Site_Visit_Questions_and_Answers.pdf
PDF 76 KB Posted
- Attached to
- Bldg 3743 Interior Fence
- Solicitation number
- FA9301-13-R-0016
About this file
Site Visit Q A
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Site_Visit_B3473_Sign_In_Sheet.pdf | ||
| 24_April_Questions_and_Answers.pdf | ||
| FA9301-13-R-0016_0001.pdf | ||
| Site_Visit_DIRECTIONS.pdf | ||
| SOW_FA9301-13-R-0016_dated_21_Mar_13.pdf | ||
| 252.209-7997.pdf | ||
| FA9301-13-R-0016.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
18 Apr 13 Site Visit Questions and Answers:
Do the gates need to be lockable?
Yes
What is the distance from the rail to the new fence above the offices?
The space from the rail to the fence is approximately 4 ft. with enough room to fit a standard pallet.
There is some HVAC equipment mounted above the offices that could possibly be in the way of the new fence, what is the preferred solution for avoiding this equipment?
If the HVAC will have to be avoided the fence needs to go around them.
Will the railing on the mezzanine above the offices be removed?
No, the railing stays.
Are there any special welding permits required?
Yes, a permit is required from the EAFB fire department prior to any work that includes welding or cutting.