Fee Proposal Worksheet Livestock Final.xlsx

XLSX spreadsheet 26 KB Posted

Attached to
Agricultural Livestock Facility Renovation
Solicitation number
PE-55761-NONST-2024-000000003
Issued by
Wilcox County, Georgia

About this file

The document provided is a Fee Proposal Worksheet related to a Design-Build project to renovate an existing multipurpose building and create a new livestock facility for the Wilcox County Board of Education in Georgia. The project includes demolition of existing buildings, renovation of the existing space to include a kitchen/dining area, show area, bathroom facilities and small concessions and dressing rooms, as well as the construction of a new covered addition between 4,000 and 6,000 square feet to serve as an animal holding area. The project duration is 10 months.

The worksheet provides detailed estimates for pre-construction and construction phase labor costs, overhead costs and expenses, as well as the design-builder's fee. The GMP (Guaranteed Maximum Price) Cost Limitation for the project is $3,300,000. The worksheet requests the proposer to provide a detailed itemization of the proposed General Conditions Costs.

View the file

Other files

File Type Posted
WCBOE LIvestock RFP Final (1).pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Pre-Construction Phase

PRE-CONSTRUCTION PHASE LABOR COSTS
Job TitleHourly RateEst. HoursTotalNotes
1Preconstruction Manager$0.00
2Estimator$0.00
3Clerical$0.00
4$0.00
5$0.00
6$0.00
7$0.00
8$0.00
PRE-CONSTRUCTION PHASE LABOR COSTS TOTAL$0.00
PRE-CONSTRUCTION PHASE OVERHEAD COSTS AND EXPENSES
DescriptionNumber of UnitsUnit (Lump
Sum, Day, Month, etc.)Cost per UnitTotalNotes
1Office Supplies$0.00
2Postage & Shopping$0.00
3Blue Prints/Copies$0.00
4Phone Charges$0.00
5Courier Service$0.00
6Travel Expenses$0.00
7$0.00
8$0.00
9$0.00
10$0.00
11$0.00
PRE-CONSTRUCTION PHASE OVERHEAD COSTS AND EXPENSES TOTAL$0.00
FEE, IF ANY (IN DOLLARS)
TOTAL PRE-CONSTRUCTION PHASE SUM$ 0.00

Construction Phase

CONSTRUCTION PHASE LABOR COSTS*
Job TitleHourly
Rate**Est. % on
ProjectMonthly
Rate**Duration
(months)***Total****Notes
1$0.00
2$0.00
3$0.00
4$0.00
5$0.00
6$0.00
7$0.00
8$0.00
9$0.00
10$0.00
11$0.00
12$0.00
13$0.00
14$0.00
15$0.00
16$0.00
17$0.00
18$0.00
CONSTRUCTION PHASE LABOR COSTS TOTAL$ 0.00
* All Design-Builder’s (construction) employees performing Basic Services shall be listed in Labor Costs.
** Design-Builder shall attach a detailed itemization of the components of the labor burden
***A Project Manager or Superintendent must be present to supervise completion of all Punchlist Items. Proposer should include Labor Costs for this supervision which is required after Material Completion.
****Total calculates as Est. % on Project multipled by Monthly Rate multiplied by Duration.
CONSTRUCTION PHASE OVERHEAD COSTS AND EXPENSES
DescriptionNumber of UnitsUnit (Lump
Sum, Day, Month, etc.)Cost per UnitTotalNotes
1Field Office Trailer$0.00
2Field Office Set-Up$0.00
3CCS Trailer (if not housed with CM)$0.00
4CCS Trailer Set-Up$0.00
5Temp Toilet/Holding Tank for Trailer(s)$0.00
6Temp Power for Trailer(s)$0.00
7Temp Power Installation for Trailer(s)$0.00
8Temp Water for Trailer(s)$0.00
9Temp Water Installation for Trailer(s)$0.00
10Telephone for Trailer(s)$0.00
11Telephone Installation for Trailer(s)$0.00
12Internet for Trailer(s)$0.00
13Internet Installation for Trailer(s)$0.00
14Cleaning for Trailer(s)$0.00
15Furniture for Trailer(s)$0.00
16Machines & Equipment for Trailer(s)$0.00
17Supplies for Trailer(s)$0.00
18Water for Consumption for Trailer(s)$0.00
19Postage & Shipping$0.00
20Reproduction of Plans & Specs$0.00
21Progress Photos$0.00
22Owner Project Identification Signs$0.00
23Mobile Phones$0.00
24Project Vehicles$0.00
25Fuel for Project Vehicles$0.00
26Travel/Lodging$0.00
27Computers$0.00
28Payment & Performance Bond$0.00
29Builder's Risk Insurance$0.00
30Liability Insurance$0.00
31$0.00
32$0.00
33$0.00
34$0.00
35$0.00
36$0.00
37$0.00
38$0.00
39$0.00
40$0.00
41$0.00
42$0.00
43$0.00
44$0.00
45$0.00
46$0.00
47$0.00
48$0.00
49$0.00
50$0.00
CONSTRUCTION PHASE OVERHEAD COSTS AND EXPENSES TOTAL$0.00

CONSTRUCTION PHASE GENERAL CONDITIONS TOTAL $ 0.00

Cover Page

EXHIBIT E
DESIGN-BUILDER’s GENERAL CONDITIONS AND FEE PROPOSAL
DESIGN FEE
DESIGN
CONTRACT ADMINISTRATION
SUB-TOTAL$0.00
DESIGN-BUILDER’S PRE-CONSTRUCTION SUM
LABOR$0.00
OVERHEAD COSTS AND EXPENSES$0.00
FEE (IF Any)$0.00
PRE-CONSTRUCTION SUM$ 0.00
Design-Builder shall propose its General Conditions Costs and Fee (if any) for Pre-Construction Phase Services. Upon acceptance by Owner, these costs shall be converted into a lump sum amount, the Pre-Construction Sum, to be paid upon completion of certain Pre-Construction Phase Milestones without the need to prove actual costs incurred.
DESIGN-BUILDER’S CONSTRUCTION PHASE GENERAL CONDITIONS COSTS
LABOR$0.00
OVERHEAD COSTS AND EXPENSES$0.00
SUB-TOTAL$0.00
DESIGN-BUILDER FEE
DESIGN-BUILDER FEE PERCENTAGE
DESIGN-BUILDER FEE AMOUNT$ 0.00
The Construction Phase Fee Amount is calculated by multiplying the Construction Phase Fee Percentage by the result obtained when the Design Fee Sub-total and the Preconstruction Sum are subtracted from the GMP Cost Limitation and the result is divided by the sum of 1 plus the Construction Phase Fee Percentage. CPFee = CPFee% x [(GMPCL - Design Fee - PreCon Sum)/(1 + CPFee%)]
TOTALS
GMP COST LIMITATION$3,300,000.00
TOTAL DESIGN FEE, PRE-CONSTRUCTION PHASE SUM,

CONSTRUCTION PHASE GENERAL CONDITIONS COSTS, AND

DESIGN-BUILDER FEE$0.00
PERCENTAGE OF PROJECT0.00%
Proposers must attach a detailed itemization of the proposed General Conditions Costs in the format attached

hereto.

Project Name:Wilcox County BOE Livestock Renovation
Proposer (Company):
Name:
Date:

File details come from the government source that posted it. Updated .