Fairfield Auxiliary Unit Storage Building (AUSB) Statement of Work (002).pdf
PDF 2 MB Posted
- Solicitation number
- 582-RFB-3232-2027
- Issued by
- Jasper County, Iowa
About this file
This Statement of Work is issued by the Iowa Department of Public Defense (Military Division) through the Iowa National Guard Armory Board for interior rehabilitation services at the Fairfield Readiness Center. The project encompasses the safe removal and replacement or durable repair of deteriorating sprayed-on ceiling insulation in a 100-foot by 60-foot storage building located at 1501 W Stone Ave, Fairfield IA, 52556-2147. The selected contractor shall provide all labor, materials, equipment, and supervision necessary to establish a code-compliant thermal barrier, with work to be coordinated around existing baseline structures including chain-link storage cages. Key deliverables include thermal barrier modernization, site integration planning, and comprehensive waste management with safe containment and proper disposal of legacy insulation and project-related debris. No specific response dates, due dates, site visit requirements, bidders' meetings, award dates, or contract term information is provided in this Statement of Work.
The solicitation requires all material purchasing to comply with the Build American Buy American Act (BABA). No pricing terms, set-asides, incumbent information, funding amounts, or funding sources are detailed in this document. The project is part of the Facility Infrastructure Modernization Initiative managed by the Construction & Facilities Management Office at Camp Dodge, Johnston, Iowa.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 1476564-event.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work (SOW) — Interior Rehabilitation Page 1 of 1
STATEMENT OF WORK (SOW)
Facility Infrastructure Modernization Initiative
Project Title: Repair Interior thermal barrier of Storage Building
Facility Dimensions: 100-foot by 60-foot
1. Statement of Work
This Statement of Work (SOW) solicits quotes for the interior rehabilitation and modernization of a 100-foot by 60-foot storage building at the Fairfield Readiness Center at 1501 W Stone Ave, Fairfield IA, 52556-2147. The selected contractor shall provide all labor, materials, equipment, and supervision necessary to safely remove and replace (or durably repair) the existing sprayed-on ceiling insulation, which is currently flaking and deteriorating as shown in the provided photographs, ensuring a secure, code-compliant thermal barrier.
All material purchasing will follow the Build American Buy American Act (BABA)
2. Key Deliverables & Requirements
• Thermal Barrier Modernization: Safely remove and replace (or durably repair) deteriorating sprayed-on ceiling insulation to establish a code-compliant thermal barrier.
• Site Integration: Plan and execute all rehabilitation activities around existing baseline structures, including chain-link storage cages.
• Comprehensive Waste Management: Ensure complete cleanup, safe containment, transport, and proper disposal of all legacy insulation, and project-related debris.
Fairfield Axillary Unit Storage Building (AUSB) 1501 W Stone Ave, Fairfield IA, 52556
Fairfield AUSB 100’
60’
Roughly 12’ wall height
AD
JU
TA
N
T G
EN
ER
AL
M
AJ
G
EN
R
O N
D
AR
D
IS
C H
AI
R
M
AN
IO
W
A N
AT
IO
N
AL
G U
AR
D
A R
M O
R Y
BO
AR
D
IO
W
A N
A
TI
O N
A L
G U
A R
D A
R M
O R
Y B
O A
R D
D
EP
AR
TM
EN
T
O F
PU
BL
IC
D
EF
EN
SE
(M
IL
IT
AR
Y
D
IV
JO
H
N
ST
O N
, I O
W A
1-
N
.W . 7
0T H
A
VE
BU
IL
D
IN
G
B -6
C
AM
P
D O
D G
E
CO
NS
TR
UC
TI
ON
F
AC
IL
IT
IE
S
M
AN
AG
EM
EN
T
OF
FI
CE
DATE:
AD
JU
TA
N
T G
EN
ER
AL
M
AJ
G
EN
R
O N
D
AR
D
IS
C H
AI
R
M
AN
IO
W
A N
AT
IO
N
AL
G U
AR
D
A R
M O
R Y
BO
AR
D
IO
W
A N
A
TI
O N
A L
G U
A R
D A
R M
O R
Y B
O A
R D
D
EP
AR
TM
EN
T
O F
PU
BL
IC
D
EF
EN
SE
(M
IL
IT
AR
Y
D
IV
JO
H
N
ST
O N
, I O
W A
1-
N
.W . 7
0T H
A
VE
BU
IL
D
IN
G
B -6
C
AM
P
D O
D G
E
CO
NS
TR
UC
TI
ON
F
AC
IL
IT
IE
S
M
AN
AG
EM
EN
T
OF
FI
CE
DRAWN BY:
CONTRACT NO.:
SHEET:
PROJECT NO.:
ARMYN
AT
IO
NA
LG
UARD
IO
W A
AU
SB
M
VS
B
W
IR
E M
ES
H
PA
RT
IT
IO
NS
FA
IR
FI
EL
D
R
EA
D
IN
ES
S
C
EN
TE
R
, F A
IR
FI
EL
D
, I A
IO
W
A A
R M
Y N
A
TI
O N
A L
G U
A R
D
18 JULY, 2007
19070047-19070048
A U
SB
S
EC
TI
O N
S
A2
B.D.
THIS PDF WAS AUTO GENERATED SCALE MAY BE OFF.
AutoCAD SHX Text
AUSB SECTION
AutoCAD SHX Text 1/8" = 1'-0"
AutoCAD SHX Text
AutoCAD SHX Text
SLIDING GATE (TYP.)
AutoCAD SHX Text
AUSB SECTION
AutoCAD SHX Text 1/8" = 1'-0"
AutoCAD SHX Text
AutoCAD SHX Text
WIRE MESH PARTITION (TYP.)
AutoCAD SHX Text
INSTALL TO SPECIFIED CLEARANCE
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
HINGED GATE
AutoCAD SHX Text
WIRE MESH PARTITION (TYP.)
AutoCAD SHX Text
EXISTING STRUCTURE
AutoCAD SHX Text
EXISTING STRUCTURE
AutoCAD SHX Text
INSTALL TO SPECIFIED CLEARANCE
File details come from the government source that posted it. Updated .