F1S0AZ5037A001 ACQ-25-R009 single_source_justification.pdf

PDF 83 KB Posted

Attached to
Emcor Server Equipment Cabinets Federal contract opportunity
Solicitation number
FA930225Q0018
Issued by
Department of the Air Force Materiel Command Test Center

About this file

This is a Single Source Justification (Simplified Acquisition) for server equipment cabinets at Edwards AFB, with an estimated contract cost of $101,469.00. The requirement is for Ward/Davis Emcor racks to be used in Mission Control Rooms (MCR) 2 and 3 for the 419th CTF to support flight and ground testing.

The justification establishes that MCRs 2 and 3 must match the specifications of existing MCR 176, which is currently equipped with Ward/Davis Emcor racks, to ensure compatibility and cross-functionality. Market research revealed that Emcor is the manufacturer and Ward/Davis is the only authorized dealer for these racks. AbilityOne and Federal Prison Industries were checked but did not have suitable alternatives. The contracting officer, Christina M. Day (NH-03), determined on February 11, 2025, that only a single source is reasonably available in accordance with FAR 13.106-1(b)(1).

View the file

Other files for this federal contract opportunity

Other files attached to Emcor Server Equipment Cabinets, newest first.
File Type Posted
Solicitation - FA930225Q0018.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Single Source Justification (Simplified Acquisition)

Security Marking (select from the drop-down list)

April 2021 Security Marking (select from the drop-down list) Page 1 of 2April 2021 Security Marking (select from the drop-down list) Page 1 of 2

Section A: General Contract Information

Is this a Bridge Action as defined in the AF Bridge Action Reduction Plan? Yes No

Contracting Activity: AFTC/PZZF

Project/Program Name: Range MCRs 2 and 3

Purchase Request / Local ID Number: F1S0AZ5037A001/ACQ-25-R009

Estimated Contract Cost (including Options): $101,469.00

Section B: Description of the Supplies/Services Required

The requirements listed above are server equipment cabinets that provide rack-mountable storage for various server components and will be utilized at Edwards AFB, CA. The 419th CTF has been approved to build a mission control rooms (MCR) 1 and 2 to support CTF flight and ground testing. This permits the 419th CTF the flexibility to schedule day and night testing with no impact to normal Edwards Range operational support.

Section C: Justification for Soliciting from a Single Source or Brand Name

The 412th Range Squadron Mission Control Rooms 2 and 3 (MCR 2 MCR 3) are required to have the same capabilities as and are built to match specifications of MCR 176 within the Range . Currently MCR 176 is equipped with Ward/Davis Emcor racks, MCRs 2 and 3 must match legacy systems that are currently installed in MCR176. Maintaining conformity among Range MCRs ensures there are no compatibility issues with existing legacy systems. This supports cross functionality within MCRs 176,2, and 3 which allows for ease of maintenance and cross utilization of racks within multiple MCRs. Utilizing other rack brands will not allow uniform placement of server systems and components in racks and hinders functionality across multiple MCRs. Without standardized rack configurations missions employing MCRs 2,3, and 176 will maintain standard operational capability. The need to maintain functionality across MCRs necessitates the use of brand name racks, in this case Emcor.

Section D: Efforts to Obtain Competition

Several market research techniques such as: Internet Searches and Contacting known suppliers were employed to conduct market searches. Emcor is the manufacturer of referenced racks and Ward/Davis is the only authorized dealer for Emcor racks. Additionally, Ward/Davis does not have a GSA schedule.

AbilityOne and Federal Prison Industries (FPI) were subsequently checked for server equipment cabinets that provide rack mountable storage, and was not found on the procurement lists.

Section E: Steps to Preclude Future Single Source or Brand Name Awards

TENG will strive to perform research, survey the market, and attain the requirements within the confines of the available mandatory sources, per the relative FAR Guidance.

Security Marking (select from the drop-down list)

April 2021 Security Marking (select from the drop-down list) Page 2 of 2April 2021 Security Marking (select from the drop-down list) Page 2 of 2

Section F: Contracting Officer's Determination

I have determined, in accordance with FAR 13.106-1(b)(1), that the circumstances of this contract action deem only a single source is reasonably available.

Date

11-Feb-2025

Typed Name and Rank/Grade of Contracting Officer

Christina M. Day, NH-03

Signature of Contracting Officer

April 2021 Page of Section A: General Contract Information Is this a Bridge Action as defined in the AF Bridge Action Reduction Plan?

Section B: Description of the Supplies/Services Required Section C: Justification for Soliciting from a Single Source or Brand Name Section D: Efforts to Obtain Competition Section E: Steps to Preclude Future Single Source or Brand Name Awards Section F: Contracting Officer's Determination I have determined, in accordance with FAR 13.106-1(b)(1), that the circumstances of this contract action deem only a single source is reasonably available.

9.0.0.2.20120627.2.874785

security_markings: Security Marking (select from the drop-down list)
CurrentPage:
PageCount:
Yes:
No:
Contract_Activity: AFTC/PZZF
Project_Name: Range MCRs 2 and 3
PR-ID_Number: F1S0AZ5037A001/ACQ-25-R009
Estimated_Cost: $101,469.00
Text:
Date: 11-Feb-2025
Name: Christina M. Day, NH-03
Signature:

File details come from the government source that posted it. Updated .