PWS - SW Development_v4_23 Oct 08_gju
126 KB Posted
- Attached to
- Electronic Warfare Software Development
- Solicitation number
- FA9302-09-R-0001
Text of this file
PERFORMANCE-BASED WORK STATEMENT
FOR
AIR FORCE FLIGHT TEST CENTER, 412th TEST WING, 412th ELECTRONIC WARFARE GROUP
SOFTWARE DEVELOPMENT
AIR FORCE FLIGHT TEST CENTER
AIR FORCE MATERIEL COMMAND
EDWARDS AFB, CA 93523-5000
NAME OF CENTER
CENTER ADDRESS
10 April 2008XXX Table of Contents
Section Page
31.0
DESCRIPTION OF SERVICES/GENERAL INFORMATION
31.1 Introduction
31.2 Scope
31.3 General Requirements
31.3.1 Personnel Requirements
41.3.2 Data Analysis
41.4 Technical Requirements
41.4.1 Software Development
51.4.2 Data Reduction and Analysis Software
51.5 Program Management
51.5.1 Program Manager
51.5.2 Project Management
61.5.3 Configuration Management and Quality Assurance
61.6 Travel
1.7 Documentation
1.7.1 Apllicable Documents
1.8 Security Requirements
1.8.1 NISPOM
1.8.2 Security Clearances
1.8.2 Physical Security
1.9 Records
1.10 Security Requirements
1.10.1 NISPOM
1.10.2 Security Clearances
1.10.3 Physical Security
1.11 Quality Control
1.11.1 Quality Control Plan
1.11.2 Quality Assurance
92.0
SERVICES SUMMARY
113.0
GOVERNMENT-FURNISHED PROPERTY AND SERVICES
4.0
APPENDICES
SECTION C-1
1.0 DESCRIPTION OF SERVICES/GENERAL INFORMATION
1.1 Introduction
This Performance-based Work Statement (PWS) outlines the requirements for an Engineering Services contract in support of the 412th Electronic Warfare Group (EWG) at Edwards AFB (EAFB), CA. The Program Management Office (PMO) for this effort will be comprised of personnel from the 771st Test Squadron (TS).
1.2 Scope
This PWS describes the requirements to provide Software Development support for existing EW quick look data analysis toolset [i.e., Quick Look Tool Set (QTS)] for the 771st TS and to perform quick look analysis of EW data post-test missions as required to continue the tools development or troubleshoot problems with the existing capabilities of the toolset. Required services include: scientific engineering services with thorough knowledge of advanced EW, ECM and RF threat system design principles and the ability to review and assess their operation and performance; operation and maintenance of test equipment and their application to advanced Radar and EW testing; operation, resources, equipment, and limitations of the Open Air Ranges (OAR); knowledge of flight data analysis software programs for quick and accurate reduction and analysis of large volumes of flight test data from multiple sources; demonstrated understanding of the operations, characteristics, limitations and capabilities in the conduct of various EW systems; and proficient in software development using C/C++.
1.3 General Requirements
The contractor shall support development of the QTS software to include the use of this tool, or of any other tool developed under this contract, to assist the 771st TS in performing post-mission quick look analysis as required to continue the tools development or troubleshoot problems with the existing capabilities of the toolset. The software shall be developed to provide a rapid and semi-automated Personal Computer (PC) based quick look tool to support reduction and analysis of EW data. The contractor shall provide additional software development in support of the squadron efforts underway at various Combined Test Forces (CTFs) at the AFFTC.
1.3.1 Personnel Requirements
To immediately support testing at AFFTC, contractor personnel must have prior and unique detailed knowledge of the AFFTC and Participating Test Organization (PTO) test ranges. The contractor must have locally operated offices with the required expertise readily available to the EWG. The contractor shall have personnel with a demonstrated background in the following areas:
1.3.1.1 The contractor shall have personnel proficient in the technical theory and testing of Radar detection and processing algorithms, Electronic Countermeasures (ECM) receiving and jamming systems, Radar versus ECM evaluation, Electronic Counter Countermeasures (ECCM) assessment and Radio Frequency (RF) interference mechanisms.
1.3.1.2 The contractor shall have personnel proficient in RF threat system design principles and be capable of reviewing and assessing their operation and performance.
1.3.1.3 The contractor shall have personnel familiar with the operation and maintenance of general and special test equipment and their application to advanced Radar and EW testing.
1.3.1.4 The contractor shall have personnel familiar with the operation, resources, equipment, and limitations of the Edwards AFB AFFTC, the China Lake Naval Weapons Center Echo Range, and the Nellis AFB Nevada Test and Training Range (NTTR).
1.3.1.5 The contractor shall have personnel with an established and accepted knowledge of flight data analysis software for quick and accurate reduction and analysis of large volumes of flight test data from multiple sources. The data analysis programs shall be compatible with multiple aircraft (i.e. F-22, B-1B, F-117, F-16, F-15, etc.), Time/Space Position Information (TSPI), and other data formats at the Edwards AFB AFFTC, the China Lake Naval Weapons Center Echo Range, and the Nellis AFB NTTR.
The contractor shall have personnel with a demonstrated understanding of the operations, characteristics, limitations and capabilities in the conduct of “Ground Mount” Hardware In The Loop (HITL), System Integration Laboratory (SIL) and Installed System Test Facility (ISTF) testing of various EW systems.
1.3.1.6 The contractor shall have personnel with experience in software systems design. The experience shall include direct experience in Software Requirements Analysis, Software Architectural Design, Software Detailed Design, User Interface Design, Implementation and Testing, System Integration and Testing, Documentation, Task Management, Data Management Support, Risk Reduction Support, Software Configuration Management, Software development using the C/C++ programming languages for QTS development.
1.3.2 Data Analysis
1.3.2.1 The contractor shall further develop and use their software tools under this contract to support quick look data analysis development for the CTFs at the AFFTC. The contractor data analysts must possess the experience described in paragraph 1.4 and have a Top Secret (TS) clearance with a “current” (within the last 5 years) Special Background Investigation.
1.3.2.2 There shall be no TS data processed at the contractor facility under this contract.
1.4 Technical Requirements
The following section describes the technical services that may be performed under this contract. These services may be provided in one or more of the following task areas.
1.4.1 Software Development
The contractor shall provide develop additional features for the QTS currently in use at the AFFTC. This includes technical assistance in the use of the QTS, setup and developing user-defined modifications, and problem resolution. As new data formats or user requirements develop, the contractor shall provide the insight, knowledge and software support to integrate them into the existing QTS. New QTS Software will be developed for hosting on a PC based operating system as required by the user. This task will include the design, coding, and support of integration testing of this new data reduction and analysis system capability. It also includes modifying the existing QTS Software as required. Periodically, the contractor shall review and analyze lessons learned during previous builds, and update the SDP process to reflect those lessons learned.
1.4.2 Data Reduction and Analysis Software
The contractor shall provide data reduction and analysis software support using a new PC based program developed for this project based upon demonstrated and proven data analysis programs such as the FTDA Software (FTDAS) currently in use at several Air Force test facilities. This new data analysis program shall have the capability to merge data from multiple sources including instrumented test beds; TSPI, Radar and EW ground sites, and telemetry data. The data analysis program(s) shall be able to reduce data and provide tabular as well as graphical data products. As a goal, quicklook data products should be available within two (2) days after all data has been received. Additionally, the contractor shall pursue the development of capabilities within the existing toolset. As a minimum this should include the calculations of Measures of Performance and/or Measures of Effectiveness, and also the preparation//conversion of raw data into a format that is usable for QTS and/or other analysis tools.
1.4.3 Deliverables
Deliverable software elements shall include documentation source code listings and files, object files, source code and executable files. Documentation shall include both software description documents and user manuals. All deliverable software elements shall be delivered under configuration management as stated in paragraph 1.5.3. Deliverable software elements and documentation shall be delivered on CD ROMs. Deliverable software elements shall use a file format that is compatible with the disk device subsystem of the target operating system. The data organization within such files shall be as required for input to other software (e.g. compilers, etc.) or an input by other software (e.g. object files). Documentation shall be delivered in contractor format with prior government approval of the contractor’s suggested format.
1.5 Program Management
The contractor shall designate a focal point to act as an overall interface between the contractor and the PMO. Subordinate contractor focal points shall be designated to handle day-to-day tasking, planning, work load execution and coordination with their government counterpart or Task Managers. Other program management support as described below shall be provided.
1.5.1 Program Manager
The contractor shall designate a Program Manager (PM) responsible for all contract efforts. This person shall be the primary point of contact for programmatic issues. The contractor shall designate an alternate PM designated to act in behalf of the PM during absences.
1.5.2 Project Management
The contractor shall establish and maintain project management processes to define and track work, work assignments, budgets and costs, schedules, progress and status of the major tasks, including software development. Issue informal brief monthly management progress reports to the PMO summarizing the status of each major function/task, including the cost and schedule estimates, and software development metrics.
1.5.3 Configuration Management and Quality Assurance
The contractor shall provide Configuration Management and Quality Assurance functions in the performance of this contract. The Configuration Management and Quality Assurance procedures and methods shall be IAW and compatible with the systems used at the AFFTC. The contractor shall keep copies of outdated versions of software and course training materials on hand in case there is a need to roll back to a previous version. The contractor shall track all software changes and enhancements suggested by both the contractor and the PMO. As a minimum, this tracking shall include: descriptions of the requested enhancement, software version used when the enhancement was suggested, descriptions of the actual software change, a summary of why the software change did not meet the full request (when applicable), the software version which first incorporates the enhancement, and the software version which first incorporates changes to the help files (where applicable). All software, course materials, and related help files should be marked with a revision number, release (or presentation) date, or both. Additionally, users of all software products should have easy access to the version number of that software.
1.6 Travel
Contractor personnel shall be available to travel to test ranges and other sites to attend software Technical Interchange Meetings (TIMs), data coordination meetings, set up tool and process data.
1.7 Documentation
The PMO will provide available documentation. Documentation includes relevant manuals, operating procedures, specifications for Commercial-off-The-Shelf (COTS) instrumentation and equipment, configuration management information.
1.7.1 Applicable Documents
The following documents are listed for reference purposes only. The contractor shall perform all tasks described in the PWS using the listed documents as guidelines. In the event of a conflict between the documents and the PWS, the PWS shall be the superseding requirement.
Standard/Document Number
Title
AFFTC I 99-1
Test and Evaluations Test Plans
AFI 99-101
Developmental Test and Evaluation
AFI 990102
Operational Test and Evaluation
AFR 55-30
Operations Security
AFMCP 91-1
Flight Safety Planning Guide for Flight Testing
AFMCPD 99-1
Test and Evaluation (T&E) Risk Management
AFFTC-TIH-93-01AFFTC Test Plan Preparation Guide
AFFTCI 99-4
Test Program Deficiency Reporting
AFFTCI 99-5
Test Control And Conduct
AFI 16-20 (C)
Disclosure of Information to Foreign Governments and
International Organizations
National Industrial Security Program Operation Manual (NISPOM) dated Jan 1995
NISPOM supplement dated February 1995
DoD Overprint to the NISPOM supplement dated Jan 1998
Program Security Directive (PSD)
Security Classification Guide (SCG)
DOD 3200.12
DOD Scientific and Technical Information Program
22 CFR 120-130
International Traffic in Arms Regulation
1.9 Records
The contractor shall be responsible for creating, maintaining, and disposing of only those government required records that are specifically cited in this PWS or required by the provisions of a mandatory directive listed in Para 1.7.1 Applicable Documents. If requested by the Government the contractor shall provide the original record or a reproducible copy of any such record within 5 working days of receipt of the request.
1.10 Security Requirements
1.10.1 National Industrial Security Program Operation Manual (NISPOM) compliance
The contractor shall comply with the National Industrial Security Program Operation Manual (NISPOM) dated January 1995; the NISPOM supplement dated February 1995, the DoD Overprint to the NISPOM supplement, dated January 1998, the Program Security Directive (PSD) and Security Classification Guide (SCG). The PSD and SCG will be provided under separate cover.
1.10.2 Security Clearances
The contractor personnel assigned to this contract performing test conduct and data analysis shall possess a TS clearance. The personnel assisting in test planning shall at a minimum possess a “current” (within the last 5 years) SECRET clearance. The contractor shall provide adequate personnel with special access clearances for the purpose of visiting classified test ranges and sites.
1.10.3 Physical Security
1.10.3.1 The contractor shall be responsible for safeguarding all government property provided for contractor use. At the end of each work period, all government facilities, equipment and materials shall be inventoried and secured.
1.10.3.2 Key Control: As required.
1.11 Quality Control
The contractor shall submit a software quality control plan to the PMO for approval within 3 weeks (15 business days) after the award of the contract.
1.11.1. Quality Control Plan (QCP) shall include:
1.11.1.1 A description of the self-inspection system to cover all services. Description shall include specifics as to the area to be inspected on a scheduled and unscheduled basis, frequency of inspections, and the title and organizational placement of the inspectors.
1.11.1.2 A description of the methods to be used for identifying and preventing defects in the quality of service performed.
1.11.1.3 A description of the records to be kept to document inspections and corrective or preventive actions taken.
1.11.1.4 The records of inspections shall be kept and made available to the government throughout the contract performance period and for the period after contract completion until final settlement of any claims under this contract.
1.11.2 Quality Assurance
1.11.2.1 In accordance with contract clause 52.212-4, entitled "Contract Terms and Conditions--Comercial Items", the government will evaluate the contractor's performance under this contract. The Quality Assurance Personnel (QAP) or evaluators will follow the methods of surveillance specified in the contract and Performance Plan (PP). Government personnel will record all surveillance observations. When an observation indicates defective performance, the QAP will require the contract manager or representative at the site to initial the observation. The initialing of the observation does not necessarily constitute concurrence with the observation, only acknowledgment that he or she has been made aware of the defective performance. Government surveillance of tasks not listed in the Services Summary (SS) or by methods other than those listed in the Performance Plan (such as provided for by the Inspection of Services clause) may occur during the performance period of this contract. Such surveillance will be done according to standard inspection procedures or other contract provisions. Any action taken by the contracting officer as a result of surveillance will be in accordance to the terms of this contract.
1.11.2.2 Performance Evaluation Meetings. The contracting officer may require the contract manager to meet with the contracting officer, contract administrator, QAP, and other government personnel as deemed necessary. The contractor may request a meeting with the contracting officer when he or she believes such a meeting is necessary. Written minutes of any such meetings shall be recorded in the contract file and signed by the contract manager and the contracting officer or contract administrator. If the contractor does not concur with any portion of the minutes, such nonoccurrence shall be provided in writing to the contracting officer within 10 calendar days following receipt of the minutes.
SECTION C-2
SERVICES SUMMARY
2.0 SERVICES SUMMARY
The contractor service requirements are summarized into performance objectives that relate to mission essential items. The performance thresholds briefly describe the minimum acceptable levels of service required for each requirement. These thresholds are critical to mission success.
Service Summary
| Performance Objective |
| PWS |
Paragraph Performance Threshold
| SS-1 |
| Provides sufficient numbers of qualified, personnel with appropriate security clearances. |
| 1.3.1 |
Available 90% of time (Comparison of available to required staffing)
| SS-2 |
| Quality QTS software and support. |
| 1.4 |
| 95% of the time |
| SS-3 |
| Project schedules and timeliness of deliveries. |
| 1.4 |
| Products delivered within two (2) days 95% of the time (Comparison of actual to scheduled delivery dates) |
| SS-4 |
| Product deliveries are accurate and error free. |
| 1.4 |
| Products are delivered are accurate and error free 100% of time |
| SS-5 |
| Technical Performance |
| 1.4 |
| The contractor will be evaluated as to the quality of the output of their work. This includes the contractor's contribution during meetings and reviews, the quality of the contractor's technical reports, the contractor's productivity and the overall quality of the technical support provided. |
| SS-6 |
| Quality development and maintenance of Software Development Plan (SDP). |
| 1.4.2 |
| Follow up actions to formal and informal inputs are addressed within one month of input. |
| SS-7 |
| Documented Software Design. |
| 1.4.2 |
| 98% of the time |
| SS-8 |
| Quality Integration and Testing. |
| 1.4.2 |
| 95% of the time |
| SS-9 |
| Quick look data products available within two (2) days after all data has been received |
| 1.4.2 |
| Goal is to have data products available within 2 days 100% of the time. The contractor should not exceed 2 days without prior approval. |
| SS-10 |
| Management |
| 1.5 |
| The contractor's management should put adequate systems in place to efficiently perform the contract. |
| SS-11 |
| Project plans, with milestones and due dates, are developed for major implementations; due dates are tracked; and 771st TS is notified if problems exist that impact planned due dates. |
| 1.5.2 |
| No more than 5% of established milestones missed. |
| SS-12 |
| Contractor Resource Control |
| 1.5.2 |
| Expenses within +/- 5% of budget baseline (Comparison of actual expenses to budget baseline). The contractor should not exceed the material, travel or other cost-reimbursables without prior approval |
| SS-13 |
| Quality processes defined and implemented. |
| 1.5.3 |
| 100% of the time |
| SS-14 |
| Software configuration documented, discrepancies identified and corrected. |
| 1.5.3 |
| 95% of the time |
| SS-15 |
| Software Quality Program Plan (SQPP) implemented. |
| 1.5.3 |
| 100% of the time |
SECTION C-3
GOVERNMENT-FURNISHED PROPERTY AND SERVICES
3.0 The government will provide the equipment, materials and services listed below:
3.1 The following items will be provided as Government Furnished Equipment (GFE):
· PC computers with Windows( operating environment
· At least one copy of Mathworks MATLAB with a current license
· The contractor will be provided with adequate GFE to reduce data from multiple type mediums (Hi8 video tapes, CVD, CD, optical disks, etc.), process and manipulate the data (Hi8 players, DVD/CD ROMs, optical disk drives, etc.), display data (see first bullet above), print hard copy and archive data on optical disk and magnetic medium. All PMO-provided data required for this effort will be in a PC-readable format.
3.2 On-site support services as required.
3.3 The contractor shall have an established and approved government property administration organization at the AFFTC to manage, control, and account for government property in possession or under control of the contractor as a result of this contract.
APPENDICES
SECTION C-4
ACRONYMS
4.0 ACRONYMS
AFFTC
Air Force Flight Test Center
CDR
Critical Design Review
COTS
Commercial Off the Shelf
CTF
Combined Test Force
DoD
Department of Defense
EAFB
Edwards Air Force Base
ECM
Electronic Countermeasures
ECCM
Electronic Counter-Countermeasures
ECN
Engineering Change Notice
EW
Electronic Warfare
FMS
Foreign Military Sales
GFE
Government-Furnished Equipment
GFI
Government-Furnished Information
HITL
Hardware-in-the-Loop
IR
Infrared
IRCM
Infrared Countermeasures
ISTF
Installed System Test Facility
MOE
Measure of Effectiveness
MOP
Measure of Performance
MOPAT
Measure of Performance Analysis Tool
NISPOM
National Industrial Security Program Operation Manual
NTTR
Nevada Test and Training Range
NWC
Naval Warfare Center
PC
Personal Computer (IBM compatible processors)
PDR
Preliminary Design Review
PM
Program Manager
PMO
Program Management Office
PP Performance Plan
PSD
Program Security Directive
PTO
Participating Test Organization
PWS Performance-based Work Statement QCP Quality Control Plan
QTS
Quick Look Tool Set
RF
Radio Frequency
RTO
Responsible Test Organization
SAM
Surface to Air Missile
SCCB
Software Configuration Control Board
SCG
Security Classification Guide
SCMP
Software Configuration Management Plan
SCR
Software Change Requests
SIL
System Integration Laboratory
SPS
Software Product Specification
SQPP
Software Quality Program Plan
SS Services Summary
SUT
System Under Test
TDD
Threat Description Documents
TIM
Technical Interchange Meeting
TS
Top Secret
TSPI
Time/Space Position Information
VDD
Version Description Document
PAGE
Attachment 1
FA9302-09-D-0001
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .