Performance Work Statement Summary
This is a Performance Work Statement (PWS) for C-5 Fire Suppression System (FSS) Component Overhaul under Purchase Request FD2060-27-00036, Revision 0. The contract is a five-year effort consisting of a basic year with four one-year ordering periods for depot-level repair and overhaul of nine specific C-5 Galaxy aircraft fire suppression components. The contractor shall perform all overhaul work at its own facility in accordance with applicable Air Force Technical Manuals, achieving a minimum 95% first-pass inspection rate with no more than one validated Product Quality Deficiency Report (PQDR) or Quality Deficiency Report (QDR) per 12-month ordering period. Services include component inspection, functional testing, packaging per AFMC Form 158, Commercial Asset Visibility (CAV-AF) reporting with printed DD1348-1 forms, and monthly production status reports.
The contractor must achieve on-time delivery 95% of the time per negotiated schedules, with the remaining 5% deliverable no later than seven calendar days late. For urgent MICAP and SURGE requirements, delivery is required within 30 to 45 calendar days depending on asset availability. The government provides unserviceable components for remanufacture and available technical data; the contractor furnishes all materials, parts, labor, tools, equipment, and facilities. Key requirements include Item Unique Identification (IUID) marking, annual government property inventory reporting, Supply Chain Risk Management (SCRM) planning including cybersecurity measures and counterfeit electronic part detection, Cybersecurity Maturity Model Certification (CMMC) Level 1 or higher within 180 days of award, and a comprehensive quality program meeting ISO 9001:2015 standards. The contract involves nine National Item Identification Numbers (NIINs) covering various fire suppression valves and components with technical manuals dated between 2004 and 2015. Contractor Performance Assessment Reporting System (CPARS) evaluation is required due to the total estimated contract value exceeding $1,000,000.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PR: FD2060-27-00036 PWS REVISION: 0 1
Performance Work Statement for
C-5 Fire Suppression System (FSS) Component Overhaul
Purchase Request: FD2060-27-00036
Date:
PR: FD2060-27-00036 PWS REVISION: 0 2
1.0 Description of Services:
1.1 Objective(s): This Performance Work Statement (PWS) describes the services required to provide serviceable Fire Suppression System (FSS) components for the C-5 Galaxy aircraft. The Contractor shall perform depot level repair (overhaul) on the components to bring them to a serviceable condition in accordance with the appropriate Air Force (AF) Technical Manual. The Contractor shall provide on time delivery in accordance with the negotiated contract delivery schedule. The Contractor shall provide reporting in Commercial Asset Visibility Air Force (CAV-AF) system, and all other requested data accurately and in a timely manner.
It is the intent of this acquisition to provide overhaul coverage for competitive C-5 FSS components. The items to be included in this acquisition are listed in section 9.0 Appendix A.
1.2 Benefit to United States Air Force (USAF): This acquisition will benefit the USAF by providing serviceable assets to maintain the C-5 Aircraft’s mission capability.
1.3 Background: These C-5 FSS components were designed specifically for the C-5 Galaxy aircraft which is a military transport aircraft. These parts are peculiar to and will only be used on the C-5 Aircraft.
2.0 Services Summary
Performance Objective
PWS
Reference
Performance Threshold
Quality of overhaul
4.4.1 Assets shall be overhauled in accordance with
appropriate AF Technical Manual Overhaul Instructions, Technical Order (TO). Overhauled assets shall pass Defense Contract Management Agency (DCMA) inspection with no more than one failure per year. At a minimum, 95% of overhauled assets shall pass initial inspection. Remaining 5% (or less) of failed assets shall pass on the second attempt. This metric will be calculated monthly. There shall be no more than one validated Product Quality Deficiency Reports (PQDR) and/or Quality Deficiency Reports (QDR) per contract ordering period (12 months).
3.0 Government Property.
3.1 Contractor Responsibility: The contractor shall be responsible for government property in accordance with the Revolutionary FAR Overhaul (RFO) and as specified in the contract/order.
3.2 Government Property to be Provided: Government property to be provided includes the unserviceable condition assets furnished for remanufacture. The Government will furnish available technical data. Technical manuals shall be obtained from the C5 Commodity Technical
PR: FD2060-27-00036 PWS REVISION: 0 3
Order Manager upon contract award. The contractor shall furnish all material, parts, labor, tools, equipment, and facilities necessary for the overhaul of the items.
3.3 Reporting of Government Property: The contractor shall have a system of internal controls to manage (control, use, preserve, protect, overhaul, and maintain) government property in its possession in accordance with RFO 52.245-1, and its property management system shall be adequate to satisfy the requirements of this clause. The contractor shall record receipt and return of all Government Furnished Property (GFP), as well as the reporting of shipment, consumption, disposal, or transfer to another contract, in the GFP Module in Procurement Integrated Enterprise Environment (PIEE), https://piee.eb.mil, as stipulated by R-DFARS 252.245-7005. This reporting requirement does not change any liability provisions or other reporting requirements that may exist under the contract. GFP training and guidance is located at the DoD Procurement Toolbox at https://dodprocurementtoolbox.com/.
3.4 Loss of Government Property
3.4.1 Definition of Loss of Government Property: “Loss of Government property” means unintended loss of or damage to government property including property that cannot be found after a reasonable search, loss due to inadequate storage, loss due to lack of security, theft, damage requiring overhaul to restore the item to usable condition, or damage that renders the property useless for its intended purpose or Beyond Economical Repair (BER). Loss of government property does not include manufacturing defects, obsolescence, normal wear and tear, or purposeful destructive testing. Unless otherwise stated in the contract/order, loss of government property does not include normal and reasonable inventory adjustments, i.e., losses of low priority consumable material, such as common hardware, as agreed to by the contractor and the Government Property Administrator.
3.4.2 Reporting Loss of Government Property: The contractor shall report loss of government property in the GFP Module located in PIEE, https://piee.eb.mil/piee-landing/.
3.5 Return or Retention of Government Property: All property provided by the Government remains the property of the Government and shall be returned to the Government as directed, but no later than completion of the contract/order, unless the Contracting Officer (CO) directs the Contractor to retain the property for continued use under a successor contract. All Government property shall be returned to the Government in the condition provided unless approved in advance by the CO. All material generated under the contract/order becomes the property of the Government and shall be returned to the Government as directed, but no later than completion of the contract/order, unless the CO directs the Contractor to retain the material for continued use under a successor contract.
4.0 Technical Requirements
4.1 Period and Place of Performance
PR: FD2060-27-00036 PWS REVISION: 0 4
4.1.1 Contract Period of Performance: The period of performance for the contract will extend five years (basic year with four one year ordering periods).
4.1.2 Place of Performance: These services will be performed at the Contractor’s facility.
4.2 Contract Data Requirements List(s) (CDRL)
4.2.1 Quality of CDRL Deliverable There shall be no more than one rejection of any deliverable. There shall be no more than two (2) total rejection(s) of deliverables per contract year. The Government will reject a deliverable if one or more technical errors or two (2) or more minor errors are found within the deliverable. A technical error is defined as the format not being in accordance with the CDRL or the content not being accurate and complete in accordance with the CDRL, PWS or contract. A minor error is exemplified by a typographical error, a grammatical error, etc. The rejected deliverable shall be corrected and resubmitted within five (5) business days of notification of Government rejection.
4.2.2 Receipt of CDRL Deliverable: CDRL deliverables, except for CAVAF reporting, shall be submitted via PIEE / Wide Area WorkFlow (WAWF). Contractor shall notify the Multi- Functional Team (MFT) member(s) identified on the CDRL when submission is completed.
There shall be no more than two (2) late submission(s) of deliverables per contract year. The Contractor shall notify the Government if the delivery of any data/document will not meet the scheduled delivery date and negotiate a revised delivery date. The data/document shall be delivered by the revised delivery date acceptable to the Government.
4.3 Timeliness of Responses (Pre-award and Post-award): The contractor is required to provide timely pre-award and post-award responses during the lifecycle of this acquisition. If a
Document Identifier Base Year
Ordering Period 1
Ordering Period 2
Ordering Period 3
Ordering Period 4
DID Title PWS Reference
(s)
A001 B001 C001 D001 E001 DI-
MGMT-
81838
Commercial Asset Visibility (CAVAF) (End Item Report)
4.4.4
A002 B002 C002 D002 E002 DI-PSSS-
81995-A
Contract Depot Maintenance (CDM) Monthly Production Report
4.4.6
A003 B003 C003 D003 E003 DI-
MGMT-
80441-D
Government Property Inventory Report (Annual)
4.4.5
A004 B004 C004 D004 E004 DI-QCIC-
81722
Quality Program Plan (QPP)
5.9
A005 B005 C005 D005 E005 DI-
MGMT-
81803A
Item Unique Identification (IUID) Marking Plan
4.3.1
A006 B006 C006 D006 E006 DI-SAFT-
81563
Accident/Incident Report
5.5.2
PR: FD2060-27-00036 PWS REVISION: 0 5
tasking and/or request for proposal is received, the contractor shall respond timely to those requests. Management and timely submission of those responses shall be considered under this PWS while the contract’s performance period is active. The contractor’s response timeliness will be considered in their annual Contractor Performance Assessment Report (CPARS) rating in accordance with RFO 42.1103(b)(2)(ii) Schedule/timeliness. Delays in response and requests for extended proposal submissions will be considered untimely.
4.4 Overhaul Services
4.4.1 Quality of Overhaul: Contractor shall provide all resources needed to inspect, accomplish functional testing and depot level repair of the commodities covered by this PWS to meet contract delivery schedules. Overhauled assets shall be made serviceable in accordance with the AF Technical Manual Overhaul Instructions, TOs listed in Appendix A and be tested to the OEM’s ATPs. The Contractor shall overhaul all units on contract for which a reparable carcass has been provided within the contract delivery schedules with no more than one (1) exception per order. Overhauled assets shall pass DCMA inspection with no more than one (1) failure per year. At a minimum, 95% of overhauled assets shall pass initial inspection. Remaining 5% (or less) of failed assets shall pass on the second attempt. This metric will be calculated monthly.
There shall be no more than one (1) validated PQDR and/or QDR per contract ordering period (12 months).
4.4.2 Item Unique Identification (IUID)
4.4.2.1 Marking Requirement: IUID is required for all items to be delivered to the Department of Defense (DoD) that meet the criteria established by the FAR. The Contractor shall provide an IUID Marking Plan for evaluation and approval. [CDRL Reference in paragraph 4.2, DI- MGMT-81803A, IUID Marking Plan]
4.4.2.2 Reporting in IUID Registry
4.4.2.2.1 Transmission of Government property must be recorded in the IUID Registry. The Government is required to record the transfer of GFP to the Contractor. The Contractor is required to record the receipt of GFP from the Government. The Contractor is required to record the return of GFP to the Government.
4.4.2.2.2 The Government or contractor/subcontractor personnel responsible for causing a “life cycle event” (i.e., abandoned, consumed, destroyed by accident, destroyed by combat, donated, exchanged – repair, exchanged – sold, exchanged – warranty, expended – experimental/target, expended – normal use, leased, loaned, lost, reintroduced, retired, scrapped, sold – foreign government, sold – historic, sold – nongovernment, sold – other federal, sold – state/local, and stolen) will update the item record in the IUID Registry.
4.4.3 Packaging: The Contractor shall package and mark material in accordance with the contract/order Air Force Materiel Command (AFMC) Form 158, Packaging Requirements, and applicable Government regulations. The Contractor shall ensure that classified material is
PR: FD2060-27-00036 PWS REVISION: 0 6
packaged, marked and delivered in accordance with 32 CFR Part 117, National Industrial Security Program Operating Manual (NISPOM).
4.4.4 Commercial Asset Visibility-Air Force (CAV-AF): The Contractor is required to comply with all CAV-AF requirements identified in the CDRLs and attachments to the contract, and shall report production in CAV-AF. Additionally, upon completion of the overhaul, the contractor is required to print the DD1348-1 (in triplicate) from CAVAF. One copy is to be placed inside the box with the returnable overhaul asset, one outside the box and one copy will be retained by contractor for their records. The Contractor shall provide data on the actions conducted for each unit by serial number and report as actions occur. [CDRL Reference in paragraph 4.2, DI-MGMT-81838, Commercial Asset Visibility (CAV-AF) (End Item Report)]
4.4.5 Government Property Inventory Report: The Contractor report shall provide to the DoD Service/Agency an inventory listing of Government Property (i.e., both GFP and Contractor Acquired Property (CAP)) in the contractor’s possession (to include subcontractors) applicable to this contract. This Data Item Description (DID) is applicable where Government Property will be furnished by the Government (i.e., GFP) or acquired, fabricated, or otherwise provided by a contractor (i.e., CAP), to include assets sent for repair/overhaul, in performance of this contract.
Contractor shall provide reports in Microsoft Excel (xls or .xlsx compatible) format. The contractor shall conduct an annual 100% physical inventory over the course of a year’s time of each NIIN so as not to impede maintenance operations. Upon completion of each National Stock Number (NSN)s 100% physical inventory, the contractor shall provide the AF government an inventory listing of the result of all AF GFP in the contractor's possession, by contract, and by NSN. The Contractor shall submit a Table for each designated repair facility / DoDAAC location for which the contractor has received inventory during the reporting period, including Subcontractor facilities. The report shall be delivered within seven (7) calendar days of the end of the first reporting period and annually thereafter, or within seven (7) calendar days of government request.[CDRL Reference in paragraph 4.2, DI-MGMT-80441D, Government Property (GP) (Annual) Inventory Report]
4.4.6 Production Status and Inventory. The Contractor shall provide a monthly status report to the Government Production Management Specialist. A two-part report which provides the Government with monthly maintenance production figures, status and accountability of assets at the contractor facility, performance to schedule, anticipated production for the next month, and a summary of unresolved problems at the end of the report period. [CDRL Reference in paragraph 4.2, DI-PSSS-81995-A Contract Depot Maintenance (CDM) Production Report / CDM Production Monthly Status Report]
4.4.7 Special Tooling and Test Equipment. The Technical Manuals identify special tooling and test equipment requirements for all items to be overhauled under this effort. It shall be the responsibility of the contractor to provide all necessary special tooling and test equipment to perform necessary overhauls IAW technical manuals. Any substitution for tooling or test equipment identified in the technical manuals shall be approved in writing by the Air Force C5 system engineer prior to use by the contractor. The Contractor shall allow 15 business days for Government review and written approval from WR-ALC AFLCMC/WLSEAB, C-5
PR: FD2060-27-00036 PWS REVISION: 0 7
Engineering. Subsequent TO authorization updates will be processed upon engineering approval. The contractor shall have required tooling and test equipment, or authorized substitute, within 60 days of contact award.
4.4.8 Inspection and Induction. Upon receipt, the contractor shall perform a visual inspection of each asset to ensure proper identification, completeness, and to identify missing components and subassemblies. Contractor shall use a Standard Form (SF) 364, Report of Discrepancy (ROD), to report any items which are misidentified, misdirected or have Air Force recoverable modules/subassemblies missing to the Contracting Officer (CO) through the Administrative Contracting Officer (ACO) for disposition instructions within ten working days of receipt. The contractor shall maintain inspection records documenting the condition of the item as received, including identification of missing components and subassemblies. The contractor is authorized to conduct a more thorough pre-induction inspection to identify estimated overhaul time and anticipated materials required for overhaul. The contractor is also authorized to induct items for overhaul on other than a first-in, first-out basis.
4.4.9 Production unit(s). Assets shall be overhauled in accordance with the applicable Technical Manual listed on section 9.2 Appendix B, Technical Manuals. Per section 3.3, Technical Manuals shall be obtained from the C5 Commodity Technical Order Manager upon contract award. WR-ALC AFLCMC/WLSEAB, C-5 Engineering, reserves the right to audit overhaul. Inspections will be conducted on a non-interference basis at the contractor’s facility.
4.4.10 Technical Order Deviations: The Contractor shall submit an Engineer Technical Assistance Request and Reply, Air Force Material Command (AFMC) Form 202, for any deviation from the AF technical manual.
4.4.11 Over and Above. Over and above shall only be considered for missing recoverable components or for work out of scope of this PWS. Identification of missing part(s) must be revealed within ten working days after the assets is removed from the shipping container and reported to the CO through the ACO in the form of a ROD using SF 364. Prior approval from the CO shall be obtained prior to performing work out of scope. The request shall include a detailed list of the O&A parts and repairs to be performed and their costs so that they can be negotiated and funded as needed.
4.4.12 Condemnations. When the total overhaul costs for a unit exceed 75% of the Standard List Price, that unit should be recommended for condemnation as BER. After coordination by DCMA QAR the contractor will forward requests for approval to condemn units they consider to BER to the PCO for government disposition. Supporting documentation/rationale should be included to expedite processing of the requests and disposition by the government. The contractor shall not condemn or scrap any asset without government authorization.
4.4.13 Replacement assets. The Government is authorized to replace a condemned end item or misshipped asset with a replacement reparable end item of the same stock number at no additional cost.
PR: FD2060-27-00036 PWS REVISION: 0 8
4.4.14 Disposition. For instances of asset discrepancy identification or condemnation, the contractor shall contact the PCO to obtain disposition instruction.
4.5 Quality Assurance. The DCMA QAR will perform on-site inspections of the contractor’s production and quality control programs to monitor performance and ensure satisfactory services are received. Quality compliance will be monitored using the deficiency reporting systems defined in T.O. 00-35D-54, USAF Deficiency Reporting, Investigation and Resolution. The contractor shall be responsible for initially validating customer complaints. However, the Deficiency Reporting Information System (DRIS) Air Force Action Point shall make final determination of the validity of customer complaint(s) in cases of disagreement. Government acceptance of the overhauled item will be made at the contractor’s facility and will be documented via WAWF, Material Inspection and Receiving Report. No more than one (1) valid PQDR/QDR per contract ordering period (12 months) shall be allowed.
4.6 On-time Delivery. The contractor shall use fast transportation to ship all serviceable end items. Air Force Materiel Command Instruction (AFMCI) 21-149 Contract Depot Maintenance (CDM) Program defines fast transportation as the means accomplishing the shipment planning process in the least amount of time and then using express transportation to deliver the shipment to the customer. In addition to fast transportation, transit visibility is required throughout the process. The customer should be able to track a requisition until it reaches the final destination.
Assets shall be delivered on-time 95% of the time in accordance with contract schedule to be negotiated prior to contract award. The remaining 5% can be no more than seven calendar days later. If delivery slips more than seven calendar days from contract delivery schedule, the Contractor shall notify the contracting officer in order to negotiate a revised delivery date.
4.6.1 Government required Urgent MICAP and SURGE Delivery Schedule: The contractor will be notified of MICAP and SURGE related requirements. These urgent type requirements shall be worked on a top priority basis and assets delivered within 45 calendar days after receipt of a delivery order, or receipt of reparable assets from the Government, whichever is later. If a delivery order and the repairable assets are already in place at the contractor, Government required delivery is 30 calendar days after the contractor is notified of the urgent requirement by the Government Contacting Officer. This may result in the contractor increasing production above normal, routine work requirements. Contractor shall explore all possible options with their sub-contractor(s) to expedite the known long-lead time materials to improve delivery times.
4.7 Surge Option: The government has the option to increase the quantity of supplies or services called for under this contract by no more than 40 percent; and/or accelerate the rate of delivery called for under this contract, at a price or cost established before contract award or to be established by negotiation.
4.8 Supply Chain Risk Management:
4.8.1 Contractor must provide a comprehensive Supply Chain Risk Management (SCRM) Plan in accordance with the instructions to offeror prior to award. This plan must be maintained during performance of this contract, will be incorporated into the contract at award, and must illustrate executable processes for identifying supply chain risks as early as possible. The SCRM
PR: FD2060-27-00036 PWS REVISION: 0 9
plan will address the broad spectrum of supply chain risks that have the potential to jeopardize the integrity of products, services, people, and technologies; compromise intellectual property;
disrupt the flow of product, materiel, information, and finances needed for continued Air Force operations; and/or drive materiel cost increases to the program. The plan and processes apply to the Contractor and their suppliers, subcontractors, associated integrators, and vendors, spanning the entirety of the supply chain from raw material stage to delivery of a finished product.
4.8.2 The SCRM plan must clearly address the following:
(a) Continuity of Operations (COOP) – Contractor will develop and/or update a Continuity of Operations Procedure/Plan (COOP), which outlines the processes and actions to prepare for, and respond to, planned/unplanned supply chain challenges.
(b) Foreign Influence – The Contractor will disclose any Foreign Ownership, Control, or Influence (FOCI) for the purpose of initial or continued facility clearance eligibility. A Standard Form 328 Certificate Pertaining to Foreign Interest must be submitted to the Government cognizant security office.
(c) Cybersecurity -The Contractor will implement a cybersecurity protection of supply chain information plan and provide a copy to the U. S. Government. As part of this process, the Contractor will conduct early and continuous monitoring throughout the life of the agreement to prevent or reduce impacts of cyber vulnerabilities where adversaries are able to exploit, steal, alter, manipulate, interrupt, or destroy system functionality, information, or technology. The plan must:
(i) Include a description of how the Contractor and any of the Contractor’s subcontractors will provide to the government a system security plan (or extract thereof) in accordance with the NIST Special Publication (SP) 800-171, “Protecting Controlled Unclassified Information in Nonfederal Systems and Organizations” in effect at the time the solicitation is issued or as authorized by the contracting officer, to describe the Contractor’s unclassified information system(s)/network(s) where covered defense information associated with the execution and performance of this contract is processed, is stored, or transmits.
(ii) Include a description of how Contractor will protect the supply chain from exploitation due to the insertion of counterfeits/malware, unauthorized production, tampering, theft, insertion of malicious software and hardware, functionality alteration, and any other elements that would allow adversaries to gain unauthorized access to data, alter data, interrupt communications, or otherwise disrupt operations.
Inform the U. S. Government of any instances of unauthorized access and/or compromise, such as those listed in item “b” to the Contractor’s digital information and parts and components.
4.8.3 Counterfeit Electronic Parts: The contractor shall establish and maintain a counterfeit electronic part detection and avoidance system to mitigate the risk of counterfeit electronic parts being installed in end items or otherwise entering the USAF/DoD inventory.
PR: FD2060-27-00036 PWS REVISION: 0 10
4.8.4 GIDEP: The contractor will participate, and ensure their subcontractors participate, IAW the GIDEP Operations Manual, (http://www.gidep.org). The contractor will register to (a) receive alerts and advisories from GIDEP, predictive tools, and other agencies (i.e. Defense Logistics Agency (DLA)), or internal sources, (b) determine any impact to their product design and already-manufactured hardware, (c) implement corrective action procedures when design and/or produced hardware are affected, and (d) ensure all of the above flow down to subcontractors. The contractor will submit alerts/advisories of its own to GIDEP. The contractor must ensure that all suspected or confirmed counterfeit items, components, or parts are entered into the GIDEP system within 30 days of discovery. The contractor will notify the Government when a GIDEP alert impacts the system IAW FAR 52.246-26, “Reporting Nonconforming Items, or as directed by AFOSI”
4.8.5 Obsolete Parts: The Contractor will notify the Government of evolving obsolete part conditions and make recommendations including last time buy opportunities and any redesign that may ensue. Requests for funding and all related issues will be sent to the PCO and the Government Program Manager (PM). Replacement parts or redesign will be recommended by the contractor to minimize impact but must be approved by the Government MFT.
4.9 Holidays and Facility Closings: Contractor/subcontractor personnel shall observe holidays and facility closings as authorized for government personnel. Contractor/subcontractor personnel shall only be permitted access to Government facilities when Government personnel are present.
5.0 General Information
5.1 Continuation of Mission-Essential Services During a Crisis: The Functional Commander/Director has determined these services are not mission-essential and will not continue in the event of a crisis.
5.2 Security Requirements
5.2.1 Security Regulations: The contractor shall ensure personnel, information, system, property, facility and, if applicable, international security requirements are met. The contractor shall ensure contractor/subcontractor personnel who perform work on a government facility comply with the security requirements of the facility.
5.2.2 Cybersecurity Maturity Model Certification (CMMC): The contractor shall achieve and maintain a CMMC Level 1 or higher, and provide the CMMC unique identifier(s) (CMMC UIDs) issued by Supplier Performance Risk System (SPRS) for each contractor information system that will process, store, or transmit Federal Contract Information (FCI) or Controlled Unclassified Information (CUI) during performance of the contract. If the contract is awarded based on an approved Plan of Action and Milestones (POA&M), the POA&M must only include controls eligible for delayed implementation in accordance with current DoW CIO CMMC policy. The Contractor shall resolve all POA&M items, achieve 100% compliance, and obtain
PR: FD2060-27-00036 PWS REVISION: 0 11
the requisite CMMC certification/record in SPRS no later than 180 days after contract award.
Failure to close out the POA&M within this 180-day period may result in contractual remedies.
5.2.3 Operations Security (OPSEC): The purpose of OPSEC is to reduce the vulnerability of USAF missions to adversary collection and exploitation of critical information. DoDD 5205.02E and DoD Manual 5205.02-M require contractors supporting DoD activities use OPSEC to protect critical information for specified contracts, subcontracts, and information used in the performance of duties in support of Air Force requirements/missions. The contractor shall ensure contractor personnel who perform work on (or in) a government facility comply with the OPSEC procedures and training requirements of the facility as specified in AFI 10-701.
5.2.4 Security Clearance: It is not expected contractor/subcontractor personnel will require security clearances for proper accomplishment of contract/order requirements.
Contractor/Subcontractor personnel shall not be authorized access to classified information and classified items or be permitted to work on classified projects and/or programs without an appropriate security clearance and a need-to-know.
5.2.5 Access to Government System(s). Access to Government system(s) will not be required to perform tasks under the contract/order.
5.2.6 Security Incident or Violation: The Contractor shall immediately notify the Government Security Office of any potential or actual security incident or violation.
5.2.7 Controlled Unclassified Information Identification and Handling: The Government will identify all CUI provided to the Contractor or generated by the Contractor during performance. To understand the categories, subcategories, and safeguarding requirements of CUI, the Contractor shall refer to the National Archives and Records Administration CUI Registry (https://www.archives.gov/cui) and the Department's CUI Registry (https://www.dodcui.mil/). The Contractor shall ensure all CUI is explicitly marked in accordance with DoDI 5200.48, Controlled Unclassified Information. The Contractor shall not process, store, or transmit CUI on personally owned devices or unapproved public cloud environments. Upon contract completion or termination, the Contractor shall return or destroy all CUI as directed by the Contracting Officer.
5.2.8 Cyber Incident Reporting Coordination: In addition to the mandatory cyber incident reporting requirements to the Government outlined in DFARS 252.204-7012, the Contractor shall simultaneously notify the Contracting Officer and the Contracting Officer’s Representative of any cyber incident involving covered contractor information systems or Covered Defense Information related to this contract. This notification shall occur within the same 72-hour window.
5.2.9 Subcontractor Cybersecurity Compliance: The prime Contractor shall ensure that all subcontractors and suppliers at all tiers handling Federal Contract Information or CUI achieve and maintain the requisite CMMC level prior to awarding the subcontract. The Contractor shall continuously monitor subcontractor NIST scores and CMMC compliance throughout the life of
PR: FD2060-27-00036 PWS REVISION: 0 12
the contract and provide verification of subcontractor compliance to the CO or COR upon request.
5.3 Environmental Management System (EMS). These services shall not be performed at a Government facility; therefore, the EMS requirement does not apply.
5.4 Agency Affirmative Procurement Programs: This acquisition does not require the purchase of Environmental Protection Agency (EPA)-designated products or United States Department of Agriculture (USDA)-designated products; therefore, the requirement does not apply.
5.5 Safety Requirements
5.5.1 Contractor Environmental, Safety, and Occupational Health Compliance: The Contractor shall comply with Government Safety and Health regulations including, but not limited to, Public Law 91-596, Occupational Safety and Health Act (OSHA), and DoD Directive 4715.1E, Environmental, Safety, and Occupational Health (ESOH). The Contractor shall require all subcontractors to comply with required safety, health and fire standards.
5.5.2 Mishap Notification/Investigation: In accordance with DODI 6055.07 and DAFI91-204, Safety Investigations and Reports, the Contractor shall report mishaps including damage to DoD property; occupational illness to DoD military or civilian personnel; injury to on- or off-duty DoD military personnel; injury to on-duty DoD civilian personnel; and damage to public or private property or injury or illness to non-DoD personnel caused by Government operations.
The Contractor shall contact the organizations listed below within four business hours. The Contractor shall immediately secure the mishap scene (and damaged property) and impound pertinent maintenance and training records until released by the Government’s Safety Office.
Such release shall be accomplished through the Contracting Officer. The Contractor shall cooperate and assist Government personnel in the investigation of the mishap and submit an Accident/Incident Report within 24 hours of the mishap. There shall be no more than one (1) instance of late mishap notification per contract year. [CDRL Reference in paragraph 4.2, DI- SAFT-81563, Accident/Incident Report].
The Contractor shall ensure the following are notified:
a. CO
b. MFT (COR, if available, or another MFT member), The following information shall be provided in support of the Mishap notification as soon as it becomes available:
a. Contract, contract number, name and title of person(s) reporting
b. Date, time and exact location of accident/incident
c. Brief narrative of accident/incident (events leading to accident/incident)
d. Cause of accident/incident, if known
e. Estimated cost of accident/incident (material and labor to repair/replace)
f. Nomenclature of equipment and personnel involved in accident/incident
g. Corrective actions (taken or proposed)
h. Other pertinent information
PR: FD2060-27-00036 PWS REVISION: 0 13
5.6 Inspection of Services: In accordance with the Inspection of Supply/Services clause(s) identified in the contract/order, the Government reserves the right to inspect Contractor performance.
5.7 Service Contract Reporting (SCR): The contract does not meet the DoD Contract Reporting criteria or reporting dollar threshold; therefore, SCR does not apply.
5.8 Invoicing/Payment and Receipt/Acceptance: The contractor shall submit/process payment requests and receipt/acceptance documents via Wide Area Workflow (WAWF).
5.9 Contractor’s Quality Program: The contractor’s quality program shall be established and maintained IAW FAR 52.246-11, Higher-Level Contract Quality Requirement. The contractor’s quality program shall meet all requirements of ISO 9001:2015, and is to be approved by the cognizant government representatives. The contractor shall permit the program office or its designated representative to periodically review its quality program.[CDRL Reference in paragraph 4.2, DI-QCIC-81722, Quality Program Plan]
5.10 Trafficking in Persons. The contractor shall comply in accordance with the RFO and applicable supplements and shall be in compliance with all applicable guidance and clauses listed in the contract as it relates to Trafficking in Persons. Additional information about Trafficking in Persons is available at the site for the Department of State’s Office to Monitor and Combat Trafficking in Persons. https://www.state.gov/
6.0 Plan for Corrective Action
6.1 Unsatisfactory Contractor performance will result in the issuance of a negative PAR. The program office will set a suspense date and forward the PAR to the Contracting Officer (CO) for submission to the Contractor. The CO will submit the PAR to the Contractor for corrective action. The Contractor shall explain the deficiency and identify the corrective action they shall take to resolve the deficiency and prevent recurrence. The Contractor shall sign and return a negative PAR to the CO by the suspense date.
6.2 If repetitive negative PARs or a single negative PAR identifying critical Contractor non-compliance are issued without satisfactory resolution, the program office will initiate the corrective action report (CAR) process. However, the Multi-Functional Team (MFT) reserves the right to issue a CAR at any time based on the severity of the Contractor non-compliance. The PCO will set a suspense date and submit the CAR to the Contractor for corrective action. The Contractor shall sign and return the CAR, with a corrective action plan, to the CO for acceptance by the Multi-functional team (MFT) by the suspense date. The corrective action will be tracked and documented until the deficiency is resolved to the satisfaction of the MFT. The CAR will become part of the CO contract file. If the CAR process fails to resolve the deficiency, the CO has the right to invoke the Inspection of Supply/Services clause(s) identified in the contract/order.
7.0 Contractor Responsibilities
PR: FD2060-27-00036 PWS REVISION: 0 14
7.1 The Contractor shall ensure the quality of services through a quality and/or inspection system. In order to meet the government’s quality requirements, a contractor’s QMS should be robust enough and resourced adequately to execute four key quality functions: 1) Detection of quality program problems and defects; 2) Identification of root causes for quality related problems/defects; 3) Correction of root causes related to detected problems/defects; and, 4) Follow-up to ensure quality related problems/defects do not recur; a mature QMS requires the contractor be the proactive party on quality issues. The goal is to obtain performance reflective of continuous improvement with no reliance on DCMA’s surveillance to detect problems/defects, determine root causes, or ensure quality related problems/defects do not recur.
7.2 Maintains an inspection process acceptable to the Government and records of inspections, which shall be made available to the Government as long as the contract requires in accordance with the Inspection of Supply/Services clause(s) identified in the contract/order.
7.3 Responsible for ensuring personnel, information, system, property, facility and, if applicable, international security requirements are met in accordance with the DD Form 254, Department of Defense Contract Security Classification Specification, and applicable Government regulations.
7.4 Signs and returns a positive PAR within five business days. Signs and returns a negative PAR with corrective action identified by the suspense date. Signs and returns a CAR with a corrective action plan by the suspense date.
8.0 Contractor Performance Assessment Reporting System (CPARS): The total estimated value of the contract exceeds $1,000,000.00; therefore, CPARS reporting is required.
8.1 The MFT will evaluate Contractor performance. The Assessing Official Representative (AOR) will review the PARs and other information contained in the COR Online File to prepare and substantiate the CPAR. CPARS will be updated, at a minimum annually, documenting Contractor performance for the contract/order. The MFT should refer to the latest CPARS Guidance for CPAR processes and timelines, https://www.cpars.gov/sysreq.htm. Users can refer to Table 4.9 for the CPARs Timeline, and “Table 1 for the Business Sector, Dollar Threshold and Reviewing Official” information.
8.2 In evaluating the quality of contractor’s performance, the following performance ratings are used in documenting past performance. The areas rated may include: Quality, Schedule, Cost Control (if applicable), Management, Small Business Subcontracting (if applicable), and Regulatory Compliance.
Performance Rating
Criteria
Exceptional Performance meets contractual requirements and exceeds many to the government’s benefits. The contractual performance of the element or sub-element being assessed was accomplished with no problems and contractor actions were highly effective.
PR: FD2060-27-00036 PWS REVISION: 0 15
Very Good Performance meets contractual requirements and exceeds some to the government benefits. The contractual performance was accomplished with few minor problems for which corrective actions taken by the contractor were effective.
Satisfactory Performance meets contractual requirements. The contractual performance contains some minor problems for which corrective actions taken by the contractor were satisfactory.
Marginal Performance does not meet some contractual requirements. The contractual performance reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear marginally effective or were not fully implemented.
Unsatisfactory Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance contains serious problem(s) for which the contractor’s corrective actions appear or were ineffective.
9.0 Appendices
9.1 Appendix A, NSN Listing of Contract Items:
NSN Part Number Applicable Technical Manuals(s) 4810010033512 7720011-106 13F7-9-3 4810010033513 7720012-105 13F7-10-3 4810010033514 7720013-107 13F7-11-3 4810010046559 7720015-107 13F7-12-3 4820001851031 7720125-101 13F7-18-3 4820001851033 7720142-101 13F7-20-3 4820001851037 7720224-101 13F12-2-3 4820001867007 7720017-102 13F8-2-3 4820002700682 7720119-102 13F7-17-3
9.2 Appendix B, Technical Manuals
Part Number Applicable Technical Manuals(s)
Title of Publication Date of Publication and Changes
7720011-106 13F7-9-3 OI w/IPB 2 - Inch Zone Fire Valve
01 Oct 2004
7720012-105 13F7-10-3 OI w/IPB Isolation Valve 09 Jun 2010 7720013-107 13F7-11-3 OI w/IPB Shutoff Valve 05 Oct 2010 7720015-107 13F7-12-3 OI w/IPB 1 ¼ - Inch Zone Fire
Valve 10 Jun 2010
7720125-101 13F7-18-3 OI w/IPB Primary Pressure Relief & Overboard Relief Valve
14 Oct 2010
7720142-101 13F7-20-3 OI w/IPB Pressure Limiter Valve 25 May 2010
PR: FD2060-27-00036 PWS REVISION: 0 16
7720224-101 13F12-2-3 OI w/IPB Secondary Pressure Regulator
03 Apr 2015
7720017-102 13F8-2-3 OI w/IPB Fill Coupling Receptacle
01 Dec 2005
7720119-102 13F7-17-3 OI W/IPB Backpressure Relief Valve
06 Oct 2010
9.3 Appendix C, Reference(s)
Publication Title of Publication Date of Publication Sections(s) that Apply
32 CFR Part
National Industrial Security Program Operating Manual
(NISPOM).
August 19, 2021 In its Entirety
DoDD 4715.1E Environment, Safety, and Occupational Health
(ESOH)
March 19, 2005 In its Entirety
Public Law 91- 596 as amended by Public Law 116-92
Occupational Safety and Health Act of 1970
December 29, 1970 as amended through December 20, 2019
In its Entirety
DoDD 5205.02E DoD Operations Security (OPSEC) Program
June 20, 2012 In its Entirety
DoD Manual 5205.02-M
DoD Operations Security (OPSEC) Program Manual
November 3, 2008 Change 2, October 29, FAR 52.245-1 Government Property September 2021 In its Entirety
FAR 52.246-11 Higher-Level Contract Quality Requirement
December 2014 In its Entirety
FAR 52.246-26 Reporting Nonconforming Items
August 2024 In its Entirety
DFARS 252.245-
Management and Reporting of Government Property
January 2024 In its Entirety
RFO
42.1103(b)(2)(ii)
Contractor Performance Information (CPARS evaluation, Schedule)
March 6 2026 (Class deviation 2026-O0050)
In its Entirety
R-DFARS
204.303
Service Contracts Inventory February 17, 2026 (Class Deviation 2026-O0043)
AFMC Form 158 Packaging Requirements (Date of form generation) In its Entirety
PR: FD2060-27-00036 PWS REVISION: 0 17
NIST SP 800-
Protecting CUI in Nonfederal Systems
May 2024 (Rev. 3) Chapter 3 (Security
Requirements)
GIDEP
Operations Manual
GIDEP Operations Manual September 10 2010 (S0300-
BT-PRO-010)
Chapter 5 (Data Input) & Chapter
6 (Data Utilization)
DODI 6055.07 Mishap Notification & Record Keeping
6 June 2011 (Change 2: 11 Jun 2019)
Enclosure 3, Paragraph 3
File details come from the government source that posted it. Updated .