About this file
This is a Notice to Contractors issued by the South Carolina Department of Transportation (SCDOT) for a highway construction project consisting of road improvements including milling, full-depth asphalt paving, and shoulder work. The project, identified as Call No. 080, is located in Dorchester County and spans approximately 17.43 miles. Work items include mobilization, bonds and insurance, excavation, full-depth reclamation, asphalt paving courses, pavement markings, sidewalk construction, and permanent grassing, with quantities ranging from 1 lump sum mobilization to 277,352 square yards of milling existing asphalt pavement at 1.75 inches. Electronic bids will be publicly opened on September 9, 2026, at 2:00 p.m. at SCDOT Headquarters in Columbia, South Carolina. Proposal bid forms and construction documents are available on the Bid Express website (www.bidx.com) and the Construction Extranet beginning August 9, 2026, with hard-copy plans and proposals available through Engineering Publications for a fee. The project completion date is June 30, 2028, and contractors must hold a valid SCDOT prequalification certificate to submit bids.
Bidders are required to submit a bid bond equal to 5% of the approximate bid amount in accordance with SCDOT Form 674 through the BidX electronic system. The project has a 0.00% Disadvantaged Business Enterprise (DBE) goal and is funded through state transportation funds. All Federal-Aid projects are subject to Title VI of the Civil Rights Act of 1964, the Fair Labor Standards Act of 1938, and the Work Hours and Safety Act of 1962. Minimum wage rates for the contract have been predetermined by the Secretary of Labor in accordance with the Davis Bacon Act, and contractors must comply with equal employment opportunity requirements. The department reserves the right to reject any or all proposals and waive any technicalities. Quantities shown are approximate and subject to change without notice. Contractors should contact the Contract Administration Office at (803) 737-7469 with questions regarding the letting.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION
NOTICE TO CONTRACTORS
For September 09, 2026
Letting Location:
SCDOT Headquarters Building
Conference Room 331 955 Park Street, Columbia, SC
Electronic Bids for the contracts listed herein will be publicly opened. All bid totals will be printed and posted on the SCDOT web site, Bid Express, and the Construction Extranet immediatley after bids are opened.
The following items will be made available on August 9, 2026 unless otherwise noted:
• Proposal bid forms on the Bid Express website (www.bidx.com)
• Construction Standards can be found under Business via SCDOT web site (www.scdot.org)
Access the Construction Extranet (https://www.scdot.org/business/constructionletting-extranet.aspx). for the following items:
• Proposals
• Plans
• Announcements
• Bids as Received
• CPM Schedule Templates
• Contractor Discussin Board
Contractors are encouraged to utilize the Discussion Board to make contact with other Prime and Subcontractors to request/offer quotes. There is no charge to access this site, but you must register for a user name and password.
Certain projects will require bidders to have a minimum quarterly CPS (Contractor Performance Score) issued by SCDOT. These projects will be noted accordingly to include the minimum score and quarter issued. Contractors wishing to verify their CPS may call SCDOT Construction Data Support at (803)737- 2031.
Hardcopy plans and proposals are available via Engineering Publications:
o Printed upon request only, call ahead for pickup orders o Located in room G23 SCDOT Headquarters o Email PlanStorage@scdot.org /Phone (803)737-4533/ Fax (803)737-4530 o Proposals are $15 and Plans are $2 per sheet o Cash, check, money order, VISA/MC accepted payable to SCDOT (No refunds) o Contractors do not have to buy plans to be able to bid o The Voluntary Plan Holders List is available on BIDX.
Please contact the Contract Administration Office at (803)737-7469 with all Letting related questions.
Call No.: 080 Letting Date: September 09, 2026 Letting Time: 2:00 pm Page: 1
South Carolina Department of Transportation 8/3/2026
SC File NO(S).: 1877890
DBE Goal Percent: 0.00%
Approx. Length (miles):17.4300
CO(S).: Dorchester Description: FDP, MILL, STB, INTM B SPEC, CMRB
Completion Date: 6/30/2028 Days Funding: ST
ITEMS OF WORK INCLUDE THE FOLLOWING:
P045343P045343PCN: Project No.:
P045344P045344PCN: Project No.:
P045345P045345PCN: Project No.:
P045347P045347PCN: Project No.:
P045348P045348PCN: Project No.:
P045349P045349PCN: Project No.:
Description Quantity Units
MOBILIZATION 1.000 LS
BONDS AND INSURANCE 1.000 LS
CONSTRUCTION STAKES, LINES & GRADES 11.000 EA
RAILROAD INSURANCE AND FLAGGING NS 1.000 LS
REMOVAL & DISPOSAL OF EXISTING PAVEMENT 350.550 SY
UNCLASSIFIED EXCAVATION 237.000 CY
BORROW EXCAVATION 3,844.900 CY
EXCAVATION FOR SHOULDER PAVING 874.400 STA
HAULING OF EXCAVATED SHOULDER MATERIAL 874.400 STA
ADDITIONAL ROCK FOR FULL DEPTH RECLAMATION 592.500 TON
MAINTENANCE STONE 67.160 TON
CEMENT MODIFIED RECYCLED BASE (12" UNIF)-CURING METHOD B 36,150.398 SY
PORTLAND CEMENT FOR CEMENT MODIFIED RECYCLED BASE COURSE 1,446.020 TON
HMA SHOULDER WIDENING COURSE 5,343.360 TON
LIQUID ASPHALT BINDER PG64-22 2,391.410 TON
FULL DEPTH ASPH. PAV. PATCHING 4" UNIF. 479.000 SY
FULL DEPTH ASPH. PAV. PATCHING 6" UNIF. 214.000 SY
FULL DEPTH ASPH. PAV. PATCHING 8" UNIF 11,231.160 SY
MILLING EXISTING ASPHALT PAVEMENT 1.75" 277,352.002 SY
MILLING EXISTING ASPHALT PAVEMENT (VARIABLE) 21,145.000 SY
ASPHALT SURFACE COURSE TYPE B 34,239.995 TON
ASPHALT SURFACE COURSE TYPE C 2,357.643 TON
DRIVEWAY PAVING-SURFACE TYPE C 1,985.625 TON
TRAFFIC CONTROL 1.000 LS
PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 3,650.563 SF
4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 8,046.000 LF
6" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 3,810.000 LF
4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 213,276.000 LF
6" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 239,184.000 LF
Call No.: 080 Letting Date: September 09, 2026 Letting Time: 2:00 pm Page: 2
Description Quantity Units
8"WHITE SOLID LINES(CROSSWALK&CHANNELIZATION)FAST DRY PAINT 2,150.000 LF
24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 3,509.000 LF
WHITE SINGLE ARROW (LEFT, STRAIGHT, RIGHT)-FAST DRY PAINT 141.000 EA
WHITE SINGLE BIKE LANE ARROW (LT, STRAIGHT, RT)-FAST DRY PAINT 28.000 EA
WHITE WORD MESSAGE "ONLY"-FAST DRY PAINT 97.000 EA
WHITE COMBINATION ARROW(STR.& RT.OR STR.& LT.)FAST DRY PAINT 11.000 EA
WHITE LANE DROP ARROW (LEFT OR RIGHT)-FAST DRY PAINT 4.000 EA
RAILROAD CROSSING SYMBOLS - FAST DRY PAINT 26.000 EA
BIKE LANE SYMBOL - FAST DRY PAINT 28.000 EA
4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 8,680.000 LF
6" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 19,620.000 LF
4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 199,364.000 LF
6"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 172,503.000 LF
6" YELLOW SOLID LINE ON CURB/MEDIAN - FAST DRY PAINT 2,097.000 LF
4" WHITE BROKEN LINES(GAPS EXCL.)PERM.PVMT.MARKING 3,786.000 LF
6" WHITE BROKEN LINES(GAPS EXCL.)PERM.PVMT.MARKING 1,430.000 LF
4" WHITE SOLID LINES (PVT. EDGE LINES) PERM.PVMT.MARKING 67,182.000 LF
6" WHITE SOLID LINES (PVT. EDGE LINES) PERM.PVMT.MARKING 91,349.000 LF
8" WHITE SOLID LINES PERM.PVMT.MARKINGS 825.000 LF
24" WHITE SOLID LINES (STOP/DIAG LINES)-PERM.PVMT.MARKING 1,489.000 LF
WHITE SINGLE ARROWS (LT, STRGHT, RT) PERM.PVMT.MARKING 50.000 EA
WHITE WORD MESSAGE "ONLY" -PERM.PVMT.MARKING 35.000 EA
WHITE COMBINATION ARROWS(STR&RT.OR STR<)PERM.PVMT.MARKING 4.000 EA
WHITE LANE DROP ARROW(LT.OR RT.)PERM.PVMT.MARKING 2.000 EA
RAILROAD CROSSING SYMBOLS - PERM.PVMT.MARKING 10.000 EA
4" YELLOW BROKEN LINES(GAPS EXC)PERM.PVMT.MARKING 7,934.000 LF
6" YELLOW BROKEN LINES(GAPS EXC)PERM.PVMT.MARKING 6,540.000 LF
4" YELLOW SOLID LINES(PVT.EDGE LINES) PERM.PVMT.MARKING 70,030.000 LF
6" YELLOW SOLID LINES(PVT.EDGE LINES) PERM.PVMT.MARKING 57,501.000 LF
BIKE LANE SYMBOL -PREFORMED THERMO - 60MIL 14.000 EA
BIKE LANE ARROW - PREFORMED THERMO - 60MIL 14.000 EA
PERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4" 273.000 EA
PERMANENT YELLOW PAVEMENT MARKERS MONO-DIR.- 4"X 4" PERM. YEL. 234.000 EA
PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 1,462.000 EA
MILLED-IN RUMBLE STRIP 32.940 MI
FURNISH & INSTALL 1.0" SCHEDULE 80 PVC CONDUIT 700.000 LF
FURNISH & INSTL NO. 14 COPPER WIRE,1-CONDUCTOR FOR LOOP WIRE 9,750.000 LF
SAWCUT FOR LOOP DETECTOR 4,825.000 LF
F&I-13"X24"X18"D.ELEC.FLUSH UNDGRD.ENCLOS-(STR.POLY.CONC.)HD 5.000 EA
CONCRETE SIDEWALK(4" UNIFORM) 311.110 SY
CONCRETE SIDEWALK(6" UNIFORM) 19.440 SY
Call No.: 080 Letting Date: September 09, 2026 Letting Time: 2:00 pm Page: 3
Description Quantity Units
DETECTABLE WARNING MATERIAL 30.000 SF
CONCRETE DRIVEWAY(6" UNIFORM) 20.000 SY
PEDESTRIAN RAMP CONSTRUCTION 50.000 SY
SURFACE APPLIED DETECTABLE WARNING 180.000 SF
PERMANENT GRASSING FOR NON-PERMITTED RESURFACING PROJECTS 15.766 ACRE
Notice is hereby given that in addition to the Standard Specifications for Highway Construction, Edition of 2025, the "Supplemental Specifications", and the "Project Special Provisions", the following govern SCDOT Highway Lettings:
STATUTES, CODES, AND REGULATIONS. The Federal-Aid Projects embraced in this advertisement contemplates the expenditure of funds pursuant to Title 23, United States Code, "Highways.
The Contractor's attention is called to the fact that the SC Department of Transportation, in accordance with the provisions of Title VI of the Civil Rights Act of 1964 (78) Sta. 252 and the Regulations of the Federal Highway Administration (15 C.F.R., Part 8), issued pursuant to such act, hereby notifies all bidders that it will affirmatively insure that in any contract entered into pursuant to this advertisement minority business enterprises will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, sex, religion or national origin in consideration for award. All bidders on Federal Aid Projects must comply with the Instructions to Bidders and Special Provision covering Disadvantaged and Women Business Enterprise (DBE/WBE) included as a part of the proposal.
Attention is directed to the Fair Labor Standards Act of 1938, as amended. Contractors will be responsible for carrying out all of the provisions of this Act, which may affect these contracts. Attention is also called to the fact that any Federal Aid Project or Projects included in this notice will be subject to the Work Hours and Safety Act of 1962 as amended, PL 87-581, PL 91-54 and implementing regulations.
PREQUALIFICATION. The Contractor's attention is called to the requirements of the SC Department of Transportation for Prequalification. ONLY CONTRACTORS WHO HAVE BEEN ISSUED A
PREQUALIFICATION CERTIFICATE BY THE SC DEPARTMENT OF TRANSPORTATION WILL BE
ALLOWED TO SUBMIT BIDS. Information concerning prequalification can be obtained at the Contracts Administration office, Room 332 in the Headquarters building, 955 Park Street, Columbia, SC, or by contacting Maria Devito at (803)737-2043 or Prequal@scdot.org.
BID BONDS FOR SCDOT WORK. Unless otherwise indicated in the advertisement, no proposal will be considered unless accompanied by a bid bond in the amount of 5% of the APPROXIMATE BID AMOUNT, written by a SURETY satisfactory to the Department, properly executed in South Carolina Department of Transportation Form 674 (furnished by the Department in each proposal).
SUBMISSION OF BID BONDS. Bid Bonds must be submitted electronically, utilizing the Bid Bonds feature within the BidX Bid Form. The Bond ID number must be provided on the Surety 2000 or Tinubu (SurePath) Network electronic bond form. NO OTHER FORM OF PROPOSAL GUARANTY WILL BE ACCEPTED.
IRREGULAR ELECTRONIC BIDS. Electronic bids may be declared irregular for any of the following reasons:
1. In the schedule of Prices,
(a) alteration of a part of bid item except for the unit price; or
(b) failure to enter a bid item unit price; or
(c) a bid item unit price is not in the proper form or is incomplete.
2. In the DBE Folder, when a project has a DBE goal, in the DBE's subcontractors information, work items, unit prices, or the other required information has not been entered in the proper form fields or is incomplete.
3. In the PROPOSAL FORM,
(a) the box at the end of the form indicating acknowledgement and acceptance of the conditions set forth in the form is not checked.
4. In the Bid Bond section of the PROPOSAL FORM, the required information for appropriate form fields is not furnished.
5. A properly executed Bid Bond is not furnished in accordance with the selected manner of submission.
TIME OF THE LETTING. The Contract Administrator, or designee, at the site of the letting shall be the sole judge of determining the local time and the arrival of the designated time for the opening and reading of the bids.
THE SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION RESERVES THE RIGHT TO REJECT
ANY OR ALL PROPOSALS AND WAIVE ANY TECHNICALITIES.
MINIMUM WAGE RATES FOR FAP CONTRACTS HAVE BEEN PREDETERMINED BY THE SECRETARY
OF LABOR IN ACCORDANCE WITH THE TERMS OF THE DAVIS BACON ACT AS AMENDED AND THE
FEDERAL HIGHWAY ACT OF 1956, AND LATER ACTS, AND THESE RATES WILL BE SET FORTH IN
THE PROPOSAL FORM. THIS CONTRACT IS ALSO SUBJECT TO THE WORK HOURS AND SAFETY
ACT OF 1962 AS AMENDED, PL 87-581, PL 91-54, AND IMPLEMENTING REGULATIONS.
CONTRACTORS ATTENTION IS ALSO CALLED TO THE FEDERAL REQUIREMENTS GOVERNING
SPECIFIC EQUAL EMPLOYMENT OPPORTUNITY RESPONSIBILITIES, WHICH WILL BE INCLUDED IN
THIS CONTRACT.
Information in this notice is the latest available at the time of its publication. The information contained in the proposals, plans, and any addenda issued shall govern over this notice. Quantities shown herein are approximate for information only and should not be used for bidding purposes. The Department reserves the right to change these quantities without notice.
Issued by: Travis Driggers Contract Administrator