Solicitation

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

FA9101-14-R-0020

2. TYPE OF SOLICITATION

SEALED BID (IFB)

NEGOTIATED (RFP)

3. DATE ISSUED

11 AUG 2014

PAGE OF PAGES

IMPORTANT - The “offer” section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

5. REQUESTION/PURCHASE REQUEST NO.

SEE SCHEDULE

6. PROJECT NO.

7. ISSUED BY AFTC PZI ARNOLD CODE FA9101 8. ADDRESS OFFER TO

AFTC/PZI (ARNOLD)

100 KINDEL DRIVE, SUITE A-332

ARNOLD AFB, TN 37389-1332

henry.daniels.2@us.af.mil

SEE BLOCK 7

DO: DO-C2 NAIC: 238220

9. FOR INFORMATION

CALL:

A. NAME

HENRY W. DANIELS III

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

931-454-5166 X

SOLICITATION

NOTE: In sealed bid solicitations “offer” and “offeror” mean “bid” and “bidder”.

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no, date):

A. This procurement is a 100% small business Set-Aside solicitation. The resulting contract will be an Indefinite Delivery Indefinite Quantity (IDIQ) contract for construction projects.

B. The period of performance will be a One (1) year Base Period and Three (3) one year Option Periods.

C. Projects under the resulting contract will be issued in the form of Delivery Orders.

D. The magnitude of construction in accordance with FAR 36.204 is between $5,000,000 and $10,000,000.

11. The Contractor shall begin performance within _30__ calendar days and complete it within __300__ calendar days after receiving award, notice to proceed. This performance period is mandatory, negotiable. (See _ _.)

12A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If “YES”, indicate within how many calendar days after award in Item 12B.)

YES NO

12B. CALENDAR DAYS

13. ADDITIONAL SOLICITATION REQUIREMENTS:

INSTRUCTIONS TO OFFEROR - Please complete the following information:

1) Page 2: Blocks 14, 15, 16, 20A, 20B, 20C, and fill in total amount in block 17.

2) Pages 3-16: Complete cost for project for line items 0001AA thru 0004AD.

3) Proposal due date will be September 11, 2014 at 2:00 PM CST.

4) Original Proposal/Offers, including all Past Performance Questionnaire responses must be received no later than September 11, 2014 at 2:00pm CST.

5) All offers are subject to (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

6) Proposal may be emailed to Henry.Daniels.2@us.af.mil or mailed/hand delivered to the address in Block 7.

7) Verify or update Online Representation and Certification at https://www.sam.gov prior to proposal due date.

NSN 7540-01-155-3212

ConWrite Version 6.14.1 Created 30 Jul 2014 2:11 PM

1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA

FAR (48 CFR) 53.236-1(e)

OFFER (Must be fully completed by offeror)

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)

16. REMITTANCE ADDRESS (Include only if different than Item 14)

CODE FACILITY CODE

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within __ __ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGEMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation – give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER

(Type or print)

20B. SIGNATURE 20C. OFFER DATE

AWARD (To be completed by Government)

21. ITEMS ACCEPTED

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

See Section G

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

ITEM

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) ( ) 41 U.S.C. 253(c) ( )

26. ADMINISTERED BY

CODE

27. PAYMENT WILL BE MADE BY

AFTC/PZI (ARNOLD)

100 KINDEL DRIVE, SUITE A-332

ARNOLD AFB, TN 37389-1332

DFAS-COLUMBUS

Attn: DFAS-JDCBB/CO P.O. Box 182317 Columbus, OH 43218-2317

EFT:T

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return _______ copies to issuing office.)

Contractor agrees to furnish and deliver all items or perform all work, requisitions identified on this form and any continuation sheets for the consideration slated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award,

(b) the solicitation, and (c) the clauses, representations, certifications, and specifications or incorporated by reference in or attached to this contract.

29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation, is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN

(Type or print)

31A. NAME OF CONTRACTING OFFICER (Type or print)

30B. SIGNATURE 30C. DATE 31B. UNITED STATES OF AMERICA

BY

31C. AWARD DATE

STANDARD FORM 1442 PAGE 2 (REV. 4-85)

PART I - THE SCHEDULE

SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS

SECTION B FA9101-14-R-0020

Qty Unit Price ITEM SUPPLIES OR SERVICES Purch Unit Total Item Amount

BASE YEAR - TIME OF AWARD - FY 2014

Noun: BASE YEAR - TIME OF AWARD - FY 2014 NSN: N - Not Applicable

REFRIGERATION SYSTEM #1 - RC12.2 - FY 2014

0001AA 1 __________

Lot __________ Noun: REFRIGERATION SYSTEM #1 - RC12.2 - FY 2014

ACRN: AA

NSN: N - Not Applicable Contract type: J - FIRM FIXED PRICE Inspection: DESTINATION Acceptance: DESTINATION

FOB: DESTINATION

Descriptive Data:

"PLEASE SUBMIT PRICING FOR CLIN 0001AA"

The Contractor shall provide t h e delivery and installation of refrigeration unit RC12.2 with a 22-foot evaporator shall for the refrigerant unit. The scope of work includes chiller package, charge of refrigerant and oil, controls and control connections, chilled brine connections, condenser water connections, auxiliary water connections, starters, electrical power connections, and all other equipment required to provide a fully functional chiller. Each Refrigeration unit

RC12.2 shall include an option to provide a portable refrigerant machine and tank sized for 14,000 pounds of R134A refrigerant. Demolition of the existing refrigeration systems will be performed by the Government and is not included in the scope of work. Work is to be done at Arnold Air Force Base, Tennessee.

THE PERIOD OF PERFORMANCE IS 300 CALENDAR DAYS AFTER THE NOTICE

TO PROCEED.

ALL INVOICES MUST BE SUBMITTED THROUGH WIDE-AREA-WORK-FLOW

(WAWF) IN ACCORDANCE WITH DFARS 252.232-7003.

Qty Unit Price ITEM SUPPLIES OR SERVICES Purch Unit Total Item Amount

PORTABLE REFRIGERANT MACHINE - RC12.2 - FY 2014

0001AB 1 __________

Lot __________ Noun: PORTABLE REFRIGERANT MACHINE - RC12.2 - FY 2014 NSN: N - Not Applicable Contract type: J - FIRM FIXED PRICE Inspection: DESTINATION Acceptance: DESTINATION

FOB: DESTINATION

Descriptive Data:

"PLEASE SUBMIT PRICING FOR CLIN 0001AB"

THIS IS FOR THE RC12.2 REFRIGERATION SYSTEM.

Provide a portable refrigerant machine and tank sized for 14,000 pounds of R134A refrigerant.

OPTION CLIN

Noun: OPTION YEAR ONE (1) - 2014 - 2015 NSN: N - Not Applicable

Option Year One is defined as 365 calendar days from the date of contract award.

Qty Unit Price ITEM SUPPLIES OR SERVICES Purch Unit Total Item Amount

REFRIGERATION SYSTEM #2 - RC12.1 - FY 2014 - 2015

0002AA 1 __________

Lot __________ Noun: REFRIGERATION SYSTEM #2 - RC12.1 - FY 2014 - 2015

ACRN: AA

NSN: N - Not Applicable Contract type: J - FIRM FIXED PRICE Inspection: DESTINATION Acceptance: DESTINATION

FOB: DESTINATION

"PLEASE SUBMIT PRICING FOR CLIN 0002AA"

unit RC12.1 with a 22-foot evaporator shall for the refrigerant unit. The scope of work includes chiller package, charge of refrigerant and oil, controls and control connections, chilled brine connections, condenser water connections, auxiliary water connections, starters, electrical power connections, and all other equipment required to provide a fully functional chiller. Each Refrigeration unit

RC12.1 shall include an option to provide a portable refrigerant machine and tank sized for 14,000 pounds of R134A refrigerant. Demolition of the existing refrigeration systems will be performed by the Government and is not included in the scope of work. Work is to be done at Arnold Air Force Base, Tennessee.

THE PERIOD OF PERFORMANCE IS 300 CALENDAR DAYS AFTER THE NOTICE

TO PROCEED.

Qty Unit Price ITEM SUPPLIES OR SERVICES Purch Unit Total Item Amount

PORTABLE REFRIGERANT MACHINE- RC12.1- FY 2014-2015

0002AB 1 __________

Lot __________ Noun: PORTABLE REFRIGERANT MACHINE - RC12.1 - FY 2014-

ACRN: AB

NSN: N - Not Applicable Contract type: J - FIRM FIXED PRICE Inspection: DESTINATION Acceptance: DESTINATION

FOB: DESTINATION

Descriptive Data:

"PLEASE SUBMIT PRICING FOR CLIN 0002AB"

THIS IS FOR THE RC12.1 REFRIGERATION SYSTEM.

Qty Unit Price ITEM SUPPLIES OR SERVICES Purch Unit Total Item Amount

REFRIGERATION SYSTEM #3 - RC22.1 - FY 2014 - 2015

0002AC 1 __________

Lot __________ Noun: REFRIGERATION SYSTEM #3 - RC22.1 - FY 2014 - 2015

ACRN: AC

NSN: N - Not Applicable Contract type: J - FIRM FIXED PRICE Inspection: DESTINATION Acceptance: DESTINATION

FOB: DESTINATION

PLEASE SUBMIT PRICING FOR CLIN 0002AC"

unit RC22.1 with a 22-foot evaporator shall for the refrigerant unit. The scope of work includes chiller package, charge of refrigerant and oil, controls and control connections, chilled brine connections, condenser water connections, auxiliary water connections, starters, electrical power connections, and all other equipment required to provide a fully functional chiller. Each Refrigeration unit

RC22.1 shall include an option to provide a portable refrigerant machine and tank sized for 14,000 pounds of R134A refrigerant. Demolition of the existing refrigeration systems will be performed by the Government and is not included in the scope of work. Work is to be done at Arnold Air Force Base, Tennessee.

THE PERIOD OF PERFORMANCE IS 300 CALENDAR DAYS AFTER THE NOTICE

TO PROCEED.

Qty Unit Price ITEM SUPPLIES OR SERVICES Purch Unit Total Item Amount

PORTABLE REFRIGERANT MACHINE- RC22.1- FY 2014-2015

0002AD 1 __________

Lot __________ Noun: PORTABLE REFRIGERANT MACHINE - RC22.1 - FY 2014-

ACRN: AD

NSN: N - Not Applicable Contract type: J - FIRM FIXED PRICE Inspection: DESTINATION Acceptance: DESTINATION

FOB: DESTINATION

Descriptive Data:

"PLEASE SUBMIT PRICING FOR CLIN 0002AD"

THIS IS FOR THE RC22.1 REFRIGERATION SYSTEM.

Noun: OPTION YEAR TWO (2) - 2015 - 2016 NSN: N - Not Applicable

Option Year Two is defined as 365 calendar days from the end of Option Year One.

Qty Unit Price ITEM SUPPLIES OR SERVICES Purch Unit Total Item Amount

OPTION YEAR TWO (2)

0003AA 1 __________

Lot __________ Noun: REFRIGERATION SYSTEM #2 - RC12.1 - FY 2015 - 2016

ACRN: AA

NSN: N - Not Applicable Contract type: J - FIRM FIXED PRICE Inspection: DESTINATION Acceptance: DESTINATION

FOB: DESTINATION

"PLEASE SUBMIT PRICING FOR CLIN 0003AA"

work includes chiller package, charge of refrigerant and oil, controls and control connections, chilled brine connections, condenser water connections, auxiliary water connections, starters, electrical power connections, and all other equipment required to provide a fully functional chiller. Each Refrigeration unit

RC12.1 shall include an option to provide a portable refrigerant machine and tank sized for 14,000 pounds of R134A refrigerant. Demolition of the existing refrigeration systems will be performed by the Government and is not included in the scope of work. Work is to be done at Arnold Air Force Base, Tennessee.

THE PERIOD OF PERFORMANCE IS 300 CALENDAR DAYS AFTER THE NOTICE

TO PROCEED.

Qty Unit Price ITEM SUPPLIES OR SERVICES Purch Unit Total Item Amount

OPTION YEAR TWO (2)

0003AB 1 __________

Lot __________ Noun: PORTABLE REFRIGERANT MACHINE - RC12.1 - FY 2015-

ACRN: AB

NSN: N - Not Applicable Contract type: J - FIRM FIXED PRICE Inspection: DESTINATION Acceptance: DESTINATION

FOB: DESTINATION

Descriptive Data:

"PLEASE SUBMIT PRICING FOR CLIN 0003AB"

THIS IS FOR THE RC12.1 REFRIGERATION SYSTEM.

Qty Unit Price ITEM SUPPLIES OR SERVICES Purch Unit Total Item Amount

OPTION YEAR TWO (2)

0003AC 1 __________

Lot __________ Noun: REFRIGERATION SYSTEM #3 - RC22.1 - FY 2015 - 2016

ACRN: AC

NSN: N - Not Applicable Contract type: J - FIRM FIXED PRICE Inspection: DESTINATION Acceptance: DESTINATION

FOB: DESTINATION

PLEASE SUBMIT PRICING FOR CLIN 0003AC"

work includes chiller package, charge of refrigerant and oil, controls and control connections, chilled brine connections, condenser water connections, auxiliary water connections, starters, electrical power connections, and all other equipment required to provide a fully functional chiller. Each Refrigeration unit

RC22.1 shall include an option to provide a portable refrigerant machine and tank sized for 14,000 pounds of R134A refrigerant. Demolition of the existing refrigeration systems will be performed by the Government and is not included in the scope of work. Work is to be done at Arnold Air Force Base, Tennessee.

THE PERIOD OF PERFORMANCE IS 300 CALENDAR DAYS AFTER THE NOTICE

TO PROCEED.

Qty Unit Price ITEM SUPPLIES OR SERVICES Purch Unit Total Item Amount

OPTION YEAR TWO (2)

0003AD 1 __________

Lot __________ Noun: PORTABLE REFRIGERANT MACHINE - RC22.1 - FY 2015 -

ACRN: AD

NSN: N - Not Applicable Contract type: J - FIRM FIXED PRICE Inspection: DESTINATION Acceptance: DESTINATION

FOB: DESTINATION

Descriptive Data:

"PLEASE SUBMIT PRICING FOR CLIN 0003AD"

THIS IS FOR THE RC22.1 REFRIGERATION SYSTEM.

Noun: OPTION YEAR THREE (3) - FY 2016 - 2017 NSN: N - Not Applicable

Option Year Three is defined as 365 calendar days from the end of Option Year Two.

Qty Unit Price ITEM SUPPLIES OR SERVICES Purch Unit Total Item Amount

OPTION YEAR THREE (3)

0004AA 1 __________

Lot __________ Noun: REFRIGERATION SYSTEM #2 - RC12.1 - FY 2016 - 2017

ACRN: AA

NSN: N - Not Applicable Contract type: J - FIRM FIXED PRICE Inspection: DESTINATION Acceptance: DESTINATION

FOB: DESTINATION

"PLEASE SUBMIT PRICING FOR CLIN 0004AA"

work includes chiller package, charge of refrigerant and oil, controls and control connections, chilled brine connections, condenser water connections, auxiliary water connections, starters, electrical power connections, and all other equipment required to provide a fully functional chiller. Each Refrigeration unit

RC12.1 shall include an option to provide a portable refrigerant machine and tank sized for 14,000 pounds of R134A refrigerant. Demolition of the existing refrigeration systems will be performed by the Government and is not included in the scope of work. Work is to be done at Arnold Air Force Base, Tennessee.

THE PERIOD OF PERFORMANCE IS 300 CALENDAR DAYS AFTER THE NOTICE

TO PROCEED.

Qty Unit Price ITEM SUPPLIES OR SERVICES Purch Unit Total Item Amount

OPTION YEAR THREE (3)

0004AB 1 __________

Lot __________ Noun: PORTABLE REFRIGERANT MACHINE - RC12.1 - FY 2016 -

ACRN: AB

NSN: N - Not Applicable Contract type: J - FIRM FIXED PRICE Inspection: DESTINATION Acceptance: DESTINATION

FOB: DESTINATION

Descriptive Data:

"PLEASE SUBMIT PRICING FOR CLIN 0004AB"

THIS IS FOR THE RC12.1 REFRIGERATION SYSTEM.

Qty Unit Price ITEM SUPPLIES OR SERVICES Purch Unit Total Item Amount

OPTION YEAR THREE (3)

0004AC 1 __________

Lot __________ Noun: REFRIGERATION SYSTEM #3 - RC22.1 - FY 2016 - 2017

ACRN: AC

NSN: N - Not Applicable Contract type: J - FIRM FIXED PRICE Inspection: DESTINATION Acceptance: DESTINATION

FOB: DESTINATION

PLEASE SUBMIT PRICING FOR CLIN 0004AC"

work includes chiller package, charge of refrigerant and oil, controls and control connections, chilled brine connections, condenser water connections, auxiliary water connections, starters, electrical power connections, and all other equipment required to provide a fully functional chiller. Each Refrigeration unit

RC22.1 shall include an option to provide a portable refrigerant machine and tank sized for 14,000 pounds of R134A refrigerant. Demolition of the existing refrigeration systems will be performed by the Government and is not included in the scope of work. Work is to be done at Arnold Air Force Base, Tennessee.

THE PERIOD OF PERFORMANCE IS 300 CALENDAR DAYS AFTER THE NOTICE

TO PROCEED.

Qty Unit Price ITEM SUPPLIES OR SERVICES Purch Unit Total Item Amount

OPTION YEAR THREE (3)

0004AD 1 __________

Lot __________ Noun: PORTABLE REFRIGERANT MACHINE - RC22.1 - FY 2015 -

ACRN: AD

NSN: N - Not Applicable Contract type: J - FIRM FIXED PRICE Inspection: DESTINATION Acceptance: DESTINATION

FOB: DESTINATION

Descriptive Data:

"PLEASE SUBMIT PRICING FOR CLIN 0004AD"

THIS IS FOR THE RC22.1 REFRIGERATION SYSTEM.

refrigerant

NOTICE: The following contract clauses pertinent to this section are hereby incorporated in full text:

OTHER CONTRACT CLAUSES IN FULL TEXT

B039 INDEFINITE QUANTITY (DEC 2005) (TAILORED)

This is an Indefinite Quantity contract as contemplated by FAR 16.504. The total scope of the technical tasks for which orders may be issued is set forth in Attachment 1 - Spec No. 13864-14-002, Statement of Work for C-Plant RC12.1, RC12.2, and RC22.1 Refrigeration Systems, Attachment 2 - Specification for C- Plant RC12.1, RC12.2, and RC22.1 Refrigeration Systems and Drawings - Appendix C-10, .Appendix C- 11, Appendix C-12, Appendix C-13, Appendix C-14.

SECTION C - DESCRIPTION/SPECS./WORK STATEMENT

SECTION C FA9101-14-R-0020

NOTICE: The following contract clauses pertinent to this section are hereby incorporated in full text:

C003 INCORPORATED DOCUMENTS/REQUIREMENTS (AUG 2006) (TAILORED)

(a) The following documents are a part of this contract:

(1) Spec No. 13864-14-001, Specification for C-Plant RC12.1, RC12.2, and RC22.1 Refrigeration Systems, dated 29 May 2014

(2) Spec No. 13864-14-002, Statement of Work for C-Plant RC12.1, RC12.2, and RC22.1 Refrigeration Systems, dated 29 May 2014.

(3) Drawings - Appendix C-10, Appendix C-11, Appendix C-12, Appendix C-13, Appendix C-14.

SECTION D - PACKAGING AND MARKING

SECTION D FA9101-14-R-0020

NO CLAUSES OR PROVISIONS IN THIS SECTION

SECTION E - INSPECTION AND ACCEPTANCE

SECTION E FA9101-14-R-0020

NOTICE: The following contract clauses pertinent to this section are hereby incorporated by reference:

FEDERAL ACQUISITION REGULATION CONTRACT CLAUSES

52.246-12 INSPECTION OF CONSTRUCTION (AUG 1996)

SECTION F - DELIVERIES OR PERFORMANCE

SECTION F FA9101-14-R-0020

SHIP MARK TRANS

ITEM SUPPLIES SCHEDULE DATA QTY TO FOR PRI DATE

0001AA 1 F1EENV FA9101 300 DARO

Noun: REFRIGERATION SYSTEM #1 - RC12.2 - FY 2014

ACRN: AA

** Period of Performance shall be 300 CALENDAR DAYS after Notice to Proceed **

All invoices must be submitted through Wide Area Work Flow (WAWF) as a CONSTRUCTION invoice in accordance with DFARS 252.232-7003 using the following codes:

Issued DODACC: FA9101 Admin DODACC: FA9101 Inspected By: F1EENV Contracting Officer: FA9101 Pay DODAAC: F03000 Mark For: FA9101

0001AB 1 F1EENV FA9101 300 DARO

Noun: PORTABLE REFRIGERANT MACHINE - RC12.2 - FY

Inspected By: F1EENV Contracting Officer: FA9101

SHIP MARK TRANS

ITEM SUPPLIES SCHEDULE DATA QTY TO FOR PRI DATE

0002AA 1 F1EENV FA9101 300 DARO

Noun: REFRIGERATION SYSTEM #2 - RC12.1 - FY 2014 -

ACRN: AA

Inspected By: F1EENV Contracting Officer: FA9101

0002AB 1 F1EENV FA9101 300 DARO

Noun: PORTABLE REFRIGERANT MACHINE - RC12.1 - FY

2014- 2015

ACRN: AB

Inspected By: F1EENV Contracting Officer: FA9101

SHIP MARK TRANS

ITEM SUPPLIES SCHEDULE DATA QTY TO FOR PRI DATE

0002AC 1 F1EENV FA9101 300 DARO

Noun: REFRIGERATION SYSTEM #3 - RC22.1 - FY 2014 -

ACRN: AC

Inspected By: F1EENV Contracting Officer: FA9101

0002AD 1 F1EENV FA9101 300 DARO

Noun: PORTABLE REFRIGERANT MACHINE - RC22.1 - FY

2014-2015

ACRN: AD

Inspected By: F1EENV Contracting Officer: FA9101

SHIP MARK TRANS

ITEM SUPPLIES SCHEDULE DATA QTY TO FOR PRI DATE

0003AA 1 F1EENV FA9101 300 DARO

Noun: REFRIGERATION SYSTEM #2 - RC12.1 - FY 2015 -

ACRN: AA

Inspected By: F1EENV Contracting Officer: FA9101

0003AB 1 F1EENV FA9101 300 DARO

2015- 2016

ACRN: AB

Inspected By: F1EENV Contracting Officer: FA9101

SHIP MARK TRANS

ITEM SUPPLIES SCHEDULE DATA QTY TO FOR PRI DATE

0003AC 1 F1EENV FA9101 300 DARO

Noun: REFRIGERATION SYSTEM #3 - RC22.1 - FY 2015 -

ACRN: AC

Inspected By: F1EENV Contracting Officer: FA9101

0003AD 1 F1EENV FA9101 300 DARO

2015 -2016

ACRN: AD

Inspected By: F1EENV Contracting Officer: FA9101

SHIP MARK TRANS

ITEM SUPPLIES SCHEDULE DATA QTY TO FOR PRI DATE

0004AA 1 F1EENV FA9101 300 DARO

Noun: REFRIGERATION SYSTEM #2 - RC12.1 - FY 2016 -

ACRN: AA

Inspected By: F1EENV Contracting Officer: FA9101

0004AB 1 F1EENV FA9101 300 DARO

2016 - 2017

ACRN: AB

Inspected By: F1EENV Contracting Officer: FA9101

SHIP MARK TRANS

ITEM SUPPLIES SCHEDULE DATA QTY TO FOR PRI DATE

0004AC 1 F1EENV FA9101 300 DARO

Noun: REFRIGERATION SYSTEM #3 - RC22.1 - FY 2016 -

ACRN: AC

Inspected By: F1EENV Contracting Officer: FA9101

0004AD 1 F1EENV FA9101 300 DARO

2015 -2016

ACRN: AD

Inspected By: F1EENV Contracting Officer: FA9101

PERIOD OF PERFORMANCE

(A) This is a Firm-Fixed Price, Indefinite Delivery, Indefinite Quantity (IDIQ) contract for three refrigeration systems be provided to Arnold Engineering Development Complex (AEDC), Arnold Air Force Base, Tennessee. This includes delivery and installation of refrigeration units with a 22-foot evaporator shell for each refrigeration unit, the RC12.1, RC12.2, and RC22.1 refrigeration systems. The scope of work includes chiller package, charge of refrigerant and oil, controls and control connections, chilled brine connections, condenser water connections, auxiliary water connections, starters, electrical power connections, and all other equipment required to provide a fully functional chiller. Each refrigeration unit shall include an option to provide a portable refrigerant machine and tank sized for 14,000 pounds of R134A refrigerant in accordance with the Statement of Work, Specification, Drawings, and issuance of individual Delivery Orders. The contract will be effective from Date of Award for a twelve (12) month basic period and three (3), twelve (12) month option periods if exercised under the terms of the contract.

(B) Delivery or Performance requirements shall be specified in each individual Deliver Order issued under the terms of this contract. Individual Delivery Order performance periods will be negotiated and/or specified on each Delivery Order.

NOTICE: The following contract clauses pertinent to this section are hereby incorporated by reference:

FEDERAL ACQUISITION REGULATION CONTRACT CLAUSES

52.211-12 LIQUIDATED DAMAGES -- CONSTRUCTION (SEP 2000)

Para (a), Amount of liquidated damages. '$181.27'

SECTION G - CONTRACT ADMINISTRATION DATA

SECTION G FA9101-14-R-0020

Obligation ACRN Appropriation/Lmt Subhead/Supplemental Accounting Data Amount

NO CLAUSES OR PROVISIONS IN THIS SECTION

SECTION H - SPECIAL CONTRACT REQUIREMENTS

SECTION H FA9101-14-R-0020

NOTICE: The following contract clauses pertinent to this section are hereby incorporated in full text:

AEDC-H001 SAFETY (JUL 2014)

1.0 The contractor is solely obligated for compliance with OSHA, CFR 1910 and 1926, AFSOH 91- 501, NFPA 101 and other applicable laws and regulations for the protection of contractor employees, subcontractor, Government employees and Government property. The government shall assume no liability or responsibility for the contractor's compliance or non-compliance with such requirements. The contractor shall furnish to each of his/her employees a place of employment, which is free from recognized hazards. The contractor shall brief his/her employees on the safety requirements of this contract and on hazards associated with prescribed tasks. The contractor is responsible for compliance with OSHA Public Law and the resultant standards identified within. In addition, the contractor is required to flow down the safety requirements/specifications to all subcontractors. The contractor shall comply with safety rules of the AEDC Support Contractor at interface points of new construction and modifications to existing systems and with all AEDC Base Safety Standards identified in the contract/SOW.

2.0 In addition, Contractor shall comply with the following:

2.1 Air Force Safety requires that contractors performing on Air Force installations provide their employees safety and health protection equal in quality to that provided to Air Force employees.

However, the contractor will be responsible for managing their health and safety program.

2.2 Contractors are required to flow down Safety requirements to all subcontractors who qualify as applicable contractors under their contract.

2.3 Contractors are required to submit a Safety and Health Plan and corresponding site safety checklist to the AEDC Safety Office, Contracting Officer and Project Manager within 10 days after contract award. The plan shall be made available to the installation safety office for acceptance prior to contract performance.

2.4 Contractors are required to submit their TCIR and DART rates and OSHA 300A form along with their safety and health plan. The TCIR and DART rates will be reviewed by AEDC Safety and may be used to determine contractor responsibility.

2.5 Contractor's performance will be accountable for compliance with their safety and health plan, to include mishap reporting.

2.6 Contractors shall ensure their employees and subcontractors report (No later than 24 hours) pertinent facts regarding all mishaps. Contractors will cooperate in any safety investigation, to include toxicology testing.

2.7 Contractors are required to identify the processes and procedures used to track compliance with the Safety and Health Plan.

3.0 The Contractor Safety and Health Plan must demonstrate a management commitment to employee safety and health. The plan shall include application and responsibility to subcontractors and shall include as a minimum the following elements:

3.1 Worksite hazard analysis with base-line hazard identification and required control measures.

3.2 Job site analysis which lists the hazards associated with performing the task and the applied control measures.

3.3 Corrective action plan for identified hazards and identifying individual responsible for corrective actions and tracking of hazards.

3.4 Inspection program for each worksite to include identifying the individual conducting the inspection and the frequency of inspection.

3.5 Employee hazard reporting procedures.

3.6 Procedures for accident investigation and reporting.

3.7 Emergency response plan including first aid/injury procedures.

3.8 Employee safety and health training requirements and documentation process.

3.9 Identify applicable safety rules and regulations.

3.10 Identify Safety roles and responsibilities of management, supervisors, employees and contractor safety coordinator.

DEFINITIONS

Applicable Contractor. A contractor whose employees worked at least 1,000 hours at the site in any calendar quarter within the last 12 months and is NOT directly supervised by the applicant (installation).

Days Away, Restricted, and or Transfer Case Incident Rate (DART). The number of recordable injuries and illness cases per 100 full-time employees resulting in days away from work, restricted work activity, and/or job transfer that a site has experienced in a given time frame.

Total Case Incidence Rate (TCIR) - Total number of recordable injuries and illness cases per 100 full-time employees that a site has experienced in a given time frame.

AEDC-H002 SANITATION (JUL 2014)

The Contractor shall provide temporary toilet facilities in a ratio of not fewer than one for each 30 persons or fraction thereof. Connections to existing sanitary sewer manholes may be made. The Contractor shall supply drinking water from connections to the existing potable water system. The Contractor shall take proper precautions to protect the water system from damage and contamination. Any temporary connections made for drinking water or toilet facilities shall be removed by the Contractor in a manner satisfactory to the Contracting Officer before final acceptance of the work.

AEDC-H003 EXISTING UNDERGROUND UTILITIES (JUL 2014)

The location of existing underground utilities as shown on the contract drawings has been taken from as built drawings. There may be underground utilities which are not shown on the contract drawings and these utilities may be dangerous if ruptured. If the Contractor unearths or strikes any underground utility not shown, the excavation work shall cease and the Contracting Officer shall be notified immediately.

The Contractor shall determine with caution the exact location of such utilities and will not proceed with further excavation unless otherwise advised by the Contracting Officer.

AEDC-H004 UTILITIES AVAILABLE (JUL 2014)

(a) Water: All reasonable required amounts of potable and raw water will be made available without cost to the Contractor from existing systems, outlets, and supplies near the vicinity of the work. All water shall be carefully conserved. All temporary connections and piping installed by the Contractor shall be removed in a manner satisfactory to the Contracting Officer prior to final acceptance of the work.

(b) Electricity: All reasonably required amounts of 60 HZ electric power at 110V and 480V will be made available without cost to the Contractor from existing electrical systems near the vicinity of the of the work.

The Contractor shall install and maintain at no cost to the Government any necessary supply connections and facilities in a manner satisfactory to the Contracting Officer. All electrical service shall be removed in a manner satisfactory to the Contracting Officer.

AEDC-H005 CONTRACT PROGRESS SCHEDULE (JUL 2014)

(a) In accordance with FAR Clause 52.236-15, which is incorporated by reference in the Contract Clauses section of this solicitation, the Contractor shall submit three copies of a progress schedule (Air Force Form 3064) for review and approval by the Contracting Officer not later than 30 days before the planned start of on-site work. The Contractor shall comply with the procedures for completing the form on the reverse of the Air Force Form 3064.

(b) The Contractor's Progress Schedule shall outline in detail the phasing of the project.

(c) The schedule shall include the major elements of work, including material submittals and approval, materials procurement, mobilization, and execution of all on-site work, including detailed construction progress milestones that would achieve completion in the time allowed.

(d) When requesting payment for materials stored on site, the Contractor shall include stored materials as a separate work element on the contract progress schedule and submit paid invoices to support the request for payment.

AEDC-H006 INSURANCE CLAUSE IMPLEMENTATION (JUL 2010)

The Contractor shall obtain and maintain the minimum kinds and amounts of insurance during performance of this contract as specified by FAR 28.307-2 Liability, and contemplated by FAR 52.228-5, Insurance--Work on a Government Installation, and/or 52.228-7, Insurance--Liability to Third Persons.

AEDC-H007 REQUIRED INSURANCE (JUL 2014)

Pursuant to FAR clause 52.228-5, Insurance - Work on a Government Installation (JAN 1997) (Deviation) the contractor shall maintain the following minimum amounts of insurance:

TYPE AMOUNT

Workers' Compensation & Employer's Liability $100,000 Insurance General Liability Insurance (Bodily Injury) $500,000 per occurrence Automobile Liability $200,000 per person $500,000 per occurrence for bodily injury $20,000 per occurrence for property damage

AEDC-H008 UNCLASSIFIED SECURITY (MAY 2014)

SECURITY: The contractor shall be required to comply with all security directives and other security requirements identified in this contract. These requirements apply to all contractors on Arnold AFB in the performance of their contract.

(a) Pass and Identification Items: The contractor shall ensure the pass and identification items required for contract performance are obtained for employees and non-Government-owned vehicles. The contractor shall retrieve all identification media from employees who depart for any reason before the contract expires, e.g., terminated for cause, retirement, etc.

The contractor shall comply with all installation access requirements as directed in Arnold Air Force Base (AAFB) 31-101, Integrated Defense Plan. The AEDC/CC reserves the right to refuse entry and/or re-entry of any person to AEDC for just cause to protect personnel, facilities, and property under their control through the use of a barment order when such actions are deemed necessary.

(b) Freedom of Information Act (FOIA): The contractor shall comply with Freedom of Information Act (FOIA) requirements IAW DOD 5400.7-R, FOIA Program, Chapter 4.

(c) For Official Use Only (FOUO): The contractor shall safeguard FOUO information provided under this contract as specified in DODM 5200.01-V4, DoD Information Security Program: Controlled Unclassified Information (CUI). CUI is information that does not meet the standards for National Security Classification under Executive Order 13526, dtd Dec 2009, but is pertinent to the national interests of the United States or to the important interests of entities of the Federal Government, and under law or policy that requires protection from unauthorized disclosure, special handling safeguards, or prescribed limits on exchange or dissemination. If FOUO information is lost, misused, compromised, or accessed by unauthorized persons, it could adversely affect U.S. national interest, the conduct of DoD programs, or the privacy of DoD personnel. CUI comes in many forms: personal data under the Privacy Act, personnel records, privileged data (chaplain and judge advocate records), investigative data, scientific and technical information (STINFO), export controlled data (critical technologies), proprietary data, or FOUO data. Sensitive information meets the criteria for exemption from mandatory public disclosure under FOIA. For guidance with marking CUI, contact AEDC/TSD-IP at (931) 454-3290.

(1) If access to CUI / Export Control / STINFO information is required, the contractor shall be required to be registered as a certified Government contractor through the Joint Certification Office, Defense Logistics Information Service (DLIS). To request DLIS Certification, submit a DD Form 2345, Militarily Critical Technical Data Agreement, to the DLIS, Battle Creek, MI address indicated at the top of the DD Form 2345 along with a copy of the company's state business license, incorporation certificate, sales tax identification form, or other documentation, which verifies the legitimacy of the company. A copy of their DD2345, Militarily Critical Technical Data Agreement, must be provided when issued.

Except as allowed by DFARS 252.225-7048, Export-Controlled Items, foreign nationals shall not have access to export-controlled information without an export license. All export control laws as stipulated in both Export Administration Regulation and International Traffic in Arms Regulation must be followed without exception. For guidance in applying appropriate export control markings, contact AEDC/XP2 at

(931) 454-7329.

(2) The contractor must obtain Foreign Disclosure Office (FDO) approval through the Contracting Officer prior to allowing any non-U.S. or un-validated U.S. Lawful Permanent Resident person’s access to CUI or export-controlled information. (Also, see DFARS Clause 252.225-7048, Export-Controlled Items).

(d) Reporting Requirements: Contractor personnel shall report to an appropriate authority any information or circumstances of which they are aware may pose a threat to the security of DOD personnel, contractor personnel, resources, and classified or unclassified defense information.

Contractor employees shall be briefed by their immediate supervisor upon initial on-base assignment.

(e) Physical Security: The contractor shall be responsible for safeguarding all Government property and controlled forms provided for contractor use. At the end of each work period, all Government facilities, equipment, and materials shall be secured.

(f) Computer Security (COMPUSEC) / Automated Information System (AIS) Requirements: If access to unclassified computer systems is required, the following requirements apply: Users must be a U.S. citizen or receive AEDC or Air Force Materiel Command (AFMC) Foreign Disclosure Office (FDO) approval prior to access being granted; requestor must have a favorable National Agency Check with Inquiries (NACI) clearance or an approved Interim AIS request on file; and requestor must complete the Air Force (AF) Information Assurance (IA) Training. To request access to an unclassified computer system, users must complete an AEDC Government Contractor (GC) Form 591, Request for Authorized Use of Central Computer Systems. Users bringing portable electronic devices (PEDs) on base and wanting to connect to AEDC computer systems / networks shall comply with AFPD 33-2, Information Assurance Program, and AFI 33-200, Information Assurance (IA) Management. Employees shall complete any additional computer security training requirements mandated by the host base.

(g) Information Security (INFOSEC): Information, regardless of media, shall be controlled and maintained in accordance with (IAW) with the National Industrial Security Program Operating Manual (NISPOM) and guidance provided by the Servicing Security Activity (SSA), AEDC/TSD-IP.

(h) Privacy Act: Comply with AFI 33-332, Privacy Act Program, when collecting and maintaining information protected by the Privacy Act of 1974, Title 5, U.S.C., Section 552a. Remove or destroy official records only IAW Air Force Records Information Management System, (AFRIMS) located on the internet at: <https://www.my.af.mil/gcss-af61a/afrims/afrims/rds/rds_series.cfm>.

(i) Operations Security (OPSEC): Comply with AFPD 10-7, Information Operations; AFI 10-701, Operations Security; DoD 5220.22-R, Industrial Security Regulation (ISR), Chapter 10; and local plans and publications.

(j) Antiterrorism (AT) Training: DoD contractors shall be provided AT information as required by DFARS Clause 252.225-7043, Antiterrorism / Force Protection for Defense Contractors Outside the United States. Level 1 AT Awareness Training shall be provided to all DoD contractor employees.

(k) Contractor Consent to Background Checks: The Contractor shall not employ persons to perform under this contract if such employee is deemed or identified as a potential threat to the health, safety, security, general well-being, or operational mission of the installation and its population; nor shall the Contractor or subcontractor employ persons under this contract who have an outstanding criminal warrant as identified by the Tennessee Information Enforcement System (TIES) through the National Crime Information Center. TIES checks will verify if a person is wanted by local, state, or federal agencies. All contractor and subcontractor personnel must consent to TIES background checks. Contractor and subcontractor personnel who do not consent to a TIES check will be denied access to the installation.

Information required to conduct a TIES check includes: full name, driver's license number, and/or social security number, date of birth of the person entering the installation, and completion of a background check questionnaire. The contractor must have this information ready to provide to the Visitor Control Center, if requested.

(1) Contractors must ensure their employees and those of their subcontracts have the proper credentials allowing them to work in the United States. Persons without proper credentials will be remanded to the appropriate authorities.

(2) The contractor shall not be entitled to any compensation for delays or expenses associated with complying with the provisions of this clause. Furthermore, nothing in this clause shall excuse the contractor from proceeding with the contract as required.

(l) Access to Installation During Force Protection Conditions (FPCONs): Gaining access to the installation during FPCONs will be done IAW the requirements outlined in the local Antiterrorism / Integrated Defense Plan(s). Contractors will be assigned a mission essential designation IAW requirements contained in Antiterrorism / Integrated Defense Plan(s). Only the installation commander or the unit commander requesting contract support will assign the mission essential designation.

(m) Property Protection: Property protection for the facility where the contractor's primary work center is located will be the responsibility of the local facility manager and local security manager, or their duly authorized representative IAW AFI 31-101, Integrated Defense, and command/local directives to include AAFB Plan 31-101. The contractor must safeguard all Government-owned equipment and materials in their possession or use.

AEDC-H009 VISIT AUTHORIZATIONS (JUL 2014)

AEDC is a U.S. Air Force installation, and individuals who are neither U.S. citizens nor immigrant aliens must be authorized to visit. Such authorization is granted only on a Government-to- Government basis.

Application should be made through the appropriate embassy in Washington, D.C. For purposes of this requirement, immigrant aliens may be admitted upon presentation of their U.S. alien registration card.

U.S. citizens or immigrant aliens representing or employed by a foreign government or foreign-owned firm are considered to be foreign representatives and must apply for authorization to visit through the appropriate embassy.

AEDC-H010 CONTRACTOR IDENTIFICATION (JUL 2014)

(a) Contractor personnel and their subcontractors must identify themselves as Contractors or subcontractors during meetings, telephone conversations, in electronic messages, or correspondence related to this contract.

(b) Contractor-occupied facilities (on AFMC or other Government installations) such as offices, separate rooms, or cubicles must be clearly identified with Contractor supplied signs, name plates or other identification, showing that these are work areas for Contractor or subcontractor personnel.

AEDC-H011 TECHNICAL SURVEILLANCE (JUL 2014)

The Government designates the Air Force Project Engineer and the AEDC Support Contractor to perform technical surveillance. They will recommend to the Contracting Officer acceptance or rejection of work under this contract. All references to the "Government Representative" within the specification or other project documents shall mean the Air Force Project Engineer or the AEDC Support contractor personnel performing technical surveillance on behalf of the Government. As used in the specification or other project documents, the term "construction monitor" shall be understood as referring to the AEDC Support Contractor personnel performing technical surveillance on behalf of the Government.

AEDC-H012 DISPOSAL AREAS (JUL 2014)

An approved disposal area is located about 2 miles from the construction site. This area is approved for surplus earth, stone, broken concrete, and building materials waste. Building materials waste also includes containers, dunnage, and other related items.

PART II - CONTRACT CLAUSES

SECTION I - CONTRACT CLAUSES

SECTION I FA9101-14-R-0020

Contract Clauses in this section are from the FAR, Defense FAR Sup, Air Force FAR Sup, and the Air Force

Materiel Command FAR Sup, and are current through the following updates:

Database_Version: 6.14.x.2200; Issued: 7/8/2014; FAR: FAC 2005-74(Partial)- 2005-75;

DFAR: DPN 20140624; DL.: DL 98-021; Class Deviations: CD 2014-O0018;

AFFAR: 2002 Edition; AFAC: AFAC 2014-0421; IPN: 98-009

I. NOTICE: The following contract clauses pertinent to this section are hereby incorporated by reference:

A. FEDERAL ACQUISITION REGULATION CONTRACT CLAUSES

52.202-01 DEFINITIONS (NOV 2013)

52.203-03 GRATUITIES (APR 1984)

52.203-05 COVENANT AGAINST CONTINGENT FEES (MAY 2014)

52.203-06 RESTRICTIONS ON SUBCONTRACTOR SALES TO THE GOVERNMENT (SEP 2006)

52.203-07 ANTI-KICKBACK PROCEDURES (MAY 2014)

52.203-08 CANCELLATION, RESCISSION, AND RECOVERY OF FUNDS FOR ILLEGAL OR

IMPROPER ACTIVITY (MAY 2014)

52.203-10 PRICE OR FEE ADJUSTMENT FOR ILLEGAL OR IMPROPER ACTIVITY (MAY 2014)

52.203-12 LIMITATION ON PAYMENTS TO INFLUENCE CERTAIN FEDERAL TRANSACTIONS

(OCT 2010)

52.203-13 CONTRACTOR CODE OF BUSINESS ETHICS AND CONDUCT (APR 2010)

52.203-17 CONTRACTOR EMPLOYEE WHISTLEBLOWER RIGHTS AND REQUIREMENT TO

INFORM EMPLOYEES OF WHISTLEBLOWER RIGHTS (APR 2014)

52.204-04 PRINTED OR COPIED DOUBLE-SIDED ON POSTCONSUMER FIBER CONTENT

PAPER (MAY 2011)

52.204-09 PERSONAL IDENTITY VERIFICATION OF CONTRACTOR PERSONNEL (JAN 2011)

52.204-10 REPORTING EXECUTIVE COMPENSATION AND FIRST-TIER SUBCONTRACT

AWARDS (JUL 2013)

52.204-13 SYSTEM FOR AWARD MANAGEMENT MAINTENANCE (JUL 2013)

52.209-06 PROTECTING THE GOVERNMENT'S INTEREST WHEN SUBCONTRACTING WITH

CONTRACTORS DEBARRED, SUSPENDED, OR PROPOSED FOR DEBARMENT

(AUG 2013)

52.209-09 UPDATES OF PUBLICLY AVAILABLE INFORMATION REGARDING RESPONSIBILITY

MATTERS (JUL 2013)

52.209-10 PROHIBITION ON CONTRACTING WITH INVERTED DOMESTIC CORPORATIONS

(MAY 2012)

52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)

(a) Number of calendar days is '30'

(c) Number of days or calendar date is '300'

52.215-02 AUDIT AND RECORDS -- NEGOTIATION (OCT 2010)

52.215-08 ORDER OF PRECEDENCE--UNIFORM CONTRACT FORMAT (OCT 1997)

52.215-15 PENSION ADJUSTMENTS AND ASSET REVERSIONS (OCT 2010)

52.216-19 ORDER LIMITATIONS (OCT 1995)

Para (a). Insert Dollar amount or quantity. '$1,000.00' Para (b)(1). Insert dollar amount or quantity '$1,000,000.00' Para (b)(2). Insert dollar amount or quantity. '$2,000,000.00' Para (b)(3). Insert number of days. '7' Para (d). Insert number of days. '10'

52.216-22 INDEFINITE QUANTITY (OCT 1995)

Para (d), Date is 'completion of all delivery orders'

52.217-07 OPTION FOR INCREASED QUANTITY -- SEPARATELY PRICED LINE ITEM (MAR

1989) Period of time is '60 days of contract expiration'

52.219-06 NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (NOV 2011)

52.219-08 UTILIZATION OF SMALL BUSINESS CONCERNS (MAY 2014)

52.219-14 LIMITATIONS ON SUBCONTRACTING (NOV 2011)

52.219-28 POST-AWARD SMALL BUSINESS PROGRAM REREPRESENTATION (JUL 2013)

52.222-01 NOTICE TO THE GOVERNMENT OF LABOR DISPUTES (FEB 1997)

52.222-03 CONVICT LABOR (JUN 2003)

52.222-04 CONTRACT WORK HOURS AND SAFETY STANDARDS - OVERTIME

COMPENSATION (MAY 2014)

52.222-06 CONSTRUCTION WAGE RATE REQUIREMENTS (MAY 2014)

52.222-07 WITHHOLDING OF FUNDS (MAY 2014)

52.222-08 PAYROLLS AND BASIC RECORDS (MAY 2014)

52.222-09 APPRENTICES AND TRAINEES (JUL 2005)

52.222-10 COMPLIANCE WITH COPELAND ACT REQUIREMENTS (FEB 1988)

52.222-11 SUBCONTRACTS (LABOR STANDARDS) (MAY 2014)

52.222-12 CONTRACT TERMINATION -- DEBARMENT (MAY 2014)

52.222-13 COMPLIANCE WITH CONSTRUCTION WAGE RATE REQUIREMENTS AND

RELATED REGULATIONS (MAY 2014)

52.222-14 DISPUTES CONCERNING LABOR STANDARDS (FEB 1988)

52.222-15 CERTIFICATION OF ELIGIBILITY (MAY 2014)

52.222-21 PROHIBITION OF SEGREGATED FACILITIES (FEB 1999)

52.222-26 EQUAL OPPORTUNITY (MAR 2007)

52.222-27 AFFIRMATIVE ACTION COMPLIANCE REQUIREMENTS FOR CONSTRUCTION (FEB

1999)

52.222-30 CONSTRUCTION WAGE RATE REQUIREMENTS - PRICE ADJUSTMENT (NONE OR

SEPARATELY SPECIFIED METHOD) (MAY 2014)

52.222-35 EQUAL OPPORTUNITY FOR VETERANS (SEP 2010)

52.222-36 AFFIRMATIVE ACTION FOR WORKERS WITH DISABILITIES (OCT 2010)

52.222-37 EMPLOYMENT REPORTS ON VETERANS (SEP 2010)

52.222-40 NOTIFICATION OF EMPLOYEE RIGHTS UNDER THE NATIONAL LABOR RELATIONS

ACT (DEC 2010)

52.222-50 COMBATING TRAFFICKING IN PERSONS (FEB 2009)

52.222-54 EMPLOYMENT ELIGIBILITY VERIFICATION (AUG 2013)

52.222-99 ESTABLISHING A MINIMUM WAGE FOR CONTRACTORS (DEVIATION) (JUN 2014)

52.223-03 HAZARDOUS MATERIAL IDENTIFICATION AND MATERIAL SAFETY DATA (JAN

1997) Para (b), Material Identification No: 'See individual delivery order.'

52.223-05 POLLUTION PREVENTION AND RIGHT-TO-KNOW INFORMATION (MAY 2011)

52.223-06 DRUG-FREE WORKPLACE (MAY 2001)

52.223-12 REFRIGERATION EQUIPMENT AND AIR CONDITIONERS (MAY 1995)

52.223-15 ENERGY EFFICIENCY IN ENERGY-CONSUMING PRODUCTS (DEC 2007)

52.223-18 ENCOURAGING CONTRACTOR POLICIES TO BAN TEXT MESSAGING WHILE

DRIVING (AUG 2011)

52.225-11 BUY AMERICAN - CONSTRUCTION MATERIALS UNDER TRADE AGREEMENTS

(MAY 2014) - ALTERNATE I (MAY 2014)

Para (b)(3). Insert excepted material or "none". 'none'

52.225-13 RESTRICTIONS ON CERTAIN FOREIGN PURCHASES (JUN 2008)

52.227-01 AUTHORIZATION AND CONSENT (DEC 2007)

52.227-02 NOTICE AND ASSISTANCE REGARDING PATENT AND COPYRIGHT

INFRINGEMENT (DEC 2007)

52.228-02 ADDITIONAL BOND SECURITY (OCT 1997)

52.228-05 INSURANCE -- WORK ON A GOVERNMENT INSTALLATION (JAN 1997)

52.228-11 PLEDGES OF ASSETS (JAN 2012)

52.228-12 PROSPECTIVE SUBCONTRACTOR REQUESTS FOR BONDS (MAY 2014)

52.228-14 IRREVOCABLE LETTER OF CREDIT (MAY 2014)

52.228-15 PERFORMANCE AND PAYMENT BONDS - CONSTRUCTION (OCT 2010)

52.229-03 FEDERAL, STATE, AND LOCAL TAXES (FEB 2013)

52.232-05 PAYMENTS UNDER FIXED-PRICE CONSTRUCTION CONTRACTS (MAY 2014)

52.232-17 INTEREST (MAY 2014)

52.232-18 AVAILABILITY OF FUNDS (APR 1984)

52.232-23 ASSIGNMENT OF CLAIMS (MAY 2014)

52.232-27 PROMPT PAYMENT FOR CONSTRUCTION CONTRACTS (MAY 2014)

52.232-33 PAYMENT BY ELECTRONIC FUNDS TRANSFER - SYSTEM FOR AWARD

MANAGEMENT (JUL 2013)

52.233-01 DISPUTES (MAY 2014) - ALTERNATE I (DEC 1991)

52.233-03 PROTEST AFTER AWARD (AUG 1996)

52.233-04 APPLICABLE LAW FOR BREACH OF CONTRACT CLAIM (OCT 2004)

52.236-02 DIFFERING SITE CONDITIONS (APR 1984)

52.236-03 SITE INVESTIGATION AND CONDITIONS AFFECTING THE WORK (APR 1984)

52.236-04 PHYSICAL DATA (APR 1984)

Description of investigational methods used: 'surveys' Summary of weather records and warnings '

(1) The location of the work is subject to the atmospheric temperature ranging from minus 10 degrees F to plus 105 degrees F. The average annual rainfall is about 54 inches and the average annual snowfall is about 4 inches.

(2) Time Extensions for Unusually Severe Weather

a. Based on data from the National Oceanic and Atmospheric Agency

(NOAA), the following…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .