Attachment_1_-_Performance_Work_Statement_(PWS)_HU16.pdf

PDF 347 KB Posted

Attached to
HU-16 Albatross Flight Services Federal contract opportunity
Solicitation number
FA930219T0005
Issued by
Department of the Air Force Materiel Command Test Center

About this file

Attachment 1 - Performance Work Statement (PWS) HU16

View the file

Other files for this federal contract opportunity

Other files attached to HU-16 Albatross Flight Services, newest first.
File Type Posted
Attachment_4_-_Qualitative_Evaluation_Review_Worksheet_HU16.pdf PDF
Attachment_3_-_USAF_TPS_Individual_Evaluation_Checklist_HU16.pdf PDF
Attachment_2_-_Exhibit_A-_Line_Item_Pricing_Sheet-HU16.pdf PDF
FBO_Posting_HU-16.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT

ATTACHMENT 1

FA9302-19-D-0005

HU-16

5 OCT 18

HEAVY WARBIRDS SERVICES

Table of Contents

1.0 SECTION I: DESCRIPTION OF SERVICES

1.1 General Scope

1.2 Background

1.3 Objective

1.4 Scope

1.5 Inherently Governmental Function

1.6 Period of Performance

1.7 Place of Performance

1.8 Specific Tasks

1.9 Minimum Qualifications

1.10 Deliverables

1.11 Contract Line Item Numbers

1.12 Inflight Emergencies

1.13 Mishap Responsibilities

1.14 Incident Discloser

2.0 SECTION II: SERVICE SUMMARY

2.1 General

2.2 Performance Evaluation

3.0 SECTION III: BASE SUPPORT and BASE SUPPORT SERVICES

3.1 Base Support

3.2 Base Support Services

4.0 SECTION IV: GENERAL INFORMATION

4.1 Hours of Operation

4.2 Contractor Personnel

4.3 Safety

4.4 Security Requirement

4.5 Emergency Operations/Mission Essential Personnel

4.6 Environmental Protection

4.7 Miscellaneous Paragraph

5.0 SECTION V APPENDICES & EXHIBITS

APPENDIX 1 Definitions, Abbreviations, and Acronyms APPENDIX 2 DCMA 8210-1C FOP/GOP Package Example

1. DESCRIPTION OF SERVICES

1.1. General Scope. The objective of this program is to provide test pilot training (not initial or recurring training) in a HU-16 Albatross for approximately 50 US Air Force (USAF) Test Pilot School (TPS) students and staff members through 2-4 deployments per year. Additional aircrew or passengers (such as photographers) may be added at the discretion of the TPS Program Manager (PM), with concurrence of the contractor. The contractor shall perform all requirements; obtain all permits and licenses in accordance to all applicable federal, state, and local guidelines. The Government shall not exercise any supervision or control over the contract service providers performing the services herein.

Such contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government.

1.1.1. Description of Services/Introduction. The Contractor shall provide all management, personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform flight and instruction as defined in this Performance Work Statement (PWS). The Contractor shall perform to the standards in this contract. This includes the planning, coordination, and surveillance of the activities necessary to ensure disciplined work performance and timely resources application to accomplish all tasking under the contract. The Contractor shall be responsible for maintaining communication with the Contracting Officer (CO) and the Project Manager (PM) and to immediately notify both the CO and the PM of any problems that would prevent timely performance of this contract. The Contractor is responsible for and required to implement, and maintain management control systems necessary to plan, organize, direct, and control all activities under this contract.

1.2. Background. The USAF TPS is where the Air Force's top pilots, navigators, and engineers learn how to conduct flight tests and generate the data needed to carry out test missions. TMPs teach the students the process of testing aircraft and aircraft systems. The Qualitative Evaluation program introduces students to a wide variety of aircraft exhibiting unique flying characteristics or mission systems and is used to broaden the students’ range of experience with unfamiliar aircraft. An aircraft is sought to provide the unique experience of flying a historic, multi-engine, water-landing capable aircraft.

1.3. Objectives.

1.3.1. Primary objective. Provide TPS students and staff with experience operating the HU-16 in practical examinations (PEs), qualitative evaluations (QEs) sorties.

1.3.2. Secondary objectives.

1.3.2.1. Use the HU-16 in a chase or target aircraft role in support of the TPS syllabus sorties in the T-38, F-16, C-12, or Learjet 25.

1.3.2.2. Use the HU-16 in support of future TPS Test Management Projects (TMPs).

1.4. Scope.

1.4.1. Primary flight events. There are two primary types of flight events: practical examinations (PEs), qualitative evaluations (QEs). PE deployments will be conducted at Edwards Air Force Base (EAFB) and typically occur in April and October to align with the TPS syllabus. Depending on the composition of the TPS class, there will usually be 10-15 PE flights per deployment (1 per day), leading to deployment durations of 2.5-3.5 weeks. Local QE flights may be flown in conjunction with PE deployments at the discretion of the PM. QE deployments are more flexible, and can occur at any time during the year and in locations other than EAFB. There will usually be 4-8 QE flights per deployment (1-3 per day), so deployment durations are expected to be 1 week, but may be longer.

The Program Manager (PM) will determine specific dates and locations for all deployments. The actual size of the groups may vary and will typically be a mix of pilots and non-pilots with various backgrounds.

For PE flights, the expected sortie duration will be 1.8-2.2 hours, or about 20-30 hours total per PE deployment. For QE flights, the profile is more flexible and may be as long as 6 hours, for a total of about 20-30 hours per QE deployment.

The Contractor shall instruct the students/staff in the typical operation of the vehicle to aid TPS staff and students in the development of the skills necessary to safely fly the aircraft within the limits as defined by the USAF TPS Qualitative Evaluation Review Board (QRB) package. The Contractor will also supervise and instruct TPS staff and students proper ground operations of the aircraft. This document will be provided to the contractor prior to the deployment to Edwards AFB. Staff/students may carry-on hand held instrumentation systems that are approved by the TPS point of contact (POC) and coordinated with the contractor. Special instrumentation equipment may need to be secured to the aircraft during flights.

Missions will not exceed the capabilities of the aircraft.

1.4.2. Secondary Flight Events.

1.4.2.1. The TPS syllabus support. The TPS syllabus has a variety of different sorties in the core aircraft of consisting of the T-38, F-16, C-12, and Learjet 25. These sorties often require another aircraft to be a target or a chase asset. It is possible an HU-16 could be used in these roles. The HU-16 may or may not be occupied by TPS students and staff while supporting the TPS syllabus sorties.

1.4.2.2. Test Management Projects (TMP) support. TMPs are team-based training events that are ongoing through the last seven months of the TPS curriculum. During the first semester, the students are divided into teams and each team is given a real-world flight test to complete. Over several months, under the supervision of the TPS faculty, the students complete thorough test and safety planning. Then, a few months into the second semester (early March for the spring group and early September for the fall group), the students have a two- or three-week fly window in which to execute their test. Over the last few months of the program, the student team analyzes the results and writes a very thorough report which will is published and delivered to the real-world customer. Typically, TMPs will be conducted using one of the core military aircraft at TPS, but a contract aircraft may be used if suitable. TMPs can be any real-world test, and although they often include testing developmental sensors, datalinks, weapons, or software modifications on military aircraft, they could also focus on other types of testing with civil aircraft. The HU-16 could be used as an aircraft to participate in a TMP. The HU-16 may or may not be occupied by TPS students and staff while supporting TMPs.

1.4.3. Aircraft crew positions and capacity: The aircraft shall have a minimum crew of 5 with an optional 6th crew member for observations and training. The crew member positions are as follows:

1.4.3.1. Safety Pilot: monitors, with ability to actuate controls as requested or intervene as required. The contractor instructor pilot will occupy this position, which will generally be at the copilot’s seat.

1.4.3.2. TPS Student Test Pilot: flies all phases of the flight. This will generally be at the primary pilot’s seat.

1.4.3.3. TPS Flight Test Engineer: acts as test conductor, with the ability to monitor flight instruments and flight conditions.

1.4.3.4. Staff Evaluator Test Pilot: Monitors the performance of the student test pilot.

1.4.3.5. Staff Evaluator Flight Test Engineer: Monitors the performance of the student flight test engineer.

1.4.3.6. Staff Observer (optional): Position used to observe mission for staff training purposes.

1.4.4. Aircraft Communication/Navigation: Equipment shall include a transponder with mode 3/A and mode C capability, as well as a VHF and/or UHF aviation band radio. The aircraft must have an intercom system that allows all crew (including TPS staff and students) to verbally communicate. Aircraft may include non-production-representative video systems to assist in recording of instruments or flight conditions. The student flight test engineer shall have the ability to monitor cockpit instruments real-time through either visual inspection while sitting in the cockpit or through a video repeater system (such as mounted camera with screen). Staff/students may carry-on hand held instrumentation systems that are approved by the TPS PM and coordinated with the contractor. The contractor shall have the right to refuse any carry on equipment if it causes safety of flight concerns.

1.4.5. Aircraft controls and instrumentation: Aircraft should be equipped with analog gauges, dials and displays for the primary flight displays and engine/flight condition control/performance instrumentation.

Retrofitted modern instrumentation (glass cockpit) is acceptable, but not desired. Modern displays and controls are acceptable on communications/transponder equipment or any video recording equipment if installed.

1.4.6. Aircraft exterior markings and insignia: The aircraft may feature historically representative exterior markings and nose/tail art. If it does, the Contractor shall provide photos (via email, post, or other suitable means) of such markings to the PM prior to the aircraft’s ferry to Edwards AFB. At the PM’s discretion, the PM may require the Contractor to adjust, cover, or modify exterior markings prior to the aircraft’s arrival at Edwards AFB. Any such modifications may be temporary in nature and the desired means of modification (paint, decal, etc.) is at the Contractor’s option and expense. Any means may be used, so long as they do not affect airworthiness, safety of flight, or environmental concerns.

1.5. Inherently Governmental Function. The Contractor shall not perform Inherently Governmental Functions as defined in FAR Subpart 7.5 in relationship to this PWS.

1.6. Period of Performance. Base Period: 1 February 2019 – 31 January 2024.

1.7. Place of Performance. The Contractor shall perform the services in the PWS at Edwards Air Force Base (EAFB), CA and the surrounding area. The QE sorties may be conducted within a 300 NM ring of EAFB.

1.8. Specific Tasks.

1.8.1. Pre-deployment. The aircraft must have an Air Force Test Center (AFTC) approved Subject Mater Expert (SME) inspection that was completed within the last 24 months. All discrepancies noted in this inspection must be fixed and documented at the time of proposal submission. The Contractor will provide USAF TPS, no later than 14 days prior to first performance, the following:

1.8.1.1. A copy of all briefing material used for curriculum support and likewise submit any changes in briefing materials to the PM for approval. The Contractor shall include with briefing material a list of any required audio/visual equipment.

1.8.1.2. One copy (paper or electronic) of the aircraft operating manual to the PM.

1.8.1.3. In accordance with DCMA 8210-1c Change 1 Attachment 16, contractor will provide a complete package of applicable Flight Operations Procedures (FOPs) and Ground Operations Procedures (GOPs) for operating the subject aircraft. See Appendix 2 to this PWS for an example package.

1.8.2. Scheduling. Sorties will be scheduled on all approved TPS fly days until the desired number of sorties are completed. There will usually be two deployment windows per calendar year: one in the spring, one in the fall.

1.8.2.1. Event scheduling. The PM will give the contractor at least 10 work days of notice prior to a scheduled TPS event (sortie or academic session) requiring the contractor’s services. Until the end of the fifth work day (nominally, 5pm Pacific time) prior to a scheduled work day that contractor services may be required, either party may renegotiate that day without fault. Any changes to the schedule (to include additions, deletions, or changes to events requiring contractor services) less than five work days into the future require the agreement of both parties. If a requested change within that timeframe cannot be agreed upon by both parties, then the party responsible for initiating the change will be considered at fault. If the Government is at fault, the Contractor will be credited for one pilot day for any cancelled day that the contractor was otherwise scheduled to accommodate. If the Contractor is at fault, no reimbursement will be provided.

1.8.2.2. Daily scheduling and flight approval. The take-off times will be scheduled the week prior to execution by the USAF TPS scheduling office. The names of the TPS students and staff will be identified by the scheduling office not later than (NLT) close of business (COB) the day prior to execution. Prior to the COB the day prior, the next day’s flights will be authorized by individuals identified by the USAF TPS Director of Operations. This authorization satisfies the requirement to have all flight approved by the Government Flight Representative.

1.8.3. Classroom Lecture. The Contractor will provide a one hour classroom lecture to all of the students that will cover the following information:

1.8.3.1. Aircraft familiarization to include a discussion of the basic systems of the aircraft (engines, electronics, hydraulics. flight controls, fuels, oxygen systems) and avionics.

1.8.3.2. Basic fundamentals of aircraft flight and flight controls.

1.8.3.3. Aircraft emergency procedures to include egress of the aircraft from their position. fire extinguishers, and any other aircraft procedures.

1.8.3.4. Sufficient discussion of the proper operation of any seat restraints and associated egress procedures.

1.8.3.5. Basic discussion of the flight profile and any test maneuvers as listed by the QRB.

1.8.4. Preflight Briefs. The Contractor will provide a preflight brief the day of the flight that will include the specifics for that day’s flight. This brief may include all the students for that day’s schedule.

This brief will cover the following:

1.8.4.1. Weather, Notices of Airman (NOTAMs) Call sign, Ops Number, Airfield status, and Bird Condition (this may be delegated to the student or staff member).

1.8.4.2. Take-off and landing data (if applicable).

1.8.4.3. All relevant checklists to include:

1.8.4.3.1. Starting procedures.

1.8.4.3.2. Taxi procedures.

1.8.4.3.3. Take-off procedures.

1.8.4.3.4. Departure procedures.

1.8.4.3.5. Recovery procedures.

1.8.4.3.6. Landing procedures.

1.8.4.4. Planned profile and maneuvers to be flown.

1.8.4.5. Review of egress procedures.

1.8.4.6. Review of crew coordination during the most common emergency procedures.

1.8.5. Inflight Instruction. The contractor shall provide a familiarization and safety briefing in the cockpit prior to takeoff. The purpose of the pre-flight brief is to familiarize student/staff with flying/safety controls and emergency procedures. Sortie duration is approximately two hours. The contractor instructor pilot shall occupy a pilot station while students/staff occupy another pilot station. Sortie completion determination will be the responsibility of the TPS government representative.

1.8.6. Post-flight Debrief. Upon sortie completion, the Contractor shall provide a post-flight debrief.

The purpose of this debrief is to review test objectives and answer student/staff questions. Typical post-flight debriefs should be approximately 0.5 hours.

1.9. Minimum Qualifications. The PM may complete evaluations of the following prior to contract award.

1.9.1. The Pilot(s). The Pilot(s) shall possess at a minimum the following qualifications:

1.9.1.1. FAA Commercial Pilot Certificate.

1.9.1.2. Type rating, Letter of Authorization or proper log book endorsement as required by 14 CFR, Part 61 or 91.

1.9.1.3. Current and qualified in aircraft type as required by 14 CFR, Part 61.57.

1.9.1.4. Minimum 1500 Flight hours, including 250 hours in type with at least 50 water landings as sole operator of the controls.

1.9.1.5. Instructor pilot must be a FAA Certified Flight Instructor with at least 500 total instructor hours;

including minimum 50 hours instructing in type.

1.9.1.6. After contract award, if the contractor would like to add additional instructor pilots, the number of instructor hours listed above can be waived if the individual has completed a GFR approved instructor upgrade program.

1.9.1.6.1. The PM reserves the right to require an instructor evaluation flight for the individual with a pilot designated by the USAF TPS commandant prior to any flights with TPS staff or students.

1.9.1.7. Experience instructing at the USAF TPS within the past 5 years.

1.9.1.7.1. If the pilot does not have experience instructing at the USAF TPS within the past 5 years, a USAF TPS staff member will fly an evaluation flight with the instructor pilot prior to flying with students. This evaluation will be graded in accordance with (IAW) the AFTC Technical Evaluation Checklist. This flight can be accomplished at the most convenient location for the contractor. The USAF TPS commandant will approve the individuals qualified to conduct this evaluation flight.

1.9.1.8. If the Contractor would like to add an additional instructor pilot, he or she must provide the documents outlined above to the PM. The PM will make a determination, and may require an evaluation flight prior to approving the additional instructor pilot.

1.9.2. The Aircraft: Aircraft safety equipment certifications shall be current and are subject to inspection by Government personnel. Safety features of the aircraft that are inoperable (such as bailout exits) shall be clearly placarded. Egress system components will be inspected and must not exceed the service life as determined by an FAA approved maintenance plan. The TPS Commandant is the final authority on acceptability of aircraft safety maintenance practices.

1.9.2.1. The Contractor shall maintain airworthiness of the aircraft in accordance with (IAW) the requirements of 14 CFR, Part 91 (www.faa.gov/regulations_policies/faa_regulations). The Contractor shall provide a copy of the current FAA airworthiness certificate(s).

1.9.2.2. While at EAFB, the Contractor shall operate IAW applicable portions of Air Force Instruction (AFI) 21-101, Maintenance Management of Aircraft. If it is determined by the PM that the maintenance practices are not in compliance with AFI 21-101, or deemed to be unsafe in any way, the aircraft shall be grounded and the Contractor shall be considered at fault for nonperformance.

1.9.2.3. The Contractor is liable for any damage or loss of the aircraft.

1.9.2.4. The Contractor shall mail current copies of the following documentation to 220 S Wolfe Ave, Edwards AFB, CA 93524, Attn: Qual-Eval Superintendent, at least four weeks prior to arrival at EAFB.

1.9.2.4.1. DD Form 2400, Civil Aircraft Certificate of Insurance, three originals signed in blue ink.

1.9.2.4.2. DD Form 2401, Civil Aircraft Landing Permit, three originals signed in blue ink. Print the front side of the form only; Edwards Airfield Management will print the reverse.

1.9.2.4.3. DD Form 2402, Civil Aircraft Hold Harmless Agreement, three originals signed in blue ink.

1.9.2.5. The Contractor shall make aircraft available for a no-notice inspection throughout contract performance.

1.9.2.6. The Contractor shall supply their own means of fuel for aircraft transit to EAFB or designated first operating location.

1.10. Deliverables. The contractor shall include the following in proposal submission:

1.10.1. Exhibit A- Line Item Pricing Sheet with unit and total prices (See Attachment 2)

1.10.2. QRB Worksheet (See Attachment 4)

1.10.3. Pilot data - Scans or legible photos:

1.10.3.1. FAA pilot certificate

1.10.3.2. FAA Instructor certificate

1.10.3.3. Medical certificate

1.10.4. Aircraft data – scans or legible photos:

1.10.4.1. Weight and balance.

1.10.4.2. Maintenance logs.

1.10.4.3. FAA Airworthiness certificate. Operating limitation, if applicable.

1.10.4.4. Aircraft Registration.

1.10.5. Aircraft data – any format:

1.10.5.1. Flight Manual.

1.10.6 APPENDIX 2. DCMA 8210-1C FOP/GOP Package

1.11. Contract Line Item Numbers (CLINs).

1.11.1. CLIN 1 (Pilot Days): In order to receive credit for pilot days, the contractor shall provide at least one qualified instructor pilot (IP) with the ability to instruct students on aircraft-specific systems.

Contractor IPs will ensure that they are on time for all scheduled events. One pilot day will be accrued for any day in which a contractor IP is scheduled for a TPS flight event or academic training session, and the contractor pilot is on time and ready to complete the event. If a scheduled flight is cancelled by the USAF after the contractor has already arrived for work (example, a weather cancellation), and the contractor was otherwise ready, then a pilot day will still be credited. If the aircraft is used for a non-TPS flight event, such as a post-maintenance check flight, the contractor will not accrue a pilot day for that flight unless a TPS event was also scheduled and accomplished on the same day.

1.11.2. CLIN 2 (Maintenance Days): The contractor shall provide qualified maintenance personnel with the ability to service and maintain the aircraft as well as complete basic repairs. These personnel will be present at the aircraft operating location and will ensure the aircraft is ready on time for all scheduled events. One maintenance day will be accrued for any day that the aircraft is scheduled for a TPS flight event that is supported by contract maintenance personnel, and the contractor is ready to complete the event. If a scheduled flight is cancelled by the USAF after the aircraft has already been declared ready for that event (example, a weather cancellation), then a maintenance day will still be credited. No maintenance days will be accrued for non-TPS flight events or for days that the aircraft is unable to fly due to maintenance issues. If qualified, the contractor IP may provide both pilot and maintenance support, but will only be credited for a pilot day in that case, not both a pilot and a maintenance day.

1.11.3. CLIN 3 (Flight Hours): For PE flights, the expected sortie duration will be 1.8-2.2 hours, or about 20-30 hours total per PE deployment. For QE flights, the profile is more flexible and may be as long as 6 hours, for a total of about 20-30 hours per QE deployment. Sortie completion determination will be the responsibility of the in-flight TPS government representative. If a sortie does not meet the training of the objectives due to an aircraft failure or non-performance of the contractor IPs, then the hours for that flight will not be accrued towards the total contract. If a sortie does not meet objectives because it returned early due to a weather recall initiated by the USAF, then any hours completed will be accrued. Flight hours will be calculated in accordance with USAF regulations (takeoff to landing, plus 5 minutes) as entered into COOL post flight, and will be billed in increments of 0.1 hour. If water landings are performed on QE flights and the engine is shut down on the water, hours will be calculated from takeoff to final water landing plus 5 minutes. A separate takeoff to land time plus 5 minutes will be calculated for the return flight to Edwards, or the aircraft’s next landing location.

1.11.4. CLIN 4 (Ferry): The contractor will ensure the aircraft is on station and ready for all flight events.

One ferry flight round-trip from the aircraft home station to the operating location is expected per deployment, but if scheduling restraints require additional ferry flights, these may be coordinated through the PM. The aircraft is expected to remain at the operating location overnight and on the weekends for the entire time of the deployment, and will not be taken off-station without prior coordination with the PM. Any aircraft relocation that does not support the TPS mission will not accrue an additional ferry flight (such as taking the aircraft to an airshow over a weekend). All personnel travel is at the contractor’s expense. Ferrying the aircraft on or off station does not result in a Pilot or Maintenance Day unless another scheduled TPS event was accomplished on the same day. QE flights that include a water landing and engine shutdown will not count as a Ferry flight to the water location or back to Edwards, or other aircraft operating location.

1.11.5. CLIN 5 (Standby Days): For any days that the aircraft and contractor personnel are on station between the first scheduled flight and the last scheduled flight of a deployment but are not scheduled for any TPS events, a standby day will be accrued. Examples of this include weekends and Federal holidays when flying is not scheduled. Standby days will not be accrued outside of the first and last scheduled TPS flight dates. For example, if the aircraft is taken to the operating location on a Friday, but the first scheduled TPS flight is the following Monday, then Saturday and Sunday are not standby days. Also, standby days are not accrued if the contractor is unable to perform (aircraft down for maintenance or contractor IP not able to fly).

1.11.6. CLIN 6 (Fuel): For all operations at EAFB, fuel will be provided by TPS. For operations at other locations, fuel will be reimbursed at the end of the contract period. The contractor will provide receipts for all fuel purchased in support of the contract. The fuel required for the ferry flight from the aircraft’s home station to the operating location will not be provided or reimbursed, but a full load of fuel will be provided (if departing EAFB) or reimbursed (if departing another operating location) for the departure ferry flight. The fuel costs associated with any non-TPS flight events conducted at locations other than EAFB will not be reimbursed, but fuel will be provided for all flight activities at EAFB. All non-TPS flight events (such as post-maintenance check flights) must be approved by the PM. The government will supply oil for one 25-hour oil change per deployment. All other expendables (hydraulic fluid, etc.)

will not be provided by the government, except as required by law or regulation.

1.12. Inflight Emergencies: Any in-flight emergency shall be immediately reported to the controlling agency. After the flight, the contractor IP will fill out an unusual occurrence log and submit it to the TPS Director of Operations (DO) and the GFR.

1.13. Mishap Responsibilities: Operations in this Performance Work Statement will be conducted under Public Aircraft Operations (PAO) per AFPD 62-6, AFI 62-601_AFMCSUP, and AFTCI62-602. In accordance with AFTC/CZ Memo for Record, a Military Flight Release (MFR) will be issued. While in this status, primary investigative authority will be the US Air Force, IAW AFI 91-204.

1.13.1. Scope of PAO. Under normal conditions, assuming the MFR has been issued, PAO status will begin and end at the ferry flights for each deployment as follows below.

1.13.1.1. Start of PAO Status: When the aircraft begins to move under its own power for purposes of taxi and/or takeoff, at the last airport of departure prior to arrival at Edwards AFB (or other designated operating location).

1.13.1.2. Termination of PAO Status: When the aircraft stops moving under its own power for purposes of shutdown or refueling, following a landing, at the first airport of arrival after departing Edwards AFB (or other designated operating location).

1.13.1.3. All operations between the start and termination that are in support of contract performance (including, for example, maintenance check flights) are under PAO.

1.13.1.4. Exception: If, during a particular deployment, the Contractor chooses to operate the aircraft for purposes other than performance of this contract (for example, taking the aircraft to an airshow during a standby day) than any operations in support of that purpose will not be under PAO.

1.14. Incident Disclosure: The contractor shall report to the GFR any incidents, accidents, or FAA investigations incurred within 3 years of the scheduled deployment dates. Pilots found either partially or completely at fault in any aircraft incident or accident may, at the discretion of the GFR, be determined unsafe and therefore disqualified to perform in any capacity of this contract.

2. SERVICE SUMMARY

2.1. General. The Contractor service requirements are summarized into performance objectives that relate directly to mission essential items. Unless indicated elsewhere these performance objectives will be measured monthly. The performance threshold briefly describes the minimum acceptable levels of service required for each requirement. These thresholds are critical to mission success.

2.2. Performance Evaluation. Performance of a service shall be evaluated to determine whether or not it meets the performance requirements of this contract re-performance of unacceptable services at no additional cost is the preferred course of action when appropriate. In the case of issued Corrective Action Reports (CARs), the CO shall take appropriate measures according to the “Inspection of Services” clause.

Performance Objective

PWS

Reference

Performance Threshold

Provide sufficient quality of instruction

1.8.5 Inflight Instruction. Sortie completion and effectiveness determination will be the responsibility of the TPS government representative.

Exceptional: Of all missions flown, including staff missions, zero reported as “non-effective” due to instructor performance, Very Good: Of all missions flown, including staff missions, no greater than one staff mission reported as “non-effective” due to instructor performance Satisfactory: Of all student missions flown, zero reported as “non-effective” due to instructor performance.

Marginal: Of all student missions flown, no more than 10% or no more than two missions (whichever is fewer) reported as “non-effective” due to instructor performance.

Unsatisfactory: Of all student missions flown, more than 10% or more than two missions (whichever is fewer) reported as “non-effective” due to instructor performance.

Provide suitable aircraft with minimum required equipment in mission ready condition

1.8.2.1 Event Scheduling. Contractor will provide a ready aircraft and instructor on-time for all scheduled events.

Exceptional: Aircraft available for 100% of scheduled missions with spare available for 50% or more of scheduled total missions, and all flown missions effective for maintenance Very Good: Aircraft available for 100% of scheduled total missions, and all flown missions effective for maintenance Satisfactory: Aircraft available for 100% of scheduled student missions, and all flown missions effective for maintenance.

Marginal: Aircraft unavailable, or mission non-effective due to maintenance, for up to 10% or up to two (whichever is fewer) scheduled student missions.

Unsatisfactory: Aircraft unavailable, or mission non-effective due to maintenance, for more than 10% or more than two (whichever is fewer) scheduled student missions.

Provide qualified instructor pilots for scheduled training events

1.8.2.1 Event Scheduling. Contractor will provide a ready aircraft and instructor on-time for all scheduled events.

Exceptional: Instructor available for 100% of scheduled missions with backup instructor available for 50% or more of scheduled total missions Very Good: Instructor available for 100% of scheduled total missions Satisfactory: Instructor available for 100% of scheduled student missions Marginal: Instructor unavailable for up to 10% or up to two (whichever is fewer) scheduled student missions Unsatisfactory: Instructor unavailable for more than 10% or more than two (whichever is fewer) scheduled student missions

3. BASE SUPPORT and BASE SUPPORT SERVICES

3.1. Base Support.

3.1.1. Aircraft Parking and Last Chance Inspection Area. The government will provide ramp space and Last Chance Inspection Area. At the discretion of the Government, contract aircraft and support equipment may be stored at TPS, however, the Contractor will be required to provide proof of insurance and assume responsibility for any damages that may occur. The Government will not provide hangar space on a regular basis. Upon request, hangar space may be provided at the PM discretion.

Additionally, TPS must be able to relocate equipment at any time.

3.1.2. Classroom and Briefing Rooms. The Government will provide classrooms, briefing rooms with multi-media equipment. These facilities shall be made available to the instructors as required. This includes projection capabilities for PowerPoint slides, video projection with audio, and dry-erase white boards in the classrooms and briefing rooms. All computer support shall be PC based. The Contractor shall ensure that any room provided by the Government is left in a clean and orderly appearance.

3.1.3. Office space. The Government will provide workspace, desks, and storage for curriculum and personal reference materials.

3.1.4. Storage. The Government will provide a secured area for storing tool boxes, ladders, and tow bars, however, Contractor shall be responsible for all loss, theft, or damage to any equipment stored at the government facility.

3.2. Base Support Services.

3.2.1. Custodial Service. The Government shall provide custodial services for restroom facilities in base facilities IAW the current base custodial contract. All inquiries regarding scheduling and level of custodial services will be directed to the PM and/or CO.

3.2.2. Emergency Medical Services. Edwards AFB will provide emergency medical services for Contractor personnel in performance of services under this contract base IAW AFI 41-115, Chapter 1.

The Contractor shall reimburse the Government for treatment provided at the current reimbursement rate for non-authorized user IAW Air Force Handbook 41-114, para 42. The Contractor shall provide to the 412th Medical Group, the name of a physician and/or hospital to which injured personnel can be transferred for further treatment and care after receiving initial emergency treatment on base. All mishaps will be promptly reported to the base safety office through the Contracting Officer Representative (COR).

3.2.3. Postal/Installation Distribution. The Base Information Transfer System is available for official government mail, messages and information pickup distribution point at USAF TPS.

3.2.4. Refuse Collection. The Government will provide refuse collection services. The Contractor shall take refuse to the nearest dumpster on a regular basis. The Contractor shall comply with all installation recycling programs, refuse volume reduction programs and hazardous waste collection policies IAW base policies.

3.2.5. Security Police and Fire Protection. Emergency Phone number for Security Forces Squadron and Fire Protection from a landline is 911. Command post number is 661-277-3040.

3.2.6. Telephone and Internet Service. The Government will provide local and DSN telephone services FOR OFFICIAL USE ONLY at no cost to the Contractor. Commercial long distance calls shall be at the Contractor’s expense. The USAF TPS Wi-Fi will be provided to the Contractor.

3.2.7. Utilities. The Government will provide all electricity, water, and sewage at no additional cost to the Contractor. The Contractor shall instruct employees in utilities conservation practices. The Contractor shall be responsible for operating under conditions that preclude the waste of utilities, which include turning off the water faucets or valves after using the required amount to accomplish requirements under this PWS.

3.2.8. Aircraft Fuel. The Government will provide all fuel needed during the performance of this contract at no cost to the Contractor, except for fuel required for the ferry flight to EAFB. Additionally, the Government will provide a full load of fuel upon performance completion at EAFB.

3.2.9. Towing Aircraft. The Government will conduct appropriate towing procedures pertaining to the type of aircraft the contractor provides. The contractor shall provide a tow bar as well as any training requirements for the aircraft.

4. GENERAL INFORMATION

4.1. Hours of Operation. The Contractor shall perform the services required under this contract during the following hours: Sunrise to end of Civil Twilight (as calculated at the airport of operations, normally EAFB), Monday through Friday except Federal Holidays or when the government facility is closed due to local or national emergencies, administrative closings, or similar government directed facility closings. For other than firm fixed price contracts, the Contractor will not be reimbursed when the government facility is closed for the above reasons. The Contractor must at all times maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS when the government facility is not closed for the above reasons. When hiring personnel, the Contractor shall keep in mind that the stability and continuity of the workforce are essential.

4.1.1. Flight duty period and crew rest. The Contractor shall not exceed 12 hours of a flight duty period. This is defined as the time the contractor arrives in the building at TPS for the preflight briefing until engine shutdown on the last flight. The Contractor shall arrive with 12 hours of crew rest. This is defined as the time the Contractor leaves the door of TPS to entering the door of TPS the next day.

4.1.2. Work Schedules, Leave, and Absences. Monthly schedules will be provided for the upcoming work month to the PM and CO. Any changes in the scheduled shall be coordinated between the Contract Manager and both the PM and CO.

4.1.3. Recognized Holidays. The Contractor is not required to perform services on holidays listed below. If the holiday falls on a Saturday, it will be observed on the preceding Friday. If the holiday falls on Sunday, it will be observed on the following Monday.

New Year’s Day Martin Luther King Jr.’s Birthday President’s Day Memorial Day Independence Day Labor Day Columbus Day Veteran’s Day Thanksgiving Day Christmas Day

4.2. Contractor Personnel.

4.2.1. Contract Manager. The Contractor shall provide a Contract Manager and alternate(s) who are knowledgeable of aircraft flights for TPS. The Contractor shall submit the name, address, and telephone number of the Contract Manager to the CO within two days of contract start date. The list shall be kept current throughout the life of the contract. The Contract Manager or alternate(s) shall have full authority to act for the Contractor on all contract matters relating to daily operation of this contract. The Contract Manager or alternate(s) shall be available within 72 hours to meet on the installation with Government personnel designated by the CO to discuss problem areas. The Contract Manager and alternate(s) shall be able to read, write and speak English. The Contract Manager shall be able to effectively communicate with Contractor employees.

4.2.1.1. Personnel Roster. The Contractor may be required to provide a personnel roster consisting of names and other pertinent personnel data to the requiring activity for the purposes of 100% accountability real-world and exercise situations. The personnel roster shall be updated as individuals are added or removed.

4.2.1.2. Contractor Manpower Reporting Application (eCMRA). The Contractor shall report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract via the secure data collection site (i.e. CMRA). The Contractor shall register in eCMRA within 30 days of contract award. The Contractor is required to completely fill in all required data fields using the following web address http://www.ecmra.mil. Reporting inputs will be for the labor executed during the period of performance during each government Fiscal Year (FY), which runs 1 October through 30 September. While inputs may be reported any time during the FY, all data shall be reported no later than 31 October of each calendar year. Contractors may direct questions to the above eCMRA help desk.

Information from the secure website is considered to be proprietary in nature when the contract number and contractor identity are associated with the direct labor hours and direct labor dollars. At no time will any data be released to the public with the contractor name and contract number associated with the data.

Data for Air Force service requirements must be input at the Air Force CMRA link, however, user manuals for government personnel and contractors are available at the CMRA link.

4.2.2. Contractor Employees. The Government reserves the right to restrict the employment, under this contract, of any contractor employee or prospective contractor employee who is identified as a potential threat to health, safety, security, general wellbeing, or the operational mission of the installation and its population. The Contractor shall perform background checks, at the Contractor’s expense, to ensure that said employee(s) has not been convicted of any sexual crime or any crime against children.

4.2.2.1. Flight Safety. Any perceived breaches in flight safety will be reviewed by the PM. If the PM determines that any Contractor Employee did not adhere to AFI 11-202 series and AFI 11-2FT series regulations, the PM will remove the employee from flight status in the execution of the duties in this

PWS.

4.2.2.2. Alcohol/Drug Use. The consumption of alcoholic beverages or illegal drugs by contractor personnel, while on duty, is strictly forbidden. The Contractor shall immediately remove any employee who is under the influence of alcohol or drugs.

4.2.2.3. Appearance. Contractor personnel shall present a neat appearance. Contractor’s uniform must be easily recognized. This shall be accomplished by wearing distinctive clothing preferably bearing the name of the company and by wearing badges that contain the company name and the employee name.

4.2.2.4. Certifications. Contractor employees shall have current and valid professional certifications and licenses required to perform the work in this PWS, prior to contract award. All certifications and licensing requirements by Federal, State, and local agencies shall be complied with at the Contractor’s expense.

4.2.2.5. Contractor Qualifications. The Contractor shall utilize employees possessing adequate training, skills, and knowledge to perform the requirements of this contract.

4.2.2.6. Employee Training. The Contractor shall give all training required to meet requirements of the PWS unless otherwise specified within the PWS or as otherwise approved by the CO. The Contractor shall maintain training and experience records for each employee during the period of this contract that reflect sufficient personnel are qualified to accomplish all tasks required by this contract and provide status of employee training upon Government request.

4.2.2.7. English Language. Employees who deal directly with customer will be required to effectively communicate with the customers in English. This requirement is strictly for the purpose of efficiently performing the contract tasks.

4.2.3. Use of Government Employees. The Contractor shall not employ any person who is an employee of the U.S. Government if employing that person would create a conflict of interest. In addition, the Contractor shall not employ any person who is an employee of the Department of Defense (DoD) if such employment would be contrary to the policies contained in AFI 64-106, Chapter 1, Industrial Labor Relations Activities.

4.2.3.1 Employment of Spouses/Dependents. The Contractor shall not employ any person who is a spouse or dependent child of a DoD employee (either military or civilian) when such employee would be placed in a conflict of interest or appearance of conflict of interest by virtue of such employment.

4.2.3.2 Off-duty Military Personnel. The Contractor is cautioned that off-duty active military personnel hired under this contract may be subject to permanent change of station, change in duty hours, or deployment. Military Reservists and National Guard members may be subject to reorder to active duty. The abrupt absence of these personnel could adversely affect the Contractor’s ability to perform, however, their absence at any time shall not constitute an excuse for nonperformance under this contract.

4.2.3.3 Identification of Contractor Employees. All contract personnel attending meetings, answering government telephones, and working in other situations where their contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression in the minds of members of the public that they are government officials. They must also ensure that all documents or reports produced by contractors are suitably marked as contractor products or that contractor participation is appropriately disclosed.

4.2.3.4 P

ersonal Conflict of Interest. The term “Personal Conflict of Interest” means that a contractor employee assigned to the contract has interest which (i) may diminish his/her capacity to give impartial, technically sound, objective assistance and advise in performing this contract, (ii) may otherwise result in a biased work product under this contract, or (iii) may result in an unfair competitive advantage.

4.2.3.4.1 F

inancial Interest. A contractor employee shall not participate (i.e. recommend, influence, or decide) in any particular matters that will have a direct or predictable effect on the financial interests of that employee, his/her spouse or minor child, or organization in which he/she serves as officer, director, trustee, general partner or employee and/or any person or organization with whom he/she is negotiating or has an arrangement concerning prospective employment that may otherwise cause a reasonable person to question his/her impartiality.

4.2.3.4.2 F

inancial Disclosure Form. The Contractor shall obtain the financial disclosure agreement, similar in form/content of the Office Government Ethics Form 450, for each employee assigned to the contract. The Contractor shall also obtain financial disclosure for all subcontractor employees assigned to the contract.

4.2.3.4.3 Post Award Disclosure. If after award, the Contractor discovers an employee’s financial conflict of interest, with respect to this contract, it shall make an immediate and full disclosure in writing to the CO. The disclosure shall include identification of the conflict, the manner in which it arose, and description of the action the Contractor has taken or proposed to take to avoid, eliminate, or neutralize the conflict. The Government may, however, terminate the contract. If the Contractor does not disclose the conflict of interest within ten (10) working days of becoming aware of such conflict, the Government may terminate the contract and the Contractor shall not be entitled to reimbursement of any cost incurred in performing this contract or payment of any fee there under. Further, such cost shall not be allocable or chargeable, directly or indirectly, to any other contract with the Government.

4.2.3.5 Privately Owned Vehicles. Each contractor employee driving a privately owned vehicle on the installation must carry minimum liability insurance as required by the State. Contractor employees shall adhere to all posed speed limits and shall not use handheld cellular telephones while driving on the installation for phone calls or texting. Use of seatbelts is mandatory. Any contractor employee cited for driving under the influence will have their driving privileges immediately revoked for a period to be determined.

4.3 Safety: It is the Contractor’s responsibility to ensure its employees and managers have a comprehensive understanding of and full compliance with OSHA requirements. Detailed information is available on the OSHA website at http://osha.gov. It is the Contractor’s sole responsibility for compliance with OSHA, Public Law 91-596. The Contractor shall comply with all Federal, State, local laws, and AFIs for the protection of their employees while working on an Air Force Installation or property. The protection of contractor employees is exclusively the obligation of the Contractor. The Contractor shall manage all work areas to ensure the safety of building occupants, base personnel, or visitors in or near the areas. The contractor shall submit a Safety and Health Plan that describes the capabilities and processes to ensure compliance with safety and health requirements during the performance of the work described in the solicitation. The Contractor’s plan shall include appropriate measures to ensure the Contractor reacts promptly to investigate, correct, and track alleged safety and health violations and/or uncontrolled hazards in contract work areas. The Contractor must ensure that personnel are properly trained on the equipment that they are tasked to operate. The Contractor shall develop site specific mishap reporting procedures which result in damage to government property or injury to Air Force personnel. These procedures are to be included in the safety and health plan for review.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.