Fee Proposal Worksheet Livestock Final.xlsx
XLSX spreadsheet 26 KB Posted
- Attached to
- Agricultural Livestock Facility Renovation
- Solicitation number
- PE-55761-NONST-2024-000000003
- Issued by
- Wilcox County, Georgia
About this file
The document provided is a Fee Proposal Worksheet related to a Design-Build project to renovate an existing multipurpose building and create a new livestock facility for the Wilcox County Board of Education in Georgia. The project includes demolition of existing buildings, renovation of the existing space to include a kitchen/dining area, show area, bathroom facilities and small concessions and dressing rooms, as well as the construction of a new covered addition between 4,000 and 6,000 square feet to serve as an animal holding area. The project duration is 10 months.
The worksheet provides detailed estimates for pre-construction and construction phase labor costs, overhead costs and expenses, as well as the design-builder's fee. The GMP (Guaranteed Maximum Price) Cost Limitation for the project is $3,300,000. The worksheet requests the proposer to provide a detailed itemization of the proposed General Conditions Costs.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| WCBOE LIvestock RFP Final (1).pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Pre-Construction Phase
| PRE-CONSTRUCTION PHASE LABOR COSTS | |||||
| Job Title | Hourly Rate | Est. Hours | Total | Notes | |
| 1 | Preconstruction Manager | $0.00 | |||
| 2 | Estimator | $0.00 | |||
| 3 | Clerical | $0.00 | |||
| 4 | $0.00 | ||||
| 5 | $0.00 | ||||
| 6 | $0.00 | ||||
| 7 | $0.00 | ||||
| 8 | $0.00 | ||||
| PRE-CONSTRUCTION PHASE LABOR COSTS TOTAL | $0.00 |
| PRE-CONSTRUCTION PHASE OVERHEAD COSTS AND EXPENSES | |||||
| Description | Number of Units | Unit (Lump | |||
| Sum, Day, Month, etc.) | Cost per Unit | Total | Notes | ||
| 1 | Office Supplies | $0.00 | |||
| 2 | Postage & Shopping | $0.00 | |||
| 3 | Blue Prints/Copies | $0.00 | |||
| 4 | Phone Charges | $0.00 | |||
| 5 | Courier Service | $0.00 | |||
| 6 | Travel Expenses | $0.00 | |||
| 7 | $0.00 | ||||
| 8 | $0.00 | ||||
| 9 | $0.00 | ||||
| 10 | $0.00 | ||||
| 11 | $0.00 | ||||
| PRE-CONSTRUCTION PHASE OVERHEAD COSTS AND EXPENSES TOTAL | $0.00 |
| FEE, IF ANY (IN DOLLARS) | |
| TOTAL PRE-CONSTRUCTION PHASE SUM | $ 0.00 |
Construction Phase
| CONSTRUCTION PHASE LABOR COSTS* | ||||||
| Job Title | Hourly | |||||
| Rate** | Est. % on | |||||
| Project | Monthly | |||||
| Rate** | Duration | |||||
| (months)*** | Total**** | Notes | ||||
| 1 | $0.00 | |||||
| 2 | $0.00 | |||||
| 3 | $0.00 | |||||
| 4 | $0.00 | |||||
| 5 | $0.00 | |||||
| 6 | $0.00 | |||||
| 7 | $0.00 | |||||
| 8 | $0.00 | |||||
| 9 | $0.00 | |||||
| 10 | $0.00 | |||||
| 11 | $0.00 | |||||
| 12 | $0.00 | |||||
| 13 | $0.00 | |||||
| 14 | $0.00 | |||||
| 15 | $0.00 | |||||
| 16 | $0.00 | |||||
| 17 | $0.00 | |||||
| 18 | $0.00 | |||||
| CONSTRUCTION PHASE LABOR COSTS TOTAL | $ 0.00 | |||||
| * All Design-Builder’s (construction) employees performing Basic Services shall be listed in Labor Costs. | ||||||
| ** Design-Builder shall attach a detailed itemization of the components of the labor burden | ||||||
| ***A Project Manager or Superintendent must be present to supervise completion of all Punchlist Items. Proposer should include Labor Costs for this supervision which is required after Material Completion. | ||||||
| ****Total calculates as Est. % on Project multipled by Monthly Rate multiplied by Duration. | ||||||
| CONSTRUCTION PHASE OVERHEAD COSTS AND EXPENSES | ||||||
| Description | Number of Units | Unit (Lump | ||||
| Sum, Day, Month, etc.) | Cost per Unit | Total | Notes | |||
| 1 | Field Office Trailer | $0.00 | ||||
| 2 | Field Office Set-Up | $0.00 | ||||
| 3 | CCS Trailer (if not housed with CM) | $0.00 | ||||
| 4 | CCS Trailer Set-Up | $0.00 | ||||
| 5 | Temp Toilet/Holding Tank for Trailer(s) | $0.00 | ||||
| 6 | Temp Power for Trailer(s) | $0.00 | ||||
| 7 | Temp Power Installation for Trailer(s) | $0.00 | ||||
| 8 | Temp Water for Trailer(s) | $0.00 | ||||
| 9 | Temp Water Installation for Trailer(s) | $0.00 | ||||
| 10 | Telephone for Trailer(s) | $0.00 | ||||
| 11 | Telephone Installation for Trailer(s) | $0.00 | ||||
| 12 | Internet for Trailer(s) | $0.00 | ||||
| 13 | Internet Installation for Trailer(s) | $0.00 | ||||
| 14 | Cleaning for Trailer(s) | $0.00 | ||||
| 15 | Furniture for Trailer(s) | $0.00 | ||||
| 16 | Machines & Equipment for Trailer(s) | $0.00 | ||||
| 17 | Supplies for Trailer(s) | $0.00 | ||||
| 18 | Water for Consumption for Trailer(s) | $0.00 | ||||
| 19 | Postage & Shipping | $0.00 | ||||
| 20 | Reproduction of Plans & Specs | $0.00 | ||||
| 21 | Progress Photos | $0.00 | ||||
| 22 | Owner Project Identification Signs | $0.00 | ||||
| 23 | Mobile Phones | $0.00 | ||||
| 24 | Project Vehicles | $0.00 | ||||
| 25 | Fuel for Project Vehicles | $0.00 | ||||
| 26 | Travel/Lodging | $0.00 | ||||
| 27 | Computers | $0.00 | ||||
| 28 | Payment & Performance Bond | $0.00 | ||||
| 29 | Builder's Risk Insurance | $0.00 | ||||
| 30 | Liability Insurance | $0.00 | ||||
| 31 | $0.00 | |||||
| 32 | $0.00 | |||||
| 33 | $0.00 | |||||
| 34 | $0.00 | |||||
| 35 | $0.00 | |||||
| 36 | $0.00 | |||||
| 37 | $0.00 | |||||
| 38 | $0.00 | |||||
| 39 | $0.00 | |||||
| 40 | $0.00 | |||||
| 41 | $0.00 | |||||
| 42 | $0.00 | |||||
| 43 | $0.00 | |||||
| 44 | $0.00 | |||||
| 45 | $0.00 | |||||
| 46 | $0.00 | |||||
| 47 | $0.00 | |||||
| 48 | $0.00 | |||||
| 49 | $0.00 | |||||
| 50 | $0.00 | |||||
| CONSTRUCTION PHASE OVERHEAD COSTS AND EXPENSES TOTAL | $0.00 |
CONSTRUCTION PHASE GENERAL CONDITIONS TOTAL $ 0.00
Cover Page
| EXHIBIT E | |
| DESIGN-BUILDER’s GENERAL CONDITIONS AND FEE PROPOSAL | |
| DESIGN FEE | |
| DESIGN | |
| CONTRACT ADMINISTRATION | |
| SUB-TOTAL | $0.00 |
| DESIGN-BUILDER’S PRE-CONSTRUCTION SUM | |
| LABOR | $0.00 |
| OVERHEAD COSTS AND EXPENSES | $0.00 |
| FEE (IF Any) | $0.00 |
| PRE-CONSTRUCTION SUM | $ 0.00 |
| Design-Builder shall propose its General Conditions Costs and Fee (if any) for Pre-Construction Phase Services. Upon acceptance by Owner, these costs shall be converted into a lump sum amount, the Pre-Construction Sum, to be paid upon completion of certain Pre-Construction Phase Milestones without the need to prove actual costs incurred. | |
| DESIGN-BUILDER’S CONSTRUCTION PHASE GENERAL CONDITIONS COSTS | |
| LABOR | $0.00 |
| OVERHEAD COSTS AND EXPENSES | $0.00 |
| SUB-TOTAL | $0.00 |
| DESIGN-BUILDER FEE | |
| DESIGN-BUILDER FEE PERCENTAGE | |
| DESIGN-BUILDER FEE AMOUNT | $ 0.00 |
| The Construction Phase Fee Amount is calculated by multiplying the Construction Phase Fee Percentage by the result obtained when the Design Fee Sub-total and the Preconstruction Sum are subtracted from the GMP Cost Limitation and the result is divided by the sum of 1 plus the Construction Phase Fee Percentage. CPFee = CPFee% x [(GMPCL - Design Fee - PreCon Sum)/(1 + CPFee%)] | |
| TOTALS | |
| GMP COST LIMITATION | $3,300,000.00 |
| TOTAL DESIGN FEE, PRE-CONSTRUCTION PHASE SUM, |
CONSTRUCTION PHASE GENERAL CONDITIONS COSTS, AND
| DESIGN-BUILDER FEE | $0.00 | ||
| PERCENTAGE OF PROJECT | 0.00% | ||
| Proposers must attach a detailed itemization of the proposed General Conditions Costs in the format attached |
hereto.
| Project Name: | Wilcox County BOE Livestock Renovation |
| Proposer (Company): | |
| Name: | |
| Date: |