FARQMT.pdf
PDF 824 KB Posted
- Solicitation number
- FA812124Q0019
About this file
This document is a First Article Requirements form related to a federal contract opportunity. The contract opportunity is for a one-time spares buy of the containment hardware 4th BOAS, NSN 2840016028421NZ, Seal, Air, Aircraft G. The first article quantity is 3 units, and first article testing will be conducted at the contractor's facility. The detailed technical requirements for the first article are identified in the drawings and specifications referenced. A test plan is required, and the government will provide written notice of approval or disapproval within 60 days after receiving the contractor's test report. The first article is due within 120 calendar days from the contract date, and the government will provide written notice of approval or disapproval within 0 days after receipt of the first article package. The estimated cost of government testing/inspection is $2,500.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| FA812124Q00190001.pdf | ||
| FA812124Q0019.pdf | ||
| TRNSPDATA.pdf | ||
| SMW.pdf | ||
| Bidset Report.pdf | ||
| IUID_Checklist.pdf | ||
| MQR_PSD1.pdf | ||
| EI.pdf | ||
| PKGRQMT.pdf | ||
| CDRL1.pdf | ||
| QAIRQMT.pdf | ||
| LPF_QAR-003_Rev_E.pdf | ||
| DID_DI_NDTI_80809B.pdf | ||
| EDL.pdf | ||
| DID_DI_NDTI_81307A.pdf |
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FIRST ARTICLE REQUIREMENTS I.DATE
(AFMCI 64-1 JO, AFMCI 23-102 and FAR Part 9, Sub Part 9.3)(Additional Instructions on Page 3) 060CT 2023
2. PR/ MIPR NUMBER 3. CAGE I REFERENCE NUMBER 4.NSN
77445 / 4081980 2840016028421NZ
5. FIRST ARTICLE QUANTITY
THE FIRST ARTICLE IS 3 UNIT(S) OF LOT I ITEM 1
AND WILL BE: □ PART OF PRODUCTION QUANTITY �IN ADDITION TO PRODUCTION QUANTITY
6.ARTICLES 7. LONG LEAD TIME ITEMS
□WILL �WILL NOT SERVE AS A MANUFACTURING STANDARD �REQUIRED □NOT REQUIRED
(See FAR 52.209-3 OR -4, alternate 11)
8. SPECIAL REQUIREMENT/PRODUCTION FACILITIES (See FAR 52.209-3 OR -4 Alternate I)
�REQUIRED □NOT REQUIRED
"The First Article offered must be manufactured at the facilities in which that item is to be produced under the contract, or if the First Article is a component not manufactured by the contractor, such component must be manufactured at the facilities in which the component is to be produced for the contract. A certification to this effect must accompany each First Article which is offered."
9. TEST I INSPECTION REQUIREMENTS
A � CONTRACTOR TESTING
□ GOVERNMENT TESTING
Performance or other characteristics which the First Articles must meet are
IDENTIFIED IN DRA WING 4081980, SUB-TIER DRAWINGS (IF AN ASSEMBLY), AND SPECIFICATIONS IDENTIFIED THEREIN.
B. The detailed technical requirements for First Article approval tests are contained in
BLOCK 12 OF THIS FORM AND LPF-QAR-003
(Cite Spec and Para number)
C. � TEST PLAN REQUIRED
Number of days for government approval / disapproval 45 days.
D. Contractor's notification to ACO and
PCO
(Requesting Activity) oftest time and location due 30 days prior to start of testing.
E. � TEST REPORT REQUIRED
(1) Forwarded to
AFLCMC/LZPED
FA Monitor DODAAC FA8111
3001 StaffDrive, STE 1AB85A
TINKER AFB, OK 73145-3041
(2) Government written notice of approval / disapproval due 60 days after receipt of contractor's report.
calendar days from date contract.
calendar days prior to shipment.
F. FIRST ARTICLE DELIVERY
(1) Due within 120
(2) Notify 0
(3) Delivered to government at
NA
(Set Forth Consignee and Address)
( 4) Government written notice of approval / disapproval within 0 days after receipt of first article package.
G. Estimated cost of government testing/ inspection evaluation.
$2,500.0000
AFMC IMT 260, 20020830, V-3 Generated by PRPS using Jasper Reports on 05 Feb 2024 Versions Page 1 of3
FD20302400149-01
First Article Testing to take place at contractor facility
File details come from the government source that posted it. Updated .