Attch_3_CDRLs_CALL_003_FINAL_20181217.docx

DOCX document 37 KB Posted

Attached to
CALL 004 - Simulation 3D HP Propagation etc FA9453-19-S-0001 ASE
Solicitation number
FA9453-19-S-0001
Issued by

About this file

Atch 3 to CALL 003 - DRAFT CDRLs dtd 17 Dec 18

View the file

Other files

File Type Posted
Atch_1_-_Cost_Proposal_Instructions_FINAL_dtd_24_Oct_18.docx DOCX document
Attch_3_CDRLs_FINAL_20181217.docx DOCX document
FA9453-19-S-0001_CALL_004_RFP_Announcement_dtd_1_May_19.docx DOCX document
Atch_2_-_SOO_CALL_004_FA9453-19-S-0001_dtd_14_Apr_19.docx DOCX document
Attch_4__'A'__-_DD_254_FINAL_Continuation_Sheet_20181022_-_Item___2.pdf PDF
Attch_7_-_DFARS_252.227-7017_PROVISION_FINAL_dated_31_Jan_18.docx DOCX document
FA9453-19-C-0001_BAA_FULL_TEXT_FINAL_dtd_5_Feb_19.docx DOCX document
Attch_6_-_DoD_Proposal_Adequacy_Checklist_FINAL_20181220.docx DOCX document
Attch_5_CALL_004_Sec_K_FINAL_20181220.docx DOCX document
Attch_4__DD254_Basic_FINAL_20181022_-_Item___1.pdf PDF
Attch_7_-_DFARS_252.227-7017_PROVISION_FINAL_dated_31_Jan_18.docx DOCX document
Attch_1_-_Cost_Proposal_Instructions_FINAL_(Non-APC)_CALL_3_D-Region_dtd_24_Oct_18.docx DOCX document
Attch_2_SOO_FINAL_CALL_003_dtd_20190212.docx DOCX document
Attch_4__DD_254_CALL_003_D-Region_FINAL_Continuation_Sheet_20181022.pdf PDF
FA9453-19-C-0001_BAA_FULL_TEXT_FINAL_dtd_20190205.docx DOCX document
FA9453-19-S-0001_CALL_003_D-Region_Announcement_20190214.docx DOCX document
Attch_5_CALL_003_Sec_K_FINAL_20181220.docx DOCX document
Attch_6_-_DoD_Proposal_Adequacy_Checklist_FINAL_20181220.docx DOCX document
Attch_4__DD254_Basic_CALL_003_D-Region_FINAL_20181022.pdf PDF
Attch_5_CALL_002_Sec_K_FINAL_20181220.docx DOCX document
Attch_4__DD_254_FINAL_Continuation_Sheet_20181022_-_CALL_2_HF_Backscatter_Signed.pdf PDF
Attch_2_SOO_FINAL_R1_CALL_002_HF_Backscatter_dtd_20190212.docx DOCX document
Attch_6_-_DoD_Proposal_Adequacy_Checklist_FINAL_20181220.docx DOCX document
Attch_7_-_DFARS_252.227-7017_PROVISION_FINAL_dated_31_Jan_18.docx DOCX document
Attch_4_DD254_Basic_FINAL_20181022_-_CALL_2_HF_Backscatter.pdf PDF
Attch_1_-_Cost_Proposal_Instructions_FINAL_(Non-APC)_CALL_2_HF_Backscatter_dtd_24_Oct_18.docx DOCX document
Attch_3_CDRLs_FINAL_CALL_2_HF_Backscatter_20181217.docx DOCX document
FA9453-19-C-0001_BAA_FULL_TEXT_FINAL_dtd_20190205.docx DOCX document
FA9453-19-S-0001_CALL_002_FINAL_R1_HF_Backscatter_Announcement_20190214.docx DOCX document
FA9453-19-C-0001_BAA_FULL_TEXT_FINAL_dtd_20190205.docx DOCX document
Attch_2_SOO_FINAL_CALL_001_dtd_20181101.docx DOCX document
FA9453-19-S-0001_CALL_001_RFP_FINAL_Announcement_20181128.docx DOCX document
Atch_1_-_Cost_Proposal_Instructions_FINAL_dtd_24_Oct_18.docx DOCX document
Attch_3_CDRLs_FINAL_20181217.docx DOCX document
Attch_4__DD_254_FINAL_Continuation_Sheet_20181022_-_Item___2.pdf PDF
Attch_6_-_DoD_Proposal_Adequacy_Checklist_FINAL_20181220.docx DOCX document
Attch_5_CALL_001_Sec_K_FINAL_20181220.docx DOCX document
Attch_4__DD254_Basic_FINAL_20181022_-_Item___1.pdf PDF
Attch_7_-_DFARS_252.227-7017_PROVISION_FINAL_dated_31_Jan_18.docx DOCX document
Show all 39

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT DATA REQUIREMENTS LIST (1 Data Item) Form Approval OMB No. 0704-0188 Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.: CLIN 0002

B. EXHIBIT....................................: A

C. CATEGORY..............................: OTHER BAA Solicitation D. SYSTEM/ITEM........: «Proposal_Title»

E. CONTRACT/PR NO.

F. CONTRACTOR.........: «Contractor »

1. DATA ITEM NO........................:
A001
2. TITLE OF DATA ITEM............:
Status Report
3. SUBTITLE..................................:
Monthly
4. AUTHORITY.............................:
DI-MGMT-80368A (http://quicksearch.dla.mil)
5. CONTRACT REFERENCE......: S
SOW

6. REQUIRING OFFICE...................: AFRL/RVBX

7. DD250 REQ................................: LT

8. APP CODE.................................:

9. DIST. STATEMENT REQUIRED......:B
10. FREQUENCY......................................:MTHLY
11. AS OF DATE........................................:N/A
12. DATE OF FIRST SUBMISSION……:See Blk 16
13. DATE OF SUBSEQUENT SUBM…...:See Blk 16

14. DISTRIBUTION

A. ADDRESSEES
B. COPIES
DRAFT
FINAL
AFRL/RVBX
0
1
AFRL DET 8/RVKVB
0
1
ACO
0
Ltr
15. TOTAL:
0
2

16. REMARKS

Blk 4: Tailored: Only 10.1-10.2.2, 10.2.4-10.2.10, 10.2.11.3-10.2.11.4, 10.2.11.9, 10.2.13; Contractor format is encouraged. All data should be presented in a format that facilitates interpretation.

Blk 9: All technical data (including electronic media/CD-R) shall be marked I.A.W. DoDI 5230.24 with Distribution Statement D, and other required markings, shown indented below:

“Distribution authorized to Department of Defense and U.S. DoD contractors only; Critical Technology, Export Control; [contractor fill in date of report (dd mmm yy)]. Other requests for this document shall be referred to AFRL/RVB, 3550 Aberdeen Avenue, SE, Kirtland AFB, NM 87117-5776.” (ADD THIS ENTIRE DISTRIBUTION STATEMENT TO THE BOTTOM OF EVERY PAGE OF THE REPORT EXCEPT THE SF 298.)

“WARNING: This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec. 2751, et seq.) or the Export Administration Act of 1979, as amended. Title 50 U.S.C. App 2401 et seq. Violations of these export laws are subject to severe criminal penalties. Disseminate I.A.W. the provisions of the DoD Directive 5230.25.” (ADD “WARNING: EXPORT CONTROLLED” TO THE BOTTOM OF EVERY PG OF THE REPORT EXCEPT THE SF 298.)

“DESTRUCTION NOTICE—For unclassified, limited documents, destroy by any method that will prevent disclosure of contents or reconstruction of the document.”

Blk 10 - 13: First report submitted within 10 working days after completion of the first full month following task order award. Monthly thereafter for the duration of the contract. Last submission shall be at contract completion.

Note: Unencrypted E-mail transmittal is not permitted.

Blk 14: The contractor shall distribute the Status Reports in accordance with Blk 14. When the addressee’s copy is identified by “Ltr”, send only a copy of the transmittal letter to that addressee.

17. PRICE GROUP:

18. ESTIMATED TOTAL PRICE :

G. PREPARED BY:
Anne W. Werkley
I. APPROVED BY: Mark Cruz
H. DATE:
26 September 2018
J. DATE: 3 December 2018

DD Form 1423-1, SEP 97 (EG) (Computer Generated) PREVIOUS EDITIONS ARE OBSOLETE Page _1 of _2 Pages

CONTRACT DATA REQUIREMENTS LIST (1 Data Item) Form Approval OMB No. 0704-0188 Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.: CLIN 0002

B. EXHIBIT....................................: A

C. CATEGORY..............................: OTHER BAA Solicitation D. SYSTEM/ITEM........: «Proposal_Title»

E. CONTRACT/PR NO.

F. CONTRACTOR.........: «Contractor »

1. DATA ITEM NO........................:
A002
2. TITLE OF DATA ITEM............:
Scientific and Technical Report and Checklist
3. SUBTITLE..................................:
Final Report
4. AUTHORITY.............................:
DI-MISC-80711A (http://quicksearch.dla.mil)
5. CONTRACT REFERENCE......: S
SOW

6. REQUIRING OFFICE...................: AFRL/RVBX

7. DD250 REQ................................: DD

8. APP CODE.................................: A

9. DIST. STATEMENT REQUIRED......:See Blk 16
10. FREQUENCY......................................:See Blk 16
11. AS OF DATE........................................:See Blk 16
12. DATE OF FIRST SUBMISSION……:See Blk 16
13. DATE OF SUBSEQUENT SUBM…...:See Blk 16

14. DISTRIBUTION

A. ADDRESSEES
B. COPIES
FINAL
CRC
AFRL/RVBX
2
1
AFRL DET 8/RVKVB
Ltr
Ltr
ACO
Ltr
Ltr
15. TOTAL:
2
1

16. REMARKS

THE REPORT WILL BE PUBLISHED WITH THE DEFENSE TECHNICAL INFORMATION CENTER (DTIC) BY AFRL STINFO OFFICE. Under no circumstances shall the contractor submit any version of the scientific and technical report to DTIC.

Blk 4: GUIDANCE FOR PREPARATION OF THE REPORT: The Scientific and Technical Report shall be prepared I.A.W. the most current AFRL ANSI/NISO Standard Z39.18-2005, or other most current report preparation guidance. The contractor shall complete the most current SF 298 Report Documentation Page, and submit it with the report. The contractor shall complete the following blocks of the SF 298: Blocks 2-5a, 6, 7, 8 and 13 (if applicable), and 14-16c. Incomplete reports will be immediately returned to the contractor. Following AFRL technical and STINFO reviews, any revisions required will be returned to the contractor. NOTE: The report preparation guidance and SF 298 are available at: http://www.afrlnewmexico.com/stinfo-1.

The contractor shall deliver two editable electronic copies of the report. The electronic copies shall be an editable .pdf file and the most current version of Microsoft Word. A CD-ROM (CD-R) is the acceptable media for submittal (CD-RWs are not acceptable). Electronic media shall be marked I.A.W. the AFRL ANSI/NISO Standard Z39.18-2005 guidelines, or other most current report preparation guidance. Submission via unencrypted or unsecure email is not permitted.

Blk 7: UPON NOTIFICATION OF ACCEPTANCE OF THE SCIENTIFIC AND TECHNICAL REPORT FROM THE PROGRAM OFFICE, the contractor shall submit the final Receiving Report (DD Form 250) in WAWF. In preparing the final DD Form 250, code the shipment number with a “Z.” Do not upload the Scientific and Technical Report into WAWF or DTIC. NOTE: SUBMITTAL OF THE DD FORM 250Z PRIOR TO ACCEPTANCE NOTIFICATION WILL RESULT IN REJECTION OF THE DD FORM 250Z FINAL RECEIVING REPORT.

Blk 9: All technical data (including electronic media/CD-R) shall be marked I.A.W. DoDI 5230.24 with Distribution Statement D, and other required markings, shown indented below:

“Distribution authorized to Department of Defense and U.S. DoD contractors only; Critical Technology, Export Control; [contractor fill in date of report (dd mmm yy)]. Other requests for this document shall be referred to AFRL/RVB, 3550 Aberdeen Avenue, SE, Kirtland AFB, NM 87117-5776.” (ADD THIS ENTIRE DISTRIBUTION STATEMENT TO THE BOTTOM OF EVERY PAGE OF THE REPORT EXCEPT THE SF 298.)

“WARNING: This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec. 2751, et seq.) or the Export Administration Act of 1979, as amended. Title 50 U.S.C. App 2401 et seq. Violations of these export laws are subject to severe criminal penalties. Disseminate I.A.W. the provisions of the DoD Directive 5230.25.” (ADD “WARNING: EXPORT CONTROLLED” TO THE BOTTOM OF EVERY PG OF THE REPORT EXCEPT THE SF 298.)

“DESTRUCTION NOTICE—For unclassified, limited documents, destroy by any method that will prevent disclosure of contents or reconstruction of the document.”

Blks 10 - 13: The contractor shall deliver the Scientific and Technical Report, in final format, no later than the date specified in the Schedule, «CLIN 0002». The USAF will review and, if necessary, return the report with comments no later than the date specified in the Schedule, «CLIN 0002». If the report is returned to the contractor with comments, the contractor shall deliver the camera-ready copy of the report no later than the date specified in the Schedule, «CLIN 0002».

Blk 14: The contractor shall distribute the Scientific and Technical Report (final/CRC version(s)) in accordance with Blk 14. When the addressee’s copy is identified by “Ltr”, send only a copy of the transmittal letter to that addressee.

17. PRICE GROUP:

18. ESTIMATED TOTAL PRICE :

G. PREPARED BY:
Anne W. Werkley
I. APPROVED BY: Mark Cruz
H. DATE:
26 September 2018
J. DATE: 3 December 2018

DD Form 1423-1, SEP 97 (EG) (Computer Generated) PREVIOUS EDITIONS ARE OBSOLETE Page _2 of _2 Pages

File details come from the government source that posted it.