FBO posting.pdf

PDF 187 KB Posted

Attached to
ID DOT T 33(1)/ Idaho Centennial Trail; and, WY DOT 22(1)/ Wyoming
Solicitation number
69056720B000017
Issued by

About this file

This document outlines the requirements for a federal construction contract to build a 2.3 mile multi-use trail in Idaho and Wyoming. The project includes constructing an asphalt bicycle and pedestrian pathway alongside two highways, replacing an existing bridge over Moose Creek, and installing two concrete underpasses. Earthwork, slope reinforcement, aggregate base courses, asphalt paving, bridge construction, culverts, guardrails, signage, and temporary traffic control are among the work items listed. The estimated price range provided is between $3 million and $5 million, with a tentative fixed completion date of July 2022. The related federal contract opportunity posting specifies this is a pre-solicitation for Solicitation Number 69056720B000017 to construct the ID DOT T 33(1)/ Idaho Centennial Trail and WY DOT 22(1)/ Wyoming Teton Pass Centennial Trail project being administered by the Department of Transportation Federal Highway Administration.

View the file

Other files

File Type Posted
Preliminary-Letter-Centennial Trail.pdf PDF
ID DOT T 33(1)_PreAdPlan.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ID DOT T 33(1)/ Idaho Centennial Trail; and, WY DOT 22(1)/ Wyoming Teton Pass Centennial Trail

The work consists of Construction of a 2.3 mile, 10’ wide asphalt bicycle and pedestrian pathway alongside Highway 33 (ID) and Highway 22 (WY), between Moose Creek and Trail Creek Campground. The project includes replacement of the existing bridge across Moose Creek and installation of two concrete underpasses.

Project length: 2.3 Miles

Tentative Fixed Completion Date: July 2022 (Once solicitation is issued, see FAR Clause 52.211-10 for exact date.)

Estimated Price Range: between $3,000,000 and $5,000,000

Location: 5 Miles E of Victor, ID

DESCRIPTION OF WORK in US CUSTOMARY UNITS

FP-14

On e S ch ed ul e

DIVISION 150 – Project Requirements

152 CONSTRUCTION SURVEY AND

STAKING (yes/no) Yes

153 CONTRACTOR QUALITY CONTROL AND

ASSURANCE (yes/no) Yes

154 CONTRACTOR SAMPLING AND

TESTING (yes/no) Yes 155 CONSTRUCTION SCHEDULE (yes/no) Yes

157 SOIL EROSION CONTROL 1 LPSM

DIVISION 200 – Earthwork

201 CLEARING AND GRUBBING 65,700

SQYD

203 REMOVAL OF GUARDRAIL 75 LNFT

203 REMOVAL OF BRIDGE 1 LPSM

On e S ch ed ul e

203 SAWCUTTING PAVEMENT 200 LNFT

204 SELECT BORROW 120 TON

204 EMBANKMENT CONSTRUCTION 13,500

CUYD

204 BACKFILL, GRANULAR 60 CUYD

204 CONSERVE AND STOCKPILE TOPSOIL 7,000 CUYD

207 SEPARATION-STABILIZATION

GEOTEXTILE, CLASS 1, TYPE A 140 SQYD

207 REINFORCEMENT GEOSYNTHETIC,

TYPE 3 500 SQYD

208 STRUCTURE EXCAVATION(BRIDGE) 100 CUYD

208 SHORING AND BRACING(TEMPORARY) 1 LPSM

DIVISION 250 – Slope Reinforcement and Retaining Walls

251 PLACED RIPRAP, METHOD B, CLASS 2 40 CUYD

255 MECHANICALLY STABILIZED EARTH

WALL, WELDED WIRE FACE 12,255 SQFT

257 CONTRACTOR FURNISHED

MECHANICALLY STABILIZED EARTH WALL

DESIGN

1 LPSM

257 CONTRACTOR FURNISHED SOIL NAIL

RETAINING WALL DESIGN

1 LPSM

259 SOIL NAIL RETAINING WALL 2,740 SQFT

DIVISION 300 – Aggregate and Base Courses

302 ROADWAY AGGREGATE, METHOD 2 8,700 TON

DIVISION 400 – Asphalt Pavements and Surface Treatments

403 ASPHALT CONCRETE PAVEMENT,

TYPE 1 3,100 TON

412 TACK COAT(GRADE CSS-1, CSS-1H,

SS-1, or SS-1H) 1,800 GAL

DIVISION 550 – Bridge Construction

552 STRUCTURAL CONCRETE, CLASS A

(AE) 40 CUYD

553 PRECAST, PRESTRESSED CONCRETE

SLABS, 48-INCH VOIDED(21-INCH DEPTH) 247 LNFT

554 REINFORCING STEEL 5,000 LB

554 REINFORCING STEEL, EPOXY COATED 2,000 LB

556 BRIDGE RAILING, STEEL, TWO RAIL 102 LNFT

559 MEMBRANE WATERPROOFING 101 SQYD

564 BEARING DEVICE, ELASTOMERIC 2 EACH

DIVISION 600 – Incidental Construction

602 12-INCH PIPE CULVERT 450 LNFT

602 18-INCH PIPE CULVERT 70 LNFT

602 24-INCH PIPE CULVERT 300 LNFT

602 END SECTION FOR 12-INCH PIPE

CULVERT 4 EACH

602 END SECTION FOR 18-INCH PIPE

CULVERT 1 EACH

602 END SECTION FOR 24-INCH PIPE

CULVERT 9 EACH

602 8 FEET SPAN, 8 FEET RISE PRECAST

REINFORCED CONCRETE BOX CULVERT 96 LNFT

604 INLET 11 EACH

607 CLEANING CULVERTS IN PLACE 200 LNFT

609 WHEELSTOP, CONCRETE 24 EACH

617 GUARDRAIL SYSTEM G4, TYPE 4,

CLASS B WOOD POSTS 1,100 LNFT

617 TERMINAL SECTION 6 EACH

617 STRUCTURE TRANSITION RAILING 41 LNFT

619 BOLLARD POST 3 EACH

624 PLACING CONSERVED TOPSOIL, 6-

INCH DEPTH

27,600

SQYD

625 SEEDING, HYDRAULIC METHOD 44,000

SQYD

625 MULCHING, HYDRAULIC METHOD,

BONDED FIBER MATRIX

44,000

SQYD

633 SIGN SYSTEM 5 EACH

634 PAVEMENT MARKINGS 1,400 LNFT

634 PAVEMENT MARKINGS, SYMBOLS 5 EACH

635 TEMPORARY TRAFFIC CONTROL 100% LPSM

636 RELOCATE ELECTRICAL LINE 100% LPSM

646 FIXTURE, PEDESTRIAN RAILING 1,120 LNFT

DIVISION 200 – Earthwork
DIVISION 250 – Slope Reinforcement and Retaining Walls
DIVISION 300 – Aggregate and Base Courses
DIVISION 400 – Asphalt Pavements and Surface Treatments
403 ASPHALT CONCRETE PAVEMENT, TYPE 1
412 TACK COAT(GRADE CSS-1, CSS-1H, SS-1, or SS-1H)
DIVISION 550 – Bridge Construction