This Request for Proposals is issued by the Commonwealth of Massachusetts Department of Conservation and Recreation, Division of Water Supply Protection, for chemical vegetation management services at the Wachusett Reservoir spillway in Clinton, Massachusetts. The project involves foliar herbicide application and cut-stem treatment using aquatic-safe formulations of glyphosate and/or triclopyr to control all vegetation within a 1.2-acre exposed rocky channel downstream of the spillway. Work must be completed by September 15, 2026, with an estimated project duration of one day. A mandatory bidders' conference will be held on Friday, August 7, 2026, at 9:00 AM at DWSP Gate 40 on South Main Street in Clinton. Questions must be submitted via the Commbuys Q&A section by August 12, 2026, at 12:00 PM, with answers provided by August 13, 2026. Proposals are due electronically through the Commbuys system by August 14, 2026, at 2:00 PM, with an estimated award date of August 21, 2026.
Evaluation of proposals will be based on vendor availability to meet project deadlines (35%), project cost (25%), completeness of proposal including acknowledgment of tasks, materials, and equipment (20%), and experience in similar work (20%). Vendors must provide a formal proposal with an attached detailed scope of work outlining all materials and equipment proposed for use. All work must comply with prevailing wage requirements, and vendors are required to notify DCR at least one week prior to starting work and notify the local Conservation Commission before commencing activities. Access to the work area is controlled through gated access point 40 on South Main Street, with DCR staff available to manage gate access or allow for contractor padlocks. Billing inquiries should be directed to Christy Raillo at christy.raillo@mass.gov.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Prevailing Wage Schedule~4.pdf | ||
| Wachusett Spillway Locus Map~1.pdf | ||
| Wachusett Spillway Basemap~1.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
The Commonwealth of Massachusetts
Department of Conservation and Recreation
Division of Water Supply Protection | 180 Beaman Street | West Boylston, MA 01583 www.Mass.gov/DCR | Tel: (508) 792-7806
Maura T. Healey
Governor
Kimberley Driscoll
Lieutenant Governor
Rebecca L. Tepper
Secretary
Nicole LaChapelle
Commissioner
Request for Proposals
RFP Title: Vegetation Management – Wachusett Spillway
Statewide Contract: FAC120, Category 4
Commbuys Bid: BD-27-1020-DCRWS-DC700-131991
Description of Need Summary: This Request for Proposals (RFP) is posted by the
Department of Conservation and Recreation (DCR), Division of Water Supply Protection
(DWSP) for the purpose of obtaining pricing estimates for the chemical treatment to control all vegetation in a 1.2-acre area of exposed rocky channel immediately downstream of the
Wachusett Reservoir spillway in the town of Clinton. See details below.
Commonwealth Eligible Entity Engaging a Vendor:
Eligible Entity Name: Department of Conservation and Recreation
Type of Eligible Entity: State Agency
Eligible Entity Mailing Address: 180 Beaman Street, West Boylston, MA 01583
Contact Name: Ken MacKenzie
E-Mail Address: ken.mackenzie@mass.gov
Telephone: 857-202-0071 (cell) https://www.mass.gov/orgs/department-of-conservation-recreation https://www.commbuys.com/bso/bid/bidSummary.sda?docId=BD-27-1020-DCRWS-DC700-131991 mailto:ken.mackenzie@mass.gov
This Request for Proposals (RFP) does not commit DCR to approve a Statement of Work
(SOW), pay any costs incurred in the preparation of a bidder’s response to this RFP, or to engage for products or services. DCR reserves the right to accept or reject any or all quotes received as a result of this RFP and to contract for some, all, or none of the responding vendors as a result of this RFP. DCR further reserves the right to negotiate with any or all responding vendors or to cancel this RFP, in part or in its entirety, if it is in the best interest of the agency to do so. All pricing, terms, and conditions of this contract apply to any award made as a result of this RFP.
Scope of Work:
Project Description:
The Wachusett Reservoir spillway is accessed through a series of gates starting at gate
40 on S Main St. in Clinton, followed by two internal gates. The spillway basin is a 1.2-acre rocky channel that hosts a wide range of native and non-native vegetation, including low growing trees, shrubs, climbing vines, and herbaceous cover. For water supply infrastructure monitoring requirements, it is necessary for the channel to be clear of visually obstructing vegetation. Vegetation in the channel has been mechanically maintained by DWSP staff, but the rocky terrain requires the use of hand tools, and the numerous persistent resprouts along with the spread of invasive vines has rendered this task unfeasible by mechanical methods alone. Long-term monitoring and maintenance of the spillway infrastructure requires chemical control of all vegetation within the basin.
Project Tasks:
1. Foliar herbicide application using an aquatic-safe formulation of glyphosate and / or triclopyr to all vegetation within the 1.2-acre basin at the top of the spillway channel (area delineated on the attached maps).
2. Cut-stem treatment also using an aquatic-safe formulation of glyphosate and / or triclopyr of any woody vegetation that is too tall to spray.
Bidders Conference:
A bidders’ conference will be held on Friday, August 7, 2026, at 9:00AM. Meeting location will be at DWSP Gate 40 on South Main Street (just past 71 South Main Street) in
Clinton (Coords: 42.407301, -71.698778).
Other Project Requirements and Information:
• All work must be completed by September 15, 2026.
• DCR staff will provide maps of the treatment area.
• Vendor shall provide DCR with anticipated schedule for starting and completing work. Vendor shall notify DCR at least one week prior to starting work in order to allow time to prepare infrastructure to receive the treatment.
• Vendor shall notify the local Conservation Commission prior to starting work.
(DCR will provide the vendor with appropriate language to include in the notification consistent with prior notifications citing maintenance work on utility infrastructure.)
• Access to the work area will be through gated access point 40 on South Main
Street, Clinton. DCR staff will be available to open and close gates or arrange for a contractor’s padlock.
Estimated Duration of Project: 1 day
Anticipated Completion of Project: September 15, 2026
Evaluation Criteria:
• Availability: vendor can meet project deadlines (35%)
• Project Cost (25%)
• Completeness of proposal (20%):
o Proposal includes acknowledgement of the project tasks and requirements.
o List all materials and equipment vendor proposes to use to complete the tasks.
• Experience in similar work (20%)
Responses:
Responses (bids/quotes) are to be submitted to DCR electronically via the “Create
Quote” function contained in Commbuys system. Responses must include an attached formal proposal outlining service, and a total proposed cost entered into the “Items” tab. If you are a vendor on the FAC120 contract and have not registered on
Commbuys, you are required to do so. Vendors should consult the Commbuys Vendor
Registration Job Aid. Help is available from the Commbuys Help Desk at 617-720-3197.
https://www.mass.gov/info-details/completing-vendor-registration-in-commbuys#overview https://www.mass.gov/info-details/completing-vendor-registration-in-commbuys#overview
Billing Contact: Department of Conservation & Recreation
180 Beaman Street
West Boylston, MA 01583
Attn: Christy Raillo christy.raillo@mass.gov
Questions: Please submit all questions via the Q&A section located in Commbuys by
August 12, 2026 – 12:00 PM.
Answers to Questions will be submitted by: August 13, 2026 – 12:00 PM
RFP Responses are due by: August 14, 2026 – 2:00PM
Estimated Award Date: August 21, 2026
Attachments:
• Wachusett Spillway Locus Map
• Wachusett Spillway Base Map
• Prevailing Wage Schedule mailto:christy.raillo@mass.gov