This statement of work outlines the requirements for refurbishing and re-installing an under vehicle inspection system (UVIS) at Gate #2 of Arnold Air Force Base in Tennessee. The selected contractor will be required to purchase and replace specific components of the UVIS, including cameras, lights, sensors, and covers. The refurbished unit must then be reinstalled and all wiring reconnected. Full system testing is required once installation is complete. Delivery will be onsite at Arnold Air Force Base. The period of performance encompasses refurbishment, reinstallation, and functional testing of the UVIS.

The related federal contract opportunity is a sources sought notice to determine the availability and capabilities of small and large businesses to meet the Air Force's need. Feedback provided through this pre-solicitation process will help define the acquisition approach, including potential set-asides, full and open competition, or single source awards.

View the file

Other files for this federal contract opportunity

Other files attached to UVIS Refurbish and Re-install, newest first.
File Type Posted
FA9101-24-Q-B023_UVIS Sources Sought.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work To Repair Under Vehicle Inspection System (UVIS) At Gate # 2, Arnold AFB, TN. 37389

Title Task: UVIS repair (Gate #2)

1. Purchase Type Service repair.

2. Requirements

1. Repair Under Vehicle Inspection System to factory recondition, replace the following items:

· OEM single board gige camera

· Center/Stitch camera lens

· VI-150 light cover set

· 4” and 6” LED light strip replacement

· Presence sensor module address 1 &2 (front and back)

2. Re-install the refurbished UVIS ramp assembly back into the Gate 2 roadway then re-terminate all wiring that is existing. The parts listed above are all the parts that the factory will be using to refurb the old unit.

3. Techs will also replace the front and rear vehicle sensors that initiate the inspection scan process which are still currently installed. This also includes resealing the new sensors with the correct factory recommended sealant.

4. Once the unit has been completely installed, the techs will power the system back up and complete a full function test of the system.

3. Delivery Instructions Re-install the refurbished the UVIS ramp assembly back into the gate 2 roadway at Arnold AFB, TN. 37389

4. Period of Performance Full function test once the system has been installed.