0.0 0.0
W2 PSS 0.5 1.0 2,635 Open‐cut 4.5 0.0 1.8 0.0 0.0
W3 PSS 1.7 2.4 3,615 HDD 0.3 0.0 0.1 0.0 0.0
W4 PFO 4.2 4.5 1,332 Open‐cut 2.2 2.2 0.9 0.0 0.9
W5 PFO 5.3 5.7 2,023 HDD 0.0 0.0 0.0 0.0 0.0
For illustration purposes only. Examples can be found on eLibrary.
Site‐Specific Plan
• Provide site‐specific plan for
– Major (>100 feet wide) waterbody crossing plans
– Construction ROW >75 feet wide in wetlands
– ATWS within 50 feet of wetlands or waterbodies (*table of justification)
– Waterbody crossings within or adjacent to a wetland crossing
If the measures identified in FERC’s Procedures cannot be met
Page | 3‐29
Site‐Specific Major Waterbody Crossing Plan Minimum Scale: none Key Elements: all construction work areas to be cleared or disturbed, spoil storage locations, sediment control structures, waterbody boundaries, buffer zones/setbacks
For illustration purposes only. Examples can be found on eLibrary.
Site‐Specific HDD Crossing
Minimum Scale: none Key Elements: all construction work areas to be cleared or disturbed, mud pit locations, HDD entry and exit holes, staging areas, pipe assembly area
Page | 3‐30
Wetland Delineation Map Minimum Scale: none Key Elements: all project facilities, work areas, and access roads;
mileposts; wetland and waterbody boundaries and classification; survey corridor; temporary and permanent ROW
Hydrostatic Test Considerations
• Identify hydrostatic test water withdrawal sources and discharge locations
– Mainline and HDD segments
• Obtain relevant permits and approvals
– Water withdrawal and relocation permits
– Discharge permits
• Ensure adequate access is available to water sources
Agency approval is required for waterbodies designated as a public water supply, exceptional value water, or as Federally listed species habitat
Page | 3‐31
Other Considerations
• Compare proposed mitigation measures with FERC Procedures
–Identify and provide justification for any modifications
• Construction within floodplains
–Executive Order 11988
RR 3: Fish, Wildlife, and Vegetation
Photo credits: U.S. Fish and Wildlife Service
• Designated fisheries
• EFH and other significant habitats
• Special‐status species
Wildlife
• Habitat types
• Designated critical habitat
• Wildlife refuges, areas, and preserves
• Special‐status species
Vegetation
• Cover types
• Sensitive community types
• Special‐status species
Fish
18 CFR §380.12(e)
Page | 3‐32
Related Federal Acts
Endangered Species Act
• FERC will make an effects determination in coordination with the FWS and/or NMFS
• FWS Approvals under Section 7 of the ESA
– No letter of concurrence required for findings of “No Effect”
– Letter of concurrence for “May Affect, but Not Likely to Adversely Affect”
– Biological Opinion for “May Affect, and Likely to Adversely Affect” or “Jeopardy”
Photo credit: U.S. Fish and Wildlife Service
Related Federal Acts
Magnuson‐Stevens Act
• Federal protection of Essential Fish Habitat
• Requires submittal of
EFH
Assessment to the NMFS
Marine Mammal Protection Act
• Prohibits take and harassment of marine mammals
• Incidental Harassment / Take Authorization issued by the
NMFS
Bald and Golden Eagle Protection Act
• Prohibits take of eagles, including parts, nests, and eggs
• Permits authorizing the non‐ purposeful take of eagles are issued by the FWS
Page | 3‐33
Migratory Bird Treaty Act
• Prohibits taking, killing, possession, transportation, and/or importation of individual birds including their eggs and chicks and active nests
– Except when specifically authorized by the Department of Interior
• FWS is primary agency responsible for enforcement
Photo courtesy of: Natural Resource Group, LLC
Migratory Bird Impacts
• FERC/FWS Memorandum of Understanding (March 2011)
• Early coordination between the FERC (or applicant) and FWS should focus on:
– Species of concern
– Habitat loss
– Project‐specific plan to avoid and minimize impacts
Photo courtesy of: Leopoldo Miranda, FWS
Page | 3‐34
Data Collection
Field surveys are primary source for vegetation types, species presence, and/or suitable habitat
Federally listed species information, designated critical habitat, and survey protocols
• FWS
• NMFS
State listed and other sensitive species information
• Land management agencies
• State wildlife agencies
• Native American tribes
Impact Analysis
• Common vegetation, wildlife and fisheries
• Species of special concern
• State‐listed
• Federally listed (e.g., ESA, MMPA, BGEPA, MBTA)
• Other lists (e.g., FS, BLM, Tribes)
• Unique and sensitive habitats
• Designated critical habitat
• EFH
• Other federally protected lands
(e.g., WMA, NWR)
• Private conservation lands (e.g., Nature Conservancy, Ducks Unlimited)
• Direct, indirect, and cumulative impacts
• Take
• Habitat loss / conversion
• Noise
• Lighting
• Introduction of invasive species
• Measures proposed to avoid and/or minimize impacts
• Agency recommendations and coordination
Page | 3‐35
Sensitive Species Table
For illustration purposes only. Examples can be found on eLibrary.
Species Listing Status Counties with Potential to
Occur Presence Construction
RestrictionsCommon Name Scientific Name Fed State Other
Birds Marbled murrelet
Brachyramphus marmoratus
T T FS Clatsop Suitable nesting habitat;
nesting pair observed
Nesting season (May 15 ‐ Sep 30)
Mammals Columbian white‐tailed deer
Odocoileus virginianus leucurus
E E BLM Clatsop, Columbia
Suitable foraging habitat
None
Insects Fender's blue butterfly
Icaricia icarioides fenderi
E E n/a Yamhill Moderately suitable foraging habitat
Reintroduce host plant
Construction Window Restrictions
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Big game wintering range
Coldwater fisheries
Marbled murrelet nesting
Bald eagle nesting
Page | 3‐36
RR 4: Cultural Resources
C o n su lt at io n s
•SHPO
•THPO
•Indian Tribes
•Land management agencies
In ve st ig at io n s
•Area of potential effects
•Survey protocols and requirements
•Ethnography R e p o rt s an d P la n s
•Overview/ Survey Report
•Treatment Plan
•Unanticipated Discoveries Plan
Refer to FERC’s guidance document “Guidance for Reporting on Cultural Resources Investigations”, 18 CFR §380.12(f), and 36 CFR §800
Related Federal Authorizations
National Historic Preservation Act
• NRHP eligibility and effects determinations made by FERC in consultation with
– SHPO
– Land managing agencies
– Native American tribes
• Reports and plans
– Overview, Survey, and Evaluation Report
– Unanticipated Discoveries Plan
– Treatment Plan may be required if NRHP‐eligible resources will be affected
Page | 3‐37
Data Collection
Field surveys are primary data source
• Records searches
• Literature searches
• Databases
SHPO
• Consultations
Native American Tribes
RR 5: Socioeconomics
Each County Crossed
Population and Housing
Employment and Revenue
Infrastructure and
Transportation
Disadvantaged and Minority Communities
18 CFR §380.12(g)
Page | 3‐38
Data Collection
• U.S. Census Bureau
• U.S. Department of Labor
• State, county, and city
– Chamber of Commerce
– Government
Department of Tourism
Department of Education
– GIS data
Fire, police, hospitals
RR 6: Geological Resources
18 CFR §380.12(h)
• Geomorphologic and Geologic Conditions
- Regional and Site (Project) Specific Conditions
• Mineral Resources
- By Milepost that are Currently or Potentially Exploitable
• Paleontological Resources
• Blasting
• Investigations for Underground Storage Facilities
(Salt Caverns, Depleted Reservoirs, Aquifers)
• Geotechnical Investigations
- Hazardous Conditions
- LNG or HDDs
Page | 3‐39
Geologic Hazards
• Seismicity
‐ Peak Ground Acceleration (PGA) with 2% in 50 Years (above ground facilities; PGA with 10% in 50 Years (Pipeline facilities). See USGS Earthquake Hazard Program http://earthquake.usgs.gov/hazards/
• Holocene‐Age Faults ‐ See USGS Quaternary Fault and Fold Database of the United States at http://earthquake.usgs.gov/hazards/qfaults/
• Soil Liquefaction (potential for saturated (near‐surface water table, and loose sandy soil conditions combined with the potential for strong ground shaking)
• Identify the Susceptibility and Incidence of Landslides ‐ See http://landslides.usgs.gov/learning/nationalmap/
• Ground Subsidence and Karst
• Flooding and Storm Surge
Shallow Bedrock along the Proposed Pipeline Route where Blasting May Be Necessary
Pipeline Diameter/County
Milepost Crossing Length (feet)
Depth to Bedrock (inches)
Bedrock Type
Beginning Ending
30‐inch pipeline
Dodge 29.8 30.2 1824 24 Hard
30.2 30.2 202 30 Hard
30.4 30.4 181 24 Soft
31.9 32.2 1354 30 Hard
35.3 35.5 405 30 Hard
35.5 35.5 105 30 Hard
20‐inch Pipeline
Brown 84.5 84.5 315 15 Hard
93.1 93.1 84 30 Soft
Total 4470
Page | 3‐40
RR 7: Soils
• Location
• Characteristics & limitations
• Rare or unique soils, including prime farmland
Soils
• Describe proposed mitigation
• Compare to FERC Plan (identify differences)
• Justify modifications
Construction/ Restoration Methods
• Erosion and sediment control measures
• Seeding mixes and dates
• Application rates
• Invasive species
Agency Consultations
18 CFR §380.12(i)
Data Collection
• Databases
– STATSGO
– SSURGO
• NRCS field offices
• Department of Agriculture, Soil Survey Division
• State Farm Bureau
• State Department of Agriculture
Page | 3‐41
Soil Associations and Soil Limitations Table
Begin
MP
Exit
MP
Soil Series
Severe Erosion Potential
Severe Compaction Potential
Poor Revegetation Potential
Shallow Bedrock
Water Wind
0.0 0.5 Rusty fine sandy loam, 1 to 5 percent slopes
No No No No No
0.5 3.2 Betis loamy fine sand, 1 to 5 percent slopes
No Yes No Yes No
3.2 5.6 Briley loamy fine sand, 5 to 12 percent slopes
No Yes No No No
5.6 7.4 Portland silt loam No No Yes No No
7.4 7.6 Sacul fine sandy loam, 5 to 12 percent slopes
Yes No No No No
For illustration purposes only. Examples can be found on eLibrary.
Soil Summary Table
Pipeline/County Total
Acres in County
Prime Farm‐ land
Hydric Soils
Compact.
Prone
Highly Erodible Reveg.
Concerns Stony/ Rocky
Shallow to
BedrockWater Wind
30‐inch pipeline
Jefferson 28.8 18.4 9.5 16.6 0.0 0.0 0.0 0.0 0.0
Dodge 438.4 132.7 114.4 173.4 44.0 0.1 4.8 13.6 19.9
Brown 16.0 16.0 0.0 5.8 0.0 0.0 0.0 0.0 0.0
20‐inch pipeline
Brown 168.5 160.9 9.3 32.0 5.0 0.3 1.9 0.0 0.7
Outagamie 80.4 74.2 21.1 47.3 1.4 0.1 2.9 34.7 0.0
Pipeline Total 732.1 402.2 154.3 275.1 50.4 0.5 9.6 48.3 20.6
Page | 3‐42
RR 8: Land Use, Recreation, and Aesthetics
• Agricultural/ specialty crops
• Residential
• Industrial
• Forest
• Open
• Planned developments
• Coastal zone
• Conservation/ management areas
• Hazardous waste sites
• Native American religious sites and traditional cultural properties
• Parks
• Campgrounds
• Monuments
• Trails
• Golf courses
• Other special interest areas (e.g., wild and scenic rivers;
federal, state, local lands)
• Scenic drives
• Scenic rivers
• Visual resource management areas
18 CFR §380.12(j)
Additional Land Use Considerations
• Public lands
• Forest Service
• Bureau of Land Management
• Bureau of Reclamation
• Department of Defense
• Fish and Wildlife Service
• State lands (e.g., wildlife management areas)
• Conservation easements
• Conservation Reserve Program
• Wetland Reserve Program
• Floodplains
Page | 3‐43
Related Federal Authorizations
Coastal Zone Management Act
• Requires submittal of a Consistency Certification
• Consistency Determination issued by state
Photo credit: U.S. Fish and Wildlife Service
Data Collection Federal Resources
•Wild and Scenic Rivers Council
•NPS
•NRCS
•Land Management Agency RMPs
•State, county, and city government
•Planning and Building Department
•Department of Recreation
Local Resources
National Land Cover GIS data layer
Aerial photography
Page | 3‐44
Land Use Impacts Table
For illustration purposes only. Examples can be found on eLibrary.
Facility County, State Open Land Forest Agriculture Industrial Total
C O C O C O C O C O
Pipeline Facilities
Santa Clara, CA 78.2 46.9 15.4 13.6 10.2 4.0 12.6 9.8 116.4 74.3
San Mateo, CA 132.5 98.4 1.3 0.8 0.0 0.0 76.2 41.3 210 140.5
Subtotal 210.7 145.3 16.7 14.4 10.2 4.0 88.8 51.1 326.4 214.8
Aboveground Facilities
Tide M/R Station Santa Clara, CA 4.6 4.6 0.0 0.0 0.0 0.0 0.0 0.0 4.6 4.6
Lyon M/R Station San Mateo, CA 0.0 0.0 0.0 0.0 0.0 0.0 4.2 4.2 4.2 4.2
Subtotal 4.6 4.6 0.0 0.0 0.0 0.0 4.2 4.2 8.8 8.8
Extra Work Areas
Extra Workspaces Various 49.6 0.0 0.0 0.0 0.9 0.0 0.0 0.0 50.5 0.0
Pipe Storage /Contractor Yards
Various 72.3 0.0 0.0 0.0 0.0 0.0 39.8 0.0 112.1 0.0
Access Roads Various 10.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 10.0 0.0
Subtotal 131.9 0.0 0.0 0.0 0.9 0.0 39.8 0.0 172.6 0.0
Total 347.2 149.9 16.7 14.4 11.1 4.0 132.8 55.3 507.8 223.6