A29 On-Call Support PWS 23 Nov 26.pdf

PDF 200 KB Posted

Attached to
Embraer A-29 Super Tucano aircraft On-Call Support
Solicitation number
FA930427Q5001B
Issued by

About this file

This is a Performance Work Statement (PWS) for on-call repair, tire replacement, and ground relocation support services for three Embraer A-29 Super Tucano aircraft in storage at Edwards Air Force Base, California, with an effective date of November 23, 2026.

The contract covers non-recurring, as-needed maintenance services limited to fuel, hydraulic, and oil leak inspection and repair; flat or unserviceable tire replacement; and aircraft ground towing and repositioning within the installation. The contractor must provide all labor, supervision, tools, parts, consumables, transportation, and travel except for Government-furnished items, which include two nose spare tires, four main spare tires, one tow vehicle, and one forklift. The contractor shall furnish replacement tires after Government-furnished inventory is exhausted and must ensure all replacement tires are the same as or equivalent to those currently installed. The scope explicitly excludes depot-level overhaul, return-to-flight maintenance, airworthiness releases, and any unauthorized modifications. Services shall be performed at Edwards AFB on an as-needed basis during the three-year period of performance (one base year plus two option years).

Performance standards require contractor acknowledgment of service requests within four hours, initial response plans within one business day, fuel leak response within one business day, flat tire response within five business days, and towing support within five business days. The contractor must provide at least three tow-certified individuals for towing operations and submit service completion reports within two business days using Microsoft Office applications. All work must comply with Federal, Department of Defense, Air Force, installation, environmental, and occupational safety requirements, including OSHA standards, hazardous material handling, spill prevention, fire prevention, Foreign Object Debris prevention, and desert tortoise awareness training. The contractor bears full responsibility for mishap reporting, environmental compliance, waste management, and obtaining all required environmental permits independently of Government permits.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Performance Work Statement for

On-Call Repair, Tire Replacement, and Ground Relocation Support for Three (3) Stored

Embraer A-29 Super Tucano Aircraft at

Edwards Air Force Base, CA

23 November 2026

1.0 Background

Three (3) fully sealed Embraer A-29 Super Tucano aircraft (herein referred to as A29) are currently in storage at Edwards Air Force Base (AFB), California. These aircraft are not expected to return to flight for use by the Air Force. However, on-call maintenance support is required to address limited conditions affecting safe storage, environmental compliance, and ground movement within the installation.

The Government requires contractor support on an as-needed basis to perform minor repairs and services necessary to:

• Stop or mitigate fuel, hydraulic, and/or oil leaks;

• Replace flat or unserviceable tires;

• Tow aircraft to a new location on Edwards AFB; and

• Provide associated labor, tools, parts, equipment, and travel necessary to accomplish the required work.

This effort is intended solely to support stored aircraft in a non-flight status. Nothing in this PWS shall be interpreted as requiring return-to-flight maintenance, airworthiness restoration, flight certification, or operational aircraft generation.

2.0 Objective

The objective of this requirement is to obtain on-call contractor maintenance and aircraft ground handling support for three (3) fully sealed and stored A-29 aircraft located at Edwards AFB. The contractor shall provide qualified personnel, supervision, tools, replacement parts, travel, and incidental support necessary to perform specified repair and towing services in a safe, timely, and professional manner.

3.0 Scope

The contractor shall furnish all management, labor, supervision, tools, equipment, repair parts, consumables, transportation, and travel required to perform on-call services under this PWS, except for items expressly identified as Government-furnished.

Services under this PWS are limited to non-recurring, as-needed actions associated with:

• Fuel, hydraulic, and/or oil leak repair or mitigation;

• Tire repair or replacement;

• Ground towing and repositioning of aircraft; and

• Related minor maintenance actions necessary to place the aircraft in a safe storage or towable condition.

The contractor shall not perform depot-level overhaul, return-to-flight maintenance, airworthiness release, engineering disposition beyond field-level repair judgment, or any modification not specifically authorized by the Government.

4.0 Place of Performance

All services shall be performed at Edwards Air Force Base, California, unless otherwise directed in writing by the Contracting Officer or authorized representative.

5.0 Period of Performance

The period of performance shall be three years; one base year and two options years. Services shall be performed on an on-call, as-needed basis during the period of performance.

6.0 Applicable Documents

The contractor shall comply with the current versions of all applicable Federal, Department of Defense, Department of the Air Force, installation, environmental, and occupational safety requirements relevant to the performance of this effort.

Applicable references include, but are not limited to:

• Installation access procedures;

• Edwards AFB safety requirements;

• Fire prevention and hazardous material handling procedures;

• Environmental spill prevention and waste disposal requirements;

• Aircraft towing and ground safety procedures applicable to the installation or aircraft type

If a conflict exists between this PWS and an applicable directive, the contractor shall notify the Government for resolution.

7.0 Definitions

For purposes of this PWS:

On-call service means contractor response to a Government request for repair, tire replacement, inspection, or towing support during the period of performance.

Equivalent tire means a replacement tire of the same size, load rating, fit, compatibility, and intended aircraft ground-use application as the tire currently installed, or a functionally equivalent substitute acceptable to the Government for non-flight storage and towing purposes.

Tow-certified individual means contractor personnel qualified in accordance with applicable aircraft towing procedures, local installation requirements, and any task-specific qualifications needed to safely participate in aircraft towing operations.

8.0 Government-Furnished Property, Equipment, and Support

8.1 Government-Furnished Equipment (GFE)

The Government will provide the following equipment for use under this requirement, if available and serviceable:

• Two (2) nose spare tires;

• Four (4) main spare tires;

• One (1) tow vehicle; and

• One (1) forklift.

These Government-furnished spare tires shall be used first, when applicable, for tire replacement actions under this PWS.

Once the Government-furnished spare tire inventory has been exhausted, the contractor shall provide replacement tires as required to complete future tire replacement services.

All replacement tires, whether Government-furnished or contractor-provided, shall be the same as, or equivalent to, the tires currently used on the aircraft.

8.2 Government-Furnished Support

The Government will provide:

• Access to the aircraft and designated work areas;

• Coordination support for base access, work scheduling, and aircraft location;

• Government direction regarding destination location for aircraft repositioning.

9.0 Contractor Responsibilities

The contractor shall:

• Provide qualified personnel capable of gaining access to the base and performing the required services;

• Provide at least three (3) tow-certified individuals when towing support is required;

• Provide all contractor-furnished tools, equipment, parts, consumables, transportation, management, and travel necessary to perform the work, except as identified as Government-furnished;

• Coordinate with the Government POC before beginning work;

• Perform all work in accordance with applicable safety, environmental, and installation requirements;

• Provide service documentation upon completion of each call event;

• Notify the Government promptly of any condition that prevents completion of the requested service or creates an unsafe condition.

10.0 Specific Tasks

10.1 Task 1 – Fuel, Hydraulic, and/or Oil Leak Inspection and Repair

The contractor shall inspect aircraft experiencing active or suspected fuel, hydraulic, and/or oil leaks and identify the source and extent of the leak. The contractor shall perform corrective action necessary to stop, contain, or mitigate the leak to support continued safe storage and ground movement, as applicable.

Services may include:

• Visual inspection and troubleshooting of accessible fuel system components;

• Removal and replacement of minor components such as seals, hoses, fittings, clamps, caps, valves, or similar items, as needed;

• Temporary containment or mitigation measures pending repair, when immediate permanent repair is not feasible;

• Cleanup and proper handling of maintenance by-products in accordance with applicable environmental and installation requirements;

• Verification that active leakage has ceased or has been reduced to a condition acceptable for storage, as determined by the Government.

The contractor shall not perform major structural fuel system modification or return-to-flight functional certification under this task.

10.2 Task 2 – Flat Tire Repair/Replacement

The contractor shall inspect, remove, and replace flat, damaged, or unserviceable aircraft tires as needed to support safe storage and/or ground towing.

Services may include:

• Positioning and securing the aircraft for maintenance;

• Use of aircraft jack(s) and related lifting/support procedures;

• Removal and replacement of wheel/tire assemblies or tire components, as applicable;

• Inflation and servicing necessary to support static load-bearing and/or towing;

• Inspection for visible related damage affecting safe storage or towing.

All tires removed from the aircraft will be returned to the Government for disposal/disposition.

The Government will furnish two (2) nose spare tires and four (4) main spare tires for initial use.

Once those Government-furnished tires have been exhausted, the contractor shall furnish replacement tires.

Any tire installed under this PWS shall be the same as, or equivalent to, the tire currently used on the aircraft.

10.3 Task 3 – Aircraft Tow to New Location

The contractor shall tow the aircraft from one location to another within Edwards AFB as directed by the Government.

Services may include:

• Pre-tow inspection for safe ground movement;

• Coordination with the Government regarding route, destination, timing, and required support;

• Provision of at least three (3) tow-certified contractor individuals;

• Use of towing equipment and associated safety devices required for safe movement;

• Aircraft repositioning, parking, chocking, and securing at the destination location.

10.4 Task 4 – Contractor-Furnished Tools, Parts, and Consumables

Except for Government-furnished items specifically identified in Section 8.0, the contractor shall furnish all tools, parts, consumables, support equipment, and incidental materials necessary to perform this effort.

This may include, but is not limited to:

• Hand tools and specialty maintenance tools;

• Fuel-safe sealants, gaskets, fittings, hoses, and clamps;

• Tire service equipment, valves, inflation consumables, and wheel service items;

• Towing accessories, adapters, safety pins, and related support equipment;

• Spill containment materials and general shop consumables;

• Replacement tires after Government-furnished tires are exhausted.

11.0 Performance Requirements

11.1 General Performance Standard

The contractor shall perform all work in a manner that is timely, safe, complete, and compliant with applicable installation, safety, and environmental requirements.

11.2 Service Summary Standards

The following service standards are recommended for incorporation into the contract and quality surveillance framework:

Performance Objective Performance Standard

Acceptable Quality Level

(AQL)

Surveillance Method

Acknowledge Government service request

Contractor acknowledges service request within 4 hours of notification

100% = Satisfactory, <100% = Unsatisfactory

Review of call logs/email records

Initial response/mobilization plan

Contractor provides estimated response date/time and required support within 1 business day of notification

100% = Satisfactory, <100% = Unsatisfactory

Review of service records

Fuel leak response

Contractor arrives on-site or begins authorized response within 1 business day of notification for active fuel leak conditions, unless otherwise coordinated by Government

100% = Satisfactory, <100% = Unsatisfactory

Review of dispatch and maintenance logs

Flat tire response

Contractor arrives on-site or begins authorized response within 5 business days of notification for flat or unserviceable tire conditions

100% = Satisfactory, <100% = Unsatisfactory

Review of dispatch and maintenance logs

Tow support response

Contractor provides towing support within 5 business days of Government request, unless a different date is coordinated

100% = Satisfactory, <100% = Unsatisfactory

Review of towing schedule and completion records

Performance Objective Performance Standard

Acceptable Quality Level

(AQL)

Surveillance Method

Tow-certified personnel Contractor provides three tow-certified individuals for each towing event

100% = Satisfactory, <100% = Unsatisfactory

Review of qualifications and tow event records

Repair completeness

Work performed resolves the reported discrepancy or clearly documents why additional work is required

100% = Satisfactory, <100% = Unsatisfactory

Government inspection and service report review

Tire replacement standard

Installed tire is same as or equivalent to currently used tire

100% = Satisfactory, <100% = Unsatisfactory

Visual verification and parts documentation

Safety compliance

No preventable safety violations, fuel spill mishandling, or towing incidents attributable to contractor negligence

100% = Satisfactory, <100% = Unsatisfactory

Government observation/report review

Documentation

Contractor provides service completion report within 2 business days after each service event

100% = Satisfactory, <100% = Unsatisfactory

Review of submitted reports

11.3 Quality Control

The contractor shall maintain a quality control process sufficient to ensure services conform to contract requirements. At a minimum, the contractor shall ensure:

• Personnel qualifications are current and appropriate;

• Parts used are documented;

• Safety and environmental procedures are followed;

• Incomplete work or discovered deficiencies are reported promptly.

12.0 Deliverables

For each service event, the contractor shall provide a service report containing, at a minimum:

• Date of request;

• Date(s) work performed;

• Aircraft identifier or tail/bureau/control number, if provided by the Government;

• Description of discrepancy or requested service;

• Corrective action taken;

• Parts, tires, consumables, and equipment used;

• Whether Government-furnished or contractor-furnished material was used;

• Final aircraft status;

• Any recommended follow-on actions;

• Name of servicing technician(s) and tow-certified individuals, if applicable.

The contractor shall submit the service report within two (2) business days of service completion. The Contractor shall develop the required report using a Microsoft Office application in a format compatible with Government systems (e.g., Microsoft Word, Excel, or PowerPoint, as applicable). The Contractor shall submit the completed report to the Government via email for review and approval by the designated Government representative.

13.0 Security and Installation Access

The contractor shall comply with all Edwards AFB access, identification, escort, force protection, and work area requirements. The contractor is responsible for ensuring personnel can access the installation in time to meet required response standards, subject to Government coordination.

14.0 Safety and Environmental Requirements

The contractor shall comply with all applicable Federal, state, local, Department of Defense, Department of the Air Force, and Edwards AFB safety and environmental requirements.

This includes, as applicable:

• Safe jacking and aircraft support procedures;

• Hazardous material handling;

• Spill prevention and response;

• Fire prevention;

• Foreign object damage prevention;

• Waste collection and disposal in accordance with installation procedures.

Any spill, accident, damage, or unsafe condition shall be reported immediately to the Government POC.

14.1 Safety and Health. It is the contractor's responsibility to ensure its employees and managers have a comprehensive understanding of OSHA requirements. Detailed information is available at http://www.osha.gov. Contractors are responsible for complying with federal and state occupational safety and health standards for their employees, except where the Air Force contractually agreed to assume responsibility.

14.2 Mishap Reporting. The Contractor shall promptly report pertinent facts to the Government Program Office (GPO) regarding mishaps involving government personnel or property, on or off the Air Force Installation, incidental to work performed IAW DAFI 91-204, Safety Investigation and Hazard Reporting. Direct costs related to the mishap shall be separated from other cost and provided to the GPO and Safety Investigators.

The Contractor is responsible for establishing requirements for all subcontractors who qualify as subcontractors under the resulting contract.

14.3 Environmental Protection. The Contractor shall comply with all applicable Federal, state, and local laws, regulations, and standards, including Air Force and installation policies, directives, and instructions, that are or may become applicable to the contractor’s activities in performance of this contract.

14.3.1. The Contractor shall ensure all hazardous materials (HM), Hazardous Material Identification and Material Safety Data, and Pollution Prevention and Right-to-Know Information are authorized and managed in compliance with applicable laws, regulations, and applicable sections of DAFMAN 32-7002, Environmental Compliance and Pollution Prevention, and Edwards Air Force Base (AFB) HM policy, to ensure compliance with Emergency Planning and Community Right-to-Know Act of 1986 (42 U.S.C. 11001-11050), and Pollution Prevention Act of 1990 (42 U.S.C. 13101-13109).

14.3.1.1. Safety Data Sheet (SDS) submissions, accompanied by a completed Contractor Hazardous Material Approval Form, are required for chemicals/materials not sourced from an installation HAZMART, and must be approved by the Edwards AFB Hazardous Material Program including the initial submission by the apparently successful offeror prior to award, and prior to use for any subsequent SDS submissions by the contractor during performance of the contract.

14.3.1.2. The Contractor shall utilize the Contractor Hazardous Materials Usage Form to capture monthly usage data for hazardous chemicals/materials not sourced from an installation HAZMART that were used on the installation in performance of this contract. The Contractor shall submit the usage form to the Contracting Officer identified COR/Government Point of

Contact (GPOC) by the 5th of the following month during performance and at completion of work.

14.3.1.3. The Point of Contact for questions concerning Hazardous Materials or SDS submissions prior to award is the Contracting Officer. After award and during contract performance, contact the Edwards AFB Environmental Management Office at (661) 277-1401 (for AFRL, call (661) 277-5135) or email 412CEG.CEVC.HMWorkflow@us.af.mil, for the HM exempt list and guidance regarding HM regulatory, usage, and tracking form requirements.

14.3.1.4. Any products that meet the criteria of “Hazardous Waste” must be tracked until permanently removed from government property. Criteria for identifying hazardous waste are contained in Subpart C of 40 CFR Part 261 and Chapter 11, Articles 1-5, of 22 CCR. Note:

Products containing chlorofluorocarbons (CFC’s) or ozone depleting substances shall not be allowed or approved for use.

14.3.1.5. The Contractor shall ensure that all solid and hazardous waste management on this contract complies with all applicable sections of DAFMAN 32-7002, and the Edwards Air Force Base Hazardous Waste Management Plan (HWMP) and Integrated Solid Waste Management Plan, the California Health and Safety Code (HSC), Title 22 California Code of Regulations (CCR), and Title 40 Code of Federal Regulations (CFR).

14.3.6. Hazardous/regulated waste shall be disposed of under the Edwards AFB, US Environmental Protection Agency (EPA) ID number, with Edwards AFB as the Generator, unless the Contractor is considered “other persons” under the Resource Conservation and Recovery Act (RCRA) and operates their HW activities independent of Edwards AFB using their own US EPA ID number.

14.3.1.7. Signed HW disposal manifests shall be required for HW that may be generated on this contract prior to transportation for off-site disposal to a California Department of Toxic Substance Control (DTSC) and/or US EPA-approved landfill or treatment facility. The Contractor shall submit draft manifests via email to the Edwards AFB Environmental Management Office at 412CEG.CEVC.HWWorkflow@us.af.mil for review. After the draft manifests have been approved, the waste shipment must be scheduled with the Environmental Office to arrange for manifest signature by government personnel with Signature Authority.

Contact the Hazardous Waste Support Facility (HWSF) personnel at (661) 277-3681, the 412CEG/CEVC HW Program Manager at (661) 277-1885, or email 412CEG.CEVC.HWWorkflow@us.af.mil for questions or additional information.

14.3.2. The Contractor shall comply with Pollution Prevention and Right-to-Know Information requirements. Control of environmental pollution requires consideration of air, water, and land uses, and involves the management of noise, solid waste, thermal energy and radioactive materials, as well as other pollutants. Protective measures shall be incorporated to control pollution and/or correct environmentally impacting conditions that may develop resulting from this contract. Environmental protection shall be provided during the life of the contract.

14.3.3. The Contractor shall complete EMS General Awareness training in accordance with DoDI 4715.05, DoDI 4715.06, and DoDI 4715.17 prior to or upon arrival at the installation and ensure proof of completion is available to the contracting office upon request. Online training is available using the TEACH course EMS100AFIT00004 (AFIT) resource:

https://usaf.learningbuilder.com/account/login/?ReturnUrl=%2f

14.3.4. Permits. The Contractor shall be solely responsible for obtaining at its cost and expense any environmental permits required for its operations under the Contract, independent of any existing permits held by the Government. Any and all environmental permits required for any of the Contractor’s operations or activities would be subject to prior concurrence of the Government. The Contractor acknowledges that the Government will not consent to being named a secondary discharger or co-permittee for any operations or activities of the Contractor under the Contract. In the event the Government is named as a secondary discharger or co-permittee for any activity or operation of the Contract, the Government shall have the right to take reasonable actions necessary to prevent, suspend, or terminate such activity or operation, including terminating this Contract, without liability or penalty.

14.3.5. Spill Response. The Contractor is responsible to report and promptly clean up all spills in a manner consistent with current environmental regulations. In the event that it is necessary to utilize Government material, equipment or personnel to clean up a Contractor caused spill, the Contractor shall be required to reimburse the Government for all associated costs.

14.3.6. Recycling, Trash and Litter Control. The Contractor shall recycle as much cardboard, paper, plastic, wood and metal as possible through the installation’s Qualified Recycling Program (QRP), and shall develop a strict recycling, trash and litter control program. The recycling and litter control program shall consist of supplying an adequate number of covered recycling, trash and litter receptacles in all appropriate locations. The QRP may be able to provide limited additional recycling containers and bins as required (call 661-277-1167 for coordination). The contractor shall take precautions to prevent Foreign Object Debris (FOD) while working on or around the flight line. The contractor will be responsible to remove all debris as a result of the contract activity.

14.3.7. The Contractor shall notify the Environmental Management Division (412 CEG/CEV) at

(661) 277-1401 (option 1) prior to installing any storage tanks on the installation. Contractors owning, operating, or procuring any storage tanks for use on the installation will comply with all federal, state, and local requirements. Contractors shall comply with the Edwards AF Base Spill Prevention, Control, and Countermeasure Plan for all petroleum storage tanks used on the installation. Upon installation of a tank, the Contractor shall send an email notification

(including tank specification information) to 412CEG.CEVC.WastewaterPOLTanks@us.af.mil to facilitate California Environmental Reporting System (CERS), Storage Tank Accounting and Reporting (STAR), and the Spill Prevention Control and Countermeasure (SPCC) Plan update requirements. The Contractor shall appoint a tank custodian, provide required training, gain access to STAR, and capture monthly inspections in STAR. 412 CEG/CEV can assist the appointed tank custodian with training and obtaining STAR access.

14.3.8. To ensure compliance with the installation’s U.S. Fish and Wildlife Service Biological Opinion for Operations and Activities Edwards Air Force Base, California (8-8-14-F-14), regarding the effects on the federally threatened desert tortoise and its critical habitat, the Contractor shall distribute the Desert Tortoise Handout (DT Handout 412 TWPA Release #18150 20180316) to vehicle and equipment drivers prior to accessing Edwards AFB and the project area. All onsite workers shall receive desert tortoise awareness training prior to commencing work by reviewing the video at: https://youtu.be/I7Vm0dHwBbU and submitting a signed roster to 412CEG.CEVA.NRFieldSurveys@us.af.mil.

15.0 Assumptions and Constraints

• Aircraft are maintained in non-flight storage status only.

• No return-to-flight actions are required or authorized under this PWS.

• Government-furnished spare tires are limited to two (2) nose and four (4) main spare tires.

• Once Government-furnished spare tires are exhausted, the contractor shall provide replacement tires.

• Contractor-provided replacement tires must be the same as or equivalent to the tires currently used.

• One Government-furnished tow vehicle and a forklift will be provided for tow/tire change events

File details come from the government source that posted it. Updated .