Falcon_Field_Engineering_RFQ_2027.docx
DOCX document 41 KB Posted
- Solicitation number
- PE-66888-NONST-2027-000000007
- Issued by
- Fayette County, Georgia
About this file
This is a Request for Qualifications (RFQ) issued by the Peachtree City Airport Authority for professional engineering, architectural, and construction inspection and administration services for Atlanta Regional Airport – Falcon Field. The Authority seeks a qualified aviation consulting firm to provide on-call services including design and technical investigations, bidding and construction services, architectural and specialized services, and coordination with planning and environmental consultants. The anticipated Capital Improvements Plan (CIP) projects span fiscal years 2027 through 2031 and include runway rehabilitation, taxiway improvements, terminal apron expansion, fuel farm replacement, airfield lighting upgrades, and perimeter fencing, with total CIP costs ranging from $90,000 to $10,916,000 per project. Written questions are due December 2, 2026, by 12:00 p.m. Eastern Time, with Statements of Qualifications due December 16, 2026, by 12:00 p.m. Eastern Time. Shortlist notices and interviews are scheduled for January 7 and 14, 2027, with anticipated selection and agreement execution by February 27, 2027. The Master Agreement term is five years from February 27, 2027, through February 26, 2032, with assignments negotiated individually through written task orders and no guaranteed minimum work volume.
Responding firms must demonstrate current Georgia Department of Transportation (GDOT) prequalification in Airport Design – Civil (Area Class 2.09(a)), Airport Design – Electrical (Area Class 2.09(b)), and Airport Construction Administration and Observation (Area Class 8.02). Pricing information, consultant fees, overhead rates, and hourly rates are explicitly prohibited from SOQs and interviews, though historical project budgets demonstrating experience and cost control may be included. Evaluation criteria are weighted as follows: comparable airport project experience (25 points), key personnel and technical qualifications (25 points), understanding and approach to identified CIP work (20 points), capacity, availability and schedule performance (15 points), past performance quality and cost control (10 points), and service delivery and coordination capability (5 points). The procurement complies with 49 U.S.C. 47107(a)(17), 40 U.S.C. Chapter 11, 2 CFR Part 200, FAA AC 150/5100-14E, and Georgia law. Disadvataged Business Enterprise (DBE) requirements apply under 49 CFR Part 26 without a designated set-aside percentage. Work authorization under the existing agreement expires in February 2027, and no task orders may be executed after agreement expiration without new funding-agency authorization. The Authority will coordinate the selection schedule with GDOT Project Manager Lew Walker and maintain a comprehensive procurement file for GDOT submission upon completion of selection.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Request for Qualifications Airport Engineering Architectural and Construction Services Atlanta Regional Airport Falcon Field Peachtree City Airport Authority Peachtree City Georgia 1 Invitation and agreement term The Peachtree City Airport Authority invites Statements of Qualifications from qualified aviation consulting firms to provide professional on-call engineering, architectural, and construction inspection and administration services for Atlanta Regional Airport - Falcon Field. The Authority intends to select one consultant team under this RFQ and execute a separate Master Agreement for these services.
The anticipated Master Agreement term is five years from February 27, 2027, ending February 26, 2032. Assignments will be negotiated individually through written task orders. Attachment A identifies specific FY2027-2031 CIP projects reasonably expected to be initiated within five years of the agreement effective date. Some services may not be required; no minimum amount of work is guaranteed.
This solicitation is independent of the Authority’s Planning and Environmental Services RFQ. A firm seeking both must submit a separate response to each; each will have its own evaluation, ranking, negotiation, agreement, and procurement file.
2 Solicitation schedule
| Milestone |
| Date and time |
| Advertisement and RFQ release |
| NOVEMBER 18, 2026 |
| Written questions due |
| DECEMBER 2, 2026, at 12:00 p.m. Eastern Time |
| Responses and addenda issued |
| DECEMBER 9, 2026, at 3:00 p.m. Eastern Time |
| Statements of Qualifications due |
| DECEMBER 16, 2026, at 12:00 p.m. Eastern Time |
| Shortlist notice and interviews |
| JANUARY 7, 2027/ JANUARY 14, 2027 |
| Anticipated selection and agreement |
| JANUARY 19, 2026 / FEBRUARY 27, 2027 |
The published schedule and any changes will be communicated by written addendum. Eastern Time means the local time in Peachtree City on the applicable date.
3 Scope of professional services Services are limited to the engineering and architectural elements of the named projects in Attachment A. The consultant will provide the professional services needed to develop and administer the identified improvements; this RFQ does not award construction contracts.
Design and technical investigations Provide topographic and engineering surveys, geotechnical investigations, pavement and drainage analyses, preliminary and final plans, specifications, estimates, safety and phasing plans, and permitting support for the identified runway, taxiway, apron, lighting, roadway, utility, fuel farm, fencing, obstruction removal, and tower improvements.
Bidding and construction services Provide bid documents, bid assistance and recommendations, construction administration, qualified resident observation and inspection, materials testing coordination, payment and change order review, record drawings, grant closeout support, and commissioning coordination as applicable to each project.
Architectural and specialized services Provide appropriately licensed architectural, structural, electrical, and other specialists for tower and facility elements within the listed projects. Identify capabilities for EMAS, MALSR and airfield electrical systems, fuel systems, and value engineering when warranted.
Coordination with planning and environmental services Coordinate design data with the separately selected planning consultant. ALP planning, environmental alternatives analysis, and environmental decision documents remain under the planning agreement. Engineering support for land and easement acquisition is limited to surveys, legal descriptions, plats, and technical exhibits; appraisal, negotiation, and acquisition are not awarded through this engineering RFQ.
4 GDOT prequalification and licensing For State funding consideration, the responding team must demonstrate current GDOT prequalification covering Airport Design - Civil, Area Class 2.09(a); Airport Design - Electrical, Area Class 2.09(b), also written 2.09b; and Airport Construction Administration and Observation, Area Class 8.02. The October 29, 2026 GDOT notice refers to Airport Design as 2.09 and identifies 2.09b as effective January 1, 2025. The published GDOT manual identifies the civil and electrical subdivisions as 2.09(a) and 2.09(b).
Provide current approval evidence, expiration dates, and a matrix identifying the prime or subconsultant performing each discipline. Each provider must hold the qualifications required for its assigned work; a prime firm’s approval does not qualify an unapproved subconsultant. Maintain required approvals and Georgia professional licenses throughout performance. The Authority will verify status with GDOT before award and task authorization.
5 Statement of Qualifications requirements Submit four paper copies in a sealed envelope or box to Hope Macaluso, A.A.E., Peachtree City Airport Authority, 7 Falcon Drive, Peachtree City, GA 30269. Clearly mark the package “Airport Engineering Architectural and Construction Services RFQ” and include the submitting firm’s name. Responses must be received by the deadline in Section 2; late responses will not be considered.
Organize the response in the following order. Do not include consultant fees, overhead rates, hourly rates, or other pricing in the SOQ or interview. Historical project budgets may be included only to demonstrate experience and cost control.
1. Firm and team. Identify the legal entity, authorized contact, firm size, proposed subconsultants, responsibilities, and current GDOT prequalification and professional licenses.
2. Personnel and organization. Provide an organization chart, project manager and key staff resumes, discipline roles, availability, and office responsible for performance.
3. Comparable experience. Describe relevant projects completed or substantially performed within the last five years at comparable airports, including scope, team role, dates, outcomes, schedule performance, and cost control.
4. Approach to the CIP. Explain the approach to Attachment A, project dependencies, regulatory coordination, operational safety, and the division of responsibilities between planning and engineering.
5. Capacity and service. Summarize current workload, staffing commitments, support offices, response capability, and ability to meet schedules. Explain relevant knowledge of FAA and GDOT aviation programs.
6. References and disclosures. Provide at least three current airport client references with contact name, agency, phone, and email. Disclose actual or apparent conflicts, prior involvement relevant to this RFQ, and any competitive advantage. Acknowledge each addendum.
6 Predetermined evaluation criteria Eligibility and responsiveness are evaluated first. Responsive SOQs will be scored on a 100-point scale using the following maximum points. The same criteria and weights apply to shortlist and final evaluation.
| Criterion |
| Maximum points |
| Comparable airport project experience |
| 25 |
| Key personnel and technical qualifications |
| 25 |
| Understanding and approach to the identified CIP work |
| 20 |
| Capacity availability and schedule performance |
| 15 |
| Past performance quality and cost control |
| 10 |
| Service delivery and coordination capability |
| 5 |
Technical qualifications include civil, electrical, architectural, and construction observation expertise, including qualified inspectors. Office location is requested to assess service delivery; no local office or residency preference is established. DBE participation is administered under applicable requirements and is not assigned qualification points.
7 Separate qualifications based selection process
1. Selection panel. The Authority will appoint a panel of at least three members, including a professional knowledgeable in the services sought. Members will disclose conflicts and follow written standards of conduct. The criteria and evaluation method will be established before advertisement.
2. Public notice and screening. The Authority will publicly advertise this RFQ, review timely SOQs for responsiveness and required qualifications, and document all eligibility decisions. It will evaluate this solicitation separately from the companion RFQ.
3. Shortlist. The panel will identify three to five best-qualified firms when sufficient qualified responses are received. If fewer than three qualified firms respond, the Authority will document the circumstances and coordinate the next steps with GDOT before proceeding. Firms not shortlisted will receive written notice.
4. Interviews and references. Shortlisted firms will be interviewed or further evaluated using Section 6. If interviews are held, each firm will receive at least seven days’ notice and the same format and opportunity. The panel may omit formal interviews if SOQs and documented reference checks provide sufficient information. No price information will be requested during ranking.
5. Final ranking. Each panelist will score each firm from zero to the maximum points for each criterion. The panel’s average total score establishes the ranking. The final evaluation supersedes the preliminary shortlist score and considers SOQs, reference checks, and interviews if conducted. Ties are resolved by higher scores for comparable experience, then key personnel, then project approach; any remaining tie requires a documented panel determination based on those criteria.
6. Award and notification. Subject to Authority approval and required funding-agency review, the Authority will execute a separate engineering Master Agreement. Unsuccessful firms will be notified in writing no later than five days after selection and contracting are completed.
8 Procurement documentation and GDOT submission The Authority will retain a separate procurement file for this solicitation containing advertisements and publication evidence; the RFQ and addenda; questions and answers; all SOQs; prequalification checks; panel appointments and conflict disclosures; shortlist decisions; individual and consolidated scores; interview and reference records; the final ranking and selection report; notices; the independent fee estimate and fee analysis; negotiation records; approvals; and the executed agreement.
Upon completion of selection, the Authority will submit the procurement documentation to GDOT, including the advertisements, RFQ, all submittals, shortlist and evaluation records, and executed agreement, as required by the October 29, 2026 guidance. Records will be retained for the applicable Federal, State, grant, audit, and litigation retention periods. The Authority will coordinate its anticipated selection schedule with GDOT Project Manager Lew Walker at LeWalker@dot.ga.gov.
9 Solicitation and contract conditions Governing requirements Selection and contracting will comply with 49 U.S.C. 47107(a)(17), applicable qualifications-based selection principles in 40 U.S.C. Chapter 11, 2 CFR Part 200 including 200.318 through 200.327 as applicable, FAA AC 150/5100-14E with Change 1, applicable Georgia law, and funding-agency requirements. Qualifications-based procurement is limited to eligible professional services; unrelated services require an appropriate separate procurement method.
Task orders and scope control Attachment A defines the projects and service boundaries of this procurement. Work may span multiple years, task orders, and Federal, State, or local funding sources. Each task order must identify its scope, deliverables, schedule, negotiated fee, funding, and required approvals before work begins. New or materially different projects require a new procurement unless a permitted addition has all required written GDOT and FAA approvals. The Authority reserves the right to procure listed services separately.
GDOT reports that the current agreement expires in February 2027. No task order or work authorization executed after an agreement’s expiration is eligible for Department funding under the supplied guidance. New work will not be authorized under an expired agreement. Any continuation of previously authorized work beyond the agreement term requires contract and funding-agency authorization; no automatic extension is created.
Nondiscrimination and DBE requirements The consultant and subconsultants shall comply with applicable nondiscrimination requirements and 49 CFR Part 26 for federally assisted contracts. Applicable DBE requirements, any approved contract goal, certification requirements, and documentation of commitments or good faith efforts will be stated in the solicitation addenda or contract documents as required before the applicable commitment deadline. Certified DBE firms must meet the applicable Georgia Unified Certification Program requirements. Failure to meet applicable contractual nondiscrimination and DBE obligations may constitute a material breach.
Conflicts and equal access Firms must disclose involvement in preparing this RFQ or its requirements, current related assignments, and actual or apparent conflicts. The Authority will apply applicable restrictions on firms that prepared procurement requirements and address unfair competitive advantage before selection. Current project information material to competition will be made available equally through addenda.
Questions submissions and reservations Direct written questions and site visit requests only to Hope Macaluso, A.A.E., Aviation Director, at hope@kffc.org, 7 Falcon Drive, Peachtree City, GA 30269; phone 770-487-2225. Written answers affecting the RFQ will be issued to all interested firms by addendum. Unauthorized solicitation-related contact with Authority officials, selection panel members, or Airport employees may result in disqualification.
The Authority may reject any or all submissions, request clarifications, or waive minor informalities consistent with applicable law and equal treatment. Firms bear their response and presentation costs. The Authority assumes no responsibility for late, improperly addressed, or incorrectly identified submissions.
Attachment A Anticipated engineering projects Source: Atlanta Regional Airport - Falcon Field Capital Improvements Plan, FY2027-2031.The first column gives fiscal year and local priority. Descriptions retain the CIP project identity with expanded abbreviations where helpful. Costs are the total budget for the listed CIP row, not consultant fees or the budget for the component assigned by this RFQ. A shared project cost is not additive across the two RFQs.
Years and budgets are anticipated and depend on funding, approvals, project readiness, and the five-year initiation limit in Section 1. A CIP listing is not a funding commitment or authorization to duplicate previously contracted work. Reimbursement items and FY2026 entries are addressed separately below.
| FY and priority |
| CIP project and services under this RFQ |
| Total CIP cost |
Air Traffic Control Tower - Construction and Construction Administration Services: Construction administration, observation, and technical coordination.
$10,916,000
Runway RSA and TSA Improvements with ALP Updates - Design Services: Engineering design only; ALP planning is in the separate planning RFQ.
$475,000
Runway 13 Easement Acquisition 1.79 plus or minus Acres and Obstruction Removal - Planning Design Bid and Construction Services: Survey and technical exhibits, obstruction removal design, bid assistance, and construction administration. Planning and acquisition are separate.
$754,000
Runway Visual Guidance System MALSR Runway Edge Light and Taxiway Foxtrot and Golf Edge Light Replacement - Design Services: Electrical design and associated civil engineering.
$165,000
Expand or Rehabilitate Terminal Apron 18500 SY and Refueler Parking Expansion - Design Services: Pavement, grading, drainage, and related design.
$185,000
Fuel Farm Replacement - Design Services: Fuel system and associated civil, structural, and electrical design.
$90,000
Attachment A Engineering projects continued
| FY and priority |
| CIP project and services under this RFQ |
| Total CIP cost |
Runway Rwy 31 Rehabilitation - Design Services: Runway rehabilitation engineering design.
$250,000
Runway RSA Improvements Phase 1 Construction Install RWY 13 EMAS Services: Construction administration, observation, and testing coordination.
$5,124,000
Install Runway Visual Guidance System MALSR and Runway Edge Light - Construction Services: Electrical and civil construction administration and observation.
$3,500,000
Taxiway Foxtrot and Golf Edge Light Replacement - Construction Services: Electrical construction administration and observation.
$1,000,000
Runway Rwy 31 including Rehabilitation - Bid and Construction Rehab or Overlay Remark or Relight Grooving Services: Bidding, construction administration, and observation.
$5,500,000
Fuel Farm Replacement - Bid and Construction Services: Bidding, construction administration, and observation.
$700,000
Expand or Rehabilitate Terminal Apron 18500 SY and Refueler Parking Expansion - Bid and Construction Services: Bidding, construction administration, and observation.
$5,450,000
Attachment A Engineering projects continued
| FY and priority |
| CIP project and services under this RFQ |
| Total CIP cost |
Runway RSA Improvements Phase 2 Construction Install RWY 31 EMAS Grading and Drainage Improvements Adjust Airfield Lighting Services: Construction administration, observation, and testing coordination.
$5,673,000
Area C Access Road Utilities Water Sanitary Power Gas Internet - Design Services: Roadway, utility, and site engineering design.
$225,000
Realignment or Extend Taxiway A at Rwy 31 End - Design Services: Taxiway engineering design and safety phasing.
$600,000
Area B Taxiway Apron Site Relocation of Hangar B 3 - Design Services: Civil and applicable architectural and building systems design.
$250,000
10000 LF Airport Perimeter Wildlife Fencing Design Build Services: Owner engineering support only as authorized. Any design-build procurement is separate; no construction award is made by this RFQ.
$150,000
Upper Ramp Lower Ramp North Ramp - Bid and Construction
$5,000,000
Attachment A Engineering projects and status
| FY and priority |
| CIP project and services under this RFQ |
| Total CIP cost |
Realignment or Extend Taxiway A at Rwy 31 End - Bid and Construction Services: Bidding, construction administration, and observation.
$8,000,000
Acquire Miscellaneous Land TTF Properties - Land Acquisition Services: Engineering survey, plats, legal descriptions, and technical exhibits only if authorized; excludes property purchase and acquisition services.
$4,000,000
Area B Taxiway Apron Hangar B 3 Relocation - Bid and Construction Services: Bidding, construction administration, and observation.
$2,625,000
Hangar Area A Taxilanes and North Ramp - Bid and Construction
$4,225,000
Reimbursement entries and excluded services
| FY and priority |
| CIP item and treatment |
| Total CIP cost |
| Reimbursement - Terminal Auto Parking Area Expansion Design and Construction. Historical reimbursement; no new design or construction services awarded. |
| $1,430,341 |
| Reimbursement - Upper Ramp Lower Ramp North Ramp Design. Historical reimbursement; no new design assignment awarded. |
| $250,000 |
| Area C Access Road Utilities - Bid and Construction Reimbursement. Reimbursement status must be verified; no automatic new assignment or duplicate payment. |
| $2,000,000 |
The FY2028 Area B and C EA or CatEx belongs to the separate planning RFQ. The FY2027 DBE plan reimbursement is excluded from this engineering procurement. FY2026 tower siting, environmental, design and feasibility study reimbursement ($763,882) and runway RSA and TSA environmental and mitigation permitting ($200,000) are outside the FY2027-2031 solicitation list and are not newly procured here.
Atlanta Regional Airport Falcon Field | Engineering RFQ | 1