VISTA_PWS_03_Mar_2015_Calspan.pdf
PDF 264 KB Posted
- Attached to
- Variable Stability In-Flight Simulator and Test Aircraft (VISTA) Federal contract opportunity
- Solicitation number
- FA9304-17-R-0001
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Redacted_FA9304-17-R-0001_JA_Signed_Redacted.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Performance-based Work Statement (PWS) for the USAF Test Pilot School (TPS)
Variable Stability In-Flight Simulator and Test Aircraft (VISTA)
03 Mar 2015
TABLE OF CONTENTS
SECTION TITLE PAGE
1 DESCRIPTION OF SERVICE 3
1.1 SCOPE OF WORK 3
1.2 BACKGROUND 3
1.3 REQUIREMENTS 3
1.3.1 AIRCRAFT MAINTENANCE SUPPORT 4
1.3.2 AIRCRAFT OPERATIONS SUPPORT 5
1.3.3 CURRICULUM SUPPORT 6
1.3.4 LOGISTICAL SUPPORT 6
1.3.5 ENGINEERING SUPPORT 7
1.3.6 PROGRAM MANAGEMENT / CONTRACTOR MANAGEMENT
SUPPORT
1.3.7 1.3.8
QUALITY (Higher Level)
SAFETY PROCEDURES SUPPORT
1.3.9 ON/OFF-STATION SUPPORT 8
1.3.10 CONTRACTOR SUPPLIED QUALIFIED VISTA F-16 PILOT 8
1.3.11 SPECIAL PROJECTS 9
2.1
QUALITY CONTROL
SERVICES SUMMARY
10-11
2.2 QUALITY CONTROL PLAN 12
2.3 QUALITY ASSURANCE 12
3 GOVERNMENT-FURNISHED PROPERTY AND SERVICES 14
3.1 GENERAL INFORMATION 14
3.2 GOVERNMENT-FURNISHED FACILITIES 14
3.3 GOVERNMNET-FURNISHED PROPERTY (GFP) 14
3.4 GOVERNMENT-FURNISHED SERVICES 15
4 GENERAL INFORMATION 17
4.1 CONTRACTOR PERSONNEL 17
4.2 HOURS OF OPERATION 18
4.3 SECURITY REQUIREMENTS 19
4.4 SAFETY 20
4.5 MISCELLANEOUS REQUIREMENTS 22
5 APPENDICES 24
A1 ANNUAL WORKLOAD ESTIMATES 24
A2 SPECIAL EVENTS 25
A3 MAPS AND WORK AREA LOCATIONS 26
A4 REQUIRED REPORTS AND PLANS 27
A5 TECHNICAL ORDERS AND INSTRUCTIONS 28-31
SECTION 1
DESCRIPTION OF SERVICES
1.1 SCOPE OF WORK. The contractor shall provide all personnel, vehicles, supervision, and other items and services necessary to perform Variable Stability In-Flight Simulator and Test Aircraft (VISTA) support services for the United States Air Force Test Pilot School (USAF TPS) as defined in this Performance Work Statement (PWS) at Edwards AFB (EAFB), CA. The USAF Test Pilot School requirement for maintenance support for the Variable Stability In-Flight Simulator and Test Aircraft (VISTA) is a sole source contract with Calspan Cooperation.
This requirement is for aircraft maintenance support (anticipating approximately 200 flight hours per year, plus or minus 20). This requirement also encompasses the following:
- Aircraft operations
- Curriculum support
- Logistics
- Engineering
- Simulator
- Hot bench
- Test management projects
- Configuration control and modifications
- Quality and safety procedures
- On/off station requirements
This requirement requires the contractor to supply qualified VISTA F-16 pilot(s) and supply program management/contractor management support.
Any travel incurred to support these requirements will be in accordance with the Joint Travel Regulations.
1.2 BACKGROUND. The United States Air Force TPS trains and graduates test pilots, test navigators, and flight test engineers to conduct and manage flight test and evaluation of research, prototype, and production manned and unmanned aerospace vehicles and their systems. The VISTA directly supports three critical phases of the USAF TPS curriculum.
These three phases are Flying Qualities, Systems, and Test Management. Support of these phases is a pinnacle part of the USAF TPS curriculum that coincides with student graduation criteria. The purpose of this Performance Work Statement is to provide qualified, professional, and technical experts on all aspects of VISTA operation to support the USAF TPS. Task Orders will be generated under this contract.
1.2.1 The VISTA, a Test and Evaluation Aircraft owned by the Air Force, is a Block 30/40 F- 16D, Serial Number 86-0048. The aircraft has a dorsal fairing, heavyweight landing gear, an F110-GE-100 engine, and Block 40 avionics. The VISTA aircraft and support equipment are government furnished property (GFP). Modifications to the aircraft include the addition of a production Digital Flight Control System (DFLCS), Airborne Instrumentation System data acquisition system (DAS), VISTA Simulation System (VSS) interface, and variable feel center stick controllers.
NOTE: VISTA uses the VISTA Simulation System and five control surfaces and engine to mimic the feel and response of a simulated aircraft. Control surfaces are operated independently. Direct lift flaps and the horizontal tail can be combined to simulate canards and delta wing aerodynamics. The VSS is integrated with the core avionics. Real-time control is accomplished through the Multi-Function Displays (MFDs) and the Up-Front Controls (UFC).
VISTA’s high performance permits realistic large amplitude maneuvers to test limiters and envelope protection devices. Major components normally located in the front cockpit of an F- 16D (e.g. Jet Fuel Starter (JFS) controls, DFLCS controls, electrical panels, Emergency Power Unit (EPU), autopilot, etc.) have been relocated to the rear cockpit. Items removed from the production aircraft include the 20mm gun, ammo drum, radar warning system, chaff/flare dispenser, nuclear weapon capability, Advance Medium Range Air-to-Air Missile (AMRAAM) capability, and Expanded Envelope Gun Sight Capability. A Global Positioning System receiver and Situational Awareness Data Link radio have been integrated into VISTA. The rear cockpit pilot is the safety pilot (SP). The SP sets up the VSS computer, performs routine F-16 flight procedures, monitors the safety of the evaluations and at any time, can disengage the VSS and take control of the aircraft. Included in the basic VISTA system are the F-16 Mode and Emergency (EMER) mode. The F-16 Mode allows the Evaluation Pilot (EP) to fly the VISTA aircraft as an F-16 via the front cockpit side stick. The SP or EP can deselect the F-16 Mode at any time by pushing any of the safety trip buttons. The EMER mode allows the EP to take control of the VISTA in the event of an emergency such as SP incapacitation. Either the SP or EP can also deselect the EMER mode.
1.3 REQUIREMENTS.
1.3.1 MAINTENANCE. Maintenance requirements of the VISTA, Government Furnished Property (GFP), include: avionics systems, design and installation of temporary and permanent aircraft modifications, engineering support to include analysis, modification design and reviews; technical reporting, logistic support and the use of U.S. Government supplied items.
The contractor shall provide on-site aircraft and equipment maintenance/support staff functions in performance of all routine maintenance and flight operations. These services include scheduled/unscheduled maintenance, phase inspections, administration of all aircraft contractor service and maintenance personnel, maintenance records, and maintenance engineering as necessary. The contractor shall perform airframe or systems modifications as required by the USAF TPS. Contractor personnel may be required to accompany the aircraft for any improvements or modifications when another contractor or government unit is performing other work required.
1.3.1.1 The contractor shall have in place an effective tool control program. The contractor shall develop and follow procedures for tool control as defined in AFI 10-220/DCMAI 8210.1.
1.3.1.2 The contractor shall establish, document, maintain, and follow an effective Foreign Object Damage (FOD) prevention program IAW AFI 10-220/DCMAI/ 8210.1.
1.3.1.3 The contractor shall develop a quality control plan that meets the requirements of ISO 9001. The contractor shall develop Flight Operations Procedures (FOP) and Ground Operations Procedures (GOP) that meet the requirements of AFI 10-220/DCMAI 8210.1. The contractor shall use and maintain all applicable USAF F-16 Technical Orders (TOs) and governing directives. The contractor shall follow these procedures and processes at all times.
1.3.1.4 The contractor shall provide personnel who are qualified and authorized to maintain and certify that an aerospace vehicle or equipment is safe for flight or use. The contractor shall provide a list of certified personnel to the CO for approval. This includes: signing exceptional releases, conditions, downgrade of Red X, and sign off of Red X symbol, certifying operational capability and performing functional check flights. This maintenance and inspection shall cover all aircraft systems except life support, egress, and explosives and external stores. F-16 Program Management office support and AFTC base support will be provided in a Memorandum of Agreement format to establish those services provided that the contractor will not be required to perform.
1.3.1.4.1 The contractor shall perform on and off equipment maintenance on the VISTA that must remain off-site due to maintenance problems or program requirements. The same operational maintenance concepts will be employed off-site as support is required.
1.3.1.4.2 The contractor shall provide on a daily basis to the Government Production Superintendent, Program Manager, COR and Quality Assurance Representative (QAR) the aircraft status, discrepancy and corrective actions required. This will be accomplished via electronic mail.
1.3.1.4.3 The contractor shall maintain a TO library on site. The contractor shall use and maintain all applicable USAF F-16 technical orders (TOs) and governing directives. The contractor shall conform to the maintenance requirements and procedures prescribed in the technical orders incorporated in the applicable documents attachment provision of the contract.
1.3.1.4.4 The contractor shall maintain a configuration control system to define the current state of the aircraft’s mechanical, electrical, and software systems as they relate to the simulation and test systems. The contractor shall follow configuration control procedures as defined in the contractor’s approved Quality Plan on Configuration Control.
1.3.1.4.5 The contractor shall perform a physical inventory of all GFP IAW the Government Property Clause on contract. The contractor shall support scheduled analyses by the Government Property Administrator.
1.3.1.4.6 The contractor shall return any repairable or excess GFP items removed from the aircraft to the USAF depot or USAF Supply Manager for repair or disposition, dependent on situation. Other items shall be disposed of through Plant Clearance Automated System
(PCARS).
1.3.1.4.7 The contractor shall provide training for all personnel as required. NOTE: If it is in the best interest of the USAF, USAF may provide AF F-16 specific training to the contractor at no cost.
1.3.2 AIRCRAFT OPERATIONS SUPPORT.
1.3.2.1 The contractor shall perform aircraft preflight inspections, post flight inspections, ground handling, servicing, towing, lubricating, launch, recovery, nonscheduled inspections and scheduled inspections of the VISTA airframe and systems excluding weapons, egress and fuel systems maintenance. The contractor shall perform on-equipment maintenance including the installation, adjustment, inspection, modification, troubleshooting, diagnosis, and repair of standard and nonstandard experimental F-16 avionics, electrical, pneumatic, and hydraulic systems. The contractor shall maintain aircraft and maintenance records pursuant to the contractor’s approved Quality Control Plan (QCP), and government directives as applicable.
1.3.2.1.1 The contractor shall conduct flight and ground operations of the GFP aircraft IAW Air Force, MAJCOM and Air Force Flight Test Center (AFFTC) Directives and AFI 10- 220/DCMAI 8210.1 as identified in Section 4 and appendix 5 .
1.3.2.1.2 The contractor may be required to provide additional contractor support to assist with day-to-day operations of the GFP aircraft.
1.3.2.1.3 The contractor may be required to provide Mission Essential Ground Personnel (MEGP) to support VISTA unique flight operations.
1.3.3 CURRICULUM SUPPORT.
1.3.3.1 The contractor shall provide qualified test pilot(s) to support the USAF Test Pilot School curriculum requirements. Contractor test pilot expertise will support aircraft flying operations and fly the VISTA as safety and evaluation pilot. The Test Pilot will provide training to Test Pilot School students and staff. This may include classroom instruction and ground simulation training.
1.3.4 LOGISTICAL SUPPORT.
1.3.4.1 The contractor shall provide a flight-line vehicle to transport, as a minimum, 6 passengers and have towing capabilities for support equipment.
1.3.4.1.1 The contractor shall provide logistical support for non-standard parts/repair of non-standard parts. TPS may require non-standard supply items: spares, spares parts, system/subsystems, and other equipment not stocked, stored, issued, maintained or otherwise bought for regular use by the USAF.
1.3.4.1.2 The contractor shall acquire non-standard parts as directed by delivery order (DO) and submit a proposal (quote) to be negotiated prior to issuance of a DO.
1.3.4.1.3 Beyond Economical Repair (BER) – The contractor shall consider parts that can be restored to a serviceable condition in accordance with the applicable requirements. Costs of repair will not exceed eighty percent (80%) of the replacement cost of a new part. The contractor shall estimate the total cost of the repair and/or overhaul of any end item received.
The contractor shall promptly notify the Contracting Officer (CO) in writing and shall not perform further services on any such items except as directed by the CO should repairs exceed the above percentage. The CO may authorize the contractor, to exceed the percentage of the part when an item is in critical supply status. This capability does not include basic F-16 airframe.
1.3.4.1.4 The contractor shall schedule training in required aircraft operational areas (e.g.
towing, jacking, oxygen servicing, fuel handling, egress, fire extinguisher, flight line driving, etc.) with Edwards base operations, at no cost to the contractor.
1.3.4.1.5 The contractor shall maintain an effective property management system to include property procedures per the government property clause on contract.
1.3.5 ENGINEERING SUPPORT.
1.3.5.1 The contractor shall provide system information, telemetry data, data processing, simulation, hot bench and all other technical support required, training support, modification information and detailed specialty engineering and technical data in the field of Test and Evaluation and Research and Development for the VISTA aircraft.
1.3.5.1.1 The contractor shall provide engineering support for staff and student projects.
1.3.5.1.2 The contractor will provide on-station engineering support staff. This will include curriculum development, classroom instruction and ground simulation support. All curriculum development will be coordinated with the TPS Director of Education, or Education Division representative. Any other technical support will be identified by the Government Program Manager and approved by the CO.
1.3.6 PROGRAM MANAGEMENT / CONTRACTOR MANAGEMENT SUPPORT.
1.3.6.1 The contractor shall provide project management onsite at USAF TPS to manage aircraft activities, schedules, and coordinate with the government so that there is efficient use of government and contractor resources.
1.3.6.1.1 The contractor may be required to support classroom instruction, ground simulation training and technical briefings.
1.3.7 QUALITY (Higher Level) .
1.3.7.1 The contractor shall establish, follow and maintain an effective quality surveillance program that is certified ISO 9001.
1.3.8 SAFETY PROCEDURES SUPPORT.
NOTE: AFFTC/EM will provide storage, handling and disposal services for hazardous materials and hazardous waste, and non-compliance reporting on a reimbursable basis. The contractor shall follow AFFTC/EM’s hazardous materials management and pollution prevention programs in accordance AFFTCI 32-19 (Hazardous Material Management).
1.3.8.1 The contractor shall handle all hazardous materials IAW all applicable AFTC and Government Directives.
1.3.8.2 The contractor shall establish a System Safety Program. This program shall ensure that safety considerations and practices are implemented throughout the planning and conduct of all flight programs. This program will be IAW the requirements of MIL-STD-882D (System Safety Program Requirements).
1.3.8.3 The contractor shall follow all posted Government established procedures for prevention and reporting of injuries and mishaps.
1.3.8.4 The contractor shall, in the event of damage to AF property or injury to AF personnel in the performance of this contract, assist and facilitate the AF investigation of mishap and reporting.
1.3.9 ON/OFF-STATION SUPPORT.
1.3.9.1 The contractor shall perform airframe or systems modifications as required by the USAF. The contractor must be able to provide the following information, specific to modification: system information, data processing, all other technical support required, training support, parameter listings telemetry data and detailed specialty engineering technical data (i.e.
engineering drawings).
1.3.9.1.1 The contractor shall be able to perform the following tasks as required for test management projects and test programs; program management, engineering and maintenance support for special projects. This includes program management/coordination, software programming, software updates, analysis, modification design and reviews, drawing updates, airborne systems evaluations, maintenance trouble-shooting, logistics for non-standard parts and services for the VISTA aircraft and technical reporting.
1.3.10 CONTRACTOR SUPPLIED QUALIFIED VISTA F-16 PILOT.
1.3.10.1 The contractor shall provide qualified, test pilot(s) to support the USAF Test Pilot School curriculum requirements. The contractor’s pilots shall perform a maximum of 300 man-days per year (man-day is equal to one eight hour day) NOTE: Qualifications include F-16 current qualified pilot and graduate of an accredited test pilot school. Contractor test pilot expertise will support aircraft flying operations and fly the GFP aircraft as safety and evaluation pilot. The Test Pilot(s), when required, will provide training to Test Pilot School students and staff. This will include classroom instruction and ground simulation training for all TPS F-16 and VISTA requirements. Training will be coordinated with the TPS Director of Operations.
Any other technical support will be identified by the Government Program Manager and approved by the CO.
1.3.10.1.1 Contractor pilot(s) shall maintain currency in the F-16 utilizing both the VISTA and fleet-support F-16 A/B/C/D aircraft in accordance with AFJI-10-220 & AFI 11-2F2.
Proficiency is required in both the VISTA and the fleet-support aircraft due to the low annual flying hours of the VISTA. It is expected that these currency requirements will be satisfied by the contractor pilot(s) serving as an instructor pilot(s) for TPS curriculum events so as to minimize the need for dedicated currency/proficiency sorties. Currency and proficiency requirements must be met through USAF TPS assets or those arranged through USAF TPS to ensure compliance in order to remain qualified.. It shall be the contractor pilot's responsibility to coordinate his/her schedule(s) with TPS flight schedulers by using the not available (NA) log and corresponding via e-mail to meld periods of availability with scheduled blocks of F-16 instructional flying. Currency qualifications will be based upon AFI 10-220/DCMAI 8210.
NOTE: Due to the limited number of qualified USAF Test Pilot School F-16 pilots as well as the requirement to have Instructor Pilot(s) (IPs) continuity within the VISTA program, the contractor is authorized to acquire F-16 Qualification/Requalification training for their pilot(s) through a certified flight school, formal USAF school, or local qualification training as approved by the GFR. If the contractor requests training for their pilot(s), the USAF shall make every reasonable attempt to heighten the priority for the pilot(s) to complete F-16 training at the appropriate training site. The contractor shall incur all contractor personnel costs (salary, travel, per diem, etc.) associated with this training while the USAF TPS incurs all flight hour costs.
1.3.10.2 VISTA flight operations shall be conducted IAW Air Force MAJCOM, Air Force Test Center (AFTC) and AFI 10-220/DCMAI 8210.1 Directives
1.3.10.2.1 Contractor shall provide an updated Modification Flight Manual (MFM) to the TPS VISTA chief pilot when warranted. Updates shall be accomplished for a hardware change, which affects the pilot’s operation of the aircraft and is not typical hardware on production Block 30/40 aircraft. The contractor shall provide updates the MFM when warranted. Updates will be accomplished for software changes that affect pilot’s operation of the aircraft. Hardware changes may be implemented by other agencies as required.
1.3.10.2.2 Test Pilot School special projects support may require qualified test pilot(s) to support USAF Test Pilots. Use of the contractor pilot(s) is contingent upon the acceptance by the TPS Director of Operations. Contractor test pilot(s) expertise will support in-flight experiments; to include flying the VISTA.
1.3.10.2.3 The contractor pilot shall schedule and complete training in all required areas (e.g.
egress, life support, equipment, hanging harness, emergency procedures simulator, check ride, etc.) with appropriate Edwards AFB offices, at no direct cost to the contractor.
1.3.11 SPECIAL PROJECTS.
1.3.11.1 As required, the contractor shall provide technical support, management guidance and aircraft, hot bench and simulator support for special projects. This support could include the following: system information, telemetry data, data processing, all other technical support required, training support, modification information and detailed specialty engineering and technical data. Special projects will consist of flying qualities, systems, and performance qualities of the VISTA F-16 to include, but not limited to, student Test Management Projects (TMPs), staff projects and any unique support (such as, studies, hot bench requirements, modeling and simulation, and VSS support) required for TPS use of VISTA.
SECTION 2
QUALITY CONTROL
2.1 SERVICES SUMMARY (SS). The contract service requirements are summarized in performance objectives that relate directly to mission essential items. The performance threshold briefly describes the minimum acceptable levels of service for each requirement. The SS and the contractor’s Quality Control Plan (QCP) provide information on contract requirements, the expected level of contractor performance.
PERFORMANCE OBJECTIVE PWS
PARA
PERFORMANCE THRESHOLDS
Aircraft Maintenance Established Quality Control Plan to comply with ISO 9001
Maintained FOD prevention program
Hazardous Material Management Process
Effective tool control program as defined in ISO Work Instructions for Flight Operations
The contractor will maintain and effective list of equipment/tools requiring calibration
Effective property control program in place and follows AF property standards
1.3.1 – 1.3.1.4.7
1.3.1
1.3.1.1
1.3.1.2.4
Maintain ISO 9001 Certification - 100%
No major discrepancies - No more than 1 valid minor discrepancy per quarter.
No major discrepancies - No more than 1 valid minor discrepancy per quarter.
No more than 2 valid discrepancies per quarter.
No more than 1 valid discrepancy per quarter.
No more than 1 valid discrepancy per quarter
Aircraft Operations
Contractor will conduct flight operations as defined in VISTA
MESL
Fully Mission Capable (FMC)
1.3.2 – 1.3.2.1.3
Fully Mission Capable (FMC) rate of 85% -target threshold is 153 flight hours per yr
Curriculum Support Qualified Test Pilot will provide flying support, classroom instruction and ground training
1.3.3
Review of student survey results with no more than two negative responses.
Logistical Support
1.3.4
Provide proposal/estimate within 3 - 10 days of parts need
Engineering Support Contractor will provide classroom instruction and ground simulation support
1.3.5
Review of student survey results with no more than two negative responses.
Program Management Provide on-site program management support
1.3.6
Up-to-date communication and tracking of schedules, cost reports, milestones and accomplishments as required by the Program Manager.
Quality Assurance (Higher Level Requirements)
1.3.7
100% Compliant
Safety Procedure Support 1.3.8
100% Compliant
Special Projects Contractor will submit technical and management work plan for special projects as required within specified time upon receipt of the Special Project
PWS
Contractor will complete exit criteria per PWS
1.3.11
100% Compliant per occurrence
NOTE: ** Discrepancy Definitions:
Major Discrepancies – are serious in nature, which could cause loss of vehicle and or life, damage to property, non- conformance to written procedures, OSHA violations and repetitive minor discrepancies.
Minor Discrepancies - Concerns contractor’s documentation, workmanship, errors/omissions, which can be corrected on the spot.
2.2 QUALITY CONTROL PLAN. The contractor shall establish and maintain a complete Quality Control Plan (QCP) to cover all requirements of the PWS including each task and service listed in the Services Summary. One copy of the contractor's QCP shall be provided to the CO for approval not later than the pre-performance conference. An updated copy reflecting any required changes must be provided to the CO on or before the contract start date.
Contractor shall provide updated copies as changes are required/occur during contract performance.
2.2.1 The CO will notify the contractor of approval or require modification no later than 5 workdays before the performance start date. The contractor shall make appropriate modifications and obtain CO approval of the QCP before the performance start date. The QCP shall include, as a minimum, the following information:
• A description of the inspection system to include all the services listed in Section 1 of the PWS. The QCP must specify the areas to be inspected and whether on either a scheduled or unscheduled basis, how often inspections will be accomplished, the title of the individual(s) who will perform the inspection, and how discrepancies shall be documented, tracked and corrected. It shall include how the process discrepancy reports will be handled (who will initiate them, how they shall be routed, and how they will be maintained for historical records). Control procedures for government furnished facilities; consumable supplies, property, and equipment shall also be included.
• A description of methods to be used for identifying and preventing defects in quality or service performed shall be addressed to avert unacceptable level of performance.
Include methods for tracking problem areas and documentation of the areas as an aid in the management of these areas. This documentation shall be made available to the government during the term of the contract and until final contract settlement.
• Description of the records to be maintained to document inspections, to include deficiencies, corrective actions (including estimated dates of completion) and preventative actions
• Records of inspections shall be kept by the contractor and made available to the Government throughout the contract performance and until final contract settlement.
2.2.2 The government will use the contractor’s QCP as part the government’s evaluation of contractor performance.
2.3 QUALITY ASSURANCE. A Contracting Officer’s Representative (COR) will perform surveillance of the services using the Government’s Quality Assurance Surveillance Plan
(QASP) which will focus on the PWS Services Summary (SS). When surveillance indicates nonconforming performance, a COR will inform the Contract Manager, or representative of the findings.
2.3.1 The COR will evaluate the contractor’s performance through random sampling, periodic surveillance and customer service feedback forms.
2.3.2 If notified of nonconforming performance, the contractor shall respond in writing within 10 days to the CO with the results of the contractor’s investigation and any corrective action, policy changes, or other actions as appropriate. Responses will be considered by the program manager for validation of nonconforming findings.
2.3.3 Performance Evaluation Meetings will be held as a minimum quarterly. Additional meetings may be requested as necessary.
2.3.4 The Quality Assurance Representative (QAR) assigned to perform higher level quality assurance will perform surveillance of the contractors quality plan. Results of surveillance will be provided to COR for inclusion in overall contractor performance evaluations.
SECTION 3
GOVERNMENT-FURNISHED PROPERTY AND SERVICES
3.1 GENERAL INFORMATION. The government will provide the facilities, equipment, materials, and services listed in this section.
3.2 GOVERNMENT FURNISHED FACILITIES. The contractor shall keep all facilities and work areas clean and neat IAW industry, Occupational, Safety and Health Administration (OSHA), fire and safety standards. Clutter and storage of incompatible materials in equipment areas is not acceptable. The contractor shall be aware that the structures may contain asbestos-containing materials, or commercial paints containing lead-, mercury-, or other heavy metal-based paints. Prior to conducting any activities that may disturb these materials; the contractor shall contact Civil Engineering at 277-3803, or 277-3272 for survey/abatement requirements.
3.2.1 FACILITIES MAINTENANCE. The maintenance of the facilities/grounds shall be the responsibility of the contractor.
3.2.1.1 The facilities assigned to the contractor shall be maintained in a neat, clean manner and present an orderly, professional appearance at all times.
3.2.1.2 The contractor shall allow Government personnel the use of facilities on a non-interference basis for training, exercises, or at other times agreed upon during the week.
3.3 GOVERNMENT-FURNISHED PROPERTY (GFP). The Government will provide the contractor equipment listed in Attachment 2 of the basic contract. GFP shall be managed in accordance with the provisions of the Government Property clause, 52.245-1.
3.3.1 EQUIPMENT INVENTORY. Not later than 5 days prior to the start of the basic contract period, the contractor shall conduct a physical inventory in accordance with 52.245-1 (f) (1) (iv) (Physical Inventory) The Contracting Officer will give disposition instructions for items beyond economical repair. The contractor and COR shall certify in writing their agreement as to the working order of the equipment.
3.3.1.1 Obtaining Additional or Replacement Equipment. The contractor shall use the Air Force supply account system to order all standard F-16 parts and equipment when possible.
The contractor shall coordinate the maintenance of all standard equipment.
3.3.1.2 Maintenance of AGE Equipment. It shall be the responsibility of the contractor to determine operational status of such equipment and notify the USAF TPS representative of malfunctions or suspected improper equipment performance. All equipment and facilities failures shall be logged out with the USAF TPS. The Government reserves the right to have maintenance personnel enter the facility at any time for the purpose of equipment inspection and/or maintenance. During an equipment outage, the contractor shall utilize backup procedures to ensure continued compliance of this PWS.
3.3.1.3 Property Management. The contractor shall provide a written Property Plan (brief executive document) on how Government property will be managed to the CO, no later than 30 days after contract award.
3.4 GOVERNMENT-FURNISHED SERVICES. The following services will be furnished to the contractor by the government. The contractor shall share some responsibility in the management of these services. Those responsibilities are identified with the stated service.
3.4.1 Utilities. The government will provide all natural gas, electrical power, water, and sewage.
3.4.1.1 Conservation of Utilities. The contractor shall conduct conservation practices and be responsible for operating under conditions, which prevent the waste of utilities.
3.4.2 Telephone/Internet Access. The Government will provide telephone service and Internet access for official use in the performance of this PWS. Service will include local commercial and Defense Switched Network (DSN). Upon request, the Government will provide the contractor access to a facsimile machine for mission-related use.
3.4.3 Radio Communication. The Government will provide mobile radios as listed in Attachment 2 of the basic contract. The Government at no cost will provide all maintenance of these radios to the contractor. The contractor shall be responsible for the safeguarding and proper use of communication equipment issued to the contractor. Any information concerning the frequencies and power output of radio communications classified as non tactical radio equipment revealed to persons other than the personnel having a need to know is a violation of communications security and will be dealt with accordingly.
3.4.4 Custodial Services The Government will provide all custodial services at no cost to the contractor. The custodial contract provides for minimal cleaning of the administration areas.
Vacuuming of carpeted areas, sweeping, mopping, and removal of trash services from the outdoor trash containers are provided. The contractor shall accomplish other basic housekeeping functions in these rooms such as dusting, cleaning countertops, emptying personal trash bins into large trash bin receptacles, and cleaning windows.
3.4.5 Refuse Collection. The Government will provide for refuse service under its existing refuse contract. All refuse will be placed in bags before disposing in the dumpster. The contractor shall comply with all recycling programs IAW AFI 32-7080, Pollution Prevention Program.
3.4.6 Emergency Medical Services. The Government will provide emergency medical treatment and emergency patient transportation service for contractor personnel who are injured or become critically ill. The contractor shall reimburse the Government for the cost of medical treatment and patient transportation service at the current inpatient or outpatient treatment rate.
Telephone 911 for emergency medical care.
3.4.7 Real Property Maintenance. The Government will provide maintenance and repair of real property facilities. Requests for repair will be submitted by the contractor to the designated USAF TPS building custodian.
3.4.8 Base Civil Engineering. The Government will provide fire prevention, protection, inspection, and maintenance of Government-furnished fire extinguishers and systems, pest control, and grounds maintenance through organic or contract resources. The Fire Department telephone extension is 911 for emergencies. The contractor shall comply with the fire prevention and protection program as outlined in AFFTCI 32-11, Fire Prevention and Protection Program and other Air Force directives.
3.4.9 Security Forces. The Government will provide general on-base Security Forces service.
Security Forces phone extensions is 911.
3.4.10 Computer Support. The Government will provide small computer maintenance and computer network support from 0700 to 1630, Monday through Friday, except holidays.
Computer trouble calls are made through the centralized Information Technology (IT) Help Desk.
3.4.11 Technical Orders and Instructions. Most technical orders and instructions are available in electronic format. The contractor shall use an electronic web site for access to technical orders and instructions to the fullest extent possible. Any technical orders and instructions listed in Appendix 5, and required for performance of this contract, shall be furnished by the Government if not available on the web site.
3.4.12 Training. The contractor shall ensure employees receive Government directed and provided training to include security, anti-terrorism, fire prevention and safety.
SECTION 4
GENERAL INFORMATION
4.1 CONTRACTOR PERSONNEL.
4.1.1 PROGRAM MANAGEMENT. The contractor shall provide an on-site program manager who shall be responsible for the performance of the work. The name of this person and an alternate(s), who shall act for the contractor, shall be designated in writing to the contracting officer. The program manager or alternate shall have full authority to act for the contractor on all contract matters related to daily operation of this contract.
4.1.2 EMPLOYEES. All employees hired to fulfill the objectives of this PWS shall be the responsibility of the contractor. The contractor shall not employ persons for work on this contract if such employee is identified to the contractor by the contracting officer as a potential threat to the health, safety, security, general well being or operational mission of the installation and its population.
4.1.2.1 All contractor employees shall have a valid state driver license and shall read, write, speak, and understand English.
4.1.2.2 Contractor employees shall present a neat, clean, professional appearance at all times, and be easily recognized.
4.1.2.3 All employees require flight line access and shall be fully qualified and thoroughly familiar with flight line rules and regulations as stated in AFI 13-213, Air Field Management.
4.1.2.4 Personnel Certifications/Qualifications. The contractor shall maintain a file containing the qualifications/certifications of each employee. A copy of the qualification/certifications of any new employee hired after the contract start date shall be submitted and reviewed.
4.1.2.5 Employee Training. The contractor shall train, qualify, and certify personnel for all tasks identified in this contract and in all areas identified in Section 4 that are not specifically identified as the responsibility of the government. Government furnished training shall be monitored by the contractor to maintain required currency. These records shall be made available to COR upon request.
4.1.2.6 The contractor shall not employ any individual who is an employee of the United States Government if the employment of that individual would create a conflict of interest. The contracting officer shall make conflict of interest determinations. The contractor shall not employ any person who is an employee of the Department of the Air Force, either military or civilian, unless such person seeks and receives approval of the employment in accordance with DODD 5500-7. In addition, the contractor shall not employ any person who is an employee of the Department of the Air Force if such employment would be contrary to the policies contained in AFI 64-106, Air Force Labor Relations Activities.
4.1.2.7 The contractor is cautioned that off-duty military personnel hired under this contract may be subject to permanent change of station (PCS) change in duty hours or deployment.
Military Reservists or National Guard members may be subject to recall to active duty. The abrupt absence of these personnel could adversely affect the contractor's ability to perform.
Their absence at any time shall not constitute an excuse for nonperformance under this contract.
4.1.2.8 Conduct Requirements. Contractor personnel who violate federal laws or regulations may be barred from this installation at the discretion on the installation commander. In such cases, the contractor is responsible for providing adequate personnel at all times to fulfill the requirements of this PWS, regardless of one or more persons being barred from the installation.
4.1.2.9 Contractor personnel are subject to all regulations governing military and civilian personnel assigned to or employed by Edwards Air Force Base. Personnel operating privately owned vehicles (POV) on this installation must meet California insurance requirements as defined in California Vehicle Code Section 16450-16457. Furthermore, all personnel operating POV's on Edwards Air Force Base are subject to all requirements described in AFI 31-204, Air Force Motor Vehicle Traffic Supervision and all supplements. Personnel experiencing such suspensions will not constitute an excuse for nonperformance under this contract.
4.1.2.10 The contractor shall, at all times, be responsible for providing adequate personnel in order to fulfill the terms of the contract. Lack of contractor furnished support equipment or personnel shall at no time constitute an excuse for nonperformance.
4.1.2.11 Compliance with Laws and Regulations. The contractor shall comply with all applicable federal, state, and local laws that protect the health and safety of employees and the community.
4.2 HOURS OF OPERATION
4.2.1 Normal hours are considered to be between 0700 through 1600 local time, five (5) days per week except on Federal Holidays. All routine or scheduled activities between these hours shall be considered “Normal Working Hours.”
4.2.1.1 Any directed or unscheduled work performed outside these hours is considered “After Hours Support” and are subject to reimbursement under the After Hours Support CLIN.
4.2.1.2 Normal aircraft flight times are 0900 and 1200 (plus or minus one hour), Monday through Friday. If a workload surge occurs to change these times the Government Program Manager and the Contracting Officer must agree to the requirement.
4.2.1.3 Daily flight schedules will be provided to the contractor one week in advance of flight requirements.
4.2.1.4 If a situation arises regarding contractor performance the PM and CO must be made aware. Determination regarding the issue will be resolved by the PM and CO.
4.2.1.5 If additional work outside normal duty hours arises, regardless of the situation, the PM and CO must be made aware prior to the event. Authorization for the contractor to proceed is solely at the discretion of the PM and CO.
4.2.2 FEDERAL HOLIDAYS. New Years Day, Martin Luther King Jr. Day, President’s Day (sometimes referred to as Washington’s Birthday), Memorial Day, Independence Day, Labor Day, Columbus Day, Veteran’s Day, Thanksgiving Day, Christmas Day. In the event that a holiday falls on a Saturday or Sunday such that the Federal holiday is observed on a Friday or Monday.
4.3 SECURITY REQUIREMENTS. The contractor shall abide by the terms set forth in AFFAR clause 5352.242-9000 and requirements contained in DD Form 254. Additionally, the contractor shall comply with all security and force protection requirements at Edwards AFB, California.
4.3.1 FORCE PROTECTION. The contractor may be required to establish a single entry control point and place a door guard to government facilities provided under this PWS during situations dictated by force protection condition (FPCON) information. Door guards shall check identification (ID) cards and inspect bags and parcels of all personnel requesting access to buildings IAW FPCON instructions. Inspections shall be conducted to detect for altered ID cards and weapons, such as explosive devises, firearms, knives with blade length exceeding three and a half (3 ½) inches, or any other suspicious devices. In the event a threat is encountered, the contractor shall alert security forces (SF) personnel and ask the person(s) to remain outside the building while SF personnel respond. The contractor must not exercise security guard measures to resist entry.
4.3.2 SECURITY CLEARANCES. The contractor shall be responsible for obtaining required security clearances for employees requiring a clearance. The cost of obtaining clearances will be paid by the government.
4.3.2.1 All personnel requiring access to the Edwards Unclassified Local Area Network must have a minimum of a favorable National Agency Check (NAC) IAW AFI 31-501. The contractor shall complete the Infocon and Information System User Computer Based Training (CBT) available at EAFB. The reference for the CBT requirement is AFI 33-204, and AFI 33-
115 VII.
4.3.2.2 All contractor employees performing VISTA support services duties require a secret clearance.
4.3.2.3 The contractor shall ensure employees acquire an Air Force Entry Control Card in order to have unescorted access to the appropriate restricted/controlled areas on Edwards AFB.
According to AFI 31-501, contractor employees require a favorable National Agency Check (NAC) as a condition for access to restricted areas.
4.3.2.4 The contractor shall appoint an on-site security manager, normally an additional duty.
The security manager shall provide Service Provider employees with training required by DOD 5200.1-R, AFPD 31-4, and AFI 31-401. The Security Manager shall provide initial and follow-on training to Service Provider personnel who work in Air Force controlled/restricted areas.
4.3.3 COMPUSEC. When applicable the contractor shall comply with established COMPUSEC programs to protect classified, sensitive, and unclassified information processed in information systems which are furnished to, and operated by, the contractor. The contractor shall comply with all existing and future applicable U. S. Air Force, MAJCOM, and local computer security directives to include AFI 33-202, AFI 33-203, and AFI 33-114
4.3.4 FACILITIY. At the close of each work period, Government facilities, property, and materials shall be secured. The contractor shall conform to the provisions of AFFTC Sup to AFI 31-101 for safeguarding the Government furnished facilities, property and material contained herein.
4.3.5 KEY CONTROL. The contractor shall establish and implement methods of ensuring that all keys/key cards issued to the contractor by the Government are accounted for and are not used by unauthorized persons. All references to keys include key cards. No keys issued to the contractor by the Government shall be duplicated. The contractor shall develop procedures covering key control that shall be included in the QCP. Procedures shall include turn-in of any issued keys by personnel who no longer require access to locked areas. The contractor shall immediately report the occurrences of lost or duplicated keys to the CO. In the event keys, other than master keys, are lost or duplicated, the contractor shall, upon direction of the CO, re-key or replace the affected lock(s). If locks are replaced or re-keyed by the Government, the cost incurred by the Government shall be deducted from the monthly payment due the contractor. In the event a master key is lost or duplicated, the Government will replace all locks and keys for that system and deduct the total replacement cost from the monthly payment due the contractor. The contractor shall prohibit the use of Government issued keys by any persons other than the contractor’s employees. The contractor shall prohibit the opening of locked areas by contractor employees to permit entrance of persons other than contractor’s employees engaged in the performance of assigned tasks in those areas, or personnel authorized entrance by the CO or COR.
4.4 SAFETY. The contractor shall establish and maintain a safety program that complies with all federal, state, county, and local regulatory requirements within 30 days of the contract start date. The contractor shall develop, deliver, maintain, and implement an Operations Safety and Health Plan that shall be included in the Site Operations Guide and approved by the Government, describing how the contractor shall accomplish operations and systems safety in a manner satisfying safety requirements imposed by this contract. The contractor shall comply with all applicable federal, state, and local laws that protect the health and safety of employees and the community. Air Force Joint Manual (AFJMAN 23-227(I), Storage and Handling of Liquefied and Gaseous Compressed Gasses and Their Full and Empty Cylinders and MIL-STD- 101B, Color Codes for Pipelines and Compressed Gas Cylinders, will be incorporated into the contractor’s safety plans.
4.4.1 Voluntary Protection Program (VPP). Edwards AFB is in the process of pursuing VPP recognition or has already been recognized under the Occupational Safety and Health Act (OSHA) Voluntary Protection Program (VPP). VPP impacts all “applicable contractors” operating on Air Force Installations. It is the contractor’s responsibility to ensure its employees and managers have a comprehensive understanding of VPP as well as full compliance with OSHA requirements. contractors (to include applicable subcontractors), whether regularly involved in routine site operations or engaged in temporary projects such as construction or repair, must follow the safety and health rules of the installation or VPP site. Detailed information is available on the OSHA website at http://www.osha.gov/dcsp/vpp/index.html.
4.4.1.1 Contractor is required to submit their Total Case Incidence Rate (TCIR) and Days Away, Restricted, and or Transfer Case Incident Rate (DART) rates and OSHA Form 300A annually to the contracting office for consolidation and submission as part of the installation’s annual VPP Safety and Health Management report. TCIR and DART rates are due by the 15th of January of each year.
4.4.1.2 Contractor’s Quality Control Plan (QCP) must identify the processes and procedures the contractor will use to track compliance with the Safety and Health Plan, and the process and procedures that will be used to correct violations.
4.4.1.3 It is the contractor’s sole responsibility for compliance with the OSHA (Public Law 91- 596). The contractor must submit a Operations Safety and Health Plan and corresponding site safety checklist to the CO no later than 10 days after contract award. The contractor’s plan shall include appropriate measures to ensure the contractor reacts promptly to investigate, correct and track alleged safety & health violations and/or uncontrolled hazards in contractor work areas.
Additional, installation specific references and policies may be included/attached to this section.
The plan shall:
a. Demonstrate a management commitment to employee safety and health;
b. Identify the application of the safety and health plan to subcontractors;
c. Identify the roles and responsibilities of the following individuals:
Management;
Supervisors;
Employees;
Safety Coordinator;
d. Identify applicable safety rules and regulations;
e. Include a worksite hazard analysis to include base-line hazard identification and required control measures;
f. Include a job site analysis to include hazards of tasks required to control measures;
g. Identify employee safety and health training requirements and the documentation process;