Updated QandA FA930224Q0004.pdf
PDF 102 KB Posted
- Attached to
- Nellis AFB 40YD Dumpster Roll-Off Service Federal contract opportunity
- Solicitation number
- FA930224Q0004
About this file
This document contains questions and answers regarding solicitation number FA930224Q0004 from the Department of the Air Force Materiel Command Test Center for roll-off dumpster services at Nellis Air Force Base. The solicitation requires contractors to provide pricing for an initial 40-yard dumpster delivery to remain on-site for one year under CLIN 0001, and pricing for up to 24 dumpster pick-ups as needed under CLIN 0002. The dumpster will contain wood crates, pallets, plastic, paper, cardboard and general trash; concrete and building debris are excluded. Access to the base is required, and will be coordinated upon award. The dumpster is anticipated to hold up to 5-6 tons of waste per pick-up.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| QandA FA930224Q0004.pdf | ||
| Solicitation - FA930224Q0004.pdf | ||
| Nellis Dumpster RFQ Requirements.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Q&A FA930224Q0004 Nellis AFB 40YD Dumpster Roll-Off Service
1. What type of waste will be disposed into the dumpsters?
• The Dumpster is for haul away of Wooden Crates and pallets used during shipping of large items, Plastic and Paper cardboard, General trash as needed.
No concrete or Bldg. Tear down debris.
2. Will the waste total up to 3 Tons?
• As a 40YD Roll Off Dumpster holds up to 5-6 Tons, there is anticipation for collecting up to and more than 3 Tons per pick up or “Lift”.
3. Are there any additional requirements?
• Access to Nellis AFB is a requirement.
4. Does the subcontractor get access to Base upon being awarded, or does the subcontractor have to already have access?
• Access to the base will be coordinated upon award.
5. Is the first line item stating the contractor needs to provide a price for a dumpster to stay for one year and line item two is asking for the price per pick-up if needed up to 24 times?
• Yes. CLIN 0001 is for the initial delivery while CLIN 0002 is for up to 24 pick ups within the Period of Performance.
File details come from the government source that posted it. Updated .