This document outlines the evaluation criteria for a solicitation seeking fire protection, emergency management, and emergency medical services. Key requirements include providing 24/7 coverage at Cape Canaveral Space Force Station, integrating various emergency response functions, proposed staffing plans to meet response time requirements, training programs for personnel, and a transition plan for assuming responsibilities within 45 days. Offerors will be evaluated on technical capability, past performance, and price. Technical capability factors include program management, personnel management, and proposed organizational structures. Past performance will be assessed for recency and relevancy. This will be a total small business set-aside solicitation to be posted on or around May 5, 2022 to provide these services for the Space Launch Delta 45 mission at Cape Canaveral Space Force Station.

View the file

Other files

Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Section M - Evaluation Factors for Award

M-1 SOURCE SELECTION

1.1. Basis for Contract Award: This is a best value source selection conducted in accordance with Federal Acquisition Regulation (FAR) 15.3, Source Selection, as supplemented by the Defense Federal Acquisition Regulation Supplement (DFARS), and the Air Force Federal Acquisition Regulation Supplement (AFFARS). These regulations are available electronically at the Air Force (AF) FAR Site, https://www.acquisition.gov/. The Government will select the best overall offer, based upon an integrated assessment of Technical Capability, Small Business Participation, and Price. The resulting contract will be awarded to the offeror who is deemed responsible in accordance with (IAW) the FAR, as supplemented, whose proposal conforms to the solicitation’s requirements (to include all stated terms, conditions, representations, certifications, and all other information required by Section L of this solicitation) and is judged, based on the evaluation factors and subfactors to represent the best value to the Government. The Government seeks to award to the offeror who best meets and/or exceeds the requirements. This may result in an award to a higher rated, higher priced offeror, where the decision is consistent with the evaluation factors, and the Source Selection Authority (SSA) reasonably determines that the technical capability and risk of the higher price offeror outweighs the cost difference. The SSA will base the source selection decision on an integrated assessment of proposals against all source selection criteria in the solicitation (described below). The Government source selection evaluation team and the SSA will strive for maximum objectivity, the source selection process, by its nature, is subjective; and therefore, professional judgment is implicit throughout the entire process.

To be eligible for award, the offeror’s proposal must be received timely and deemed responsive in that the proposal meets all requirements of the solicitation; conforms to all required terms and conditions; includes all required representations and certifications; and acknowledges all amendments, if applicable. Furthermore, offerors should ensure the requested information is Section L is included or updated as needed. An offeror’s proposal deemed non-responsive may not be evaluated further.

An offeror’s proposal deemed non-responsive may not be evaluated further.

1.2. Number of Contracts to Be Awarded: The Government intends to award one contract for the Fire Protection, Emergency Management, and Emergency Medical Services (FEMS IV). However, the Government reserves the right to not award a contract.

1.3. Discussions: If, during the evaluation period, it is determined to be in the best interest of the Government to hold discussions, offeror responses to Evaluation Notices (ENs) and the Final Proposal Revision (FPR) will be considered in making the source selection decision. If the offeror’s proposal has been evaluated as acceptable at the time discussions are closed, any changes or exceptions in the FPR are subject to evaluation and may introduce risk that the offeror’s proposal be determined unacceptable and ineligible for award.

M-2 EVALUATION FACTORS

The following evaluation factors and subfactors will be used to evaluate each proposal. Award will be made to the offeror proposing the most advantageous combination to the Government based upon an integrated assessment of the factors and subfactors described below.

Factor 1: Technical Capability
Subfactor 1: Program Management

Subfactor 2: Management of Personnel

Factor 2: Past Performance
Factor 3: Price

2.1. Factor 1: Technical Capability. The Technical evaluation provides for distinct evaluation of Combined Technical/Risk Rating. The Combined Technical/Risk rating includes consideration of technical approach and risk in conjunction with the strengths, weaknesses, significant weaknesses,and deficiencies in determining technical ratings. Technical Capability evaluations shall utilize the ratings listed in Table 2.1(a) Combined Technical/Risk Rating Method Ratings. Technical Capability subfactors are of equal importance. Non-price factors when combined are significantly more important than Price.

2.1.1. Combined Technical/Risk Rating: Each Technical Capability subfactor will receive one of the color ratings described Table 2.1(a) – Combined Technical/Risk Rating Method Ratings Description. The rating focuses on the strengths and deficiencies of the offeror's proposal.

The purpose of the Technical/Risk Rating is to assess technical approach and the risk of the proposed technical approach. A “strength” is an aspect of an offeror's proposal that has merit or exceeds specified performance or capability requirements in a way that will be advantageous to the Government during contract performance. A “deficiency” is a material failure of a proposal to meet a Government requirement or a combination of significant weaknesses in a proposal that increases the risk of unsuccessful contract performance to an unacceptable level. For each subfactor within the Technical Capability Factor, the Government may assign weaknesses or significant weaknesses. “Weakness” means a flaw in the proposal that increases the risk of unsuccessful contract performance. “Significant weakness” in the proposal is a flaw that appreciably increases the risk of unsuccessful contract performance. The identification of risks will result in either a weakness or significant weakness.

A “risk,” as it pertains to source selection, is the potential for unsuccessful contract performance. The consideration of risk assesses the degree to which an offeror’s proposed approach to achieving the technical subfactors may involve risk of disruption of schedule, degradation of performance, the need for increased Government oversight, and the likelihood of unsuccessful contract performance.

The color rating depicts how well the offeror’s proposal meets the Combined Technical/Risk subfactor requirements. Subfactor ratings shall not be rolled up into an overall color rating for the Technical Capability factor. In arriving at a best value decision, the Government reserves the right to give positive consideration, for performance in excess of Statement of Work (SOW) requirements, which may be used as a tradeoff for a higher cost proposal.

Table 2.1(a) - Combined Technical/Risk Rating Method Ratings

Color Rating
Adjectival Rating

Description

Blue

Outstanding
Proposal indicates an exceptional approach and understanding of the requirements and contains multiple strengths, and risk of unsuccessful performance is low.
Purple
Good
Proposal indicates a thorough approach and understanding of the requirements and contains at least one strength, and risk of unsuccessful performance is low to moderate.
Green
Acceptable
Proposal meets requirements and indicates an adequate approach and understanding of the requirements, and risk of unsuccessful performance is no worse than moderate.
Yellow
Marginal
Proposal has not demonstrated an adequate approach and understanding of the requirements, and/or risk of unsuccessful performance is high.
Red
Unacceptable
Proposal does not meet requirements of the solicitation, and thus, contains one or more deficiencies, and/or risk of unsuccessful performance is unacceptable. Proposal is unawardable.

2.1.2. Subfactor 1: Program Management. The proposed methodology shall demonstrate a sound, rational, effective, and efficient approach to Program Management. This subfactor evaluates:

2.1.2.1. The proposed ability to effectively integrate Fire Emergency Service (FES), Emergency Management (EM), and Emergency Medical Services (EMS) response IAW SOW Section 1.

2.1.2.2. The proposed ability to effectively interface with Patrick SFB (PSFB) Office of Emergency Management (OEM), Brevard County OEM, Kennedy Space Center, Space Launch Delta 45, the PSFB Fire Department and the FEMS IV Program Management Directorate.

2.1.2.3. The proposed organizational chart depicting the organization functions to be performed IAW the SOW. The detailed organizational chart depicted the offeror’s organizational structure for all FES, EM, and EMS positions to include the EMS Director. Identified the reporting chain for daily operations and mission events. Identified which positions are considered key personnel and which are subcontractor positions.

2.1.2.4. The proposed position description(s) of the FES section managers to include a brief description of qualifications (DOD/IFSAC/Pro-Board certificates are sufficient for FES personnel) IAW DODM 6055.06.

2.1.2.5. The proposed position description(s) of the EM key personnel to include the qualifications and the functions assigned. Include a narrative description of how offeror’s proposed organization will interface with team members, other range contractors, the PSFB OEM, Brevard County OEM, Local Emergency Planning Council, Kennedy Space Center, and the FEMS IV Program Management Directorate IAW SOW Section 1 and Section 1.14.

2.1.2.6. The proposed position description(s), qualifications and functions assigned to the EMS key personnel, including an EMS Director IAW SOW Section 1 and Section 1.9.8.

2.1.2.7. The proposed Phase-In/Transition Plan not to exceed 45 days.

2.1.2.7.1. A list of required contractor provided equipment, to include description and quantity, necessary to meet SOW requirements.

2.1.2.7.2. The proposed approach for the 45-day Phase-In Plan IAW SOW Paragraph 4.1 and supporting documentation. Describe approach on how the contractor will use the Phase–In time to assume full operational capability prior to full contract performance.

2.1.2.7.3. The proposed initial staffing and how it will increase over the Phase-In period. Include personnel Phase-In by time and labor category, and how the “full” staffing level will be attained within the 45-days. Describe employee training/orientation activities and plan for acquiring necessary security clearances prior to assumption of full responsibilities of contract requirements.

2.1.3. Subfactor 2: Management of Personnel. The proposed methodology shall demonstrate a sound, rational, effective, and efficient approach to Management of Personnel. This subfactor evaluates:

2.1.3.1. Personnel/Staffing. The proposed staffing approach in numbers and labor categories (skill mixes) IAW SOW Section 1.9.

2.1.3.2. The proposed chart showing proposed number of shifts and number of personnel per shift for staffing IAW paragraph 1.9 of the SOW to fully staff each fire station/position for day-to-day operations to meet response times (24/7) to all areas of Cape Canaveral Space Force Station.

2.1.3.3. The proposed overall training approach (initial and recurring) that addresses contractor and subcontractor employees and ensures the workforce is technically qualified to meet the SOW requirements in paragraph 1.10.

2.1.3.4. The proposed description of the offeror’s approach to validate and track all required personnel training, qualifications, certifications and licenses for FES, EM and EMS IAW SOW sections 1.9, 1.10 and 1.14.

2.1.3.5 The proposed approach to ensure standards of care will be followed on medical responses IAW Brevard County protocols and Florida State Statutes as specified SOW section 1.9.8.

2.1.3.6. The proposed description of the offeror’s experience and effectiveness in resolving day- to-day union and labor relation issues.

2.1.3.7. The proposed detailed description of the offeror’s contingency plan for continuing contract performance in the event of a labor strike or personnel shortage IAW SOW Section 1.

2.1.3.8. The proposed description to maintain a qualified Emergency Operations Center (EOC) Manager and qualified Emergency Management Analyst(s) for 24 hour operations for extended periods up to seven days IAW SOW Paragraph 1.14.

2.2. FACTOR 2: PAST PERFORMANCE. The past performance assessment will assess the offeror’s/joint venture members’ ability (which includes, if applicable, the extent of its critical subcontractors’ involvement) to successfully accomplish the proposed effort based on the offeror’s demonstrated present and past work record. A critical subcontractor is defined as an entity (subcontractor and/or teaming contractor), other than the offeror itself, that will perform critical elements, to include fire protection, emergency management, and/or emergency medical services. The Government will evaluate the offeror’s/joint venture members’ and if applicable, the critical subcontractors’ demonstrated record of contract compliance in supplying products and services that meet users’ needs, including cost and schedule. The recency and relevancy of the information, the source of the information, context of the data and general trends in the contractor’s performance will be considered. For purposes of this evaluation, recency is defined as active or completed efforts performed within the past five (5) years from the issuance date of this solicitation. The Government will take into account past performance information regarding predecessor companies (if used), affiliates, other divisions, or corporate management if such was provided for evaluation and if the offeror’s past performance volume demonstrates the company, affiliate, or division will provide the offeror with resources for the instant proposed effort, such as workforce, management, facilities, or other capabilities demonstrating direct and meaningful involvement in the performance of the proposed instant effort.

2.2.1. Past Performance Assessment: In assessing present and past performance, the Government will employ several approaches, including, but not limited to:

2.2.1.1. Other Sources of Information: Pursuant to FAR 15.305(a)(2)(ii), the Past Performance Team evaluation is not limited to review of the information provided in the offeror’s Present/Past Performance volume. Present/Past performance information may be obtained from the Government’s Federal Awardee Performance and Integrity Information System (FAPIIS), Contractor Performance Assessment Reporting System (CPARS), and the Past Performance Information Retrieval System (PPIRS). The Government reserves the right to use performance information from other sources such as Defense Contract Management Agency (DCMA), Fee Determining Officials, or commercial sources. Data from previous source selections may be used if the data is recent and relevant.

2.2.1.2. Adverse Past Performance: Offerors shall be given an opportunity to address adverse past performance information if the offeror, joint venture member and/or critical subcontractor has not had a previous opportunity to respond to the information. Recent contracts will be examined to ensure that corrective measures have been implemented. The past performance evaluation assessment will consider issues including but not limited to the number and severity of the problems, the appropriateness and/or effectiveness of any corrective actions taken (not just planned or promised), and the overall work record. Prompt corrective action in isolated instances may not outweigh overall negative trends.

2.2.1.3. Critical Subcontractors: The evaluation of the offeror’s/joint venture members’ present/past performance WILL NOT include the present/past performance of any subcontractor(s).

2.2.1.4. Key Personnel: For offerors/joint venture members or critical subcontractors that are newly formed entities (in existence less than three (3) years from the issuance date of this solicitation) who either have no prior contracts or do not possess relevant corporate past performance, but have key personnel with relevant past performance while employed by another company, the quality of such key personnel’s performance as verified by the Past Performance Team will be considered if the submitted contract involves the key personnel performing the same role currently being proposed on the instant acquisition and this performance occurred during the past three (3) years from the issuance date of this solicitation. Any such key personnel must already be employed by the offeror/joint venture member, or in the case of a critical subcontractor, must already be employed by the critical subcontractor. Offerors are reminded that a letter of intent to hire does not constitute employment.

2.2.2. Recency Definition: An evaluation of each past performance information citation will be completed to determine if the project is recent. To be determined recent, a project must be ongoing or completed within the past five (5) years from the date of solicitation issuance.This includes projects awarded prior to this period, but still had performance during the recency timeframe. Past performance information will be given a recency rating in accordance with Table 2.2.2.(a). Recency Evaluation Method.

Table 2.2.2.(a). Recency Evaluation Method

RATING
DESCRIPTION
Recent
A project must be ongoing or completed within the past five (5) years from the date of solicitation issuance.
Not Recent
A project that is not ongoing or completed within the past five (5) years from the date of solicitation issuance.

Past performance information that is not recent will not be evaluated further.

2.2.3. Relevancy Definitions: The Government will perform an independent determination of relevancy of the data provided and/or obtained. A relevancy determination will be made for each Past and Present Performance contract that has met the recency criteria. The Government is not bound by the offeror’s opinion of relevancy. The Statement of Work will be utilized to determine the relevancy of the work performed on Past and Present contracts to include but not limited to all aspects of performance that relate to this acquisition may be considered. Offeror will be given a relevancy rating in accordance with Table 2.2.3.(a). Past Performance Relevancy Rating Method:

Table 2.2.3.(a) Past Performance Relevancy Rating Method

Adjectival Rating
Description
Very Relevant
Present/past performance effort involved essentially the same scope and magnitude of effort and complexities this solicitation requires.
Relevant
Present/past performance effort involved similar scope and magnitude of effort and complexities this solicitation requires
Somewhat Relevant
Present/past performance effort involved some of the scope and magnitude of effort and complexities this solicitation requires.
Not Relevant
Present/past performance effort involved little or none of the scope and magnitude of effort and complexities this solicitation requires.

2.2.4. Past Performance Evaluation Ratings: As a result of the recency, relevancy and quality assessments of the contracts evaluated, one of the ratings as described in the DoD Source Selection Procedures will be assigned to the Past Performance factor. The performance confidence assessment ratings are excerpted below in Table 2.2.4.(a). Performance Confidence Assessments Rating Method

Table 2.2.4.(a) Performance Confidence Assessments Rating Method

Adjectival Rating
Description
Substantial Confidence
Based on the offeror’s recent/relevant performance record, the Government has a high expectation that the offeror will successfully perform the required effort.
Satisfactory Confidence
Based on the offeror’s recent/relevant performance record, the Government has a reasonable expectation that the offeror will successfully perform the required effort.
Neutral Confidence
No recent/relevant performance record is available or the offeror’s performance record is so sparse that no meaningful confidence assessment rating can be reasonably assigned. The offeror may not be evaluated favorably or unfavorably on the factor of past performance.
Limited Confidence
Based on the offeror’s recent/relevant performance record, the Government has a low expectation that the offeror will successfully perform the required effort.
No Confidence
Based on the offeror’s recent/relevant performance record, the Government has no expectation that the offeror will be able to successfully perform the required effort.

Note: In the case of an offeror without a record of relevant past performance or for whom information on past performance is not available or is so sparse that no meaningful past performance rating can be reasonably assigned, the offeror may not be evaluated favorably or unfavorably on past performance (see FAR 15.305(a)(2)(iv)). Therefore, the offeror shall be determined to have unknown past performance and will be assigned a performance confidence rating of “Neutral”. A strong record of relevant past performance may be considered more advantageous to the Government than a “Neutral Confidence” rating.

2.3. FACTOR 3: PRICE. The price shall be complete, reasonable, and balanced. The Government reserves the right to eliminate an offeror from competition if unreasonable. Offerors whose price is determined to be incomplete, unreasonable and/or unbalanced may not be considered for award.

If the CO determines the offeror non-responsible, the CO will comply with FAR Subpart 19.6, Certificate of Competency and Determination of Responsibility.

2.3.1. Complete: The Government will evaluate completeness of the offeror’s submitted Vol. III - Price. Any proposal which fails to conform to the requirements or specification in the solicitation may be considered ineligible for award. Proposals should be complete and clear and not require additional explanation of information. The Government may make a final determination as to whether a proposal is acceptable or unacceptable based solely on the proposal as presented and submitted.

2.3.2. Reasonable: The offeror’s price proposal will be evaluated to ensure it is fair and reasonable, pursuant to FAR 15.404. Reasonableness will be based on an evaluation of the offeror’s Total Evaluated Price (TEP). The TEP will be the total/sum of all proposed prices for separately priced line items CLINS 0001, 1001-1005, 2001-2005, 3001-3005, 4001-4005, 5001-5005, 6001-6005 (option to extend services). For additional information, see FAR 31.201-3. The evaluation techniques described under FAR 15.404-1(c), as determined appropriate, may also be performed in further determining the reasonableness of the proposal.

2.3.3. Balanced: Offerors are cautioned against submitting an offer that contains unbalanced pricing. Unbalanced pricing may increase performance risk and could result in payment of unreasonably high prices. Unbalanced pricing exists when, despite an acceptable total evaluated price, the price of one or more contract line items is significantly over or understated as indicated by the application of price analysis techniques. The Government shall analyze offers to determine whether they are unbalanced with the respect to separately priced line items. An offer may be rejected if the Procuring Contracting Officer (PCO) determines that the lack of balance poses an unacceptable risk to the Government.