FD2030-21-30011 CDRL A0001 Monthly Status Report.pdf
PDF 224 KB Posted
- Solicitation number
- FA8121-21-R-0012
View the file
Other files
| File | Type | Posted |
|---|---|---|
| FD2030-21-30011 CDRL A0002 Deficiency Report.pdf | ||
| IUID for 015040016.pdf | ||
| QASP DEEC and EDU.docx | DOCX document | |
| DI-ALSS-81535 PQDRs.pdf | ||
| IUID for 015401790.pdf | ||
| DEEC PWS.docx | DOCX document | |
| IUID for 014982052.pdf | ||
| IUID for 015511072.pdf | ||
| DID Status Report .pdf | ||
| Packaging FD2030-21-30011.pdf | ||
| IUID for 015203563.pdf | ||
| IUID for 015195438.pdf | ||
| FA812121R0012.pdf | ||
| IUID for 015511078.pdf | ||
| IUID for 014493101.pdf | ||
| Transportation FD2030-21-30011.pdf |
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DATA REQUIREMENTS LIST Form Approved CMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 222202-2302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract. PR No. listed in Block E.
A. Contract Line Item No.
B. Exhibit A
C. Category
D. System/Item.
F100-PW-220/229 Digital Electronic Engine Control and Engine Diagnostic Unit E. Contract/PR NO.
FD2030-21-30011
F. Contractor
1. Data Item No.
A001
2. Title of Data Item:
Production Report for Contractor Receipt/Shipment of FMS R/R
3. Subtitle:
4. Authority (Data Acquisition Document No.)
DI-MGMT-80368A
5. Contract Reference
PWS 1.1.2.1
6. Requiring Office
AFLCMC/LPSIB
7. DD 250 Req N/A
1. Dist Statement Required N/A
10. Frequency Monthly
12. Date of First Submission See Block 16
14. Distribution
8. APP Code N/A
11. As of Date See Block 16
13. Date of Subsequent Submission See Block 16
a. Addressee b. Copies D r a f t
Final
Reg Repro
16. REMARKS
BLOCK 4: DID IS TAILORED AS FOLLOWS:
THE CONTRACTOR SHALL PREPARE AND FURNISH A MONTHLY CUMULATIVE
STATUS REPORT FOR ALL ITEMS THAT HAVE BEEN PLACED ON CONTRACT. THE
REPORT SHALL BE PREPARED AS OF THE LAST WORKING DAY OF EACH MONTH
AND FORWARDED BY E-MAIL NO LATER THAN THE 5TH WORKING DAY OF THE
FOLLOWING MONTH. THE INITIAL REPORT WILL BE PREPARED FOR THE MONTH
DURING WHICH THE CONTRACT ASSETS ARE RECEIVED. REPORTS WILL CONTINUE
TO BE FORWARDED UNTIL ALL END ITEMS ARE REPARIED. THE LAST REPORT
WILL BE ANNOTATED “FINAL REPORT”. NEGATIVE REPORTS ARE REQUIRED.
THIS REPORT SHOULD REFLECT THE APPLICABLE COUNTRY, CASE/LINE NUMBER,
DOCUMENT CONTROL NUMBER, PART NUMBER, NATIONAL STOCK NUMBER,
NOMENCLATURE, SERIAL NUMBER, DELIVERY ORDER NUMBER, CLIN, ASSET
RECEIVED DATE, QUANITY PLACED ON ORDER, CONTRACTUAL START DATE,
INDUCTION DATE, CONTRACT COMPLETION DATE, FORECAST COMPLETION DATE,
ACCEPTANCE DATE, TURNAROUND TIME, SHIPMENT TRACKING NUMBER, AND
COMMENTS FOR PRODUCTION STATUS. THE REPORT SHOULD BE FURNISHED IN
DELIVERY ORDER SEQUENCE.
ANY DELAYS OR SLIPPAGE TO FORECAST COMPLETION DATE SHALL BE
COMMUNICATED TO LPSIB VIA DETAILED E-MAIL OR PHONE CONVERSATION.
DETAILED INFORMATION SHALL INCLUDE, BUT NOT BE LIMITED TO, CAUSE FOR
DELAY/SLIPPAGE (I.E., PARTS CONSTRAINTS, TEST-STAND ISSUES, PERSONNEL
SHORTAGE, ETC.,).
FOR E-MAIL ADDRESS & ADDITIONAL PHONE NUMBERS CALL Scott Robinson AT 865-
742-3274 OR EMAIL AT SCOTT.ROBINSON.15@US.AF.MIL
AFLCMC/LPSIB 1
DCMA/ACO 1
PCO 1
15. TOTAL 3
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE
DD Form 1423-1, JUN 90 Previous editions are obsolete Page 1 of 1 Pages mailto:SCOTT.ROBINSON.15@US.AF.MIL
CONTRACT DATA REQUIREMENTS LIST
| CONTRACT DATA REQUIREMENTS LIST: |
| Form Approved CMB No 07040188: |
| A Contract Line Item No: |
| B Exhibit A: |
| C Category: |
| F Contractor: |
| 1 Data Item No A001: |
| 3 Subtitle: |
| 4 Authority Data Acquisition Document No DIMGMT80368A: |
| 5 Contract Reference PWS 1121: |
| 8 APP Code NA: |
| 1 Dist Statement Required NA: |
| 10 Frequency Monthly: |
| 12 Date of First Submission See Block 16: |
| 14 Distribution: |
| 11 As of Date See Block 16: |
| 13 Date of Subsequent Submission See Block 16: |
| b Copies: |
| Final: |
| a Addressee16 REMARKS BLOCK 4 DID IS TAILORED AS FOLLOWS THE CONTRACTOR SHALL PREPARE AND FURNISH A MONTHLY CUMULATIVE STATUS REPORT FOR ALL ITEMS THAT HAVE BEEN PLACED ON CONTRACT THE REPORT SHALL BE PREPARED AS OF THE LAST WORKING DAY OF EACH MONTH AND FORWARDED BY EMAIL NO LATER THAN THE 5TH WORKING DAY OF THE FOLLOWING MONTH THE INITIAL REPORT WILL BE PREPARED FOR THE MONTH DURING WHICH THE CONTRACT ASSETS ARE RECEIVED REPORTS WILL CONTINUE TO BE FORWARDED UNTIL ALL END ITEMS ARE REPARIED THE LAST REPORT WILL BE ANNOTATED FINAL REPORT NEGATIVE REPORTS ARE REQUIRED THIS REPORT SHOULD REFLECT THE APPLICABLE COUNTRY CASELINE NUMBER DOCUMENT CONTROL NUMBER PART NUMBER NATIONAL STOCK NUMBER NOMENCLATURE SERIAL NUMBER DELIVERY ORDER NUMBER CLIN ASSET RECEIVED DATE QUANITY PLACED ON ORDER CONTRACTUAL START DATE INDUCTION DATE CONTRACT COMPLETION DATE FORECAST COMPLETION DATE ACCEPTANCE DATE TURNAROUND TIME SHIPMENT TRACKING NUMBER AND COMMENTS FOR PRODUCTION STATUS THE REPORT SHOULD BE FURNISHED IN DELIVERY ORDER SEQUENCE ANY DELAYS OR SLIPPAGE TO FORECAST COMPLETION DATE SHALL BE COMMUNICATED TO LPSIB VIA DETAILED EMAIL OR PHONE CONVERSATION DETAILED INFORMATION SHALL INCLUDE BUT NOT BE LIMITED TO CAUSE FOR DELAYSLIPPAGE IE PARTS CONSTRAINTS TESTSTAND ISSUES PERSONNEL SHORTAGE ETC FOR EMAIL ADDRESS ADDITIONAL PHONE NUMBERS CALL Scott Robinson AT 865 7423274 OR EMAIL AT SCOTTROBINSON15USAFMIL: |
| D r a f16 REMARKS BLOCK 4 DID IS TAILORED AS FOLLOWS THE CONTRACTOR SHALL PREPARE AND FURNISH A MONTHLY CUMULATIVE STATUS REPORT FOR ALL ITEMS THAT HAVE BEEN PLACED ON CONTRACT THE REPORT SHALL BE PREPARED AS OF THE LAST WORKING DAY OF EACH MONTH AND FORWARDED BY EMAIL NO LATER THAN THE 5TH WORKING DAY OF THE FOLLOWING MONTH THE INITIAL REPORT WILL BE PREPARED FOR THE MONTH DURING WHICH THE CONTRACT ASSETS ARE RECEIVED REPORTS WILL CONTINUE TO BE FORWARDED UNTIL ALL END ITEMS ARE REPARIED THE LAST REPORT WILL BE ANNOTATED FINAL REPORT NEGATIVE REPORTS ARE REQUIRED THIS REPORT SHOULD REFLECT THE APPLICABLE COUNTRY CASELINE NUMBER DOCUMENT CONTROL NUMBER PART NUMBER NATIONAL STOCK NUMBER NOMENCLATURE SERIAL NUMBER DELIVERY ORDER NUMBER CLIN ASSET RECEIVED DATE QUANITY PLACED ON ORDER CONTRACTUAL START DATE INDUCTION DATE CONTRACT COMPLETION DATE FORECAST COMPLETION DATE ACCEPTANCE DATE TURNAROUND TIME SHIPMENT TRACKING NUMBER AND COMMENTS FOR PRODUCTION STATUS THE REPORT SHOULD BE FURNISHED IN DELIVERY ORDER SEQUENCE ANY DELAYS OR SLIPPAGE TO FORECAST COMPLETION DATE SHALL BE COMMUNICATED TO LPSIB VIA DETAILED EMAIL OR PHONE CONVERSATION DETAILED INFORMATION SHALL INCLUDE BUT NOT BE LIMITED TO CAUSE FOR DELAYSLIPPAGE IE PARTS CONSTRAINTS TESTSTAND ISSUES PERSONNEL SHORTAGE ETC FOR EMAIL ADDRESS ADDITIONAL PHONE NUMBERS CALL Scott Robinson AT 865 7423274 OR EMAIL AT SCOTTROBINSON15USAFMIL: |
| Reg16 REMARKS BLOCK 4 DID IS TAILORED AS FOLLOWS THE CONTRACTOR SHALL PREPARE AND FURNISH A MONTHLY CUMULATIVE STATUS REPORT FOR ALL ITEMS THAT HAVE BEEN PLACED ON CONTRACT THE REPORT SHALL BE PREPARED AS OF THE LAST WORKING DAY OF EACH MONTH AND FORWARDED BY EMAIL NO LATER THAN THE 5TH WORKING DAY OF THE FOLLOWING MONTH THE INITIAL REPORT WILL BE PREPARED FOR THE MONTH DURING WHICH THE CONTRACT ASSETS ARE RECEIVED REPORTS WILL CONTINUE TO BE FORWARDED UNTIL ALL END ITEMS ARE REPARIED THE LAST REPORT WILL BE ANNOTATED FINAL REPORT NEGATIVE REPORTS ARE REQUIRED THIS REPORT SHOULD REFLECT THE APPLICABLE COUNTRY CASELINE NUMBER DOCUMENT CONTROL NUMBER PART NUMBER NATIONAL STOCK NUMBER NOMENCLATURE SERIAL NUMBER DELIVERY ORDER NUMBER CLIN ASSET RECEIVED DATE QUANITY PLACED ON ORDER CONTRACTUAL START DATE INDUCTION DATE CONTRACT COMPLETION DATE FORECAST COMPLETION DATE ACCEPTANCE DATE TURNAROUND TIME SHIPMENT TRACKING NUMBER AND COMMENTS FOR PRODUCTION STATUS THE REPORT SHOULD BE FURNISHED IN DELIVERY ORDER SEQUENCE ANY DELAYS OR SLIPPAGE TO FORECAST COMPLETION DATE SHALL BE COMMUNICATED TO LPSIB VIA DETAILED EMAIL OR PHONE CONVERSATION DETAILED INFORMATION SHALL INCLUDE BUT NOT BE LIMITED TO CAUSE FOR DELAYSLIPPAGE IE PARTS CONSTRAINTS TESTSTAND ISSUES PERSONNEL SHORTAGE ETC FOR EMAIL ADDRESS ADDITIONAL PHONE NUMBERS CALL Scott Robinson AT 865 7423274 OR EMAIL AT SCOTTROBINSON15USAFMIL: |
| Repro16 REMARKS BLOCK 4 DID IS TAILORED AS FOLLOWS THE CONTRACTOR SHALL PREPARE AND FURNISH A MONTHLY CUMULATIVE STATUS REPORT FOR ALL ITEMS THAT HAVE BEEN PLACED ON CONTRACT THE REPORT SHALL BE PREPARED AS OF THE LAST WORKING DAY OF EACH MONTH AND FORWARDED BY EMAIL NO LATER THAN THE 5TH WORKING DAY OF THE FOLLOWING MONTH THE INITIAL REPORT WILL BE PREPARED FOR THE MONTH DURING WHICH THE CONTRACT ASSETS ARE RECEIVED REPORTS WILL CONTINUE TO BE FORWARDED UNTIL ALL END ITEMS ARE REPARIED THE LAST REPORT WILL BE ANNOTATED FINAL REPORT NEGATIVE REPORTS ARE REQUIRED THIS REPORT SHOULD REFLECT THE APPLICABLE COUNTRY CASELINE NUMBER DOCUMENT CONTROL NUMBER PART NUMBER NATIONAL STOCK NUMBER NOMENCLATURE SERIAL NUMBER DELIVERY ORDER NUMBER CLIN ASSET RECEIVED DATE QUANITY PLACED ON ORDER CONTRACTUAL START DATE INDUCTION DATE CONTRACT COMPLETION DATE FORECAST COMPLETION DATE ACCEPTANCE DATE TURNAROUND TIME SHIPMENT TRACKING NUMBER AND COMMENTS FOR PRODUCTION STATUS THE REPORT SHOULD BE FURNISHED IN DELIVERY ORDER SEQUENCE ANY DELAYS OR SLIPPAGE TO FORECAST COMPLETION DATE SHALL BE COMMUNICATED TO LPSIB VIA DETAILED EMAIL OR PHONE CONVERSATION DETAILED INFORMATION SHALL INCLUDE BUT NOT BE LIMITED TO CAUSE FOR DELAYSLIPPAGE IE PARTS CONSTRAINTS TESTSTAND ISSUES PERSONNEL SHORTAGE ETC FOR EMAIL ADDRESS ADDITIONAL PHONE NUMBERS CALL Scott Robinson AT 865 7423274 OR EMAIL AT SCOTTROBINSON15USAFMIL: |
| D r a fAFLCMCLPSIB: |
| Repro1: |
| D r a fDCMAACO: |
| Repro1_2: |
| D r a fPCO: |
| Repro1_3: |
| PCO16 REMARKS BLOCK 4 DID IS TAILORED AS FOLLOWS THE CONTRACTOR SHALL PREPARE AND FURNISH A MONTHLY CUMULATIVE STATUS REPORT FOR ALL ITEMS THAT HAVE BEEN PLACED ON CONTRACT THE REPORT SHALL BE PREPARED AS OF THE LAST WORKING DAY OF EACH MONTH AND FORWARDED BY EMAIL NO LATER THAN THE 5TH WORKING DAY OF THE FOLLOWING MONTH THE INITIAL REPORT WILL BE PREPARED FOR THE MONTH DURING WHICH THE CONTRACT ASSETS ARE RECEIVED REPORTS WILL CONTINUE TO BE FORWARDED UNTIL ALL END ITEMS ARE REPARIED THE LAST REPORT WILL BE ANNOTATED FINAL REPORT NEGATIVE REPORTS ARE REQUIRED THIS REPORT SHOULD REFLECT THE APPLICABLE COUNTRY CASELINE NUMBER DOCUMENT CONTROL NUMBER PART NUMBER NATIONAL STOCK NUMBER NOMENCLATURE SERIAL NUMBER DELIVERY ORDER NUMBER CLIN ASSET RECEIVED DATE QUANITY PLACED ON ORDER CONTRACTUAL START DATE INDUCTION DATE CONTRACT COMPLETION DATE FORECAST COMPLETION DATE ACCEPTANCE DATE TURNAROUND TIME SHIPMENT TRACKING NUMBER AND COMMENTS FOR PRODUCTION STATUS THE REPORT SHOULD BE FURNISHED IN DELIVERY ORDER SEQUENCE ANY DELAYS OR SLIPPAGE TO FORECAST COMPLETION DATE SHALL BE COMMUNICATED TO LPSIB VIA DETAILED EMAIL OR PHONE CONVERSATION DETAILED INFORMATION SHALL INCLUDE BUT NOT BE LIMITED TO CAUSE FOR DELAYSLIPPAGE IE PARTS CONSTRAINTS TESTSTAND ISSUES PERSONNEL SHORTAGE ETC FOR EMAIL ADDRESS ADDITIONAL PHONE NUMBERS CALL Scott Robinson AT 865 7423274 OR EMAIL AT SCOTTROBINSON15USAFMIL: |
| D r a f16 REMARKS BLOCK 4 DID IS TAILORED AS FOLLOWS THE CONTRACTOR SHALL PREPARE AND FURNISH A MONTHLY CUMULATIVE STATUS REPORT FOR ALL ITEMS THAT HAVE BEEN PLACED ON CONTRACT THE REPORT SHALL BE PREPARED AS OF THE LAST WORKING DAY OF EACH MONTH AND FORWARDED BY EMAIL NO LATER THAN THE 5TH WORKING DAY OF THE FOLLOWING MONTH THE INITIAL REPORT WILL BE PREPARED FOR THE MONTH DURING WHICH THE CONTRACT ASSETS ARE RECEIVED REPORTS WILL CONTINUE TO BE FORWARDED UNTIL ALL END ITEMS ARE REPARIED THE LAST REPORT WILL BE ANNOTATED FINAL REPORT NEGATIVE REPORTS ARE REQUIRED THIS REPORT SHOULD REFLECT THE APPLICABLE COUNTRY CASELINE NUMBER DOCUMENT CONTROL NUMBER PART NUMBER NATIONAL STOCK NUMBER NOMENCLATURE SERIAL NUMBER DELIVERY ORDER NUMBER CLIN ASSET RECEIVED DATE QUANITY PLACED ON ORDER CONTRACTUAL START DATE INDUCTION DATE CONTRACT COMPLETION DATE FORECAST COMPLETION DATE ACCEPTANCE DATE TURNAROUND TIME SHIPMENT TRACKING NUMBER AND COMMENTS FOR PRODUCTION STATUS THE REPORT SHOULD BE FURNISHED IN DELIVERY ORDER SEQUENCE ANY DELAYS OR SLIPPAGE TO FORECAST COMPLETION DATE SHALL BE COMMUNICATED TO LPSIB VIA DETAILED EMAIL OR PHONE CONVERSATION DETAILED INFORMATION SHALL INCLUDE BUT NOT BE LIMITED TO CAUSE FOR DELAYSLIPPAGE IE PARTS CONSTRAINTS TESTSTAND ISSUES PERSONNEL SHORTAGE ETC FOR EMAIL ADDRESS ADDITIONAL PHONE NUMBERS CALL Scott Robinson AT 865 7423274 OR EMAIL AT SCOTTROBINSON15USAFMIL_2: |
| 116 REMARKS BLOCK 4 DID IS TAILORED AS FOLLOWS THE CONTRACTOR SHALL PREPARE AND FURNISH A MONTHLY CUMULATIVE STATUS REPORT FOR ALL ITEMS THAT HAVE BEEN PLACED ON CONTRACT THE REPORT SHALL BE PREPARED AS OF THE LAST WORKING DAY OF EACH MONTH AND FORWARDED BY EMAIL NO LATER THAN THE 5TH WORKING DAY OF THE FOLLOWING MONTH THE INITIAL REPORT WILL BE PREPARED FOR THE MONTH DURING WHICH THE CONTRACT ASSETS ARE RECEIVED REPORTS WILL CONTINUE TO BE FORWARDED UNTIL ALL END ITEMS ARE REPARIED THE LAST REPORT WILL BE ANNOTATED FINAL REPORT NEGATIVE REPORTS ARE REQUIRED THIS REPORT SHOULD REFLECT THE APPLICABLE COUNTRY CASELINE NUMBER DOCUMENT CONTROL NUMBER PART NUMBER NATIONAL STOCK NUMBER NOMENCLATURE SERIAL NUMBER DELIVERY ORDER NUMBER CLIN ASSET RECEIVED DATE QUANITY PLACED ON ORDER CONTRACTUAL START DATE INDUCTION DATE CONTRACT COMPLETION DATE FORECAST COMPLETION DATE ACCEPTANCE DATE TURNAROUND TIME SHIPMENT TRACKING NUMBER AND COMMENTS FOR PRODUCTION STATUS THE REPORT SHOULD BE FURNISHED IN DELIVERY ORDER SEQUENCE ANY DELAYS OR SLIPPAGE TO FORECAST COMPLETION DATE SHALL BE COMMUNICATED TO LPSIB VIA DETAILED EMAIL OR PHONE CONVERSATION DETAILED INFORMATION SHALL INCLUDE BUT NOT BE LIMITED TO CAUSE FOR DELAYSLIPPAGE IE PARTS CONSTRAINTS TESTSTAND ISSUES PERSONNEL SHORTAGE ETC FOR EMAIL ADDRESS ADDITIONAL PHONE NUMBERS CALL Scott Robinson AT 865 7423274 OR EMAIL AT SCOTTROBINSON15USAFMIL: |
| Repro16 REMARKS BLOCK 4 DID IS TAILORED AS FOLLOWS THE CONTRACTOR SHALL PREPARE AND FURNISH A MONTHLY CUMULATIVE STATUS REPORT FOR ALL ITEMS THAT HAVE BEEN PLACED ON CONTRACT THE REPORT SHALL BE PREPARED AS OF THE LAST WORKING DAY OF EACH MONTH AND FORWARDED BY EMAIL NO LATER THAN THE 5TH WORKING DAY OF THE FOLLOWING MONTH THE INITIAL REPORT WILL BE PREPARED FOR THE MONTH DURING WHICH THE CONTRACT ASSETS ARE RECEIVED REPORTS WILL CONTINUE TO BE FORWARDED UNTIL ALL END ITEMS ARE REPARIED THE LAST REPORT WILL BE ANNOTATED FINAL REPORT NEGATIVE REPORTS ARE REQUIRED THIS REPORT SHOULD REFLECT THE APPLICABLE COUNTRY CASELINE NUMBER DOCUMENT CONTROL NUMBER PART NUMBER NATIONAL STOCK NUMBER NOMENCLATURE SERIAL NUMBER DELIVERY ORDER NUMBER CLIN ASSET RECEIVED DATE QUANITY PLACED ON ORDER CONTRACTUAL START DATE INDUCTION DATE CONTRACT COMPLETION DATE FORECAST COMPLETION DATE ACCEPTANCE DATE TURNAROUND TIME SHIPMENT TRACKING NUMBER AND COMMENTS FOR PRODUCTION STATUS THE REPORT SHOULD BE FURNISHED IN DELIVERY ORDER SEQUENCE ANY DELAYS OR SLIPPAGE TO FORECAST COMPLETION DATE SHALL BE COMMUNICATED TO LPSIB VIA DETAILED EMAIL OR PHONE CONVERSATION DETAILED INFORMATION SHALL INCLUDE BUT NOT BE LIMITED TO CAUSE FOR DELAYSLIPPAGE IE PARTS CONSTRAINTS TESTSTAND ISSUES PERSONNEL SHORTAGE ETC FOR EMAIL ADDRESS ADDITIONAL PHONE NUMBERS CALL Scott Robinson AT 865 7423274 OR EMAIL AT SCOTTROBINSON15USAFMIL_2: |
| PCO16 REMARKS BLOCK 4 DID IS TAILORED AS FOLLOWS THE CONTRACTOR SHALL PREPARE AND FURNISH A MONTHLY CUMULATIVE STATUS REPORT FOR ALL ITEMS THAT HAVE BEEN PLACED ON CONTRACT THE REPORT SHALL BE PREPARED AS OF THE LAST WORKING DAY OF EACH MONTH AND FORWARDED BY EMAIL NO LATER THAN THE 5TH WORKING DAY OF THE FOLLOWING MONTH THE INITIAL REPORT WILL BE PREPARED FOR THE MONTH DURING WHICH THE CONTRACT ASSETS ARE RECEIVED REPORTS WILL CONTINUE TO BE FORWARDED UNTIL ALL END ITEMS ARE REPARIED THE LAST REPORT WILL BE ANNOTATED FINAL REPORT NEGATIVE REPORTS ARE REQUIRED THIS REPORT SHOULD REFLECT THE APPLICABLE COUNTRY CASELINE NUMBER DOCUMENT CONTROL NUMBER PART NUMBER NATIONAL STOCK NUMBER NOMENCLATURE SERIAL NUMBER DELIVERY ORDER NUMBER CLIN ASSET RECEIVED DATE QUANITY PLACED ON ORDER CONTRACTUAL START DATE INDUCTION DATE CONTRACT COMPLETION DATE FORECAST COMPLETION DATE ACCEPTANCE DATE TURNAROUND TIME SHIPMENT TRACKING NUMBER AND COMMENTS FOR PRODUCTION STATUS THE REPORT SHOULD BE FURNISHED IN DELIVERY ORDER SEQUENCE ANY DELAYS OR SLIPPAGE TO FORECAST COMPLETION DATE SHALL BE COMMUNICATED TO LPSIB VIA DETAILED EMAIL OR PHONE CONVERSATION DETAILED INFORMATION SHALL INCLUDE BUT NOT BE LIMITED TO CAUSE FOR DELAYSLIPPAGE IE PARTS CONSTRAINTS TESTSTAND ISSUES PERSONNEL SHORTAGE ETC FOR EMAIL ADDRESS ADDITIONAL PHONE NUMBERS CALL Scott Robinson AT 865 7423274 OR EMAIL AT SCOTTROBINSON15USAFMIL_2: |
| D r a f16 REMARKS BLOCK 4 DID IS TAILORED AS FOLLOWS THE CONTRACTOR SHALL PREPARE AND FURNISH A MONTHLY CUMULATIVE STATUS REPORT FOR ALL ITEMS THAT HAVE BEEN PLACED ON CONTRACT THE REPORT SHALL BE PREPARED AS OF THE LAST WORKING DAY OF EACH MONTH AND FORWARDED BY EMAIL NO LATER THAN THE 5TH WORKING DAY OF THE FOLLOWING MONTH THE INITIAL REPORT WILL BE PREPARED FOR THE MONTH DURING WHICH THE CONTRACT ASSETS ARE RECEIVED REPORTS WILL CONTINUE TO BE FORWARDED UNTIL ALL END ITEMS ARE REPARIED THE LAST REPORT WILL BE ANNOTATED FINAL REPORT NEGATIVE REPORTS ARE REQUIRED THIS REPORT SHOULD REFLECT THE APPLICABLE COUNTRY CASELINE NUMBER DOCUMENT CONTROL NUMBER PART NUMBER NATIONAL STOCK NUMBER NOMENCLATURE SERIAL NUMBER DELIVERY ORDER NUMBER CLIN ASSET RECEIVED DATE QUANITY PLACED ON ORDER CONTRACTUAL START DATE INDUCTION DATE CONTRACT COMPLETION DATE FORECAST COMPLETION DATE ACCEPTANCE DATE TURNAROUND TIME SHIPMENT TRACKING NUMBER AND COMMENTS FOR PRODUCTION STATUS THE REPORT SHOULD BE FURNISHED IN DELIVERY ORDER SEQUENCE ANY DELAYS OR SLIPPAGE TO FORECAST COMPLETION DATE SHALL BE COMMUNICATED TO LPSIB VIA DETAILED EMAIL OR PHONE CONVERSATION DETAILED INFORMATION SHALL INCLUDE BUT NOT BE LIMITED TO CAUSE FOR DELAYSLIPPAGE IE PARTS CONSTRAINTS TESTSTAND ISSUES PERSONNEL SHORTAGE ETC FOR EMAIL ADDRESS ADDITIONAL PHONE NUMBERS CALL Scott Robinson AT 865 7423274 OR EMAIL AT SCOTTROBINSON15USAFMIL_3: |
| 116 REMARKS BLOCK 4 DID IS TAILORED AS FOLLOWS THE CONTRACTOR SHALL PREPARE AND FURNISH A MONTHLY CUMULATIVE STATUS REPORT FOR ALL ITEMS THAT HAVE BEEN PLACED ON CONTRACT THE REPORT SHALL BE PREPARED AS OF THE LAST WORKING DAY OF EACH MONTH AND FORWARDED BY EMAIL NO LATER THAN THE 5TH WORKING DAY OF THE FOLLOWING MONTH THE INITIAL REPORT WILL BE PREPARED FOR THE MONTH DURING WHICH THE CONTRACT ASSETS ARE RECEIVED REPORTS WILL CONTINUE TO BE FORWARDED UNTIL ALL END ITEMS ARE REPARIED THE LAST REPORT WILL BE ANNOTATED FINAL REPORT NEGATIVE REPORTS ARE REQUIRED THIS REPORT SHOULD REFLECT THE APPLICABLE COUNTRY CASELINE NUMBER DOCUMENT CONTROL NUMBER PART NUMBER NATIONAL STOCK NUMBER NOMENCLATURE SERIAL NUMBER DELIVERY ORDER NUMBER CLIN ASSET RECEIVED DATE QUANITY PLACED ON ORDER CONTRACTUAL START DATE INDUCTION DATE CONTRACT COMPLETION DATE FORECAST COMPLETION DATE ACCEPTANCE DATE TURNAROUND TIME SHIPMENT TRACKING NUMBER AND COMMENTS FOR PRODUCTION STATUS THE REPORT SHOULD BE FURNISHED IN DELIVERY ORDER SEQUENCE ANY DELAYS OR SLIPPAGE TO FORECAST COMPLETION DATE SHALL BE COMMUNICATED TO LPSIB VIA DETAILED EMAIL OR PHONE CONVERSATION DETAILED INFORMATION SHALL INCLUDE BUT NOT BE LIMITED TO CAUSE FOR DELAYSLIPPAGE IE PARTS CONSTRAINTS TESTSTAND ISSUES PERSONNEL SHORTAGE ETC FOR EMAIL ADDRESS ADDITIONAL PHONE NUMBERS CALL Scott Robinson AT 865 7423274 OR EMAIL AT SCOTTROBINSON15USAFMIL_2: |
| Repro16 REMARKS BLOCK 4 DID IS TAILORED AS FOLLOWS THE CONTRACTOR SHALL PREPARE AND FURNISH A MONTHLY CUMULATIVE STATUS REPORT FOR ALL ITEMS THAT HAVE BEEN PLACED ON CONTRACT THE REPORT SHALL BE PREPARED AS OF THE LAST WORKING DAY OF EACH MONTH AND FORWARDED BY EMAIL NO LATER THAN THE 5TH WORKING DAY OF THE FOLLOWING MONTH THE INITIAL REPORT WILL BE PREPARED FOR THE MONTH DURING WHICH THE CONTRACT ASSETS ARE RECEIVED REPORTS WILL CONTINUE TO BE FORWARDED UNTIL ALL END ITEMS ARE REPARIED THE LAST REPORT WILL BE ANNOTATED FINAL REPORT NEGATIVE REPORTS ARE REQUIRED THIS REPORT SHOULD REFLECT THE APPLICABLE COUNTRY CASELINE NUMBER DOCUMENT CONTROL NUMBER PART NUMBER NATIONAL STOCK NUMBER NOMENCLATURE SERIAL NUMBER DELIVERY ORDER NUMBER CLIN ASSET RECEIVED DATE QUANITY PLACED ON ORDER CONTRACTUAL START DATE INDUCTION DATE CONTRACT COMPLETION DATE FORECAST COMPLETION DATE ACCEPTANCE DATE TURNAROUND TIME SHIPMENT TRACKING NUMBER AND COMMENTS FOR PRODUCTION STATUS THE REPORT SHOULD BE FURNISHED IN DELIVERY ORDER SEQUENCE ANY DELAYS OR SLIPPAGE TO FORECAST COMPLETION DATE SHALL BE COMMUNICATED TO LPSIB VIA DETAILED EMAIL OR PHONE CONVERSATION DETAILED INFORMATION SHALL INCLUDE BUT NOT BE LIMITED TO CAUSE FOR DELAYSLIPPAGE IE PARTS CONSTRAINTS TESTSTAND ISSUES PERSONNEL SHORTAGE ETC FOR EMAIL ADDRESS ADDITIONAL PHONE NUMBERS CALL Scott Robinson AT 865 7423274 OR EMAIL AT SCOTTROBINSON15USAFMIL_3: |
| PCO16 REMARKS BLOCK 4 DID IS TAILORED AS FOLLOWS THE CONTRACTOR SHALL PREPARE AND FURNISH A MONTHLY CUMULATIVE STATUS REPORT FOR ALL ITEMS THAT HAVE BEEN PLACED ON CONTRACT THE REPORT SHALL BE PREPARED AS OF THE LAST WORKING DAY OF EACH MONTH AND FORWARDED BY EMAIL NO LATER THAN THE 5TH WORKING DAY OF THE FOLLOWING MONTH THE INITIAL REPORT WILL BE PREPARED FOR THE MONTH DURING WHICH THE CONTRACT ASSETS ARE RECEIVED REPORTS WILL CONTINUE TO BE FORWARDED UNTIL ALL END ITEMS ARE REPARIED THE LAST REPORT WILL BE ANNOTATED FINAL REPORT NEGATIVE REPORTS ARE REQUIRED THIS REPORT SHOULD REFLECT THE APPLICABLE COUNTRY CASELINE NUMBER DOCUMENT CONTROL NUMBER PART NUMBER NATIONAL STOCK NUMBER NOMENCLATURE SERIAL NUMBER DELIVERY ORDER NUMBER CLIN ASSET RECEIVED DATE QUANITY PLACED ON ORDER CONTRACTUAL START DATE INDUCTION DATE CONTRACT COMPLETION DATE FORECAST COMPLETION DATE ACCEPTANCE DATE TURNAROUND TIME SHIPMENT TRACKING NUMBER AND COMMENTS FOR PRODUCTION STATUS THE REPORT SHOULD BE FURNISHED IN DELIVERY ORDER SEQUENCE ANY DELAYS OR SLIPPAGE TO FORECAST COMPLETION DATE SHALL BE COMMUNICATED TO LPSIB VIA DETAILED EMAIL OR PHONE CONVERSATION DETAILED INFORMATION SHALL INCLUDE BUT NOT BE LIMITED TO CAUSE FOR DELAYSLIPPAGE IE PARTS CONSTRAINTS TESTSTAND ISSUES PERSONNEL SHORTAGE ETC FOR EMAIL ADDRESS ADDITIONAL PHONE NUMBERS CALL Scott Robinson AT 865 7423274 OR EMAIL AT SCOTTROBINSON15USAFMIL_3: |
| D r a f16 REMARKS BLOCK 4 DID IS TAILORED AS FOLLOWS THE CONTRACTOR SHALL PREPARE AND FURNISH A MONTHLY CUMULATIVE STATUS REPORT FOR ALL ITEMS THAT HAVE BEEN PLACED ON CONTRACT THE REPORT SHALL BE PREPARED AS OF THE LAST WORKING DAY OF EACH MONTH AND FORWARDED BY EMAIL NO LATER THAN THE 5TH WORKING DAY OF THE FOLLOWING MONTH THE INITIAL REPORT WILL BE PREPARED FOR THE MONTH DURING WHICH THE CONTRACT ASSETS ARE RECEIVED REPORTS WILL CONTINUE TO BE FORWARDED UNTIL ALL END ITEMS ARE REPARIED THE LAST REPORT WILL BE ANNOTATED FINAL REPORT NEGATIVE REPORTS ARE REQUIRED THIS REPORT SHOULD REFLECT THE APPLICABLE COUNTRY CASELINE NUMBER DOCUMENT CONTROL NUMBER PART NUMBER NATIONAL STOCK NUMBER NOMENCLATURE SERIAL NUMBER DELIVERY ORDER NUMBER CLIN ASSET RECEIVED DATE QUANITY PLACED ON ORDER CONTRACTUAL START DATE INDUCTION DATE CONTRACT COMPLETION DATE FORECAST COMPLETION DATE ACCEPTANCE DATE TURNAROUND TIME SHIPMENT TRACKING NUMBER AND COMMENTS FOR PRODUCTION STATUS THE REPORT SHOULD BE FURNISHED IN DELIVERY ORDER SEQUENCE ANY DELAYS OR SLIPPAGE TO FORECAST COMPLETION DATE SHALL BE COMMUNICATED TO LPSIB VIA DETAILED EMAIL OR PHONE CONVERSATION DETAILED INFORMATION SHALL INCLUDE BUT NOT BE LIMITED TO CAUSE FOR DELAYSLIPPAGE IE PARTS CONSTRAINTS TESTSTAND ISSUES PERSONNEL SHORTAGE ETC FOR EMAIL ADDRESS ADDITIONAL PHONE NUMBERS CALL Scott Robinson AT 865 7423274 OR EMAIL AT SCOTTROBINSON15USAFMIL_4: |
| 116 REMARKS BLOCK 4 DID IS TAILORED AS FOLLOWS THE CONTRACTOR SHALL PREPARE AND FURNISH A MONTHLY CUMULATIVE STATUS REPORT FOR ALL ITEMS THAT HAVE BEEN PLACED ON CONTRACT THE REPORT SHALL BE PREPARED AS OF THE LAST WORKING DAY OF EACH MONTH AND FORWARDED BY EMAIL NO LATER THAN THE 5TH WORKING DAY OF THE FOLLOWING MONTH THE INITIAL REPORT WILL BE PREPARED FOR THE MONTH DURING WHICH THE CONTRACT ASSETS ARE RECEIVED REPORTS WILL CONTINUE TO BE FORWARDED UNTIL ALL END ITEMS ARE REPARIED THE LAST REPORT WILL BE ANNOTATED FINAL REPORT NEGATIVE REPORTS ARE REQUIRED THIS REPORT SHOULD REFLECT THE APPLICABLE COUNTRY CASELINE NUMBER DOCUMENT CONTROL NUMBER PART NUMBER NATIONAL STOCK NUMBER NOMENCLATURE SERIAL NUMBER DELIVERY ORDER NUMBER CLIN ASSET RECEIVED DATE QUANITY PLACED ON ORDER CONTRACTUAL START DATE INDUCTION DATE CONTRACT COMPLETION DATE FORECAST COMPLETION DATE ACCEPTANCE DATE TURNAROUND TIME SHIPMENT TRACKING NUMBER AND COMMENTS FOR PRODUCTION STATUS THE REPORT SHOULD BE FURNISHED IN DELIVERY ORDER SEQUENCE ANY DELAYS OR SLIPPAGE TO FORECAST COMPLETION DATE SHALL BE COMMUNICATED TO LPSIB VIA DETAILED EMAIL OR PHONE CONVERSATION DETAILED INFORMATION SHALL INCLUDE BUT NOT BE LIMITED TO CAUSE FOR DELAYSLIPPAGE IE PARTS CONSTRAINTS TESTSTAND ISSUES PERSONNEL SHORTAGE ETC FOR EMAIL ADDRESS ADDITIONAL PHONE NUMBERS CALL Scott Robinson AT 865 7423274 OR EMAIL AT SCOTTROBINSON15USAFMIL_3: |
| Repro16 REMARKS BLOCK 4 DID IS TAILORED AS FOLLOWS THE CONTRACTOR SHALL PREPARE AND FURNISH A MONTHLY CUMULATIVE STATUS REPORT FOR ALL ITEMS THAT HAVE BEEN PLACED ON CONTRACT THE REPORT SHALL BE PREPARED AS OF THE LAST WORKING DAY OF EACH MONTH AND FORWARDED BY EMAIL NO LATER THAN THE 5TH WORKING DAY OF THE FOLLOWING MONTH THE INITIAL REPORT WILL BE PREPARED FOR THE MONTH DURING WHICH THE CONTRACT ASSETS ARE RECEIVED REPORTS WILL CONTINUE TO BE FORWARDED UNTIL ALL END ITEMS ARE REPARIED THE LAST REPORT WILL BE ANNOTATED FINAL REPORT NEGATIVE REPORTS ARE REQUIRED THIS REPORT SHOULD REFLECT THE APPLICABLE COUNTRY CASELINE NUMBER DOCUMENT CONTROL NUMBER PART NUMBER NATIONAL STOCK NUMBER NOMENCLATURE SERIAL NUMBER DELIVERY ORDER NUMBER CLIN ASSET RECEIVED DATE QUANITY PLACED ON ORDER CONTRACTUAL START DATE INDUCTION DATE CONTRACT COMPLETION DATE FORECAST COMPLETION DATE ACCEPTANCE DATE TURNAROUND TIME SHIPMENT TRACKING NUMBER AND COMMENTS FOR PRODUCTION STATUS THE REPORT SHOULD BE FURNISHED IN DELIVERY ORDER SEQUENCE ANY DELAYS OR SLIPPAGE TO FORECAST COMPLETION DATE SHALL BE COMMUNICATED TO LPSIB VIA DETAILED EMAIL OR PHONE CONVERSATION DETAILED INFORMATION SHALL INCLUDE BUT NOT BE LIMITED TO CAUSE FOR DELAYSLIPPAGE IE PARTS CONSTRAINTS TESTSTAND ISSUES PERSONNEL SHORTAGE ETC FOR EMAIL ADDRESS ADDITIONAL PHONE NUMBERS CALL Scott Robinson AT 865 7423274 OR EMAIL AT SCOTTROBINSON15USAFMIL_4: |
| PCO16 REMARKS BLOCK 4 DID IS TAILORED AS FOLLOWS THE CONTRACTOR SHALL PREPARE AND FURNISH A MONTHLY CUMULATIVE STATUS REPORT FOR ALL ITEMS THAT HAVE BEEN PLACED ON CONTRACT THE REPORT SHALL BE PREPARED AS OF THE LAST WORKING DAY OF EACH MONTH AND FORWARDED BY EMAIL NO LATER THAN THE 5TH WORKING DAY OF THE FOLLOWING MONTH THE INITIAL REPORT WILL BE PREPARED FOR THE MONTH DURING WHICH THE CONTRACT ASSETS ARE RECEIVED REPORTS WILL CONTINUE TO BE FORWARDED UNTIL ALL END ITEMS ARE REPARIED THE LAST REPORT WILL BE ANNOTATED FINAL REPORT NEGATIVE REPORTS ARE REQUIRED THIS REPORT SHOULD REFLECT THE APPLICABLE COUNTRY CASELINE NUMBER DOCUMENT CONTROL NUMBER PART NUMBER NATIONAL STOCK NUMBER NOMENCLATURE SERIAL NUMBER DELIVERY ORDER NUMBER CLIN ASSET RECEIVED DATE QUANITY PLACED ON ORDER CONTRACTUAL START DATE INDUCTION DATE CONTRACT COMPLETION DATE FORECAST COMPLETION DATE ACCEPTANCE DATE TURNAROUND TIME SHIPMENT TRACKING NUMBER AND COMMENTS FOR PRODUCTION STATUS THE REPORT SHOULD BE FURNISHED IN DELIVERY ORDER SEQUENCE ANY DELAYS OR SLIPPAGE TO FORECAST COMPLETION DATE SHALL BE COMMUNICATED TO LPSIB VIA DETAILED EMAIL OR PHONE CONVERSATION DETAILED INFORMATION SHALL INCLUDE BUT NOT BE LIMITED TO CAUSE FOR DELAYSLIPPAGE IE PARTS CONSTRAINTS TESTSTAND ISSUES PERSONNEL SHORTAGE ETC FOR EMAIL ADDRESS ADDITIONAL PHONE NUMBERS CALL Scott Robinson AT 865 7423274 OR EMAIL AT SCOTTROBINSON15USAFMIL_4: |
| D r a f16 REMARKS BLOCK 4 DID IS TAILORED AS FOLLOWS THE CONTRACTOR SHALL PREPARE AND FURNISH A MONTHLY CUMULATIVE STATUS REPORT FOR ALL ITEMS THAT HAVE BEEN PLACED ON CONTRACT THE REPORT SHALL BE PREPARED AS OF THE LAST WORKING DAY OF EACH MONTH AND FORWARDED BY EMAIL NO LATER THAN THE 5TH WORKING DAY OF THE FOLLOWING MONTH THE INITIAL REPORT WILL BE PREPARED FOR THE MONTH DURING WHICH THE CONTRACT ASSETS ARE RECEIVED REPORTS WILL CONTINUE TO BE FORWARDED UNTIL ALL END ITEMS ARE REPARIED THE LAST REPORT WILL BE ANNOTATED FINAL REPORT NEGATIVE REPORTS ARE REQUIRED THIS REPORT SHOULD REFLECT THE APPLICABLE COUNTRY CASELINE NUMBER DOCUMENT CONTROL NUMBER PART NUMBER NATIONAL STOCK NUMBER NOMENCLATURE SERIAL NUMBER DELIVERY ORDER NUMBER CLIN ASSET RECEIVED DATE QUANITY PLACED ON ORDER CONTRACTUAL START DATE INDUCTION DATE CONTRACT COMPLETION DATE FORECAST COMPLETION DATE ACCEPTANCE DATE TURNAROUND TIME SHIPMENT TRACKING NUMBER AND COMMENTS FOR PRODUCTION STATUS THE REPORT SHOULD BE FURNISHED IN DELIVERY ORDER SEQUENCE ANY DELAYS OR SLIPPAGE TO FORECAST COMPLETION DATE SHALL BE COMMUNICATED TO LPSIB VIA DETAILED EMAIL OR PHONE CONVERSATION DETAILED INFORMATION SHALL INCLUDE BUT NOT BE LIMITED TO CAUSE FOR DELAYSLIPPAGE IE PARTS CONSTRAINTS TESTSTAND ISSUES PERSONNEL SHORTAGE ETC FOR EMAIL ADDRESS ADDITIONAL PHONE NUMBERS CALL Scott Robinson AT 865 7423274 OR EMAIL AT SCOTTROBINSON15USAFMIL_5: |
| 116 REMARKS BLOCK 4 DID IS TAILORED AS FOLLOWS THE CONTRACTOR SHALL PREPARE AND FURNISH A MONTHLY CUMULATIVE STATUS REPORT FOR ALL ITEMS THAT HAVE BEEN PLACED ON CONTRACT THE REPORT SHALL BE PREPARED AS OF THE LAST WORKING DAY OF EACH MONTH AND FORWARDED BY EMAIL NO LATER THAN THE 5TH WORKING DAY OF THE FOLLOWING MONTH THE INITIAL REPORT WILL BE PREPARED FOR THE MONTH DURING WHICH THE CONTRACT ASSETS ARE RECEIVED REPORTS WILL CONTINUE TO BE FORWARDED UNTIL ALL END ITEMS ARE REPARIED THE LAST REPORT WILL BE ANNOTATED FINAL REPORT NEGATIVE REPORTS ARE REQUIRED THIS REPORT SHOULD REFLECT THE APPLICABLE COUNTRY CASELINE NUMBER DOCUMENT CONTROL NUMBER PART NUMBER NATIONAL STOCK NUMBER NOMENCLATURE SERIAL NUMBER DELIVERY ORDER NUMBER CLIN ASSET RECEIVED DATE QUANITY PLACED ON ORDER CONTRACTUAL START DATE INDUCTION DATE CONTRACT COMPLETION DATE FORECAST COMPLETION DATE ACCEPTANCE DATE TURNAROUND TIME SHIPMENT TRACKING NUMBER AND COMMENTS FOR PRODUCTION STATUS THE REPORT SHOULD BE FURNISHED IN DELIVERY ORDER SEQUENCE ANY DELAYS OR SLIPPAGE TO FORECAST COMPLETION DATE SHALL BE COMMUNICATED TO LPSIB VIA DETAILED EMAIL OR PHONE CONVERSATION DETAILED INFORMATION SHALL INCLUDE BUT NOT BE LIMITED TO CAUSE FOR DELAYSLIPPAGE IE PARTS CONSTRAINTS TESTSTAND ISSUES PERSONNEL SHORTAGE ETC FOR EMAIL ADDRESS ADDITIONAL PHONE NUMBERS CALL Scott Robinson AT 865 7423274 OR EMAIL AT SCOTTROBINSON15USAFMIL_4: |
| Repro16 REMARKS BLOCK 4 DID IS TAILORED AS FOLLOWS THE CONTRACTOR SHALL PREPARE AND FURNISH A MONTHLY CUMULATIVE STATUS REPORT FOR ALL ITEMS THAT HAVE BEEN PLACED ON CONTRACT THE REPORT SHALL BE PREPARED AS OF THE LAST WORKING DAY OF EACH MONTH AND FORWARDED BY EMAIL NO LATER THAN THE 5TH WORKING DAY OF THE FOLLOWING MONTH THE INITIAL REPORT WILL BE PREPARED FOR THE MONTH DURING WHICH THE CONTRACT ASSETS ARE RECEIVED REPORTS WILL CONTINUE TO BE FORWARDED UNTIL ALL END ITEMS ARE REPARIED THE LAST REPORT WILL BE ANNOTATED FINAL REPORT NEGATIVE REPORTS ARE REQUIRED THIS REPORT SHOULD REFLECT THE APPLICABLE COUNTRY CASELINE NUMBER DOCUMENT CONTROL NUMBER PART NUMBER NATIONAL STOCK NUMBER NOMENCLATURE SERIAL NUMBER DELIVERY ORDER NUMBER CLIN ASSET RECEIVED DATE QUANITY PLACED ON ORDER CONTRACTUAL START DATE INDUCTION DATE CONTRACT COMPLETION DATE FORECAST COMPLETION DATE ACCEPTANCE DATE TURNAROUND TIME SHIPMENT TRACKING NUMBER AND COMMENTS FOR PRODUCTION STATUS THE REPORT SHOULD BE FURNISHED IN DELIVERY ORDER SEQUENCE ANY DELAYS OR SLIPPAGE TO FORECAST COMPLETION DATE SHALL BE COMMUNICATED TO LPSIB VIA DETAILED EMAIL OR PHONE CONVERSATION DETAILED INFORMATION SHALL INCLUDE BUT NOT BE LIMITED TO CAUSE FOR DELAYSLIPPAGE IE PARTS CONSTRAINTS TESTSTAND ISSUES PERSONNEL SHORTAGE ETC FOR EMAIL ADDRESS ADDITIONAL PHONE NUMBERS CALL Scott Robinson AT 865 7423274 OR EMAIL AT SCOTTROBINSON15USAFMIL_5: |
| PCO16 REMARKS BLOCK 4 DID IS TAILORED AS FOLLOWS THE CONTRACTOR SHALL PREPARE AND FURNISH A MONTHLY CUMULATIVE STATUS REPORT FOR ALL ITEMS THAT HAVE BEEN PLACED ON CONTRACT THE REPORT SHALL BE PREPARED AS OF THE LAST WORKING DAY OF EACH MONTH AND FORWARDED BY EMAIL NO LATER THAN THE 5TH WORKING DAY OF THE FOLLOWING MONTH THE INITIAL REPORT WILL BE PREPARED FOR THE MONTH DURING WHICH THE CONTRACT ASSETS ARE RECEIVED REPORTS WILL CONTINUE TO BE FORWARDED UNTIL ALL END ITEMS ARE REPARIED THE LAST REPORT WILL BE ANNOTATED FINAL REPORT NEGATIVE REPORTS ARE REQUIRED THIS REPORT SHOULD REFLECT THE APPLICABLE COUNTRY CASELINE NUMBER DOCUMENT CONTROL NUMBER PART NUMBER NATIONAL STOCK NUMBER NOMENCLATURE SERIAL NUMBER DELIVERY ORDER NUMBER CLIN ASSET RECEIVED DATE QUANITY PLACED ON ORDER CONTRACTUAL START DATE INDUCTION DATE CONTRACT COMPLETION DATE FORECAST COMPLETION DATE ACCEPTANCE DATE TURNAROUND TIME SHIPMENT TRACKING NUMBER AND COMMENTS FOR PRODUCTION STATUS THE REPORT SHOULD BE FURNISHED IN DELIVERY ORDER SEQUENCE ANY DELAYS OR SLIPPAGE TO FORECAST COMPLETION DATE SHALL BE COMMUNICATED TO LPSIB VIA DETAILED EMAIL OR PHONE CONVERSATION DETAILED INFORMATION SHALL INCLUDE BUT NOT BE LIMITED TO CAUSE FOR DELAYSLIPPAGE IE PARTS CONSTRAINTS TESTSTAND ISSUES PERSONNEL SHORTAGE ETC FOR EMAIL ADDRESS ADDITIONAL PHONE NUMBERS CALL Scott Robinson AT 865 7423274 OR EMAIL AT SCOTTROBINSON15USAFMIL_5: |
| D r a f16 REMARKS BLOCK 4 DID IS TAILORED AS FOLLOWS THE CONTRACTOR SHALL PREPARE AND FURNISH A MONTHLY CUMULATIVE STATUS REPORT FOR ALL ITEMS THAT HAVE BEEN PLACED ON CONTRACT THE REPORT SHALL BE PREPARED AS OF THE LAST WORKING DAY OF EACH MONTH AND FORWARDED BY EMAIL NO LATER THAN THE 5TH WORKING DAY OF THE FOLLOWING MONTH THE INITIAL REPORT WILL BE PREPARED FOR THE MONTH DURING WHICH THE CONTRACT ASSETS ARE RECEIVED REPORTS WILL CONTINUE TO BE FORWARDED UNTIL ALL END ITEMS ARE REPARIED THE LAST REPORT WILL BE ANNOTATED FINAL REPORT NEGATIVE REPORTS ARE REQUIRED THIS REPORT SHOULD REFLECT THE APPLICABLE COUNTRY CASELINE NUMBER DOCUMENT CONTROL NUMBER PART NUMBER NATIONAL STOCK NUMBER NOMENCLATURE SERIAL NUMBER DELIVERY ORDER NUMBER CLIN ASSET RECEIVED DATE QUANITY PLACED ON ORDER CONTRACTUAL START DATE INDUCTION DATE CONTRACT COMPLETION DATE FORECAST COMPLETION DATE ACCEPTANCE DATE TURNAROUND TIME SHIPMENT TRACKING NUMBER AND COMMENTS FOR PRODUCTION STATUS THE REPORT SHOULD BE FURNISHED IN DELIVERY ORDER SEQUENCE ANY DELAYS OR SLIPPAGE TO FORECAST COMPLETION DATE SHALL BE COMMUNICATED TO LPSIB VIA DETAILED EMAIL OR PHONE CONVERSATION DETAILED INFORMATION SHALL INCLUDE BUT NOT BE LIMITED TO CAUSE FOR DELAYSLIPPAGE IE PARTS CONSTRAINTS TESTSTAND ISSUES PERSONNEL SHORTAGE ETC FOR EMAIL ADDRESS ADDITIONAL PHONE NUMBERS CALL Scott Robinson AT 865 7423274 OR EMAIL AT SCOTTROBINSON15USAFMIL_6: |
| 116 REMARKS BLOCK 4 DID IS TAILORED AS FOLLOWS THE CONTRACTOR SHALL PREPARE AND FURNISH A MONTHLY CUMULATIVE STATUS REPORT FOR ALL ITEMS THAT HAVE BEEN PLACED ON CONTRACT THE REPORT SHALL BE PREPARED AS OF THE LAST WORKING DAY OF EACH MONTH AND FORWARDED BY EMAIL NO LATER THAN THE 5TH WORKING DAY OF THE FOLLOWING MONTH THE INITIAL REPORT WILL BE PREPARED FOR THE MONTH DURING WHICH THE CONTRACT ASSETS ARE RECEIVED REPORTS WILL CONTINUE TO BE FORWARDED UNTIL ALL END ITEMS ARE REPARIED THE LAST REPORT WILL BE ANNOTATED FINAL REPORT NEGATIVE REPORTS ARE REQUIRED THIS REPORT SHOULD REFLECT THE APPLICABLE COUNTRY CASELINE NUMBER DOCUMENT CONTROL NUMBER PART NUMBER NATIONAL STOCK NUMBER NOMENCLATURE SERIAL NUMBER DELIVERY ORDER NUMBER CLIN ASSET RECEIVED DATE QUANITY PLACED ON ORDER CONTRACTUAL START DATE INDUCTION DATE CONTRACT COMPLETION DATE FORECAST COMPLETION DATE ACCEPTANCE DATE TURNAROUND TIME SHIPMENT TRACKING NUMBER AND COMMENTS FOR PRODUCTION STATUS THE REPORT SHOULD BE FURNISHED IN DELIVERY ORDER SEQUENCE ANY DELAYS OR SLIPPAGE TO FORECAST COMPLETION DATE SHALL BE COMMUNICATED TO LPSIB VIA DETAILED EMAIL OR PHONE CONVERSATION DETAILED INFORMATION SHALL INCLUDE BUT NOT BE LIMITED TO CAUSE FOR DELAYSLIPPAGE IE PARTS CONSTRAINTS TESTSTAND ISSUES PERSONNEL SHORTAGE ETC FOR EMAIL ADDRESS ADDITIONAL PHONE NUMBERS CALL Scott Robinson AT 865 7423274 OR EMAIL AT SCOTTROBINSON15USAFMIL_5: |
| Repro16 REMARKS BLOCK 4 DID IS TAILORED AS FOLLOWS THE CONTRACTOR SHALL PREPARE AND FURNISH A MONTHLY CUMULATIVE STATUS REPORT FOR ALL ITEMS THAT HAVE BEEN PLACED ON CONTRACT THE REPORT SHALL BE PREPARED AS OF THE LAST WORKING DAY OF EACH MONTH AND FORWARDED BY EMAIL NO LATER THAN THE 5TH WORKING DAY OF THE FOLLOWING MONTH THE INITIAL REPORT WILL BE PREPARED FOR THE MONTH DURING WHICH THE CONTRACT ASSETS ARE RECEIVED REPORTS WILL CONTINUE TO BE FORWARDED UNTIL ALL END ITEMS ARE REPARIED THE LAST REPORT WILL BE ANNOTATED FINAL REPORT NEGATIVE REPORTS ARE REQUIRED THIS REPORT SHOULD REFLECT THE APPLICABLE COUNTRY CASELINE NUMBER DOCUMENT CONTROL NUMBER PART NUMBER NATIONAL STOCK NUMBER NOMENCLATURE SERIAL NUMBER DELIVERY ORDER NUMBER CLIN ASSET RECEIVED DATE QUANITY PLACED ON ORDER CONTRACTUAL START DATE INDUCTION DATE CONTRACT COMPLETION DATE FORECAST COMPLETION DATE ACCEPTANCE DATE TURNAROUND TIME SHIPMENT TRACKING NUMBER AND COMMENTS FOR PRODUCTION STATUS THE REPORT SHOULD BE FURNISHED IN DELIVERY ORDER SEQUENCE ANY DELAYS OR SLIPPAGE TO FORECAST COMPLETION DATE SHALL BE COMMUNICATED TO LPSIB VIA DETAILED EMAIL OR PHONE CONVERSATION DETAILED INFORMATION SHALL INCLUDE BUT NOT BE LIMITED TO CAUSE FOR DELAYSLIPPAGE IE PARTS CONSTRAINTS TESTSTAND ISSUES PERSONNEL SHORTAGE ETC FOR EMAIL ADDRESS ADDITIONAL PHONE NUMBERS CALL Scott Robinson AT 865 7423274 OR EMAIL AT SCOTTROBINSON15USAFMIL_6: |
| PCO16 REMARKS BLOCK 4 DID IS TAILORED AS FOLLOWS THE CONTRACTOR SHALL PREPARE AND FURNISH A MONTHLY CUMULATIVE STATUS REPORT FOR ALL ITEMS THAT HAVE BEEN PLACED ON CONTRACT THE REPORT SHALL BE PREPARED AS OF THE LAST WORKING DAY OF EACH MONTH AND FORWARDED BY EMAIL NO LATER THAN THE 5TH WORKING DAY OF THE FOLLOWING MONTH THE INITIAL REPORT WILL BE PREPARED FOR THE MONTH DURING WHICH THE CONTRACT ASSETS ARE RECEIVED REPORTS WILL CONTINUE TO BE FORWARDED UNTIL ALL END ITEMS ARE REPARIED THE LAST REPORT WILL BE ANNOTATED FINAL REPORT NEGATIVE REPORTS ARE REQUIRED THIS REPORT SHOULD REFLECT THE APPLICABLE COUNTRY CASELINE NUMBER DOCUMENT CONTROL NUMBER PART NUMBER NATIONAL STOCK NUMBER NOMENCLATURE SERIAL NUMBER DELIVERY ORDER NUMBER CLIN ASSET RECEIVED DATE QUANITY PLACED ON ORDER CONTRACTUAL START DATE INDUCTION DATE CONTRACT COMPLETION DATE FORECAST COMPLETION DATE ACCEPTANCE DATE TURNAROUND TIME SHIPMENT TRACKING NUMBER AND COMMENTS FOR PRODUCTION STATUS THE REPORT SHOULD BE FURNISHED IN DELIVERY ORDER SEQUENCE ANY DELAYS OR SLIPPAGE TO FORECAST COMPLETION DATE SHALL BE COMMUNICATED TO LPSIB VIA DETAILED EMAIL OR PHONE CONVERSATION DETAILED INFORMATION SHALL INCLUDE BUT NOT BE LIMITED TO CAUSE FOR DELAYSLIPPAGE IE PARTS CONSTRAINTS TESTSTAND ISSUES PERSONNEL SHORTAGE ETC FOR EMAIL ADDRESS ADDITIONAL PHONE NUMBERS CALL Scott Robinson AT 865 7423274 OR EMAIL AT SCOTTROBINSON15USAFMIL_6: |
| D r a f16 REMARKS BLOCK 4 DID IS TAILORED AS FOLLOWS THE CONTRACTOR SHALL PREPARE AND FURNISH A MONTHLY CUMULATIVE STATUS REPORT FOR ALL ITEMS THAT HAVE BEEN PLACED ON CONTRACT THE REPORT SHALL BE PREPARED AS OF THE LAST WORKING DAY OF EACH MONTH AND FORWARDED BY EMAIL NO LATER THAN THE 5TH WORKING DAY OF THE FOLLOWING MONTH THE INITIAL REPORT WILL BE PREPARED FOR THE MONTH DURING WHICH THE CONTRACT ASSETS ARE RECEIVED REPORTS WILL CONTINUE TO BE FORWARDED UNTIL ALL END ITEMS ARE REPARIED THE LAST REPORT WILL BE ANNOTATED FINAL REPORT NEGATIVE REPORTS ARE REQUIRED THIS REPORT SHOULD REFLECT THE APPLICABLE COUNTRY CASELINE NUMBER DOCUMENT CONTROL NUMBER PART NUMBER NATIONAL STOCK NUMBER NOMENCLATURE SERIAL NUMBER DELIVERY ORDER NUMBER CLIN ASSET RECEIVED DATE QUANITY PLACED ON ORDER CONTRACTUAL START DATE INDUCTION DATE CONTRACT COMPLETION DATE FORECAST COMPLETION DATE ACCEPTANCE DATE TURNAROUND TIME SHIPMENT TRACKING NUMBER AND COMMENTS FOR PRODUCTION STATUS THE REPORT SHOULD BE FURNISHED IN DELIVERY ORDER SEQUENCE ANY DELAYS OR SLIPPAGE TO FORECAST COMPLETION DATE SHALL BE COMMUNICATED TO LPSIB VIA DETAILED EMAIL OR PHONE CONVERSATION DETAILED INFORMATION SHALL INCLUDE BUT NOT BE LIMITED TO CAUSE FOR DELAYSLIPPAGE IE PARTS CONSTRAINTS TESTSTAND ISSUES PERSONNEL SHORTAGE ETC FOR EMAIL ADDRESS ADDITIONAL PHONE NUMBERS CALL Scott Robinson AT 865 7423274 OR EMAIL AT SCOTTROBINSON15USAFMIL_7: |
| 116 REMARKS BLOCK 4 DID IS TAILORED AS FOLLOWS THE CONTRACTOR SHALL PREPARE AND FURNISH A MONTHLY CUMULATIVE STATUS REPORT FOR ALL ITEMS THAT HAVE BEEN PLACED ON CONTRACT THE REPORT SHALL BE PREPARED AS OF THE LAST WORKING DAY OF EACH MONTH AND FORWARDED BY EMAIL NO LATER THAN THE 5TH WORKING DAY OF THE FOLLOWING MONTH THE INITIAL REPORT WILL BE PREPARED FOR THE MONTH DURING WHICH THE CONTRACT ASSETS ARE RECEIVED REPORTS WILL CONTINUE TO BE FORWARDED UNTIL ALL END ITEMS ARE REPARIED THE LAST REPORT WILL BE ANNOTATED FINAL REPORT NEGATIVE REPORTS ARE REQUIRED THIS REPORT SHOULD REFLECT THE APPLICABLE COUNTRY CASELINE NUMBER DOCUMENT CONTROL NUMBER PART NUMBER NATIONAL STOCK NUMBER NOMENCLATURE SERIAL NUMBER DELIVERY ORDER NUMBER CLIN ASSET RECEIVED DATE QUANITY PLACED ON ORDER CONTRACTUAL START DATE INDUCTION DATE CONTRACT COMPLETION DATE FORECAST COMPLETION DATE ACCEPTANCE DATE TURNAROUND TIME SHIPMENT TRACKING NUMBER AND COMMENTS FOR PRODUCTION STATUS THE REPORT SHOULD BE FURNISHED IN DELIVERY ORDER SEQUENCE ANY DELAYS OR SLIPPAGE TO FORECAST COMPLETION DATE SHALL BE COMMUNICATED TO LPSIB VIA DETAILED EMAIL OR PHONE CONVERSATION DETAILED INFORMATION SHALL INCLUDE BUT NOT BE LIMITED TO CAUSE FOR DELAYSLIPPAGE IE PARTS CONSTRAINTS TESTSTAND ISSUES PERSONNEL SHORTAGE ETC FOR EMAIL ADDRESS ADDITIONAL PHONE NUMBERS CALL Scott Robinson AT 865 7423274 OR EMAIL AT SCOTTROBINSON15USAFMIL_6: |
| Repro16 REMARKS BLOCK 4 DID IS TAILORED AS FOLLOWS THE CONTRACTOR SHALL PREPARE AND FURNISH A MONTHLY CUMULATIVE STATUS REPORT FOR ALL ITEMS THAT HAVE BEEN PLACED ON CONTRACT THE REPORT SHALL BE PREPARED AS OF THE LAST WORKING DAY OF EACH MONTH AND FORWARDED BY EMAIL NO LATER THAN THE 5TH WORKING DAY OF THE FOLLOWING MONTH THE INITIAL REPORT WILL BE PREPARED FOR THE MONTH DURING WHICH THE CONTRACT ASSETS ARE RECEIVED REPORTS WILL CONTINUE TO BE FORWARDED UNTIL ALL END ITEMS ARE REPARIED THE LAST REPORT WILL BE ANNOTATED FINAL REPORT NEGATIVE REPORTS ARE REQUIRED THIS REPORT SHOULD REFLECT THE APPLICABLE COUNTRY CASELINE NUMBER DOCUMENT CONTROL NUMBER PART NUMBER NATIONAL STOCK NUMBER NOMENCLATURE SERIAL NUMBER DELIVERY ORDER NUMBER CLIN ASSET RECEIVED DATE QUANITY PLACED ON ORDER CONTRACTUAL START DATE INDUCTION DATE CONTRACT COMPLETION DATE FORECAST COMPLETION DATE ACCEPTANCE DATE TURNAROUND TIME SHIPMENT TRACKING NUMBER AND COMMENTS FOR PRODUCTION STATUS THE REPORT SHOULD BE FURNISHED IN DELIVERY ORDER SEQUENCE ANY DELAYS OR SLIPPAGE TO FORECAST COMPLETION DATE SHALL BE COMMUNICATED TO LPSIB VIA DETAILED EMAIL OR PHONE CONVERSATION DETAILED INFORMATION SHALL INCLUDE BUT NOT BE LIMITED TO CAUSE FOR DELAYSLIPPAGE IE PARTS CONSTRAINTS TESTSTAND ISSUES PERSONNEL SHORTAGE ETC FOR EMAIL ADDRESS ADDITIONAL PHONE NUMBERS CALL Scott Robinson AT 865 7423274 OR EMAIL AT SCOTTROBINSON15USAFMIL_7: |
| PCO16 REMARKS BLOCK 4 DID IS TAILORED AS FOLLOWS THE CONTRACTOR SHALL PREPARE AND FURNISH A MONTHLY CUMULATIVE STATUS REPORT FOR ALL ITEMS THAT HAVE BEEN PLACED ON CONTRACT THE REPORT SHALL BE PREPARED AS OF THE LAST WORKING DAY OF EACH MONTH AND FORWARDED BY EMAIL NO LATER THAN THE 5TH WORKING DAY OF THE FOLLOWING MONTH THE INITIAL REPORT WILL BE PREPARED FOR THE MONTH DURING WHICH THE CONTRACT ASSETS ARE RECEIVED REPORTS WILL CONTINUE TO BE FORWARDED UNTIL ALL END ITEMS ARE REPARIED THE LAST REPORT WILL BE ANNOTATED FINAL REPORT NEGATIVE REPORTS ARE REQUIRED THIS REPORT SHOULD REFLECT THE APPLICABLE COUNTRY CASELINE NUMBER DOCUMENT CONTROL NUMBER PART NUMBER NATIONAL STOCK NUMBER NOMENCLATURE SERIAL NUMBER DELIVERY ORDER NUMBER CLIN ASSET RECEIVED DATE QUANITY PLACED ON ORDER CONTRACTUAL START DATE INDUCTION DATE CONTRACT COMPLETION DATE FORECAST COMPLETION DATE ACCEPTANCE DATE TURNAROUND TIME SHIPMENT TRACKING NUMBER AND COMMENTS FOR PRODUCTION STATUS THE REPORT SHOULD BE FURNISHED IN DELIVERY ORDER SEQUENCE ANY DELAYS OR SLIPPAGE TO FORECAST COMPLETION DATE SHALL BE COMMUNICATED TO LPSIB VIA DETAILED EMAIL OR PHONE CONVERSATION DETAILED INFORMATION SHALL INCLUDE BUT NOT BE LIMITED TO CAUSE FOR DELAYSLIPPAGE IE PARTS CONSTRAINTS TESTSTAND ISSUES PERSONNEL SHORTAGE ETC FOR EMAIL ADDRESS ADDITIONAL PHONE NUMBERS CALL Scott Robinson AT 865 7423274 OR EMAIL AT SCOTTROBINSON15USAFMIL_7: |
| D r a f16 REMARKS BLOCK 4 DID IS TAILORED AS FOLLOWS THE CONTRACTOR SHALL PREPARE AND FURNISH A MONTHLY CUMULATIVE STATUS REPORT FOR ALL ITEMS THAT HAVE BEEN PLACED ON CONTRACT THE REPORT SHALL BE PREPARED AS OF THE LAST WORKING DAY OF EACH MONTH AND FORWARDED BY EMAIL NO LATER THAN THE 5TH WORKING DAY OF THE FOLLOWING MONTH THE INITIAL REPORT WILL BE PREPARED FOR THE MONTH DURING WHICH THE CONTRACT ASSETS ARE RECEIVED REPORTS WILL CONTINUE TO BE FORWARDED UNTIL ALL END ITEMS ARE REPARIED THE LAST REPORT WILL BE ANNOTATED FINAL REPORT NEGATIVE REPORTS ARE REQUIRED THIS REPORT SHOULD REFLECT THE APPLICABLE COUNTRY CASELINE NUMBER DOCUMENT CONTROL NUMBER PART NUMBER NATIONAL STOCK NUMBER NOMENCLATURE SERIAL NUMBER DELIVERY ORDER NUMBER CLIN ASSET RECEIVED DATE QUANITY PLACED ON ORDER CONTRACTUAL START DATE INDUCTION DATE CONTRACT COMPLETION DATE FORECAST COMPLETION DATE ACCEPTANCE DATE TURNAROUND TIME SHIPMENT TRACKING NUMBER AND COMMENTS FOR PRODUCTION STATUS THE REPORT SHOULD BE FURNISHED IN DELIVERY ORDER SEQUENCE ANY DELAYS OR SLIPPAGE TO FORECAST COMPLETION DATE SHALL BE COMMUNICATED TO LPSIB VIA DETAILED EMAIL OR PHONE CONVERSATION DETAILED INFORMATION SHALL INCLUDE BUT NOT BE LIMITED TO CAUSE FOR DELAYSLIPPAGE IE PARTS CONSTRAINTS TESTSTAND ISSUES PERSONNEL SHORTAGE ETC FOR EMAIL ADDRESS ADDITIONAL PHONE NUMBERS CALL Scott Robinson AT 865 7423274 OR EMAIL AT SCOTTROBINSON15USAFMIL_8: |
| 116 REMARKS BLOCK 4 DID IS TAILORED AS FOLLOWS THE CONTRACTOR SHALL PREPARE AND FURNISH A MONTHLY CUMULATIVE STATUS REPORT FOR ALL ITEMS THAT HAVE BEEN PLACED ON CONTRACT THE REPORT SHALL BE PREPARED AS OF THE LAST WORKING DAY OF EACH MONTH AND FORWARDED BY EMAIL NO LATER THAN THE 5TH WORKING DAY OF THE FOLLOWING MONTH THE INITIAL REPORT WILL BE PREPARED FOR THE MONTH DURING WHICH THE CONTRACT ASSETS ARE RECEIVED REPORTS WILL CONTINUE TO BE FORWARDED UNTIL ALL END ITEMS ARE REPARIED THE LAST REPORT WILL BE ANNOTATED FINAL REPORT NEGATIVE REPORTS ARE REQUIRED THIS REPORT SHOULD REFLECT THE APPLICABLE COUNTRY CASELINE NUMBER DOCUMENT CONTROL NUMBER PART NUMBER NATIONAL STOCK NUMBER NOMENCLATURE SERIAL NUMBER DELIVERY ORDER NUMBER CLIN ASSET RECEIVED DATE QUANITY PLACED ON ORDER CONTRACTUAL START DATE INDUCTION DATE CONTRACT COMPLETION DATE FORECAST COMPLETION DATE ACCEPTANCE DATE TURNAROUND TIME SHIPMENT TRACKING NUMBER AND COMMENTS FOR PRODUCTION STATUS THE REPORT SHOULD BE FURNISHED IN DELIVERY ORDER SEQUENCE ANY DELAYS OR SLIPPAGE TO FORECAST COMPLETION DATE SHALL BE COMMUNICATED TO LPSIB VIA DETAILED EMAIL OR PHONE CONVERSATION DETAILED INFORMATION SHALL INCLUDE BUT NOT BE LIMITED TO CAUSE FOR DELAYSLIPPAGE IE PARTS CONSTRAINTS TESTSTAND ISSUES PERSONNEL SHORTAGE ETC FOR EMAIL ADDRESS ADDITIONAL PHONE NUMBERS CALL Scott Robinson AT 865 7423274 OR EMAIL AT SCOTTROBINSON15USAFMIL_7: |
| Repro16 REMARKS BLOCK 4 DID IS TAILORED AS FOLLOWS THE CONTRACTOR SHALL PREPARE AND FURNISH A MONTHLY CUMULATIVE STATUS REPORT FOR ALL ITEMS THAT HAVE BEEN PLACED ON CONTRACT THE REPORT SHALL BE PREPARED AS OF THE LAST WORKING DAY OF EACH MONTH AND FORWARDED BY EMAIL NO LATER THAN THE 5TH WORKING DAY OF THE FOLLOWING MONTH THE INITIAL REPORT WILL BE PREPARED FOR THE MONTH DURING WHICH THE CONTRACT ASSETS ARE RECEIVED REPORTS WILL CONTINUE TO BE FORWARDED UNTIL ALL END ITEMS ARE REPARIED THE LAST REPORT WILL BE ANNOTATED FINAL REPORT NEGATIVE REPORTS ARE REQUIRED THIS REPORT SHOULD REFLECT THE APPLICABLE COUNTRY CASELINE NUMBER DOCUMENT CONTROL NUMBER PART NUMBER NATIONAL STOCK NUMBER NOMENCLATURE SERIAL NUMBER DELIVERY ORDER NUMBER CLIN ASSET RECEIVED DATE QUANITY PLACED ON ORDER CONTRACTUAL START DATE INDUCTION DATE CONTRACT COMPLETION DATE FORECAST COMPLETION DATE ACCEPTANCE DATE TURNAROUND TIME SHIPMENT TRACKING NUMBER AND COMMENTS FOR PRODUCTION STATUS THE REPORT SHOULD BE FURNISHED IN DELIVERY ORDER SEQUENCE ANY DELAYS OR SLIPPAGE TO FORECAST COMPLETION DATE SHALL BE COMMUNICATED TO LPSIB VIA DETAILED EMAIL OR PHONE CONVERSATION DETAILED INFORMATION SHALL INCLUDE BUT NOT BE LIMITED TO CAUSE FOR DELAYSLIPPAGE IE PARTS CONSTRAINTS TESTSTAND ISSUES PERSONNEL SHORTAGE ETC FOR EMAIL ADDRESS ADDITIONAL PHONE NUMBERS CALL Scott Robinson AT 865 7423274 OR EMAIL AT SCOTTROBINSON15USAFMIL_8: |