Site Visit Q A

View the file

Other files

File Type Posted
Site_Visit_B3473_Sign_In_Sheet.pdf PDF
24_April_Questions_and_Answers.pdf PDF
FA9301-13-R-0016_0001.pdf PDF
Site_Visit_DIRECTIONS.pdf PDF
SOW_FA9301-13-R-0016_dated_21_Mar_13.pdf PDF
252.209-7997.pdf PDF
FA9301-13-R-0016.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

18 Apr 13 Site Visit Questions and Answers:

Do the gates need to be lockable?

Yes

What is the distance from the rail to the new fence above the offices?

The space from the rail to the fence is approximately 4 ft. with enough room to fit a standard pallet.

There is some HVAC equipment mounted above the offices that could possibly be in the way of the new fence, what is the preferred solution for avoiding this equipment?

If the HVAC will have to be avoided the fence needs to go around them.

Will the railing on the mezzanine above the offices be removed?

No, the railing stays.

Are there any special welding permits required?

Yes, a permit is required from the EAFB fire department prior to any work that includes welding or cutting.