Request For Quotation Number: FDA-19-SOL-1208321

Office Paper BPA

Food and Drug Administration (FDA)

Request for Quotations (RFQ) #: FDA-19-SOL-1208321 Office Paper BPA Request for Quotation Background The Food and Drug Administration (FDA) is a science-based regulatory agency critically important to the stability of the nation’s public health and health care systems. FDA protects and promotes the health and safety of all Americans by enhancing the availability of safe medical products and foods and promoting innovation that addresses unmet medical and public health needs. FDA decisions must be based on the best available scientific data and use the best tools and methods available to ensure products meet the highest quality standards for consumers, while fostering and advancing innovation in the products it regulates.

On July 9, 2012, the Generic Drug User Fee Amendments of 2012 (GDUFA) was signed into law. This legislation will increase the FDA head count by approximately 1,080 within the next five years. This increase in staffing presents a noteworthy challenge to provide effective office space and office equipment for new hires at a time when FDA office/lab space is already limited. In support of this mission, the Center maintains orders paper in bulk so the employees can support the mission.

Material Requirements The FDA is requesting quotations to fulfill a Blanket Purchase Agreement (BPA) for office paper. The agreement shall provide CDER with the option to order paper as needed. CDER estimates that orders will be place approximately every 2-5 months. The delivery schedule shall provide estimated ordering amounts over the duration of the agreement. Please note that the delivery schedule states that paper deliveries must be made to each specific room. Per the delivery schedule, the bulk of the paper required will be letter size paper, with the legal and ledger paper being listed as an option in case the program office runs out. The amount of legal and ledger paper required will be significantly lower than the amount of letter paper required. The paper must meet the specifications outlined below:

Paper specifications:

· Letter - 8.5" X 11" – White, 20lb, 92 bright, 30% recycled content, acid free, moisture resistant, laser and inkjet print technology, 92 brightness, archival quality

· Legal - 8.5” X 14” – White, 20lb, 92 bright, 30% recycled content, acid free, moisture resistant, laser and inkjet print technology, 92 brightness, archival quality

· Ledger - 11" X 17" – White, 20lb, 92 bright 30% recycled content, acid free, moisture resistant, laser and inkjet print technology, 92 brightness, archival quality Place of Performance

Paper may be delivered to three locations within the DC metro area. Delivery locations will be identified at the order level. Please see the attached delivery schedule to ensure you understand the scale of the delivery requirements. The three potential locations are as follows:

· 10903 New Hampshire Avenue

Silver Spring, MD 20993 (WO21, WO22, WO31, WO32, WO51, WO52, WO71, WO72, and WO75)

· Hillandale Building

10001 New Hampshire Avenue

Silver Spring, MD 20993

· 5901 Ammendale Road, Beltsville, MD 20705

Paper shall be delivered to copier rooms located within the designated buildings and according to the schedule provided in the contract. Please see the attached delivery schedule for an idea of the delivery requirements and scale of the delivery. The FDA does not have any specific delivery requirements beyond the product specifications and locations. Details regarding specific delivery methods shall be left to the bidders. The contract shall not provide for any maintenance related services. The scope of the contract is strictly limited to the delivery of paper at the designated locations.

Period of Performance and Proposed Ordering Period

Anticipated Ordering Period

May 29, 2019 – May 28, 2020 Ordering

A request for quote (RFQ) will be issued to the contractor via email. RFQs will clearly describe the services required, anticipated contract type and location of performance (offsite/onsite). The contractor will have a minimum of three (3) business days to respond to any RFQ.

Quotes submitted in response to an RFQ must utilize the rates listed in the resultant BPA award based on the performance start date of the call order, and that rate must be used for the duration of the call order performance period (not to exceed 12 months, and the performance end date cannot be more than 12 months after the BPA performance end date).

Call Orders against the BPA will be issued via email.

Pricing

In order to submit a conforming bid, the vendor shall supply firm fixed pricing for the paper. Per box pricing shall be provided for all three (3) paper sizes.

Contractor Performance Evaluations In accordance with Federal Acquisition Regulation (FAR) 42.15, FDA will complete annual and final contractor performance evaluations on orders with an estimated value greater than the simplified acquisition threshold, inclusive of options. Annual evaluations will be prepared to coincide with the anniversary date of the orders. Additional interim performance evaluations may be prepared at the Contracting Officer’s discretion, as necessary. Final performance evaluations will be completed upon order expiration.

FDA will utilize the Contractor Performance Assessment Reporting System (CPARS) to execute annual and final contractor performance evaluations. CPARS is a secure Internet website located at http://www.cpars.csd.disa.mil/cparsmain.htm. FDA will register the contractor in CPARS upon receipt of the name and email address of the individual who will be responsible for serving as the Contractor’s CPARS contacts. Once FDA registers the contractor in CPARS, the Contractor will receive an automated CPARS email message which contains User ID and instructions for creating a password.

Once a performance evaluation is issued, the Contractor’s primary and alternate CPARS contact will receive an email instructing them to logon to CPARS in order to review the performance evaluation. The Contractor has 60 days from the date of performance evaluation issuance in which to review the evaluation. If the Contractor is in agreement with the performance evaluation outcome, the evaluation becomes final. Should the Contractor be in disagreement with the performance evaluation outcome, rebuttal comments must be submitted via the CPARS within 14 days from date the evaluation was issued by FDA. Any disagreement between the Contracting Officer and the Contractor will be referred to a contracting official one level above the Contracting Officer, whose decision will be final.

Copies of each performance evaluation and contractor responses, if any, will be retained as part of the official contract file and will be used to support future award decisions. Evaluations will also be stored for a 3-year period in the Past Performance Information Retrieval System (PPIRS) at www.ppirs.gov.

Contractors may obtain CPARS training material and register for on-line training at http://www.cpars.csd.disa.mil/allapps/cpcbtdlf.htm. There is no fee for registration or use of the CPARS.

Contract Administration Contract Specialist (Primary POC) Contracting Officer (Alternate POC)

Aaron Fisher

Gary Klaff

4041 Powder Mill Rd.

4041 Powder Mill Rd.

Beltsville, MD 20705

Beltsville, MD 20705 aaron.fisher@fda.hhs.gov gary.klaff@fda.hhs.gov 301-796-6762

240-402-7555 Contracting Officer’s Representative

TBD at the time of the award.

Contracting Officer’s Authority

The Contracting Officer (CO) has responsibility for ensuring the performance of all necessary actions for effective contracting; ensuring compliance with the terms of the BPA and safeguarding the interests of the United States in its contractual relationships. The CO is the only individual who has the authority to enter into, administer, or terminate this BPA and/or any resulting order issued against the BPA and is the only person authorized to approve changes to any of the requirements under this BPA, and notwithstanding any provision contained elsewhere in this BPA, this authority remains solely with the CO.

No statement, whether oral or written, by anyone other than the Contracting Officer, shall be interpreted as modifying the terms and conditions of this BPA. It is the Contractor’s responsibility to contact the CO immediately if there is even the appearance of any technical direction that is or may be outside the scope of the BPA or any order issued against the BPA. The Government will not reimburse the Contractor for any work not authorized by the Contracting Officer, including work outside the scope of the BPA.

Contracting Officer’s Representative The Contracting Officer may designate other Government personnel, known as the Contracting Officer’s Representative (COR) to act as his or her authorized representative for contract administration functions which do not involve changes to the scope, price, schedule, or terms and conditions of the order. The designation will be in writing, signed by the Contracting Officer, and will set forth the authorities and limitations of the representative(s) under the BPA and orders issued against the BPA. Such designation will not contain authority to sign contractual documents, order contract changes, modify contract terms, or create any commitment or liability on the part of the Government different from that set forth in the order.

The COR will provide the technical direction for the required work. The term “technical direction” is defined to include, without limitation, the following:

· Directions to the Contractor which redirect the BPA/Order effort, shift work emphasis between work areas or tasks, require pursuit of certain lines of inquiry, fill in details or otherwise serve to accomplish the contractual statement of work.

· Provision of information to the Contractor which assists in the interpretation of drawings, specifications, or technical portions of the work descriptions.

· Review and, where required by the BPA/Order, approval of technical reports, drawings, specifications, and technical information to be delivered by the Contractor to the Government under the BPA/Order.

Technical direction must be within the general scope of work stated in this BPA and subsequent BPA Orders. The COR does not have the authority to and may not issue any technical direction which:

· Constitutes an assignment of additional work outside this agreement’s general scope of work or any of the issued Orders.

· In any manner cause an increase or decrease in the total Order price or the time required for Order performance.

· Change any of the expressed terms, conditions, or specifications of the Order.

All technical direction shall be issued orally and/or in writing by the COR or shall be confirmed by him/her in writing within 5 working days after issuance.

The Contractor shall proceed promptly with the performance of technical direction duly issued by the COR in the manner prescribed by this article and within his/her authority under the provisions of this article.

If, in the opinion of the Contractor, any instructions or direction issued by the COR is within one of the categories described above, the Contractor shall not proceed but shall notify the Contracting Officer in writing within 5 working days after the receipt of any such instructions or direction and shall request the Contracting Officer issue a formal modification accordingly. Upon receiving such notification from the Contractor, the Contracting Officer shall issue an appropriate formal remedy or advise the Contractor in writing that, in his/her opinion, the technical direction is within the scope of the BPA/Order. The Contractor shall proceed immediately with the instructions or directions and shall be subject to the “Disputes” clause in their GSA Schedule Contract.

The Contractor shall immediately contact the Contracting Officer if there is any question regarding the authority of an individual to act on behalf of the Contracting Officer under this BPA.

The Government may unilaterally change its COR designation.

The BPA COR will serve as the Contractor’s first point of contact for any technical questions and is responsible for: (1) monitoring the Contractor’s technical progress, including the surveillance and assessment of performance and compliance with all substantive project objectives; (2) interpreting the statement of work and any other technical performance requirements; (3) performing technical evaluation as required; (4) performing technical inspections and acceptances required by this BPA; (5) assisting in the resolution of technical problems encountered during performance; and (6) providing technical direction; and, (7) reviewing of invoices/vouchers.

The BPA COR does not have authority to act as agent of the Government under this BPA. Only the Contracting Officer has authority to: (1) direct or negotiate any changes in the statement of work; (2) modify or extend the period of performance; (3) change the delivery schedule; (4) authorize reimbursement to the Contractor any costs incurred during the performance of this BPA; or (5) otherwise change any terms and conditions of this BPA Observance of Federal Holidays

The Government will not require support at the Government facility on Saturdays, Sundays, or the Federal holidays shown below, or days of government closure due to inclement weather:

1. New Year's Day

1 January

2. Martin Luther King's Birthday Third Monday in January

3. President's Day

Third Monday in February

4. Memorial Day

Last Monday in May

5. American Independence Day (Observed) 4 July

6. Labor Day

First Monday in September

7. Columbus Day

Second Monday in October

8. Veteran's Day

11 November

9. Thanksgiving Day

Fourth Thursday in November

10. Christmas Day (Observed)

25 December

Inclement Weather – The Contractor is not required to provide on-site service on days when the Federal Government is closed due to inclement weather. In the event the Federal Government is closed by order of the President of the United States or the U.S. Office of Personnel Management for any reason, or the agency, the center or the building is closed for administrative or safety reasons, the Contractor shall follow directives issued by responsible officials concerning reporting for work.

Inspection and Acceptance

In accordance with the inspection and acceptance clauses in the Contractor’s underlying GSA FSS contract, all work under this BPA is subject to inspection and final acceptance by the Contracting Officer or the duly authorized representative of the Government. The Government’s Contracting Officer’s Representative (COR) is a duly authorized representative of the government and is responsible for inspection and acceptance of all items to be delivered under this BPA.

Invoicing Instructions—3-Way Matching

FDA Three-Way Match Invoicing Procedures

A. The contractor shall submit all invoices to:

U.S. FOOD AND DRUG ADMINISTRATION

Attn: Vendor Payments

Office of Financial Services

10903 New Hampshire Ave

WO32 - Second Floor

MAIL HUB 2145

Silver Spring, MD 20993-0002

Phone: 301-827-3742

Email: FDAVendorPaymentsTeam@fda.gov

*** Acceptable methods of delivery include: E-mail (preferred) and Standard Mail.

B. Invoices submitted under this contract must comply with the requirements set forth in FAR Clauses 52.232-25 (Prompt Payment) and 52.232-33 (Payment by Electronic Funds Transfer – System for Award Management) and/or other applicable FAR clauses specified herein. To constitute a proper invoice, the invoice must be submitted on company letterhead and include each of the following:

(i) Name and address of the contractor;

(ii) Invoice date and invoice number;

(iii) BPA Call Order number (including a reference to any base award for Indefinite-Delivery/Indefinite-Quantity Contracts or Blanket Purchase Agreements);

(iv) Description, quantity, unit of measure, unit price, and extended price supplies delivered or services performed, including:

(a) period of performance for which costs are claimed;

(b) itemized travel costs, including origin and destination;

(c) any other supporting information necessary to clarify questionable expenditures;

(d) the contractor shall include the Contract Line Item/Funding line item for each description, quantity, unit of measure, unit price, and extended price supplies delivered or services performed;

(v) Shipping number and date of shipment, including the bill of lading number and weight of shipment if shipped on government bill of lading;

(vi) Terms of any discount for prompt payment offered (Prompt Payment terms other than NET 30);

(vii) Name and address of official to whom payment is to be sent (must be the same as that in the purchase order/award, or in a proper notice of assignment)

(viii) Name, title, and phone number of person to notify in event of defective invoice;

(ix) Taxpayer Identification Number (TIN);

(x) Electronic funds transfer (EFT) banking information, including routing transit number of the financial institution receiving payment;

(xi) Name and telephone number of the FDA Contracting Officer Representative (COR) or other Program Center/Office point of contact, as referenced on the award;

(xii) For all Time-and-Materials and Labor-Hour Awards, the Contractor is required to attach an invoice log addendum to each invoice which shall include, at a minimum, the following information for contract administration and reconciliation purposes:

(a) list of all invoices submitted to date under the subject award, including the following:

(1) invoice number, amount, & date submitted

(2) corresponding payment amount & date received

(b) total amount of all payments received to date under the subject contract or order

(c) and, for definitized contracts or orders only, total estimated amounts yet to be invoiced for the current, active period of performance;

(xiii) Any other information or documentation required by the award.

C. An electronic invoice is acceptable if submitted in adobe acrobat (PDF) format. All items listed in (i) through (xii) of this clause must be included in the electronic invoice. Electronic invoices must be on company letterhead and must contain no ink changes and be legible for printing.

D. Questions regarding invoice payments should be directed to the FDA Payment Office at the email address or phone number provided above in Section A.

FAR Clauses in Full text

FAR 52.252-2 Clauses Incorporated by Reference. (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):

https://www.acquisition.gov/ https://www.hhs.gov/grants/contracts/contract-policies-regulations/hhsar/index.html

FAR Provisions Incorporated by Reference:

FAR 52.203-18 Prohibition on Contracting with Entities that Require Certain Internal Confidentiality Agreements or Statements-Representation (Jan 2017)

FAR 52.217-5 Evaluation of Options (July 1990)

FAR 52.212-1 - Instructions to Offerors – Commercial Items (Oct 2018)

FAR 52.212-2 - Evaluation – Commercial Items (Oct 2014

FAR Provisions Incorporated by Full Text:

52.233-2 – Service of Protest (Sep 2006)

(a) Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from 4041 Powder Mill Road, Beltsville, Maryland 20705.

(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.

(End of Provision)

FAR Clauses Incorporated by Reference:

FAR 52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (Jan 2017)

52.232-39 Unenforceability of Unauthorized Obligations (Jun 2013)

52.233-3 Protest after Award (Aug 1996)

HHSAR Clauses incorporated by reference:

HHSAR 352.203-70 Anti-Lobbying (December 18, 2015)

HHSAR 352.208-70 Printing and Duplication (December 18, 2015)

HHSAR 352.222-70 Contractor Cooperation in Equal Employment Opportunity Investigations (December 18, 2015)

HHSAR 352.223-70 Safety and Health (December 18, 2015)

HHSAR 352.227-70 Publications and Publicity (December 18, 2015)

FAR Clauses in Full Text:

52.217-9 Option to Extend the Term of the Contract (MAR 2000)

1. (a) The Government may extend the term of this contract by written notice to the Contractor at any time within the current performance period; provided that the Government gives the Contractor a preliminary written notice of its intent to extend at least 30 days before the contract expires. The preliminary notice does not commit the Government to an extension.

2. (b) If the Government exercises this option, the extended contract shall be considered to include this option clause.

3. (c) The total duration of this contract, including the exercise of any options under this clause, shall not exceed five (5) years.

52.212-5 Contract Terms and Conditions Required To Implement Statutes or Executive Orders—Commercial Items.

As prescribed in 12.301(b)(4), insert the following clause:

Contract Terms and Conditions Required To Implement Statutes or Executive Orders—Commercial Items (Aug 2018)

(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses, which are incorporated in this contract by reference, to implement provisions of law or Executive orders applicable to acquisitions of commercial items:

(1) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (Jan 2017) (section 743 of Division E, Title VII, of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L. 113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).

(2) 52.204-23, Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab and Other Covered Entities (Jul 2018) (Section 1634 of Pub. L. 115-91).

(3) 52.209-10, Prohibition on Contracting with Inverted Domestic Corporations (Nov 2015).

(4) 52.233-3, Protest After Award (Aug 1996) (31 U.S.C. 3553).

(5) 52.233-4, Applicable Law for Breach of Contract Claim (Oct 2004)(Public Laws 108-77 and 108-78 (19 U.S.C. 3805 note)).

(b) The Contractor shall comply with the FAR clauses in this paragraph (b) that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial items:

[Contracting Officer check as appropriate.]

__ (1) 52.203-6, Restrictions on Subcontractor Sales to the Government (Sept 2006), with Alternate I (Oct 1995) (41 U.S.C. 4704 and 10 U.S.C. 2402).

__ (2) 52.203-13, Contractor Code of Business Ethics and Conduct (Oct 2015) (41 U.S.C. 3509)).

__ (3) 52.203-15, Whistleblower Protections under the American Recovery and Reinvestment Act of 2009 (June 2010) (Section 1553 of Pub. L. 111-5). (Applies to contracts funded by the American Recovery and Reinvestment Act of 2009.)

__ (4) 52.204-10, Reporting Executive Compensation and First-Tier Subcontract Awards (Oct 2016) (Pub. L. 109-282) (31 U.S.C. 6101 note).

__ (5) [Reserved].

__ (6) 52.204-14, Service Contract Reporting Requirements (Oct 2016) (Pub. L. 111-117, section 743 of Div. C).

__ (7) 52.204-15, Service Contract Reporting Requirements for Indefinite-Delivery Contracts (Oct 2016) (Pub. L. 111-117, section 743 of Div. C).

__ (8) 52.209-6, Protecting the Government’s Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment. (Oct 2015) (31 U.S.C. 6101 note).

__ (9) 52.209-9, Updates of Publicly Available Information Regarding Responsibility Matters (Jul 2013) (41 U.S.C. 2313).

__ (10) [Reserved].

__ (11)(i) 52.219-3, Notice of HUBZone Set-Aside or Sole-Source Award (Nov 2011) (15 U.S.C. 657a).

__ (ii) Alternate I (Nov 2011) of 52.219-3.

__ (12)(i) 52.219-4, Notice of Price Evaluation Preference for HUBZone Small Business Concerns (Oct 2014) (if the offeror elects to waive the preference, it shall so indicate in its offer) (15 U.S.C. 657a).

__ (ii) Alternate I (Jan 2011) of 52.219-4.

__ (13) [Reserved]

__ (14)(i) 52.219-6, Notice of Total Small Business Set-Aside (Nov 2011) (15 U.S.C. 644).

__ (ii) Alternate I (Nov 2011).

__ (iii) Alternate II (Nov 2011).

__ (15)(i) 52.219-7, Notice of Partial Small Business Set-Aside (June 2003) (15 U.S.C. 644).

__ (ii) Alternate I (Oct 1995) of 52.219-7.

__ (iii) Alternate II (Mar 2004) of 52.219-7.

__ (16) 52.219-8, Utilization of Small Business Concerns (Nov 2016) (15 U.S.C. 637(d)(2) and (3)).

__ (17)(i) 52.219-9, Small Business Subcontracting Plan (Aug 2018) (15 U.S.C. 637(d)(4)).

__ (ii) Alternate I (Nov 2016) of 52.219-9.

__ (iii) Alternate II (Nov 2016) of 52.219-9.

__ (iv) Alternate III (Nov 2016) of 52.219-9.

__ (v) Alternate IV (Aug 2018) of 52.219-9.

__ (18) 52.219-13, Notice of Set-Aside of Orders (Nov 2011) (15 U.S.C. 644(r)).

__ (19) 52.219-14, Limitations on Subcontracting (Jan 2017) (15 U.S.C. 637(a)(14)).

__ (20) 52.219-16, Liquidated Damages—Subcon-tracting Plan (Jan 1999) (15 U.S.C. 637(d)(4)(F)(i)).

__ (21) 52.219-27, Notice of Service-Disabled Veteran-Owned Small Business Set-Aside (Nov 2011) (15 U.S.C. 657 f).

__ (22) 52.219-28, Post Award Small Business Program Representation (Jul 2013) (15 U.S.C. 632(a)(2)).

__ (23) 52.219-29, Notice of Set-Aside for, or Sole Source Award to, Economically Disadvantaged Women-Owned Small Business Concerns (Dec 2015) (15 U.S.C. 637(m)).

__ (24) 52.219-30, Notice of Set-Aside for, or Sole Source Award to, Women-Owned Small Business Concerns Eligible Under the Women-Owned Small Business Program (Dec 2015) (15 U.S.C. 637(m)).

__ (25) 52.222-3, Convict Labor (June 2003) (E.O. 11755).

__ (26) 52.222-19, Child Labor—Cooperation with Authorities and Remedies (Jan 2018) (E.O. 13126).

__ (27) 52.222-21, Prohibition of Segregated Facilities (Apr 2015).

_x_(28)(i) 52.222-26, Equal Opportunity (Sept 2016) (E.O. 11246).

(ii) Alternate I (Feb 1999) of 52.222-26.

(29)(i) 52.222-35, Equal Opportunity for Veterans (Oct 2015)(38 U.S.C. 4212).

(ii) Alternate I (July 2014) of 52.222-35.

(30)(i) 52.222-36, Equal Opportunity for Workers with Disabilities (July 2014) (29 U.S.C. 793).

(ii) Alternate I (July 2014) of 52.222-36.

_x_ (31) 52.222-37, Employment Reports on Veterans (Feb 2016) (38 U.S.C. 4212).

__ (32) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act (Dec 2010) (E.O. 13496).

_x_ (33)(i) 52.222-50, Combating Trafficking in Persons (Mar 2015) (22 U.S.C. chapter 78 and E.O. 13627).

__ (ii) Alternate I (Mar 2015) of 52.222-50 (22 U.S.C. chapter 78 and E.O. 13627).

__ (34) 52.222-54, Employment Eligibility Verification (Oct 2015). (Executive Order 12989). (Not applicable to the acquisition of commercially available off-the-shelf items or certain other types of commercial items as prescribed in 22.1803.)

__ (35)(i) 52.223-9, Estimate of Percentage of Recovered Material Content for EPA–Designated Items (May 2008) (42 U.S.C. 6962(c)(3)(A)(ii)). (Not applicable to the acquisition of commercially available off-the-shelf items.)

__ (ii) Alternate I (May 2008) of 52.223-9 (42 U.S.C. 6962(i)(2)(C)). (Not applicable to the acquisition of commercially available off-the-shelf items.)

__ (36) 52.223-11, Ozone-Depleting Substances and High Global Warming Potential Hydrofluorocarbons (Jun 2016) (E.O. 13693).

__ (37) 52.223-12, Maintenance, Service, Repair, or Disposal of Refrigeration Equipment and Air Conditioners (Jun 2016) (E.O. 13693).

__ (38)(i) 52.223-13, Acquisition of EPEAT®-Registered Imaging Equipment (Jun 2014) (E.O.s 13423 and 13514).

__ (ii) Alternate I (Oct 2015) of 52.223-13.

__ (39)(i) 52.223-14, Acquisition of EPEAT®-Registered Televisions (Jun 2014) (E.O.s 13423 and 13514).

__ (ii) Alternate I (Jun 2014) of 52.223-14.

__ (40) 52.223-15, Energy Efficiency in Energy-Consuming Products (Dec 2007) (42 U.S.C. 8259b).

__ (41)(i) 52.223-16, Acquisition of EPEAT®-Registered Personal Computer Products (Oct 2015) (E.O.s 13423 and 13514).

__ (ii) Alternate I (Jun 2014) of 52.223-16.

_x_ (42) 52.223-18, Encouraging Contractor Policies to Ban Text Messaging While Driving (Aug 2011) (E.O. 13513).

__ (43) 52.223-20, Aerosols (Jun 2016) (E.O. 13693).

__ (44) 52.223-21, Foams (Jun 2016) (E.O. 13693).

__ (45)(i) 52.224-3, Privacy Training (JAN 2017) (5 U.S.C. 552a).

__ (ii) Alternate I (JAN 2017) of 52.224-3.

__ (46) 52.225-1, Buy American—Supplies (May 2014) (41 U.S.C. chapter 83).

__ (47)(i) 52.225-3, Buy American—Free Trade Agreements—Israeli Trade Act (May 2014) (41 U.S.C. chapter 83, 19 U.S.C. 3301 note, 19 U.S.C. 2112 note, 19 U.S.C. 3805 note, 19 U.S.C. 4001 note, Pub. L. 103-182, 108-77, 108-78, 108-286, 108-302, 109-53, 109-169, 109-283, 110-138, 112-41, 112-42, and 112-43.

__ (ii) Alternate I (May 2014) of 52.225-3.

__ (iii) Alternate II (May 2014) of 52.225-3.

__ (iv) Alternate III (May 2014) of 52.225-3.

__ (48) 52.225-5, Trade Agreements (Aug 2018) (19 U.S.C. 2501, et seq., 19 U.S.C. 3301 note).

__ (49) 52.225-13, Restrictions on Certain Foreign Purchases (June 2008) (E.O.’s, proclamations, and statutes administered by the Office of Foreign Assets Control of the Department of the Treasury).

__ (50) 52.225-26, Contractors Performing Private Security Functions Outside the United States (Oct 2016) (Section 862, as amended, of the National Defense Authorization Act for Fiscal Year 2008; 10 U.S.C. 2302 Note).

__ (51) 52.226-4, Notice of Disaster or Emergency Area Set-Aside (Nov 2007) (42 U.S.C. 5150).

__ (52) 52.226-5, Restrictions on Subcontracting Outside Disaster or Emergency Area (Nov 2007) (42 U.S.C. 5150).

__ (53) 52.232-29, Terms for Financing of Purchases of Commercial Items (Feb 2002) (41 U.S.C. 4505, 10 U.S.C. 2307(f)).

__ (54) 52.232-30, Installment Payments for Commercial Items (Jan 2017) (41 U.S.C. 4505, 10 U.S.C. 2307(f)).

_x_ (55) 52.232-33, Payment by Electronic Funds Transfer—System for Award Management (Jul 2013) (31 U.S.C. 3332).

__ (56) 52.232-34, Payment by Electronic Funds Transfer—Other than System for Award Management (Jul 2013) (31 U.S.C. 3332).

__ (57) 52.232-36, Payment by Third Party (May 2014) (31 U.S.C. 3332).

__ (58) 52.239-1, Privacy or Security Safeguards (Aug 1996) (5 U.S.C. 552a).

__ (59) 52.242-5, Payments to Small Business Subcontractors (Jan 2017)(15 U.S.C. 637(d)(12)).

__ (60)(i) 52.247-64, Preference for Privately Owned U.S.-Flag Commercial Vessels (Feb 2006) (46 U.S.C. Appx. 1241(b) and 10 U.S.C. 2631).

__ (ii) Alternate I (Apr 2003) of 52.247-64.

__ (iii) Alternate II (Feb 2006) of 52.247-64.

(c) The Contractor shall comply with the FAR clauses in this paragraph (c), applicable to commercial services, that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial items:

[Contracting Officer check as appropriate.]

__ (1) 52.222-17, Nondisplacement of Qualified Workers (May 2014)(E.O. 13495).

__ (2) 52.222-41, Service Contract Labor Standards (Aug 2018) (41 U.S.C. chapter 67).

__ (3) 52.222-42, Statement of Equivalent Rates for Federal Hires (May 2014) (29 U.S.C. 206 and 41 U.S.C. chapter 67).

__ (4) 52.222-43, Fair Labor Standards Act and Service Contract Labor Standards-Price Adjustment (Multiple Year and Option Contracts) (Aug 2018) (29 U.S.C. 206 and 41 U.S.C. chapter 67).

__ (5) 52.222-44, Fair Labor Standards Act and Service Contract Labor Standards—Price Adjustment (May 2014) (29 U.S.C. 206 and 41 U.S.C. chapter 67).

__ (6) 52.222-51, Exemption from Application of the Service Contract Labor Standards to Contracts for Maintenance, Calibration, or Repair of Certain Equipment—Requirements (May 2014) (41 U.S.C. chapter 67).

__ (7) 52.222-53, Exemption from Application of the Service Contract Labor Standards to Contracts for Certain Services—Requirements (May 2014) (41 U.S.C. chapter 67).

__ (8) 52.222-55, Minimum Wages Under Executive Order 13658 (Dec 2015).

__ (9) 52.222-62, Paid Sick Leave Under Executive Order 13706 (JAN 2017) (E.O. 13706).

__ (10) 52.226-6, Promoting Excess Food Donation to Nonprofit Organizations (May 2014) (42 U.S.C. 1792).

__ (11) 52.237-11, Accepting and Dispensing of $1 Coin (Sept 2008) (31 U.S.C. 5112(p)(1)).

(d) Comptroller General Examination of Record. The Contractor shall comply with the provisions of this paragraph (d) if this contract was awarded using other than sealed bid, is in excess of the simplified acquisition threshold, and does not contain the clause at 52.215-2, Audit and Records—Negotiation.

(1) The Comptroller General of the United States, or an authorized representative of the Comptroller General, shall have access to and right to examine any of the Contractor’s directly pertinent records involving transactions related to this contract.

(2) The Contractor shall make available at its offices at all reasonable times the records, materials, and other evidence for examination, audit, or reproduction, until 3 years after final payment under this contract or for any shorter period specified in FAR subpart 4.7, Contractor Records Retention, of the other clauses of this contract. If this contract is completely or partially terminated, the records relating to the work terminated shall be made available for 3 years after any resulting final termination settlement. Records relating to appeals under the disputes clause or to litigation or the settlement of claims arising under or relating to this contract shall be made available until such appeals, litigation, or claims are finally resolved.

(3) As used in this clause, records include books, documents, accounting procedures and practices, and other data, regardless of type and regardless of form. This does not require the Contractor to create or maintain any record that the Contractor does not maintain in the ordinary course of business or pursuant to a provision of law.

(e)(1) Notwithstanding the requirements of the clauses in paragraphs (a), (b), (c), and (d) of this clause, the Contractor is not required to flow down any FAR clause, other than those in this paragraph (e)(1) in a subcontract for commercial items. Unless otherwise indicated below, the extent of the flow down shall be as required by the clause—

(i) 52.203-13, Contractor Code of Business Ethics and Conduct (Oct 2015) (41 U.S.C. 3509).

(ii) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (Jan 2017) (section 743 of Division E, Title VII, of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L. 113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).

(iii) 52.204-23, Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab and Other Covered Entities (Jul 2018) (Section 1634 of Pub. L. 115-91).

(iv) 52.219-8, Utilization of Small Business Concerns (Nov 2016) (15 U.S.C. 637(d)(2) and (3)), in all subcontracts that offer further subcontracting opportunities. If the subcontract (except subcontracts to small business concerns) exceeds $700,000 ($1.5 million for construction of any public facility), the subcontractor must include 52.219-8 in lower tier subcontracts that offer subcontracting opportunities.

(v) 52.222-17, Nondisplacement of Qualified Workers (May 2014) (E.O. 13495). Flow down required in accordance with paragraph (l) of FAR clause 52.222-17.

(vi) 52.222-21, Prohibition of Segregated Facilities (Apr 2015)

(vii) 52.222-26, Equal Opportunity (Sept 2016) (E.O. 11246).

(viii) 52.222-35, Equal Opportunity for Veterans (Oct 2015) (38 U.S.C. 4212).

(ix) 52.222-36, Equal Opportunity for Workers with Disabilities (Jul 2014) (29 U.S.C. 793).

(x) 52.222-37, Employment Reports on Veterans (Feb 2016) (38 U.S.C. 4212)

(xi) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act (Dec 2010) (E.O. 13496). Flow down required in accordance with paragraph (f) of FAR clause 52.222-40.

(xii) 52.222-41, Service Contract Labor Standards (Aug 2018) (41 U.S.C. chapter 67).

(xiii)

52.222-50, Combating Trafficking in Persons (Mar 2015) (22 U.S.C. chapter 78 and E.O 13627). Alternate I (Mar 2015) of 52.222-50 (22 U.S.C. chapter 78 and E.O 13627).

(xiv) 52.222-51, Exemption from Application of the Service Contract Labor Standards to Contracts for Maintenance, Calibration, or Repair of Certain Equipment-Requirements (May 2014) (41 U.S.C. chapter 67).

(xv) 52.222-53, Exemption from Application of the Service Contract Labor Standards to Contracts for Certain Services-Requirements (May 2014) (41 U.S.C. chapter 67).

(xvi) 52.222-54, Employment Eligibility Verification (Oct 2015) (E.O. 12989).

(xvii) 52.222-55, Minimum Wages Under Executive Order 13658 (Dec 2015).

(xviii) 52.222-62, Paid Sick Leave Under Executive Order 13706 (Jan 2017) (E.O. 13706).

(xix)(A) 52.224-3, Privacy Training (Jan 2017) (5 U.S.C. 552a).

(B) Alternate I (Jan 2017) of 52.224-3.

(xx) 52.225-26, Contractors Performing Private Security Functions Outside the United States (Oct 2016) (Section 862, as amended, of the National Defense Authorization Act for Fiscal Year 2008; 10 U.S.C. 2302 Note).

(xxi) 52.226-6, Promoting Excess Food Donation to Nonprofit Organizations (May 2014) (42 U.S.C. 1792). Flow down required in accordance with paragraph (e) of FAR clause 52.226-6.

(xxii) 52.247-64, Preference for Privately Owned U.S.-Flag Commercial Vessels (Feb 2006) (46 U.S.C. Appx. 1241(b) and 10 U.S.C. 2631). Flow down required in accordance with paragraph (d) of FAR clause 52.247-64.

(2) While not required, the Contractor may include in its subcontracts for commercial items a minimal number of additional clauses necessary to satisfy its contractual obligations.

(End of clause)

GENERAL EVALUATION INFORMATION

The Government intends to award a firm-fixed price BPA resulting from this solicitation to the responsible offeror whose offer conforming to the solicitation will be most advantageous to the Government, price and other factors considered. Contractor selection will be based on the lowest price technically acceptable (LPTA) offer that can “meet or exceed” the requirements stated in this solicitation. The Government reserves the right to award without discussions.

Technical Acceptability: The Government will evaluate the degree to which the quote meets or exceeds the requirements and specifications described in this solicitation. The Offeror’s quote shall demonstrate the ability to “meet or exceed” the technical specifications of this requirement. Quotes will be rated either “Technically Acceptable” or “Technically Unacceptable.”

Price: Prices quoted shall be evaluated to ensure the best value to the Government and must be determined to be fair and reasonable in order to be considered for award. This RFQ does not commit the Government to pay any costs incurred in the preparation of the submission of the quotation or to contract for the supplies or services.